Fermi 2 Annual Assessment Meeting Reactor Oversight Program - CY 2003 Nuclear Regulatory Commission - Region III Lisle, Illinois 04/01/2004
Agenda
! Introduction
! Review of Reactor Oversight Process
! National Summary of Plant Performance
! Discussion of Plant Performance Results
! Licensee Response and Remarks
! NRC Closing Remarks
! Break
! NRC available to address public questions
NRC Representatives
! Patrick Hiland, Deputy Division Director, DRP
- (630) 829-9601
! Harold Chernoff, Project Manager, NRR
- (301) 415-4018
! Steve Campbell, Senior Resident Inspector
- (734) 586-2798
! Tim Steadham, Resident Inspector
- (734) 586-2798
! Robert Lerch, Senior Project Engineer
- (630) 829-9759
! Mark Ring, Branch Chief
- (630) 829-9703
Region III Organization James L. Caldwell Regional Administrator Geoffrey E. Grant Deputy Regional Administrator Steven A. Reynolds Cynthia D. Pederson Director Division of Reactor Projects Director Division of Reactor Safety Patrick L. Hiland Roy Caniano Deputy Director Deputy Director Mark A. Ring Regional Specialists Branch Chief Fermi Project Engineers Resident Inspectors Robert M. Lerch Stephen J. Campbell Paul R. Pelke Timothy C. Steadham
NRC Performance Goals
! Maintain safety and protect the environment
! Enhance public confidence
! Improve effectiveness, efficiency, and realism of processes and decision making
! Reduce unnecessary regulatory burden
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections
! Equipment Alignment ~92 hrs/yr
! Triennial Fire Protection ~200 hrs every 3 yrs
! Operator Response ~125 hrs/yr
! Emergency Preparedness ~80 hrs/yr
! Rad Release Controls ~100 hrs every 2 yrs
! Worker Radiation Protection ~100 hrs/yr
! Corrective Action Program ~200 hrs every 2 yrs
! Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
Purpose of Todays Meeting
! A public forum for discussion of the licensees performance
! NRC will address the licensee performance issues identified in the annual assessment letter
! Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total Units 102*
- Davis-Besse is in IMC 0350 process
National Summary
! Performance Indicator Results (at end of CY 2003)
< Green 1825
< White 15
< Yellow 0
< Red 0
! Total Inspection Findings (at the end of CY 2003)
< Green 748
< White 19
< Yellow 2
< Red 4
Fermi 2 Assessment Results (Jan 1 - Dec 31, 2003)
! In Regulatory Response Column of Action Matrix
! 1 White Performance Indicator
! There were no supplemental inspections at Fermi in 2003
Safety Significant Findings or PIs
! No greater than Green findings
! 1 White Performance Indicator L Safety System Unavailability - Emergency AC Power
Fermi 2 Major Activities (Jan 1 - Dec 31, 2003)
! Refueling Outage in April 2003
! Blackout 2003 on August 14, 2003
! 11 Green findings & 1 Severity IV violation
! Problem Identification & Resolution Inspection
! Safety Sytem Design Inspection
Fermi 2 Planned Inspection Activities (Jan 1 - Dec 31, 2004)
! IP 95001 Supplemental Inspection for White PI planned for April 2004
! Refueling outage inspections planned to coincide with licensees refueling outage toward end 04
! Emergency preparedness exercise conducted in March
! No near term major team inspections planned Modifications inspection - October 04 Triennial Fire Protection - June 05
Fermi 2 Annual Assessment Summary January 1- December 31, 2003
! Detroit Edison operated Fermi 2 in a manner that preserved public health and safety
! All cornerstone objectives were met with only one White Performance Indicator (PI) identified (Safety System Unavailability, Emergency AC Power)
! NRC plans baseline inspections at Fermi for the remainder of the assessment period and a supplemental inspection for the White PI
Licensee Response and Remarks William OConner Vice President Detroit Edison Company
Contacting the NRC
! Report an emergency
< (301) 816-5100 (call collect)
! Report a safety concern:
< (800) 695-7403
< Allegation@nrc.gov
! General information or questions
< www.nrc.gov
< Select What We Do for Public Affairs
Reference Sources
! Reactor Oversight Process
< http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
! Public Electronic Reading Room
< http://www.nrc.gov/reading-rm.html
! Public Document Room
< 1-800-397-4209 (Toll Free)