Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 4PR 0 6 2004 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of
)
Docket No.50-390 Tennessee Valley Authority
)
WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 -
BULLETIN 2003 POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS -
CORRECTION (TAC NO.
MB 9360)
The purpose of this letter is to correct a statement in TVA's response to the subject bulletin for WBN dated August 8, 2003.
In the response to Item 5, "Ensuring containment drainage paths are unblocked," third paragraph, a statement was made regarding drains in Accumulator Rooms 3 and 4 that "Both of these floor drains are protected by a screened enclosure."
It was recently identified that screens did not cover the drains in those rooms.
Upon investigation, it was determined that the screens had previously been deleted from the plant design and were never installed.
In lieu of screens, the drains had been rerouted away from the containment sump screens.
This feature has been re-evaluated and has been determined to remain acceptable.
Therefore, TVA does not plan to install screens over these drains.
There are no commitments identified in this submittal.
If you have any questions concerning this correction, please contact me at (423) 365-1824.
pu03
U.S. Nuclear Regulatory Commission Page 2 APR 0 6 2004 I declare under penalty of perjury that the foregoing is true and correct.
Executed on this 6th day of April, 2004.
Sincerely, P.. Pace Manager, Site Licensing and Industry Affairs cc:
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303