Text
Duke rwPowere A Duke Energy Company R. A. JONES Vice President Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax March 30, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
SUBJECT:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 Commitment Change Annual Report Attached is a list of commitment change evaluations completed during the 2003 calendar year for Oconee Nuclear Station. These evaluations and subsequent commitment changes were made based on the guidance defined in NEI 99-04, Guidelines for Managing NRC Commitnents and have no adverse effect on compliance with NRC rules and regulations.
If there are any questions, please contact Judy E Smith at 864-885-4309.
Sincer R.
. J es, Site Vice President www.duke-energy. corn
U. S. Nuclear Regulatory Commission Commitment Change Evaluation Annual Report for 2003 March 30,2004 Page 2 xc:
L. A. Reyes Regional Administrator, Region 11 U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan (addressee only)
Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Senior Resident Inspector Oconee Nuclear Station
NRC Number -
Source:
Original Commitment
-Notification Document Modified Commitment R e quiri ed__
Yes 2003-0-001 Response, July Volumetric examinations will be Postpone the ONS Unit I HPI 14, 1999, to performed on all HPI Safe Ends as a RT examination from IEOC21 NRC Bulletin result of NRC Bulletin 88-08. These to I EOC22 88-08 items are to be scheduled for every other outage for the remainder of the third inservice inspection interval. This schedule cannot be changed.
No 2003-0-002 Response to URI A change will be made to reflect Delete Commitment concerning 88-08-02, May 3 management decision on how or when to post-maintenance lubrication.
1988 perform post-maintenance lubrication.