ML041040025

From kanterella
Jump to navigation Jump to search

March 2004 Monthly Operating Report for South Texas Project, Units 1 & 2
ML041040025
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/07/2004
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-04001707, STI: 31722184
Download: ML041040025 (14)


Text

Nuclear Operating Company Siwkw)Wudz~azqw POW49 H,<~

April 7, 2004 NOC-AE-04001707 File No.: G02 10CFR50.71 STI: 31722184 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for March 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for March 2004.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1)

STPEGS Unit 1 Monthly Operating Report - March 2004

2)

STPEGS Unit 2 Monthly Operating Report - March 2004

cc:

(paper copy)

(electronic copy)

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MNI 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service David H. Jaffe U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT MARCH 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:

_ate__

E.D. HAI61IN Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT I

DATE Apr. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 3/1/04 - 3/31104 GROSS HOURS IN REPORTING PERIOD:

744

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE

5.

NUMBER OF HOURS REACTOR CRITICAL 744.0 2.128.9 106.144.4

6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE 744.0 2,112.8 104.440.3

8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2.878.992 8.135811 391 103.268

10.

NET ELECTRICAL ENERGY GENERATED (MWH) 955,646 2,704 154 127 778.991

11.

REACTOR SERVICE FACTOR (%)

100.0 97.5 77.6

12.

REACTOR AVAILABILITY FACTOR (%)

100.0 97.5 77.6

13.

UNIT SERVICE FACTOR (%)

100.0 96.7 76.4

14.

UNIT AVAILABILITY FACTOR (%)

100.0 96.7 76.4

15.

UNIT CAPACITY FACTOR - Using MDC (as) 102.7 99.0 74.7

16.

UNIT CAPACITY FACTOR - Using DER (%)

102.7 99.0 74.7

17.

UNIT FORCED OUTAGE RATE (%)

0.0 3.3 14.5

18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT I

DATE Apr. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH MARCH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1290 2

1289 3

1288 4

1287 5

1289 6

1291 7

1291 8

1292 9

1292 10 1292 11 1286 12 1288 13 1282 14 1280 15 1285 16 1285 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 1285 1282 1283 1284 1286 1281 1285 1281 1284 1284 1285 1285 1273 1271 1263

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT I

DATE Apr. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH MARCH I

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Rcport #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I

I I

I I

I I

I 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT MARCH 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By:

E.D.

PIN Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated through March 30, at full power with no unit shutdowns or significant reactor power reductions. On March 31, at 0001 the unit was removed from service for refueling and scheduled maintenance.

OPERATING DATA REPORT DOCKETNO.

UNIT DATE COMPLETED BY TELEPHONE 50-499 2

Apr. 5, 2004 R.L. Hill 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 3/1/04 - 3/31/04 GROSS HOURS IN REPORTING PERIOD:

744

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE

5.

NUMBER OF HOURS REACTOR CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ON LINE

8.

UNIT RESERVE SHUTDOWN HOURS 9.

10.

11.

12.

13.

14.

15.

16.

17.

GROSS THERMAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR (%/)

REACTOR AVAILABILITY FACTOR (%)

UNIT SERVICE FACTOR (%)

UNIT AVAILABILITY FACTOR (%)

UNIT CAPACITY FACTOR - Using MDC (%)

UNIT CAPACITY FACTOR - Using DER (as)

UNIT FORCED OUTAGE RATE (%)

720.4 0

720.0 0

2,774.867 913.265 96.8 96.8 96.8 96.8 98.2 98.2 0.0 2,160.4 0

2.160.0 0

8,347,916 2.750.161 98.9 98.9 98.9 98.9 100.7 100.7 0.0 103,864.8 0

101.565.5 0

380.036,021 123.848.338 80.1 80.1 78.4 78.4 76.4 76.4 13.7

18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POVER LEVEL DOCKETNO.

50-499 UNIT 2

DATE Apr. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH MARCH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1277 2

1276 3

1275 4

1275 5

1275 6

1276 7

1276 8

1276 9

1276 10 1276 11 1275 12 1275 13 1274 14 1274 15 1274 16 1274 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1274 18 1273 19 1273 20 1273 21 1273 22 1273 23 1274 24 1274 25 1273 26 1272 27 1273 28 1272 29 1272 30 1101 31 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE Apr. 5. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH MARCH 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor 04-01 040331 S

24.0 C

1 N/A N/A N/A Scheduled refueling and maintenance outage.

1 F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE SUMIMIARY There were no PORV or Safety Valves challenged during the reporting period.