Notification of Turkey Point Nuclear Plant - Safety System Design and Performance Capability Inspection - NRC Inspection Report 05000250-04-008 and 05000250-04-008
ML040990170
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/06/2004
From: Ogle C
Division of Reactor Safety II
To: Stall J
Florida Power & Light Co
References
IR-04-008
Download: ML040990170 (8)


See also: IR 05000250/2004008

Text

April 6, 2004

Florida Power and Light Company

ATTN: Mr. J. A. Stall, Senior Vice President

Nuclear and Chief Nuclear Officer

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT: NOTIFICATION OF TURKEY POINT NUCLEAR PLANT - SAFETY SYSTEM

DESIGN AND PERFORMANCE CAPABILITY INSPECTION - NRC

INSPECTION REPORT 05000250/2004008 AND 05000250/2004008

Dear Mr. Stall:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a safety system design and performance capability inspection at

your Turkey Point Nuclear Plant during the weeks of June 7 and June 21, 2004. A team of five

inspectors will perform this inspection. The inspection team will be led by Mr. Jim Moorman, a

Senior Reactor Inspector from the NRC Region II Office. This biennial inspection will be

conducted in accordance with baseline inspection program Attachment 71111.21, Safety

System Design And Performance Capability.

The inspection will evaluate the capability of installed plant equipment to detect and respond to

a steam generator tube rupture event. Procedures which direct the mitigating actions for this

event will also be evaluated.

During a telephone conversation on April 5, 2004, Mr. Norman Merriweather, and Mr. Walt

Parker of your staff, confirmed arrangements for an information gathering site visit and the two-

week onsite inspection. The schedule is as follows:

  • Information gathering visit: Week of May 16, 2004
  • Onsite inspection weeks: June 7 and June 21, 2004

The purpose of the information gathering visit is to obtain information and documentation,

outlined in the Enclosure, that is needed to support the inspection. Mr. Walt Rogers, a

Region II Senior Reactor Analyst, may accompany Mr. Moorman during the information

gathering visit to review probabilistic risk assessment data and identify risk significant

components which will be examined during the inspection. Please contact Mr. Moorman prior

to preparing copies of the materials listed in the Enclosure. The inspectors will try to minimize

your administrative burden by specifically identifying only those documents required for

inspection preparation. During the information gathering visit, the team leader will also discuss

the following inspection support administrative details: office space; specific documents

requested to be made available to the team in their office space; arrangements for site access;

and the availability of knowledgeable plant engineering and licensing personnel to serve as

points of contact during the inspection.

FP&L 2

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Moorman at (404) 562-4647 or me

at (404) 562-4605.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

Enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publically Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/

adams.html (the Public Electronic Reading Room).

Sincerely,

/RA: Walter Rogers for:/

Charles R. Ogle, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-250, 50-251

License Nos.: DPR-31, DPR-41

Enclosure: Information Request for the Safety System Design and Performance Capability

Inspection.

cc w/encl:

T. O. Jones

Site Vice President

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Walter Parker

Licensing Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Michael O. Pearce

Plant General Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

(cc w/encl contd - See page 3)

FP&L 3

(cc w/encl contd)

David Moore, Vice President

Nuclear Operations Support

Florida Power & Light Company

Electronic Mail Distribution

Rajiv S. Kundalkar

Vice President - Nuclear Engineering

Florida Power & Light Company

Electronic Mail Distribution

M. S. Ross, Managing Attorney

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi, Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee, FL 32304

William A. Passetti

Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

County Manager

Metropolitan Dade County

Electronic Mail Distribution

Craig Fugate, Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

Curtis Ivy

City Manager of Homestead

Electronic Mail Distribution

Distribution w/encl: See page 4

FP&L 4

Distribution w/encl:

E. Brown, NRR

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE RII:DRS RII:DRP

SIGNATURE RA RA

NAME MOORMAN MUNDAY

DATE 4/6 /2004 4/6 /2004

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

PUBLIC DOCUMENT YES NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040990170.wpd

INFORMATION REQUEST FOR THE SAFETY SYSTEM DESIGN AND PERFORMANCE

CAPABILITY INSPECTION

TURKEY POINT STEAM GENERATOR TUBE RUPTURE MITIGATION

(Please provide the information electronically in searchable .pdf files on CDROM. The

CDROM should be indexed and hyperlinked to facilitate ease of use. Information in

lists should contain enough information to be easily understood by someone who has a

knowledge of pressurized water reactor technology.)

1. Piping and instrumentation drawings for Safety Injection System (SI), Auxiliary

Feedwater System (AFW), Main Steam (MS), Chemical and Volume Control System

(CVCS), Residual Heat Removal System (RHR), Intake Cooling Water (ICW),

Component Cooling Water, (CCW) Reactor Coolant System, including the pressurizer

(RCS), and Instrument Air (IA) (Paper copies (2) are preferred for these)

2. The normal operating procedures for the systems listed above. Include the procedures

which specify the normal valve alignment for these systems.

3. Surveillance procedures used to ensure the operability of equipment required by your

Technical Specifications that is used during the mitigation of the SGTR event.

4. Procedures used for the operational testing of check valves in portions of the

emergency core cooling systems used during mitigation of the SGTR event.

5. System description and operator training modules for a SGTR event.

6. Procedures used to sample the reactor coolant system and steam generators during an

SGTR event.

7. Calibration and functional testing procedures for all radiation monitoring instrumentation

used in the detection and mitigation phases of the SGTR event.

8. Calibration and functional test procedures for instruments used to monitor RCS

pressure, pressurizer level and pressure, SG level and pressure, RCS hot and cold leg

temperature, RCS subcooling, feedwater flow, steam flow, core exit temperature, high

pressure injection flow, SI flow, refueling water storage tank level, pressurizer heater

status, safety relief valve position indicator, AFW flow, condensate storage tank (CST)

level, makeup flow, and letdown flow.

9. Test procedures for the primary and secondary system safety relief valves and

pressurizer power operated relief valves.

10. Test procedures for the AFW starting logic.

11. Emergency Operating Procedures (EOPs) and supporting procedures, EOP basis

documents, step deviation document, writers guide, and users guide. Abnormal

Operating Procedures that would be used during a steam generator tube leak/rupture

event.

Enclosure

2

12. Calculations used to support the setpoints in Emergency Operating Procedures for a

SGTR event.

13. A list of engineering calculations applicable to AFW, SI, CVCS, RCS, CC, and other

systems used in the mitigation of the SGTR event.

14. A list of temporary modifications and operator work-arounds since 2001.

15. A list of operability determinations performed since 1999.

16. A list of corrective action program documents and non-routine work requests initiated

since 2001 for the following: CVCS, AFW, SI, ICW, CCW, MS, Radiation Monitoring,

intermediate voltage electrical, low voltage electrical, direct current systems as well as

the Pressurizer PORVs and Steam Generator atmospheric dump valves.

17. System Health Reports and System Performance Trends for all systems going back 2

years.

18. A copy of the Maintenance Rule performance criteria for all plant systems. A list of plant

systems currently monitored under 50.65(a)(1) and the performance goals. A list of

Maintenance Rule functional failures since 2000.

19. Quality Assurance audits, self-assessments and third party assessments performed on

AFW, SI, CVCS, RCS, IA systems and other related systems in the last 24 months.

20. Quality Assurance audits, self-assessments, and third party assessments performed on

engineering and maintenance department activities performed in the last 24 months.

21. Operator training lesson plans, system descriptions, and job performance measures for

the EOPs, EOP support procedures, abnormal, and normal operating procedures that

would be used to mitigate an SGTR event.

22. Key electrical single line drawings of the intermediate and low voltage alternating current

(AC) and DC power systems. (Paper copies (2) are preferred for these)

23. The electrical system load list(s).

24. A brief description of the mitigation strategy for handling the SGTR event, including

operator actions and equipment used.

25. A list of Operating Experience Program evaluations of industry, vendor, or NRC generic

issues for the past 3 years.

26. A list of equipment and operator actions with a Risk Achievement Worth (RAW) greater

than 1.02.

Enclosure

3

27. Probabilistic Risk Assessment (PRA) Event Tree for SGTR initiating event. A List of

PRA system dependencies and success criteria for AFW, SI, CVCS, MS, CCW

systems, and their support systems.

28. Design Basis Manual for major plant electrical, mechanical, and control systems.

29. Plant Technical Specifications, Bases, and Technical Requirements Manual

30. A current copy of the Updated Final Safety Analysis Report.

31. A list of all plant permanent plant changes, design changes, setpoint changes,

procedure changes, equivalency evaluations, suitability analyses, calculations, and

commercial grade dedications since 2001.

32. Plant procedures that provide the guidelines for the following: 1) Corrective Action

Program, 2) Program for the evaluation of changes, tests, and experiments [50.59

Program] 3) Program for the incorporation of local and industry operating experience

into Turkey Point programs and procedures 4) Program for modifications to safety-

related plant systems 5) Program for implementation of the Maintenance Rule

33. A current copy of the Offsite Dose Calculation Manual

Enclosure