ATTACEZ4 2
(Deleted by Aendment 114)
0
.UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555 Docket No. 50-416 Amendment to Indemnity Agreement No. B-72 Amendment too. 4 Effective
, Indemnity Agreement No. B-72, between Mississippi Power and Light Company, System Energy Resources, Inc., and South Mississippi Electric Power Association and the Nuclear Regulatory Commission dated July 15, 1981, as amended, is hereby further amended as follows:
The following namied licensee "Entergy Operations, Inc."
is added to the indemnity agreement.
FOR THE U.S. NUCLEAR REGULATORY COMMISSION Eileen M. McKenna, Acting Chief Policy Development and Technical Support Branch Program Management, Policy Development and Analysis Staff Office of Nuclear Reactor Regulation Accepted
, 1989 Accepted
, 1989 By By Mississippi Power and Light-Company System Energy Resources, Inc.
Accepted By _
, 1989 Accepted
, 1989 By South Mississippi Electric Power Association Entergy Operations, Inc.
Recirculation Loops Operating 3.4.1 Figure 3.4.1-1 Deleted via Amendment 141 No new Page was issued Grand Gulf 3.4-5 Amendment +20 141
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555OOO January 4, 1995 Mr. C. Randy Hutchinson Vice President, Operations GGNS Entergy Operations, Inc.
Post Office Box 756 Port Gibson, Mississippi 39150
SUBJECT:
ISSUANCE OF AMENDMENT NO. 114 TO FACILITY OPERATING LICENSE NO. NPF GRAND GULF NUCLEAR STATION, UNIT I (TAC NO. M89761)
Dear Mr. Hutchinson:
The Nuclear Regulatory Commission has issued the enclosed Amendment No.114 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1. This amendment revises the Technical Specifications (TSs) in response to your application dated June 17, 1994, as supplemented by letter dated August 17, 1994.
The amendment removes License Condition 2.C.(25)(b) and Attachment 2 to Facility Operating License No. NPF-29, 'Transamerica Delaval Inc. (TDI) Diesel Generator Maintenance and Surveillance Requirements (NUREG-1216, August 1985).
A copy of our related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely, Q)
&ei' Paul W. O'Connor, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosures:
- 1. Amendment No. 114 to NPF-29
- 2. Safety Evaluation cc w/encls:
See next page
ATTACHMENT TO LICENSE AMENDMENT NO. 114 FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following page of the License with the attached page and remove to Facility Operating License No. NPF-27. The revised page is identified by amendment number and contains a vertical line indicating the area of change.
REMOVE INSERT 10 10
e4, as 9UNITED STATES NUCLEAR REGULATORY-COMMISSION WASHINGTON, D. C. 20555
+
December 14, 1989 Docket No. 50-416 Mr. W. T. Cottle Vice President, Nuclear Operations System Energy Resources, Inc.
Post Office Box 469 Port Gibson, Mississippi 39150
Dear fir. Cottle:
SUBJECT:
ISSUANCE OF AMENDMENT NO. 65 TO FACILITY OPERATING LICENSE NO.
NPF GRAND GULF NUCLEAR STATION, UNIT 1, REGARDING TRANSFER OF OPERATIONS TO ENTERGY OPERATIONS, INC.
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 65 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit I (the facility). This amendment consists of changes to the facility operating license and Technical Specifications (TS) in response to your application dated August 15, 1989, as supplemented by letters dated August 22, September 22, and September 27 (two letters), October 27, October 30, November 21, and November 30, 1989.
The amendment Implements the authorization to transfer control and performance of licensed activities from System Energy Resources, Inc. (SERI) to Entergy Operations, Inc. (EOI).
SERI remains 90X owner and leaseholder of the facility and South Mississippi Electric Power Association (SMEPA) continues to own the remaining 10 of the facility. SERI and SMEPA have designated EUI as their agent in licensing matters.
Mississippi Power & Light Company (MP&L) remains as a licensee subject to the completion of an antitrust review which will address whether MP&L should be removed from the license as requested by a previous application dated September 2, 1986.
We have reviewed the operating agreement between EOI and SERI and have determined that it is not appropriate to require it by a license condition.
SERI and EOI are joint licensees under the facility operating license conditions, each responsible for specific areas and jointly responsible for regulatory compliance and response. The operating agreement between SERI and EOI will not circumvent these responsibilities.
Finally, since EOI is to be the operator of the plant, we intend to communicate on most matters with EOI.
However, EOI is expected to communicate with SERI to provide data, information, and other support, as may be necessary, to enable SERI and SMEPA to satisfac-torily discharge any responsibilities they may have as owners of the plant, with regard to maintaining regulatory compliance.
8912280170 891214 PDR ADOCK 05000416\\
P PNU
Mr. W. T. Cottle A copy of the Safety Evaluation supporting the amendment and the transfer of control of licensed activities from SERI to EOI is also enclosed. The Notice of Issuance will be Included In the Commission's bi-weekly Federal Register notice.
Five signed copies of Amendment No. 4 to Indemnity Agreement 1no. B-72 which covers the activities authorized under License No. NPF-29 are also enclosed.
Please sign all copies and return one copy to this office.
Sincerely, Original Signed By:
Dennis M. Crutchfield, Associate Director for Special Projects Office of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No. 65 to NPF-29
- 2. Safety Evaluation
- 3.
Amendment No. 4 to Indemnity Agreement No. B-72 cc w/enclosures:
See next page
- L DRPRPM
- DRPR:OGC (
D:,P1:LRPR :
1Er-~
P!NW:
4Khnrs::~ucfeld: E~en~
t---------#----
F------
/.%/89 if A/89
- V'9/
989 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C.
155-Mi
-January 19, 2000
.Mr. William A. Eaton Vice President, Operations GGNS Entergy Operations, Inc.
P. 0. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1-ISSUANCE OF AMENDMENT
'RE: REACTOR CORE STABILIlY ENHANCED OPTION 1-A rTAC NO. MA3406).
Dear Mr. Eaton:
The Nuclear Regulatory.Commission has Issued the enclosed Amendment No. 141 to Facility Operating License No. NPF-29 for.the Grand Gulf Nuclear'Station (GGNS), Unit 1. This amendment revilses the Technical Specifications (TSs) In response to your application dated July 20,1998, as supplemented by letter dated June 29, 1999.
The amendment Incorporates the TS aIanges necessary for Implementation of the Boiling Water Reactor Owners' Group Reactor Stabllity Long-Term Solution, Enhanced Option 1-A.
You are requested to Implement this amendment within 120 days of the amendment date, and to Inform the staff when these operational changes, Including associated component mod lications, hive been completed.
A copy of our related Safety Evaluation Is also enclosed. The Notice of Issuance win be Included In the Commission's next biweekly Federal RegIster notice.
Sincerely, S. Patrick Sekerak, Project Manager, Section 1 Project Directorate IV & Decommissioning Division of LIcensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-416 141
Enclosures:
- 1. Amendment No.
to NPF-29
- 2. Safety Evaluation cc w/encls: See next page
ATTACHMEN TO LICENSE AMENDMENT NO.
FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following pages of the Appendix A Technical SpecHications with the attached revised pages. The revised pages are Identified by amendment number and contain marginal lines Indicating the areas of change.
RemoveInsert 1.0-3 1.0-3 1.0-3a 32-4 3.2-5
- 3.2-6 3.3-4 3.3-4 3.3-4a 3.3-5*
3.3-5 3.3-Sa 3.3-6 3.3-6 3.3-1Sa
- 3.3-13b 3.4-1 3.4-1 3.A-2 3.4-2 3.4-3 3.4-3 3.4-4 3.4-4 3.4-5 5.0-18 5.0-18 5.0-20 5.0-20
ATTACHMENT 2 CORRECTIONS TO PM's COPY GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416 Replace the following pages of the operating license with the attached revised pages.
Item Remove Insert Amendment/Correction Letter Reason No.
1 Attachm, The Letter of Issuance of the Page Numbers do ent 1, Page 19 Operating License dated not match. OCIO Page 2 November 1, 1984.
Copy says "19" and PM's copy is hand marked as "2' 2
Deletion of Attachment 2 ( 4 pages) by Amendment 114 First Page with proper format and Notation, "Deleted By Amendment 114, Dated 1-4-1995" is not in PM's Copy.
3 Letter of Issuance of the Operating License dated December 14, 1989, Enclosure 4, Amendment 4 (the latest) to Indemnity Agreement B-72 is not in PM's Copy.
Replace the following pages of Appendix A Technical Specifications with the attached revised pages.
Item Remove Insert Amendment/Correction Letter Reason No.
4 3.4-5 3.4-5 with Deleted by Amendment 141.
Deletion Wording Standard However, Deleted page was not and Format is not Format.
included when the amendment Followed.
was originally issued. OCIO Added this page but did not follow the standard format G:\\PDIV-1 \\GrandGulf\\MC 1750\\MC1 750-LTR to OCIO-rev 1-021104.wpd
!2
- I
_)@. _
19 -
(2) Implement the upgraded EOP's Prior to startup following the first refueling outaae
'e) Emergency Response Facilities (1) Technical Support Center fully functional with exception of Reoulatory Guide 1.97 implementation (2) Operational Support Center fully functional with exception of Regulatory Guide 1.97 impl ementation (3) Emergency Operations Facility fully functional with exception of Regulatory Guide 1.97 implementation Prior to startup following the first refueling outage Prior to startup following the first refueling outage Prior to startup following the first refueling outage
ATTAcHDE= 2 (Deleted by Amendment 114)
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555 Docket No. 50-416 Amendment to Indemnity Agreement No. B-72 Amendment no. 4 Effective I indemnity Agreement No. B-72, between Mississippi Power and Light Company, System Energy Resources, Inc., and South Mississippi Electric Power Association and the Nuclear Regulatory Commission dated July 15, 1981, as amended, is hereby further amended as follows:
The following named licensee "Entergy Operations, Inc."
is added to the indemnity agreement.
FOR THE U.S. NUCLEAR REGULATORY COMMISSION upQQ-AJ714 7K C Eileen M. McKenna, Acting Chief Policy Development and Technical Support Branch Program Management, Policy Development and Analysis Staff Office of Nuclear Reactor Regulation Accepted
, 1989 Accepted
, 1989 By By Mississippi Power and Light Company System Energy Resources, Inc.
Accepted By
_, 1989 Accepted
, 1989 By South Mississippi Electric Power Association Entergy Operations, Inc.
Recirculation Loops Operating 3.4.1 Figure 3.4.1-1 Deleted via Amendment 141 No new Page was issued Grand Gulf 3.4-5 Amendment +26 141
lCFN.NSE AUT1'.OFRITY FiLE COP' UNITED STATES
- NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DO NOT iREMGu*
November 1, 1984 Docket No. 50-416 My. d. B. Richard Senior Vice President, Nuclear
- Mississippi Power & Light Company
- P.O. Box 23054
- Jackson, Mississippi 39205
Dear Mr. Richard:
p0 porke
/a0n.
c ee D>~~
'9 w-en$ i Gil P
/i at 4 e
o od
Subject:
Issuance of Facility Operating License NPF Grand Gulf Nuclear Station, Unit 1
.The U.S. Nuclear Regulatory Commission has issued the enclosed Facility Oper-ating License NPF-29, together with Technical Specifications and'Environmental Protection Plan.for the Grand Gulf Nuclear Station, Unit 1. This action has been taken in accordance with the Commission's Order dated October 25, 1984.
This license authorizes operation at 100% power (3833 megawatts thermal).
Also enclosed are copies of a related notice; the original of which has been forwarded to the Office of the Federal Register for publication, and of an
- e.
evaluation of.the effect of 40 years of license duration with'respect to
()A
¶.nvironmental matters.
Four signed copies of Amendment No. 2, Indemnity Agreement No. B-72 which covers the activities authorized under License No. NPF-29 are also enclosed.
flease sign all copies and return bne copy to this office.
i-C4 nror l vi Darrell Ei Director e
Division of Licensing Office of Nuclear. Reactor Regulation.
Enclosures:
- 1. Facility Operating License NPF-29
- 2. Federal Register Notice
- 3. 40-year Evaluation
- 4. Amendment No. 2 to Indemnity Agreement B-72 cc w/encl:
See next page An,;
. l !
I.I I.
I
,t cUNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2555-OW1 January 4, 1995 Mr. C. Randy Hutchinson Vice President, Operations GGNS Entergy Operations, Inc.
Post Office Box 756 Port Gibson, Mississippi 39150
SUBJECT:
ISSUANCE OF AMENDMENT NO. 214 TO FACILITY OPERATING LICENSE NO. NPF GRAND GULF NUCLEAR STATION, UNIT I (TAC NO. M89761)
Dear Mr. Hutchinson:
The Nuclear Regulatory Commission has issued the enclosed Amendment No.'114 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1. This amendment revises the Technical Specifications (TSs) in response to your application dated June 17, 1994, as supplemented by letter dated August 17, 1994.
The amendment removes License Condition 2.C.(25)(b) and Attachment 2 to Facility Operating License No. NPF-29, "Transamerica Delaval Inc. (TDI) Diesel Generator Maintenance and Surveillance Requirements (NUREG-1216, August 1985).-
A copy of our related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely, T-,t
) O4e6..u Paul W. O'Connor, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosures:
- 1. Amendment No. 114 to NPF-29
- 2. Safety Evaluation cc w/encls: See next page
ATTACHMENT TO LICENSE AMENDMENT NO. 114 FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following page of the License with the attached page and remove to Facility Operating License No. NPF-27. The revised page is identified by amendment number and contains a vertical line indicating the area of change.
REMOVE INSERT 10 10
UNITED STATES NUCLEAR REGULATORY-COMMISSION WASHINGTON. D. C. 20555 December 14, 1989 Docket No. 50-416 Mr. W. T. Cottle Vice President, Nuclear Operations System Energy Resources, Inc.
Post Office Box 469 Port Gibson, Mississippi 39150
Dear tHr. Cottle:
SUBJECT:
ISSUANCE OF AMENDMENT NO.
65 TO FACILITY OPERATING LICENSE NO. NPF GRAND GULF NUCLEAR STATION, UNIT 1, REGARDING TRANSFER OF OPERATIONS TO ENTERGY OPERATIONS, INC.
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 65 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1 (the facility).
This amendment consists of changes to the facility operating license and Technical Specifications (TS) in response to your application dated August 15, 1989, as supplemented by letters dated August 22, September 22, and September 27 (two letters), October 27, October 30, November 21, and November 30, 1989.
The amendment implements the authorization to transfer control and performance of licensed activities from System Energy Resources, Inc. (SERI) to Entergy Operations, Inc. (EOI).
SERI remains 90% owner and leaseholder of the facility and South Mississippi Electric Power Association (SMEPA) continues to own the remaining 10% of the facility. SERI and SMEPA have designated E0I as their agent in licensing matters.
Mississippi Power & Light Company (MP&L) remains as a licensee subject to the completion of an antitrust review which will address whether MP&L should be removed from the license as requested by a previous application dated September 2, 1986.
We have reviewed the operating agreement between EOI and SERI and have determined that it is not appropriate to require it by a license condition.
SERI and EOI are joint licensees under the facility operating license conditions, each responsible for specific areas and jointly responsible for regulatory compliance and response. The operating agreement between SERI and EOI will not circumvent these responsibilities. Finally, since EOI is to be the operator of the plant, we intend to communicate on most matters with EOI.
However, EOI is expected to coimmunicate with SERI to provide data, information, and other support, as may be necessary, to enable SERI and SMEPA to satisfac-torily discharge any responsibilities they may have as owners of the plant, with regard to maintaining regulatory compliance.
8912280170 891214
-K PDR ADOCK 05000416 P
PNU
Mr. W. T. Cottle A copy of the Safety Evaluation supporting the amendment and the transfer of control of licensed activities from SERI to EOI is also enclosed. The Notice of Issuance will be included in the Commission's bi-weekly Federal Register notice.
Five signed copies of Amendment No. 4 to Indemnity Agreement No. B-72 which covers the activities authorized under License No. NPF-29 are also enclosed.
Please sign all copies and return one copy to this office.
Sincerely, Original Signed By:
Dennis M. Crutchfield, Associate Director for Special Projects Office of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No. 65 to NPF-29
- 2. Safety Evaluation
- 3. Amendment No. 4 to Indemnity Agreement No. B-72 cc w/enclosures:
See next page
- LA:PD2 iDRPR:PM:P
- DRPR:OGC (->\\J 1 -
- Aj D
- )1:IRPR :
F-------
Er-ton Liner:sw:
- Drtchfield:Etd m::::
i_---_____-___ ------------:--
i---------------------------
OFFIC
- L
/89 RR CO/89P OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2O155-O1 3anuary 19, 2000
.Mr. William A. Eaton Vice President, Operations GGNS Entergy Operations, Inc.
P. 0. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1-ISSUANCE OF AMENDMENT RE: REACTOR CORE STABILITY ENHANCED OPTION 1-A (TAC NO. MA3406).
Dear Mr. Eaton:
The Nuclear FRegulatory.Commissfon has Issued the enclosed Amendment No. 141 to Facility
- Operating Ucense No. NPF-29 for.the Grand Gulf Nuclear'Statlon (GGNS), Unit 1. This amendment revises the Technical Spdclfications (TSs) In response to your application dated July 20,1998, as supplemented by letter dated June 29, 1999.
The amendment Incorporates the TS flanges necessary for Implementation of the Boiling Water Reactor Owners' Group Reactor Stability Long-Term Solution, Enhanced Option 1-A.
You are requested to Implement this amendment within 120 days of the amendment date, and to Inform the staff when these operational changes, Including associated component modifications, have been completed.
A copy of our related Safety Evaluation Is also enclosed. The Notice of Issuance will be Included In the Commission's next biweeldy FederalRegIsternotice.
Sincerely, S. Patrick Sekerak, Project Manager, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 60 416
Enclosures:
- 1. Amendment No.141 toNPF-29
- 2. Safety Evaluation cc w/encls: See next page
ATACRHMENT TO LICENSE AMENDMENT NO. 1 FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are Identified by amendment number and contain marginal lines Indicating the areas of change.
emeInsert 1.0-3 1.0-3 1.0-3a 3.2-4 3.2-5
- 3.2-6 3.3-4 3.3-4
.3.3-4a 3.3-5 3.3-5 3.3-Sa 3.3-6 3.3-6
-3.3-S13a 3.3-13b 3.4-1 3.4-1 SA-2 3.4-2 3.4-3 3.4-3 3.4-4 3.4-4 3.4-5 5.0-18 5.0-21 5.0-20 5
.0-.20