Meeting Summary - Annual Assessment Meeting Shearon Harris Nuclear Power Plant
ML040920120
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/01/2004
From: Fredrickson P
NRC/RGN-II/DRP/RPB4
To: Scarola J
Carolina Power & Light Co
Shared Package
ML040920119 List:
References
Download: ML040920120 (5)


Text

April 1, 2004 Carolina Power & Light Company ATTN: Mr. James Scarola Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

MEETING

SUMMARY

- ANNUAL ASSESSMENT MEETING - SHEARON HARRIS NUCLEAR POWER PLANT

Dear Mr. Scarola:

This refers to the open annual assessment category 1 public meeting that was conducted at our request at the Apex Holiday Inn Express on March 24, 2004, to present the results of the 2003 annual assessment. The topics discussed included the reactor oversight process, the NRCs action matrix and the performance of the Shearon Harris Nuclear Power Plant. A list of attendees and a copy of the presentation handouts are enclosed. It is our opinion that this meeting was beneficial.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact us.

Sincerely,

/RA/

Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-400 License No. NPF-63

Enclosures:

1. List of Attendees
2. NRC Presentation Handout
3. Licensee Presentation Handout cc w/encls: (See page 2)

CP&L 2 cc w/encls: Peggy Force James W. Holt, Manager Assistant Attorney General Performance Evaluation and State of North Carolina Regulatory Affairs CPB 9 Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution Public Service Commission State of South Carolina Robert J. Duncan II P. O. Box 11649 Director of Site Operations Columbia, SC 29211 Carolina Power & Light Company Shearon Harris Nuclear Power Plant Chairman of the North Carolina Electronic Mail Distribution Utilities Commission c/o Sam Watson, Staff Attorney Benjamin C. Waldrep Electronic Mail Distribution Plant General Manager--Harris Plant Carolina Power & Light Company Robert P. Gruber Shearon Harris Nuclear Power Plant Executive Director Electronic Mail Distribution Public Staff NCUC 4326 Mail Service Center Terry C. Morton, Manager Raleigh, NC 27699-4326 Support Services Carolina Power & Light Company Herb Council, Chair Shearon Harris Nuclear Power Plant Board of County Commissioners Electronic Mail Distribution of Wake County P. O. Box 550 John R. Caves, Supervisor Raleigh, NC 27602 Licensing/Regulatory Programs Carolina Power & Light Company Tommy Emerson, Chair Shearon Harris Nuclear Power Plant Board of County Commissioners Electronic Mail Distribution of Chatham County Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Institute of Nuclear Power Operations Department 700 Galleria Parkway Progress Energy Service Company, LLC Atlanta, GA 30339-5957 Electronic Mail Distribution Distribution w/encls:: (See page 3)

John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution

CP&L 3 Distribution w/encl:

C. Patel, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE DRP/RII SIGNATURE GTM NAME GMacDonald:as DATE 04/ 01 /2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040920120.wpd

List of Attendees NRC Attendees P. Fredrickson, Branch Chief, Division of Reactor Projects (DRP), Branch 4, Region II, (RII)

R. Hannah, Public Affairs Officer, RII R. Musser, Senior Resident Inspector, Harris, DRP, RII Licensee Attendees J. Scarola, Site Vice President, Harris Nuclear Plant (HNP)

T. Morton, Manager Support Services, HNP F. Diya, Engineering Manager, HNP G. Miller, Maintenance Manager, HNP T. Natale, Outage and Scheduling Manager, HNP J. Caves, Licensing Supervisor, HNP D. Braund, Superintendent Nuclear Security, HNP T. Pilo, Emergency Preparedness Supervisor, HNP H. Deja, Harris Site Communications L. Hill, Harris Site Communications R. Hill, Lead Engineer Licensing, HNP T. Maness, Engineering, HNP S. OConnor, Engineering, HNP P. Oakley-Lisk, Harris Site Communications M. Wallace, Senior Licensing Specialist, HNP M. Clayton, Progress Energy Community Relations T. Groblewski, Corporate Regulatory Affairs Other Attendees W. Cash, Citizen C. Coletter, The Daily Tar Heel K. Ellis, Engineer NCUC B. Goldstein, Independent Weekly H. Jaffe, Citizen, Apex, NC J. James, NCRPS - Emergency Response Branch Manager T. Law, NC State Official P. MacDowell, Citizen, Chapel Hill, NC B. McFeaters, Assistant Director, Wake County Emergency Management T. Preston, Sanford Herald W. Rawlins, News and Observer J. Warren, Executive Director NC WARN B. Williams, Assistant Emergency Management Coordinator, Harnett County M. Willoughby, NC News Network G. Wilson, Citizen, Cary, NC Enclosure 1