Letter Sequence RAI |
---|
|
|
MONTHYEARML0403703312004-01-30030 January 2004 Request for Relaxation from NRC Order EA-03-009, Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. Project stage: Request ML0406901882004-03-0909 March 2004 Draft RAI on Relaxation of Order EA-03-009 Project stage: Draft RAI ML0408307422004-04-0505 April 2004 Request for Additional Information Request for Relaxation of Inspection Requirements of Order EA-03-009 Project stage: RAI ML0411302932004-04-13013 April 2004 Response to Request for Additional Information Regarding Interim Inspection Requirements for Reactor Pressure Vessel Head Project stage: Response to RAI ML0412400282004-04-27027 April 2004 Supplemental Data for Request for Relaxation from Interim Inspection Requirements for Reactor Pressure Vessel Head Project stage: Supplement ML0412400972004-05-0404 May 2004 Relaxation of Requirements of Order (EA-03-009), Regarding Reactor Pressure Vessel Head Inspections Project stage: Acceptance Review 2004-04-13
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21130A0382021-05-21021 May 2021 Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21053A3142021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20275A0032020-09-30030 September 2020 Request for Additional Information Regarding Alternative Request Re Inservice Inspection Impracticality (L-2020-LLR-0089) ML20167A2532020-06-15015 June 2020 Second Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20157A0782020-06-0505 June 2020 Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H0132020-05-14014 May 2020 IP 71111.17T (50.59) List of Documents Request ML20083F5892020-03-21021 March 2020 Request for Additional Information Regarding License Amendment Request Concerning Reactor Coolant Pump Flywheel Inspection Program ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19261B2202019-09-18018 September 2019 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19155A1612019-06-11011 June 2019 Changes to Draft Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Systems, Structures and Components ML19155A1272019-06-0404 June 2019 Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 Risk Informed Categorization and Treatment of Systems, Structures, and Components ML19070A0192019-03-11011 March 2019 Request for Additional Information Regarding Exemption Request from 10CFR50.46(A)(1) to Support Resolution of GSI-191 ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18347A3972018-12-13013 December 2018 Request for Additional Information Regarding Relocation of Emergency Operation Facility ML18138A1372018-05-22022 May 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Risk Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18128A3842018-05-0808 May 2018 Plants, Units 1 and 2 - Draft Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17345A0912018-01-19019 January 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Alternative Request SI-RR-01, Rev. 0 (CAC Nos. MG0068 and MG0069; EPID L-2017-LLR-0078) ML17346A9092017-12-21021 December 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17304A9412017-11-13013 November 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17075A0152017-03-16016 March 2017 E-mail from R. Guzman to E. Villar - Calvert Cliffs Unit Nos. 1 and 2 - Request for Additional Information License Amendment Request - Control Room Emergency Ventilation System ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16222A1252016-08-0909 August 2016 Request for Additional Information - Relief Request No. RR-ISI-04-11, 2016/08/08 E-mail from R.Guzman to T.Loomis ML15299A2792015-11-0303 November 2015 Request for Additional Information Regarding Relief Request for Dissimilar Metal Butt Welds ML15230A0322015-08-13013 August 2015 Request for Additional Information Regarding the National Association Standard 805 License Amendment Request Fire Protection 2024-01-11
[Table view] |
Text
April 5, 2004 Mr. George Vanderheyden, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION RE: REQUEST FOR RELAXATION OF INSPECTION REQUIREMENTS OF ORDER EA-03-009 (TAC NO. MC1921)
Dear Mr. Vanderheyden:
In reviewing your submittal of January 30, 2004, concerning the subject proposed relaxation request to the Order EA-03-009, the Nuclear Regulatory Commission (NRC) staff determined that it needs additional information to continue its review. The NRC staff discussed the issue with your staff on March 17, 2004. As we indicated during our conversation, we are enclosing the request for additional information. You recognize that you desire our response to your request before the inspection during the upcoming refueling outage; therefore, we need your response as soon as practical in order to meet your date.
Sincerely,
/RA/
Guy S. Vissing, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-317
Enclosure:
As stated cc w/encl: See next page
April 5, 2004 Mr. George Vanderheyden, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION RE: REQUEST FOR RELAXATION OF INSPECTION REQUIREMENTS OF ORDER EA-03-009 (TAC NO. MC1921)
Dear Mr. Vanderheyden:
In reviewing your submittal of January 30, 2004, concerning the subject proposed relaxation request to the Order EA-03-009, the Nuclear Regulatory Commission (NRC) staff determined that it needs additional information to continue its review. The NRC staff discussed the issue with your staff on March 17, 2004. As we indicated during our conversation, we are enclosing the request for additional information. You recognize that you desire our response to your request before the inspection during the upcoming refueling outage; therefore, we need your response as soon as practical in order to meet your date.
Sincerely,
/RA/
Guy S. Vissing, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-317
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC RLaufer SLittle PDI-1 R/F GVissing ADAMS Accession Number: ML040830742 OFFICE PDI-1/PM PDI-1/LA EMCB PDI-1/SC NAME GVissing SLittle TChan RLaufer DATE 4/5/04 4/5/04 4/5/04 4/5/04 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION CONCERNING REQUEST FOR RELAXATION OF INSPECTION REQUIREMENTS OF ORDER EA-03-009 FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-317 Relaxation Request 1:
- 1. Please provide the total number for each type of reactor pressure vessel head (RPVH) nozzles that are affected by this relaxation in Unit 1.
- 2. Please provide justification that coverage up to 0.75 inch above the weld will provide an adequate level of quality and safety. Are there residual stress data for Unit 1 that indicates that 0.75 inch is a sufficient level above the weld, or is there any other basis that demonstrates an acceptable level of quality and safety for the restricted inspections?
- 3. If the guide sleeves are removed, would there be additional geometric constraints on performing the examination required in the Order?
- 4. The Order allows either ultrasonic testing (UT) or a surface examination. The hardship is for UT only. For a similar situation for Unit 2, the licensee responded to a request for additional information by indicating that there was a contractor that could provide the capability to deliver an eddy current probe to the region where access is limited.
However, that contractor was not available for Unit 2 during its 2003 outage. Discuss why the licensee is not proposing the use of eddy current examination for Unit 1. If the eddy current inspections could be performed, there would be no need for relaxation of the Order.
- 5. Is the 10-million dollar cost just for the removal of the thermal guide sleeves? Please expand on what this estimate includes.
- 6. Did the licensee perform a crack growth evaluation above the weld? If so, what was the initial flaw size and was it through wall? The licensee is requested to describe the methodology in detail, and provide examples for the crack growth calculations. Did the licensee perform this evaluation in accordance with the MRP-55 guidelines? Did the licensee perform the evaluation, or was it performed by a contractor? Was the crack growth evaluation based on the as-built weld geometry? Please provide justification if the crack growth evaluation was not based on the as-built weld geometry.
Enclosure
It should be noted that in its Safety Evaluation (SE) dated April 18, 2003, the NRC staff understood that the licensee demonstrated hardship to perform certain Order inspections for the Unit 2 2003 outage due to the timing of the issuance of the Order. However, the staff also recognized and stated in the SE that the licensee did not demonstrate a hardship for Unit 1 or for subsequent Unit 2 outages.
Relaxation Request 2
- 1. What is the maximum hoop stress in the bottom portion of the nozzle. Please provide crack growth predictions for through wall axial flaws located at various angles in the control element drive mechanisms.
- 2. What are the yield strengths and heat numbers of the material used in Unit 1?
- 3. Was the crack growth rates assessed using MRP-55? What was the initial flaw size used? Please provide more detail of what was used in the calculations and what assumptions were used. The licensee is requested to describe the methodology in detail and provide examples for the crack growth calculations. Was the crack growth evaluation based on the as-built weld geometry? If not, please provide justification if the crack growth evaluation was not based on the as-built weld geometry.
- 4. What is the distance from below the J-groove weld to the area of the nozzle that cannot be inspected?
Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 cc:
President Patricia T. Birnie, Esquire Calvert County Board of Co-Director Commissioners Maryland Safe Energy Coalition 175 Main Street P.O. Box 33111 Prince Frederick, MD 20678 Baltimore, MD 21218 James M. Petro, Esquire Mr. Loren F. Donatell Counsel NRC Technical Training Center Constellation Energy Group, Inc. 5700 Brainerd Road 750 East Pratt Street, 5th floor Chattanooga, TN 37411-4017 Baltimore, MD 21202 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge 2300 N Street, NW Washington, DC 20037 Mark Geckle Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Kristen A. Burger, Esquire Maryland Peoples Counsel 6 St. Paul Centre Suite 2102 Baltimore, MD 21202-1631