ML040780682

From kanterella
Jump to navigation Jump to search
February 2004 Monthly Operating Report for Palo Verde Units 1 2 & 3
ML040780682
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/11/2004
From: Danni Smith
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00721-DMS
Download: ML040780682 (4)


Text

ZARFS A sihsidianr qfPinnacle 1*.vt Capsital Corlwrarion Palo Verde Nuclear Generating Station David M. Smith Plant Manager Nuclear Production Tel.

623-393-6116 Fax.

623-393-6077 e-mail: DSMITH10@apsc.com Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 March 11, 2004 035-00721-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for FEBRUARY 2004 Enclosed are the Monthly Operating Reports for FEBRUARY 2004, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Don Vogt at (623) 393-5926.

DMS/ap

Enclosures:

FEBRUARY 2004 Monthly Operating Reports cc:

(all w/enclosures)

Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute

  • ~ Zi

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-528 Palo Verde I March 11, 2004 Don Vogt (623) 393-5926 REPORTING PERIOD:

February 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00

3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 606.30 591.50 0.00 719,052.17 Yr-to-Date 1,350.30 1,335.50 0.00 1,653,858.95 Cumulative 124,132.22 122,724.53 0.00 147,909,549.2 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments 04-01 02/0312004 F

104.50 A

1 Manually shutdown the unit due to a socket weld leak on the RCS pressure boundary upstream of valve SIA-V056.

SUMMARY

The unit began month in Mode I with RX power at 99.1 1%. On 02/03104 an RCS pressure boundary was discovered and the unit commenced a controlled downpower to 20%. The RX was manually tripped at 20% per RX shutdown procedure. After repair the unit went critical on 02/07/04 and the main generator was synchronized on 02/08104. Full RX power was reached on 02/09/04. The unit ended the month in Mode I with RX power at 99.02%

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of I

I OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-529 Palo Verde 2 March 11,2004 Don Vogt (623) 393-5926 D:

February 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00

3. Number of Hours the Reactor was Critical
4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 450.38 450.38 0.00 603,445.57 Yr-to-Date 1,194.38 1,194.38 0.00 1,610,103.35 Cumulative 121,983.64 120,583.90 0.00 146,998,196.2 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments 04-01 02/19/2004 F

245.62 A

1 Manually tripped RX per shutdown procedure at 20% power due to SG#1 tube leak.

SUMMARY

The unit began month in Mode I with RX power at 99.87%. On 02119/04 a small tube leak was detected on SG#1 and the unit commenced a controlled downpower to 20%. The RX was manually tripped at 20% per RX shutdown procedure and the unit was cooled down to Mode 5 for cause analysis and plugging of the affected tube.

The unit ended month in Mode 5.

Unit was uprated during the last refueling outage. Unit capacity appears to have increased by approximately 92 MW, however, previous values of Design Electrical Rating and Maximum Dependable Capacity will continue to be used until new capacity values are determined.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-530 Palo Verde 3 March 11, 2004 Don Vogt (623) 393-5926 REPORTING PERIOD:

February 2004

1.

Design Electrical Rating

2. Maximum Dependable Capacity (MWe-Net) 1,269.00 1,247.00
3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 656.73 655.63 0.00 832,763.41 Yr-to-Date 1,400.73 1,399.63 0.00 1,778,827.86 Cumulative 119,364.03 118,311.00 0.00 144,840,695.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments 04-01 02/28/2004 F

40.37 A

1 Automatic turbine trip on loss of generator field due to an excitation control system failure. Following turbine trip the RX was manually shutdown.

SUMMARY

The unit began the month in Mode I with RX power at 98.60%. On 02/28/04 the main turbine generator tripped, immediately followed by an automatic RX power cutback. The cause of the turbine trip was the loss of the generator field due to an excitation control failure. The unit commenced a downpower to 20% to troubleshoot the excitation problem. The RX was manually tripped at 20% per RX shutdown procedure. On 02/29/04 during a walkdown of the RCS a small leak was found at one of the pressurizer heater sleeves. The unit commenced a cool down to Mode 5 and ended the month in Mode 4.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of I