Draft Information Input Relaxation of Ventilation System Heater Surveillance Acceptance - Attachment 10
ML040770177
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/12/2004
From: Kalyanam N
NRC/NRR/DLPM/LPD4
To: Barry Miller
- No Known Affiliation
Kalyanam N, NRR/DLPM, 415-1480
Shared Package
ML040830346 List:
References
TAC MC0749
Download: ML040770177 (4)


Text

--

uIvaII--I I


veptance Criteria ag From:

N. Kaly Kalyanam To:

Bryan Miller Date:

2/12/04 10:51AM

Subject:

RAI - TSCR on Relaxation of Ventilation System Heater Surveillance Acceptance Criteria

Bryan, I am attaching the RAI from the Technical Reviewer on the subject TSCR, TAC No. MC0749.

Let us see if we can have a conference call and resolve these questions. Otherwise, I can send a formal RAI and you can docket the response.

Also, with reference to the EPU, Rich Lobel would like to obtain a copy of the topical report on the FLOOD3 computer code. Could you please send a copy or provide a reference to a submittal date and docket number. He couldn't find it in ADAMS.

Thanks.

IC)0o/kQ>

0, -C) 0 o 3 C2-(00VG-



R A-'TIL 1011h-I [) 4---,,T l

rage Waterford RAI Question

1.

In the staff review of the licensees submittal, we were unable to determine what value was used for the power of the heaters in the diesel load calculation EC-E90-006. Please confirm that Calculation EC-E90-006 considered +5 percent tolerance of the subject heaters ( i.e. 63 KW, 21 KW, and 10.5 KW). Are there any other loads that may be operating at more than nameplate rated values or at a service factor? The staff is concerned about the cumulative effect of all such loads. How will this additional KW load be captured in the calculation?

2.

The submittal stated in the background section that approximately half of the heating coils were replaced due to the shield building ventilation system being declared inoperable on May 22, 2003. Please provide us with the root cause of the change of heating coils resistance of B train SBVS on May 22, 2003? What is the reason that the new coils were able to pass the surveillance test and the old coils which had in the past found to be acceptable were no longer able to pass the surveillance test.

-oeIMuure commitment complete F

From:

Edwin Forrest To:

N. Kaly Kalyanam Date:

2/12/04 9:53AM

Subject:

TAC MC0749 RAI for Waterford -schedule commitment complete Please submit the attached two RAI's to Waterford. Amar Pal of EEIB is supporting this task and has requested these questions. If a phone conference develops on these questions, Amar should be included.

This completes the RAI schedule commitment.

Ed Forrest 301-415-3755 CC:

Amar Pal; Andrzej Drozd; Robert Dennig

Waterford RAI Question

1.

In the staff review of the licensees submittal, we were unable to determine what value was used for the power of the heaters in the diesel load calculation EC-E90-006. Please confirm that Calculation EC-E90-006 considered +5 percent tolerance of the subject heaters ( i.e. 63 KW, 21 KW, and 10.5 KW). Are there any other loads that may be operating at more than nameplate rated values or at a service factor? The staff is concerned about the cumulative effect of all such loads. How will this additional KW load be captured in the calculation?

2.

The submittal stated in the background section that approximately half of the heating coils were replaced due to the shield building ventilation system being declared inoperable on May 22, 2003. Please provide us with the root cause of the change of heating coils resistance of B train SBVS on May 22, 2003? What is the reason that the new coils were able to pass the surveillance test and the old coils which had in the past found to be acceptable were no longer able to pass the surveillance test.