July/August 2002 Retake Exam 50-369/2002-302 Draft Admin/Outline
ML040620542
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/04/2002
From:
NRC/RGN-II
To:
References
50-369/02-302
Download: ML040620542 (27)


See also: IR 05000369/2002302

Text

Draft Submittal

(Pink Paper)

MCGUIRE JULYIPIUGUST 2002

RETAKE EXAM NO. 58-369/2002-302

1

~

Administrative QuestisnslJPMs

2.

Administrative Topics Outline ES-301-2

ES- 301

Administrative Topics Outline

Form ES-301- 1

--

Plant

Parameter

Verification

KIA 2.1.7

3 . 7 / 4 . 4

Shift Staffing

Requirements

K/A 2 . 1 . 4

2 . 3 / 3 . 4

Equipment

Control

KIA 2.2.23

2.6/3.8

Control of

Radiation

Rdeases

K/A 2.3.6

2.1/3. I

Emergency

Protective

Action

iecommendation

K/A 2 . 4 . 4 4

2 . 1 / 4 . 0

P

Oescribe method of evalcation:

1. ONE Administrative J P K , OR

2. TWO Administrative Questions

JPM: Calculate Shutdown Kargin in Modes 3,4 and 5

JPM: Determine if hours worked exceed guidelines

Deficription

3PM: manually Complete Tech Spec Evaluatior. and

Logbook Entry

JPM: Review and authorize a Gaseous Waste Release

JPM: Determine Protective Action Recommendations

affected counties ar.d perform the initial

notification.

NUREG-1021, Revision 8

JPMADMIN-ISRO-1

PAGE 1 OF 6

Reviewed By

Approved By

TASK:

POSITION:

ISRO

Perform a Manuel Shutdown Margin Calculation (Unit Shutdown)

Operator's Name

Location:

Control Room

Method:

Perform

Estimated JPM Completion Time:

-25-

Minutes

Actual JPM Completion Time:

Minutes

The JPM Operator's performance was evaluated against the standards of this JPM and is

determined to be:

SAT1 SFACTORYlU NSATI SFACTORY (circle one)

Evaluator's Signature

Bate

I

I

KA:

2.1.7 3.714.4

References: OPIOIN6100/006 Reactivity Balance Calculation

OP/I/N6100/22 Unit 1 Data Book

Attachments:

Rev. 02104-10-2002

JPM-ABMIN-ISRO-1

PAGE 2 OF 6

INITIAL CONDITIONS

You are the Unit 1 Operator at the Controls (OATC). The reactivity computer (REACT) is out of

service. Preparations are being made to commence a plant couldown.

Based on the information provided to you on the Data Sheet, perform a Shutdown Margin

Calculation per QPIOiN6106iQ06 Enclosure 4.5 (Shutdown Margin - Unit Shutdown, Modes

5,4, or 3 Without Xenon Credit).

JPM OVERALL STANDARD:

Technical Specification 3.1 .I

requirements (1.3%AKIK CQLR limit).

Shutdown Margin is calculated and correctly evaluated against

NOTES:

0P/O/A/6100/006 Enclosure 4.5 (Shutdown Margin - Unit Shutduwn, Modes 5, 4, or 3 Without

Xenon Credit). Also required is access to the Data Book Curves. The evaluator should either

allow the Data Book to be utilized by the candidate or supply the candidate with the associated

curves.

The evaluator should supply the candidate with a copy of the procedure

KA 2.1.7 3.714.4

JPMADMIN-ISWQ-1

PAGE 3 OF 6

3.1.1

3.1.2

3.1.3

3.1.4

3.1.5

3.1.6

3.1.7

3.1.8

3.2

  • 3.3.1

EL EM E NTS

Kecord requested data:

Datemime ___ I

Unit -

Cycle

Burnup

EFPD

NCS Boron

Concentration

PPm

Present NCS

Desired NCS Temp for

this SDM calculation

"F

Temperature

"F

Number of Known

Inoperable Control Rods

(RCCAs)

Inoperable RCCA core

location(s)

Performs Section 3.3 and

NIA's Section 3.2

Required SDM boron

concentration 9 200 "F

STANDARD

Operator records info

according to data given

on data sheet:

Datemime Xlxlxx I xxxx

Unit -1-

Cycle -25-

Burnup -430-

EFPD

NCS Boron

Concentration

Present NCS

Temperature -557-"

F

Desired NCS Temp for

this SDM calculation

-

31 0-"F

Operator

records number of known

hoper Control Rods

--

0

(RCCAs)

Operator records the core

location of the inoperable

control rod

-N/A

Operator records NIA in

the Automated

calculation using REACT

section.

Same

COMMENTS

REQUIRED

FOR UNSAT

  • BENOES CRITICAL

JPM-ADMIN-ISRO-1

PAGE 4 OF 6

3.3.2

3.3.3

3.3.4

3.3.5

ELEMENTS

(from 1.3% tabular data

of Data Book Table 6.5 at

cycle burnup of Step

3.2.3 and at desired NC

system temperature of

Step 3.1.6))

PPm

Required SDM boron

concentration 5 200 "F

(from tabular data of Data

Book Table 6.5 for 1 .O%

SDM at the cycle burnup

of 3.1.3 and at 33 O F , NIB

if Step 3.1.6 is

200 O F )

PPm

IF this SDM

determination is

performed after refueling

and before ZPPT is

complete, record 100

ppm additional boron

conc penalty.

OTHERWISE RECORD

ZERQ.

PPm

Stuck Rod Eoron Conc

Allowance (from Data

Book Table 1.15)

+

PPm

Calculate the Stuck Rod

Penalty

STANDARD

Range of 920 to 960 ppm

Due to Note in

procedure, NlAs this

step.

-.-N/A-

PPm

Due to Note in

procedure, enters

-

SIU

COMMENTS

REQUIRED

FQR UNSAT

  • DENOTES CRITICAL

JFM-ADMIN -ESRQ-I

PAGE 5 OF 6

3.3.6

3.3.7

  • 3.3.8
  • 3.4.1

ELEMENTS

Record all Rods In

Differential Boron worth

at Burnup of Step 3.1.3

and NC Temperature of

Step 3.1.5.

Calculate Shutdown

Margin Adjustment

(Step 3.1.8IStep 3.3.6)

Calculate the Adjusted

Shutdown Boron Conc

(Step 3.3.4 or 3.3.2 +

Step 3.3.3 + Step 3.3.5)

(.-..-

~

I =

t

+

PPm

NC Boron Concentration

(Step 3.1.4) is greater

than or equal to Adjusted

(Step 3.3.6 or REACT

output) and adequate

shutdown margin exists

at temperature of Step

3.1.6.

-Yes

~

No

Shutdown Boron COnC

STANDARD

ZERO for this step.

Ppm

-9.7 pcmlppm

-100 I - 9.69 = 10.3 ppm

Range of Values

( 926 i

0 + 0 -10.3)

= -

915.7- ppm

( 960 + 0 + 0 - 10.3) =

-

949.7- ppm

Same

Operator determines

answer is "NO" and

designates in blank.

-YES

x

10

SIU

COMMENTS

REQUIRED

FOR UNSAT

  • DENOTES CRITICAL

JPM-ADMIN-ISRO-1

PAGE 6 OF 6

ELEMENTS

I C Boron Concentration

Step 3.1.4) is less than
o Adjusted Shutdown

3oron Conc (Step 3.3.6

3r REACT output) and it

,s desired to decrease

temperature to or

maintain temperature at

that of Step 3.1.6 above.

NC Boron Conc MUST

be adjusted equal to or

greater than Adjusted

Shutdown Boron

concentration.

Calcuiations Performed

By:

Date:

Separate Verificatiun

By:

Date:

STANDARD

Same

Operator correctly

determines that NC

Borun Conc must be

adjusted to calculated

value.

x

YES

~

NO

- s

By: ~ x x x x x x x x x ~

Date: -

x/x/xx ~

Cue: For the purposes

of this JPM, no

Separate Verification of

the calculation will be

performed.

~

SIU

COMMENTS

REQUIRED

FOR UNSAT

  • DENOTES CRITICAL

INITIAL CONDITIONS

You are the Unit 1 Operator at the Controls (OATC). The reactivity computer (REACT) is out of

service. Preparations are being made to commence a plant cooldown.

Based on the information provided to you on the Data Sheet, perform a Shutdown Margin

Calculation per OPIQIAI61QQIQQ6

Enclosure 4.5 (Shutdown Margin - Unit Shutdown, Modes

5,4, or 3 Without Xenon Credit).

DATA SHEET

Unit

Current Cycle

Inoperable Control Rod(s)

Current Power Level

Present NC system temperature

Desired NC system temperature

Cycle Burnup

Present NCS Boron Concentration (sample)

Samarium Difference

1

15

None

0%

557 degrees

310 degrees

430 EFPS

71 0 ppm

-100 pcm

JPM-ADMIN-USRO-2

PAGE 1 OF 3

Reviewed By

Approved By

TASK:

Determine if hours worked exceeds guidelines

POSITION: ISRO

Operator's Name

Location:

Control Room

Method:

Perform

Estimated JPM completion Time:

Actual JPM Completion Time:

Minutes

The JPM Operator's performance was evaluated against the standards of this JPM and is

determined to be:

15 Minutes

SAYISFACTORY/UNSA~ISFACTORY (circle one)

Evaluator's Signature

Date

I

I

References: NSD 200 Overtime Control

Tech Spec 6.2.2

KA

2.1.4 2.313.4

Attachments: NSB 200 Appendix A

Rev. 02/04-10-2002

JPM-ADMIN-USRO-2

PAGE 2 OF 3

INITIAL CONDITIONS

Determine for the following three operators if the hours worked exceeded Tech Specs and NSD

200 guidelines. State

requirements that are violated, if applicable.

3perator

A

B

C

Friday

1900 Reports to shift

1915 Turnover complete

assumes duties

1000 Relief arrives late

101 5 Turnover complete

stands relieved

1900 Reports to shift

I91 5 Turnover complete

assumes duties

0800 Relief arrives, but

goes home sick

1100 Alternate relief

arrives

11 I 5 Turnover complete

stands relieved

1900 Reports to shift

2915 Turnover complete

assumes duties

1000 Relief arrives, but

goes home sick

1 'I 00 Alternate relief

arrives

11 15 Turnover complete

stands relieved

Saturdav

1800 Reports to shift for

schedule Just In

Time Training

(JITT)

1830 Turnover complete

assumes duties

1915 Turnover complete

assumes duties

____________HQME--

__________

2000 Reports to shift

201 5 Turnover complete

assumes duties

0615 Relief arrives

0630 Turnover complete

stands relieved

0745 Relief arrives

0800 Turnover complete

stands relieved

0745 Relief arrives

0800 Turnover complete

stands relieved

JPM OVERALL STANDARD: Determines that Operators A and B are not within guidelines.

Determines that Operator C is within guidelines.

STEPS

1

2

3

ELEMENTS

Compare hours worked

by Operator A to Tech

Spec guidelines

Compare hours worked

by Operator E3 to Tech

Spec guidelines

Compare hours worked

by Operator C to Tech

Spec guidelines

JPM-ADMIN-USRO-2

PAGE 3 OF 3

STANDARD

Determines that Operator

A has violated Tech

Spec. Guidelines by not

having 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> off

between Friday and

Saturday.

Determines that Operator

B violated Tech Spec

guidelines by not having

an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> break between

work on Friday and

arriving for work on

Saturday. Plus has

exceed 28 in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />

worked rule.

Determines that Operator

C has not violated the

guidelines.

SIU

COMMENTS

REQUIRED

FOR UNSAT

INITIAL CONDITIONS

Determine for the following three operators if the hours worked exceeded Tech Specs and NSD

200 guidelines. State a

requirements that are violated, if applicable.

3perator

A

B

c

Friday

1900 Reports to shift

191 5 Turnover complete

1000 Relief arrives late

101 5 Turnover complete

assumes duties

stands relieved

1900 Reports to shift

1915 Turnover complete

assumes duties

0800 Relief arrives, but

goes home sick

11 00 Alternate relief

arrives

11 I 5 Turnover complete

stands relieved

1900 Reports to shift

1915 Turnover complete

assumes duties

1000 Relief arrives, but

goes home sick

1100 Alternate relief

arrives

I 1 15 Turnover complete

stands relieved

Saturday

I

Sunday

scheduled Just In

stands relieved

1830 Turnover complete

assumes duties

0745 Relief arrives

stands relieved

1900 Reports to shift

1925 Turnover complete

assumes duties

0745 Relief arrives

0800 Turnover complete

_ _ _ _ _ s s

_-__

-HOME ____________

2000 Reports to shift

201 5 Turnover complete

stands relieved

assumes duties

JPMADMIN-ISR03

PAGE I

OF 3

Reviewed By

Approved By

TASK: Manually Complete Technical Specification Evaluation and Logbook Entry

POSITION: ISRQ

Qperatork Name

Location:

Control Room

Method:

Perform

Estimated JPM Cumpletion Time:

20

Minutes

Actual JPM Completion Time:

Minutes

The JPM Operator's performance was evaluated against the standards af this JPM and is

determined tu be:

SBTISFACTORY/UNSA~IS~ACTQRY

(circle one)

Evaluator's Signature

Date

I

I

References:

KA:

2.2.23 2.613.0

JPM verified current with references by

Date

i

i

Rev. 110410-2002

JPM-ADMIN-ISRQ-3

P A W 2 OF 3

INITIAL CONDITIONS

You are the Control Room SRO. Both Units are at 100% power. The Technical Specification

Action Item (TSAIL) computer program is out of service on Unit 1.

Cold beg Accumulator I C was declared inoperable yesterday, at 12:QO noon, due to low Boron

concentration. Feed and Bleed of the I C accumulator was begun at 16:00, and has been in

progress since. Chemistry reported the most recent Boron sample results, taken two hours ago,

as 2460 PPM.

The Operation Test Group is in the process of performing the quarterly valve stroke timing

surveillance for the B Train NI system.

During the performance of the surveillance procedure, the Unit 1 Balance of Plant Operator

reports to you that valve 1 NI-431B is in the intermediate position, and will not close.

Evaluate plant status in accordance with Technical Specifications, based upon the data

provided. Complete any necessary Technical Specification Logbook entries as required.

JPM OVERALL STANDARD: Required Technical Specification Logbook entry (TS 3.0.3)

completed in accordance with OMP-5-3.

NOTES: Entry into TS 3.0.3 is determined by referencing Test Acceptance Criteria (TAC) sheet,

Drawing number MCTC-1562-NI.VO31-01. And Tech Spec 3.5.4. TSAIL entry is

completed on Attachment 1 of Operations Management Procedure (OMP) 5-3,

Tech Spec Action items Log.

KA

2.2.23

JF'M-ADMIN-ISRO-3

PAGE 3 OF 3

STEPS

z

  • %

3

  • 4

5

evaluation.

Acceptance Criteria for

NI system. (Drawing

OPEN.

I inoperable.

inoperable Coid Leg

3.5.1, action D.l

Accumulators

Complete Attachment I

.

1 Attachment 1 completed.

of QMP 5-3.

1 CUE: item number 8.

CUE: Use present Date

and Time for

inoperability.

Note: See answer key for

example of completed

Attachment 1. Critical

items are denoted with

an asterisk.

-

SIU

COMMENTS

REQUIRED

FOR UNSAT

  • DNOTES CRITICAL

INITIAL CONDITIONS

You are the Control Room SWO. Both Units are at 100% power. The Technical

Specification Action Item (TSAIL) computer program is cut of service on Unit 1.

Cold Leg Accumulator 1 C was declared inoperable yesterday, at 12:OO noon, due to

low Boron concentration. Feed and Bleed of the I C accumulator was begun at 16:00,

and has been in progress since. Chemistry reported the most recent Boron sample

results, taken two hours ago, as 2460 PPM.

The Operation Test Group is in the process of performing the quarterly valve stroke

timing surveillance for the B Train NI system.

During the performance of the surveillance procedure, the Unit 1 Balance of Plant

Operator reports to you that valve INI-4315 is in the intermediate position, and will not

close.

Evaluate plant status in accordance with Technical Specifications, based upon

the data provided. Complete any necessary Technical Specification Logbook

entries as required.

J BM-ADM IN-ISRO-5

PAGE 1 OF 7

Reviewed By

Approved By

TASK:

Determine Protective Action Recommendations and perform the initial

notifications.

POSITION:

ISRO

Operator's Name

Location:

Simulator

Estimated JPM completion time: 20 Minutes

Actual JPM Completion Time:

Minutes

Method:

PWf0rm

The JPM Operator's performance was evaluated against the standards of this JPM and is

determined to be:

SATISFACPQRYIUNSATIS~AACTOBY (circle one)

Evaluator's Signature

Date

/

I

KA:

2.4.44 2.114.0

References: RP/O/N5700/000

Classification of an Emergency

RP/0lN5700/004

General Emergency

Attachments:

Rev. 02/04-10-2002

JPM-ADMIN-ISRO-5

PAGE 2 OF 7

INITIAL CONDITIONS

Assume: Today is Monday.

It is now

on July

  • At
  • A SGTR has occurred with an unisolable secondary line break on 1B S/G inside containment.

8

Due to degrading conditions (Loss of 2 of 3 Fission Product Barriers and potential for loss af

the third barrier), the QSM just now

decided to declare a General Emergency based

on emergency classification of 4.1 .C.4, 4.1 .N.3 and 4.1 F.4.

8

The event has been announced over the plant PA system.

e

Due to instrument 1EEBCR9100 being out of service, the National Weather Service was

called and reported wind speed to be 6-8 MPH.

e Wind direction is 229 degrees from North.

8

Containment radiation levels are remaining normal (5 Rlhr)

, the Reactor on Unit #I

was tripped due decreasing inventory and pressure.

You are the WCC SRO a General Emergency has just been declared. The QSM directs you

to use RPIQ/A/5700/004 (General Emergency) and complete the Initial Notification to the

State and Counties with the appropriate Protective Action Recommendations.

NOTE: This is a Time Critical JPM.

JPM OVERALL STANDARD:

The Initial Notification form is completed with the appropriate

Protective Action Recommendations within 15 minutes.

NOTES:

This JPM is intended to be used with a blank Emergency Notification Form

provided to the candidate. Also provide the student with a complete copy of

RP/O/A/5790/804 General Emergency.

JPM-ADMIN-ISRO-5

PAGE3OF 7

ELEMENTS

Candidate implements

procedure for General

Emergency.

The Operations Shift

Manager or delegate

SHALL ANNOUNCE the

event over the plant P.A.

system by performing the

following:

Complete items 1 - I O ,

15 and 16 on Enclosure

4.1 - Emergency

Notification Form in

accordance with

Enclosure 4.3, section 1

Complete Enclosure 4.1-

Emergency Notification

Form as follows:

Check A for Drill E

B for

Emergency

AND

STANDARD

Event was classified as a

General Emergency by

the OSM. When

evaluator provides

procedure/form to

candidate, start the clock.

Start Time For Time

Critical

Operator determines

from initial conditions that

this has already been

performed

Same

Same

Operator checks B for

emergency

COMMENTS

REQUIRED

FOR UNSAT

  • DENOTES CRITICAL

JPMADM[N-I§RO-5

PAGE4OF 7

ELEMENTS

  • DENOTE§ CRITICAL

Continued

Check INITIAL

Write in message

number.

Write in the unit($)

AND

Communicator's name

Write in the transmittal

time &NJ

date

Write in the appropriate

number

code word

STANDARD

same

3perator writes message

lumber 1

3perator writes in Unit 1

Elperator writes

sommunicators name

Operator wili not enter a

time and date since

helshe will not actually be

making the transmission

Qperator will not enter a

number and code word

since helshe will not

actually be making the

transmission

~

SlU

COMMENTS

REQUIRED

FOR UNSAT

STEPS

4

4

DENQTI

ELEMENTS

Continued

Checks D for GENERAL

EMERGENCY

Check A for Emergency

Declaration At:

AND

Write the time

dale

the classification is

declared:

2000, July 1 sth.

Continued

Write the reason for

declaring the

classification

Check 6 for the

appropriate plant

condition

i CRITICAL

JPMADMIN-ISRQ-5

PAGE5QF 7

STANDARD

Same

Same

Same

NOTE: The Declaration

Time of

X

and Date

of July 15 is entered in

space provided.

-ti. -

Same

Degrading

-

SIU

COMMENTS

REQUIRED

FOR UNSAT

ELEMENTS

sntinued

heck A SHUTDOWN

write the time and date of

ieactor Shutdown

heck E3 AND write in the

qeactor Power level

Check C . a release is

xcurring due to the SG

Tube Leak.

Step #I4 is not required

but can be filled in with

appropriate data.

Check I3 & C,

EVACUATE & SHELTER

IN-PLACE.

Also fills in appropriate

zones.

JPM-ADMlbl-ISROB

PAGE6QF 7

STANDARD

ieactor Shutdown:

h e :

X

late: -0711 5102-

NIA

Operator checks that a

release is occurring due

to the SG Tube Leak.

If Step #14 is completed,

it should be filled in with:

Wind Direction of 220

deg from North, and

Wind Speed of 6-8 mph.

Same

Fills in zones . l r

Evacuate:

b, B, M, C, A, N, D

-

SIU

COMMENTS

REQUIRED

FOR UNSAT

  • DENOTES CRITICAL

JPM-ADMIN-ISRO-5

PAGE7OF 7

STEPS

ELEMENTS

Continued

Have the Emergency

Coordinator approve the

message

Write in the time &NJ

date the message was

approved

Make initial notification to

State and County

authorities using the

Emergency Notification

Form in accordance with

Enclosure 4.3, section 2.

Go to step 2.4 as soon

as possible

STANDARD

Cue:

The Emergency

Coordinator, John Doe,

just approved the

message. Please enter

time and date for the

present.

Same

NOTE: This step

signifies the end of the

Time Critical portion of

this JPM. Enter the stop

time below

Cue: Another operator

will make the

transmission the State

and Counties.

Stop Time For Time

Critical

Note:

Start Time - Stop Time

must be

25 minutes.

-

S/U

COMMENTS

REQUIRED

FOR UNSAT

  • DENOTES CRITICAL

JPMADMIN-ISROB

PAGE 8 OF 9

ELEMENTS

STANDARD

  • DENOTES CRITICAL

INITIAL CONDITIONS

Assume: Today is Monday. It is now

on Jury

At

0

A SGTR has occurred with an unisoiable secondary line break on 1B S/G inside containment.

Due to degrading conditions (Loss of 2 of 3 Fission Product Barriers and potential for loss of

the third barrier), the OSM just now

decided to declare a General Emergency based

on emergency classification sf4.1.C.4,4.1.N.3

and 4.1.F.4.

The event has been announced over the plant PA system.

0

Due to instrument 1 EEBCWSI 00 being out of service, the National Weather Service was

called and reported wind speed to be 6-8 MPH.

o Wind direction is 220 degrees from North.

Containment radiation levels are remaining normal (4

Whr)

, the Reactor was tripped due decreasing inventory and pressure.

YOU are the WCC SRO a General Emergency has just been declared. The QSM directs you

to MSB RPIOIAi570QIQQ4

(General Emergency) and complete the Initial Notification to the

State and Counties with the appropriate Protective Action Recommendations.

NOTE: Phis is a Time Critical JPM.