ML040610772

From kanterella
Jump to navigation Jump to search
Transmittal of Startup Test Report for Cycle 16
ML040610772
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/18/2004
From: Scace S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-079
Download: ML040610772 (18)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station ;Dominion-Rope Ferry Road 0 Waterford, CT 06385 FEB I 8 21004 U.S. Nuclear Regulatory Commission Serial No.04-079 Attention: Document Control Desk MPS Lic/MAE RO Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT.2 STARTUP TEST REPORT FOR CYCLE 16 Pursuant to Section 6.9.1.3 of the Millstone Unit 2 Technical Specifications, Dominion Nuclear Connecticut, linc. hereby submits the ehclosed Startup Test Report for Cycle 16.

There are no regulatory commitments c6ntained within this letter.

If you have any questions or require additional information,,please contact Mr. David W.

  • Dodsonat (860) 447-1791, extension 2346.

Very truly yours, StepherE. cace, Director Nuclear Station Safety and Licensing

__T___&_

Serial No.04-079 Page 2 of 2 Enclusures: (1)

Commitments made in this letter: None.

cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2

.Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

Enclosure Startup Test Report for Cycle 16 Millstone Power Station, Unit 2 Dominion Nuclear Connecticut, Inc. (DNC)

Serial No. 04-079/Enclosure/Page 1 Table of Contents

1.

SUMMARY

2

2. INTRODUCTION 3
3. LOW POWER PHYSICS TESTING RESULTS 3 3.1 Unrodded Critical Boron Concentration 4 3.2 Moderator Temperature Coefficient 4 3.3 Control Element Assembly Rod Worth Parameters 5 3.4 Rodded Critical Boron Concentration 6 3.5 Control Rod Drop Time Measurements 7
4. POWER ASCENSION TESTING RESULTS 7 4.1 Power Peaking, Linear Heat Rate and Incore Tilt Measurements 7 4.2 Critical Boron Measurements 8 4.3 Flux Symmetry Measurements 8 4.4 Moderator Temperature Coefficient 9 4.5 Reactor Coolant System Flow 10 4.6 Core Power Distributions 10 4.7 Reactor Coolant System Radiochemistry 11
5. REFERENCES 11
6. FIGURES 11 February 2004

Serial No. 04-079/Enclosure/Page 2

1.

SUMMARY

The refueling outage preceding the Cycle 16 startup was approximately 46 days, starting on October 11, 2003 and ending on November 26, 2003.

The results of the Millstone 2, Cycle 16 low power physics testing and power ascension testing programs were in good agreement with the core design predictions. With the exception of azimuthal power tilt, all other measured parameters were within the review and acceptance criteria of the tests. The azimuthal power tilt exceeded the Technical Specification Limiting Condition of Operation (LCO), however, all Technical Specification Action Statement requirements were met.

February 2004

Serial No. 04-079/Enclosure/Page 3

2. INTRODUCTION The Millstone 2 Cycle 16 fuel loading was completed on October 28, 2003. The attached core map (Figure 6.1) shows the final core loading. The subsequent operation/testing milestones were completed as follows:

Initial Criticality November 26, 2003 Low Power Physics Testing Complete November 26, 2003 Turbine On-Line November 26, 2003 30% Power Testing Complete December 1, 2003 69% Power Testing Complete December 2, 2003 100% Power Testing Complete December 5, 2003 The Millstone 2 Cycle 16 core is comprised of 217 Framatome ANP manufactured fuel assemblies.

3. LOW POWER PHYSICS TESTING RESULTS Low Power Physics Testing was conducted at a power level of approximately 2 x 10.2 % power.

February 2004

Serial No. 04-079/Enclosure/Page 4 3.1 Unrodded Critical Boron Concentration The Critical Boron Concentration measured with CEA Group 7 at 133 steps withdrawn and an RCS temperature of 533.0 0 F was 1656 ppm.

Adjusted to the prediction conditions of Group 7 at 140 steps withdrawn and an RCS temperature of 532 0 F yields an adjusted, measured CBC of 1661 ppm.

Adjusted, measured unrodded CBC = 1661 ppm Predicted unrodded CBC = 1666 ppm Difference -5 ppm Review Criteria is +/- 50 ppm of the predicted CBC.

Acceptance Criteria is +/- 100 ppm of the predicted CBC.

Review and Acceptance Criteria met? Yes.

3.2 Moderator Temperature Coefficient The Isothermal Temperature Coefficient (ITC) measurements were performed at a boron concentration of 1655 ppm, an average RCS temperature of 532.5 0 F, and CEA Group 7 at 132 steps.

The measured ITC at these conditions was +0.130 x 104 Ap/0 F.

Adjusted to the prediction conditions for an RCS boron concentration of 1666 ppm and an RCS temperature of 532 0 F yields an adjusted, measured ITC of +0.144 x 104 Ap/ 0F.

Adjusted, measured ITC = +0.144 x 104 Ap/0 F Predicted ITC = +0.182 x 104 Ap/OF Difference = -0.038 x 104 Ap/OF February 2004

Serial No. 04-079/Enclosure/Page 5 Review Criteria is +/- 0.2 x 104 Ap/0F of the predicted ITC.

Review Criteria met? Yes.

The Moderator Temperature Coefficient was determined by subtracting the predicted Doppler Temperature Coefficient at the test conditions.

The MTC at these conditions was +0.288 x 104 Ap/'F. The Millstone 2 Technical Specifications require the MTC be less positive than +0.7 x 10- Ap/0 F for power levels less than 70% power.

Technical Specification limit met? Yes.

3.3 Control Element Assembly Rod Worth Parameters Control Element Assembly (CEA) Rod Worth Parameters were measured using the 'rod swap" method. Figure 6.2 shows the CEA group configuration.

CEA Group "A" was used as the "reference" group and its reactivity worth was measured using the 'boron exchange' method (dilution results are shown below). The reactivity worth of the remaining CEA groups was measured by establishing a critical condition with the 'test" group fully inserted and the 'reference" group partially withdrawn.

The results of the CEA worth measurements were:

Group Measured Prediction Difference %Difference A 0.881%Ap 0.957 %Ap 0.076 %Ap 7.94 %

B 0.511 %Ap 0.470 %Ap -0.041 %Ap -8.72 %

1 0.684 %Ap 0.674 %Ap -0.010 %Ap -1.48 %

2 0.826 %oAp 0.837 %Ap 0.011 %Ap 1.31 %

3 0.507 %Ap 0.481 %Ap -0.026 %Ap -5.41 %

4 0.695 %Ap 0.681 %Ap -0.014 %Ap -2.06 %

5 0.356 %Ap 0.327,%Ap -0.029 %Ap -8.87 %

6 0.358 %Ap 0.328 %Ap -0.030 %Ap -9.15 %

7 0.754 %Ap 0.746 %Ap -0.008 %Ap -1.07 %

Total 5.573 %Ap 5.502 %Ap -0.071 %Ap -1.29 %

February 2004

Serial No. 04-079/Enclosure/Page 6 The Review and Acceptance Criteria are:

1. The measured 'reference' group worth is within +/- 10% of the predicted worth.
2. The measured worth of the individual CEA groups is within

+/- 0.1%Ap or +/- 15% of the predicted worth, whichever is larger.

3. The sum of the measured CEA worths is within +/- 10% of the sum of the predicted CEA worths.

Review Criteria met for 'reference' CEA group? Yes.

Review Criteria met for individual CEA groups? Yes.

Acceptance Criteria met for sum of CEA group worths? Yes.

3.4 Rodded Critical Boron Concentration The Critical Boron Concentration measured with CEA Group A at 0 steps withdrawn and an RCS temperature of 533.5 0 F was 1558 ppm.

Adjusted to the prediction conditions of Group A at 0 steps withdrawn and an RCS temperature of 5320 F yield an adjusted, measured CBC of 1556 ppm.

Adjusted, measured rodded CBC = 1556 ppm Predicted rodded CBC = 1565 ppm Difference = -9 ppm Review Criteria is +/- 50 ppm of the predicted CBC.

Acceptance Criteria is +/- 100 ppm of the predicted CBC.

Review and Acceptance Criteria met? Yes.

February 2004

Serial No. 04-079/Enclosure/Page 7 3.5 Control Rod Drop Time Measurements The Millstone 2 Technical Specifications require that all CEAs drop in less than or equal to 2.75 seconds to the 90% inserted position, with RCS conditions at greater than or equal to 515'F and full flow (all reactor coolant pumps operating).

Control rod drop time testing was done at an RCS temperature of 5350 F with all 4 reactor coolant pumps operating. The average control rod drop time was 2.26 seconds to 90% insertion, with the fastest and slowest drop times being 2.16 seconds and 2.34 seconds, respectively.

Technical Specification limits met? Yes.

4. POWER ASCENSION TESTING RESULTS 4.1 Power Peaking, Linear Heat Rate and Incore Tilt Measurements The following core power distribution parameters were measured during the power ascension to ensure compliance with the Technical Specifications:
  • Total Unrodded Integrated Radial Peaking Factor (F7) is the ratio of the peak fuel rod power to the average fuel rod power in an unrodded core. This value includes the effect of Azimuthal Power Tilt.
  • Linear Heat Rate (LHR) is the amount of power being produced per linear length of fuel rod.
  • Azimuthal Power Tilt is the maximum difference between the power generated in any core quadrant (upper or lower) and the average power of all quadrants in that half (upper or lower) of the core divided by the average power of all quadrants in that half (upper or lower) of the core.

The measurements of these parameters were:

Power Level FT Peak Linear Heat Rate Incore Tilt 69% 1.630 9.58 KW/ft 0.0226 100% 1.609 13.15 KW/ft 0.0210 February 2004

Serial No. 04-079/Enclosure/Page 8 The corresponding Technical Specification limits for all power levels for these parameters are:

FT'T < 1.69 (Note - larger values of Fr T are permissible at less than 100%

power)

  • Peak Linear Heat Rate < 15.1 KW/ft
  • Azimuthal Power Tilt < 0.02 Technical Specification limit for FrT met? Yes.

Technical Specification limit for LHR met? Yes.

Technical Specification limit for Tilt met? No. Incore tilt calculated by INPAX shows a higher than expected azimuthal power tilt value of about 0.021 at BOC. All requirements of the Technical Specification Action Statement were met. Incore tilt trended below the Technical Specification limit at approximately 352 MWD/MTU. Further investigation by Millstone and the vendor is ongoing.

4.2 Critical Boron Measurements Critical Boron Concentration (CBC) measurement was performed at 100%

power at equilibrium xenon conditions.

The CBC measured at 99.8% power with CEA Group 7 at 166 steps withdrawn and an RCS temperature of 572.5 0 F was 1175 ppm. The cycle average exposure at the time of this measurement was 240 MWD/MTU.

Adjusted to the prediction conditions of 100% power at an All Rods Out (ARO) condition and an RCS temperature of 5720 F yields an adjusted, measured CBC of 1178 ppm.

Adjusted, measured 100% power CBC = 1178 ppm Predicted 100% power CBC = 1191 ppm Difference -13 ppm Review Criteria is +/- 50 ppm of the predicted CBC.

Acceptance Criteria is +/- 100 ppm of the predicted CBC.

Review and Acceptance Criteria met? Yes.

February 2004

Serial No. 04-079/Enclosure/Page 9 4.3 Flux Symmetry Measurements The core neutron flux symmetry was measured at approximately 30%

power using the fixed incore detector monitoring system. The differences between measured and calculated signals in operable incore detector locations ranged from -5.42% to +5.00%.

Review Criteria is +/- 10% (deviation between the highest and lowest values in symmetric incore locations).

Review Criteria met? Yes.

4.4 Moderator Temperature Coefficient The Isothermal Temperature Coefficient (ITC) measurements were performed at a power level of 97.8 %, an RCS boron concentration of 1192 ppm, an average RCS temperature of 570.90 F, and CEA Group 7 at 180 steps.

The measured ITC at these conditions was -0.430 x 104 Ap/ 0F.

The predicted ITC was determined for a power level of 100%, an RCS boron concentration of 1201 ppm, an average RCS temperature of 573.8 0 F, and at an All Rods Out (ARO) condition.

The predicted ITC at these conditions was -0.693 x 104 Ap/0 F.

The predicted ITC adjusted for an actual RCS boron concentration of 1192 ppm and an RCS temperature of 570.90 F yields an adjusted, predicted ITC of -0.678 x 104 ApI 0F.

Measured ITC - -0.430 x 104 Ap/0 F Predicted ITC - -0.678 x 104 Ap/ 0 F Difference - -0.248 x 104 Ap/0 F Review Criteria is +/- 0.3 X 104 Ap/0 F of the predicted ITC.

Review Criteria met? Yes.

February 2004

Serial No. 04-079/Enclosure/Page 10 The Moderator Temperature Coefficient (MTC) was determined by subtracting the predicted Doppler Temperature Coefficient at the test conditions. The MTC at these conditions was -0.307 x 10' Ap/'F. The Millstone 2 Technical Specifications require the MTC be less than or equal to +0.4 x 104 ApI0 F for power levels greater than 70% power.

Technical Specification limit met? Yes.

4.5 Reactor Coolant System Flow The RCS flow rate was measured using the secondary calorimetric method, in which the RCS flow rate is inferred by performing a heat balance around the steam generators and RCS to determine reactor power, and measuring the differential temperature across the reactor core to determine the enthalpy rise.

The measured RCS flow rate at 100% power was 380,017 GPM.

When 13,000 GPM is subtracted from the measured flow rate to account for measurement uncertainties, the Minimum Guaranteed Safety Analysis RCS Flow Rate is 367,017 GPM. This value is used to satisfy the Technical Specification surveillance requirement.

The Millstone 2 Technical Specifications require the RCS flow rate to be greater than 360,000 GPM.

Technical Specification limit met? Yes.

4.6 Core Power Distributions The core power distribution measurements were inferred from the signals obtained by the fixed incore detector monitoring system. These measurements were performed at 67% power and 100% to determine if the measured and predicted core power distributions are consistent.

The core power distribution map for 67% power, cycle average exposure of 29 MWD/MTU, non-equilibrium xenon conditions is shown in Figure 6.3.

This map shows that there is good agreement between the measured and predicted values.

The core power distribution map for 100%, cycle average exposure of 211 MWD/MTU, equilibrium xenon conditions is shown in Figure 6.4. This February 2004

Serial No. 04-079/Enclosure/Page 11 map also shows that there is good agreement between the measured and predicted values.

The Review Criteria for these measurements are:

1. The difference between the measured and predicted Relative Power Densities (RPDs) for core locations with an operable incore detector is less than 0.1.
2. The Root Mean Square (RMS) of all of the differences between the measured and predicted RPDs is less than 5%.

Review Criteria met? Yes, for both 67% and 100% power.

4.7 Reactor Coolant System Radiochemistry RCS radiochemistry analysis during the power ascension testing program and during subsequent power operation indicate activity levels with Iodine-131 values of about 1.1 x 104 jICi/ml. These RCS activity levels show that all failed fuel assemblies have been discharged from the core.

5. REFERENCES 5.1 EN 21004K, 'Cycle 16, Low Power Physics Test' 5.2 EN 21004J, 'Cycle 16, Power Ascension Testing' 5.3 'Millstone Unit 2, Cycle 16, Startup and Operations Report' 5.4 SP 21010, "CEA Drop Times,'
6. FIGURES 6.1 Cycle 16 Core Loading Map 6.2 CEA Group Configuration 6.3 67% Core Power Distribution Map 6.4 100% Core Power Distribution Map February 2004

Serial No. 04-079/Enclosure/Page 12 f-8a Y-10 IY-12 f-14

_ S-59 S-52 S-25 S-66

- I- - V V - Y - - I (-16

- - s-el

(-17 X-5 (-7 (.9 (-11 X-13 (-15 X 16 017 x-6 Ala5 5-31 S-45 S-42 S-09 V-07 V.30 V-2 S-16 S 16 S-31 S-61 118 S-9 119 N-4 W-6 N-7 N-9 Nv-1l 1/-13 'N-15 W-16 N-17 N-18 S-54 5/-54 V-11 V-43 V-23 T-25 T-40 T-32 V-18 V-38 V-14 S-36 133 98 182 104 126

- a -a-i. - I. - -

  • 4-I- U. - U. 1-3 1-4 V.5 '.6 1-7 /-9 f-1lI 1-13 7-15 V-16 /-17 18 1-19 S-33 V-27 T-10 T-43 T-76 S-23 V.46 S-40 T-69 T-46 T-14 V-26 S-53 180 110 175 173 127 176 r-2 T43 -4 5 T-6 T-7 -9 T-11 T-13 r-l5 T-16 f-1i7 18a -l9 r-20 S-62 V-15 T-15 T-33 V-67 T-68 V-55 T-79 V-50 T-61 V-62 T-36 T-09 V-10 S-48 123 106 _ 159 132 S2 S-3 4 S5 3-6 S7 S9 S11 13 3-15 S16 i-17 19 20 218 S-32 V-39 T-47 V-63 S-20 T-02 T-50 T-60 T-55 T-06 S-19 V-66 T-42 V-42 S-41 114 162 155 128 S-8 R-2 R-3 -4 R-5 -4 R.7 R-9 R-11 -13 -15 R.16 R17 R-18 R-19 R-20 S-13 V-19 T-70 T-62 T-07 V-59 S-07 V-34 S-02 V-58 T-01 T-67 T-75 V22 S-12

,.I 97 93 154 160 137 156 165 '-21 S-67 S-70 N-2 4-3 .-4 N-5 N-6 N7 N-9 N-11 N-13 N-15 N-1 N-17 N-18 N-19 N-20 V-03 T-29 S-37 V-51 T-56 S-03 T-17 T-24 T-20 S-06 T49 V-54 S-22 T-28 V-06 1.1- 113 174 105 109 168 121 J-21 S-26 -51 L-2 L-3 4 L-5 L-6 L -9 L-11 L-13 L-15 -16 L-17 -18 L-19 L-20 V-31 T-37 V-47 T-80 T-57 V-35 T-21 N47 T-23 V-33 T-59 T-78 V.45 T-39 V-29

(-1 181 163 170 161 177 <-21 S49 5-28 J-2 J-3 -4 J-5 J-6 J-7 9 J t -13 -15 -16 -17 J-18 - 9 J-20 V-08 T-26 S-24 V-56 T-51 S-08 T-18 T-22 T-19 S-01 T-54 V-49 S-39 T-31 V-01 1 117 179 108 111 169 120 1-21 S-72 S-65 G-2 -3 G-4 G-5 G-6 G-7 G-9 G-1l G-13 G-15 G-16 G-17 3-18 G l9 G-20 S-10 V-24 T-73 T-65 T-03 V-60 S-04 V-36 S-05 V-57 T-05 T-64 T-72 V-17 S-15 95 92 135 157 134 129 164 F-2 F-3 F4 ~ -5 F-6 F-7 F-9 F-11 F-13 -15 F-16 F-17 1 -18 F-19 -20 S43 V.44 T-44 V-68 S-17 T-08 T-53 T-58 T-52 T-04 S-18 V-61 T-45 V-37 S-30 S-7 112 166 158 125 E-2 c-3 E-4 E-5 -86 -7 E-9 C-l E-13 -E15 E-16 -17 E-18 r-19 E20 S-46 V-12 T-1 I T-34 V-64 T-63 V-52 T-77 V-53 T-66 V-65 T-35 T-13 V-13 S-64 96 94 122 130 1-3 D-4 S-55 V-28 T-16 D D3-5 T-48D -7T-71D [S-38 6 9 D IV-48 1 S-21 } rT-74

[lD13 15 T-41 T-12 [ .V-25 7:18D L)9S-35 178 107 & - 172 .5- 167 124 171

- .5 _____ J ______ I. - & - i dh - I. - & -

lo MA l C-4 0-5 G-6 I -7 _9 &11 C-13 &15 C-16 C-17 -18 S-34 V.16 IV-40 IV-20 IT-30 T-38 T-27 V-21 V41 V-09 5-56 100 9 183 103 136 16-5 3-6 3-7 3-9 s-1I E3-13 3-15 3-16 13-7 S-63 S-29 S-14 V.04 V-32 V.05 S-I 8.44 1S.47 115 S-10 116

- a- a a *

  • a- &-

A-BA-10 IA12 A-14 NORTH t

rS 68[ S-27 S-50 S-69 Figure 6.1 Millstone Unit No. 2 Cycle 16 Core Map Source Core Location Guidetube 7 F-3 SW 8 S-19 SE 9 X-11 NW 10 B-l1 SW February 2004

Serial No. 04-079/Enclosure/Page 13 Channel "TY Uncompensated 0J Ion Chamber _

1.

NORTH AL Channel "X7 Uncompensated Ion Chamber Figure 6.2 Millstone Unit No. 2 CEA Group Configuration February 2004

Serial No. 04-079/Enclosure/Page 14 FF0 r sl 1s r12 Ir-'4 1 0226 X-5

(-6 K-7 Y -

K(9

'U -

[

  • -11

'U -

X-13 I

[140226

(-15 I* -

K-16

'U -

'-17 INOP 1.199 INOP 1.256

-0.057

- I. - I. - 'U - 'U - UN-Il

- I - 'U- 'U - 'UN-li

- 'UN-18 N-4 v.5 *-5 N-6 N.7 'N-11l W-13 N-15 N-16 'N-17 N-18 0.361 1.112 1.122 0.358 1.159 1.150 0.003 -0.047 0.028 I - I - 4-4-4 f.7 V-il I - 4-4-4 e-3 V-4 1-5 1-6 v- V-13 1-15 1-16 1-17 V-18 V-19 1.273 1.191 0.369 1.329 1.171 0.358

.0.056 0.020 0.011 r2 1-3 .4 -5 T4-6 -7 T-9 1.11 1-13 T-15 T-16 r-17 T-18 T-19 T-20 0.257 1.307 1229 0246 1.369 1.271 001t 10.062 -0042 S2 S-3 S4 a-5 S-6 S-7 S9 S-11 13 9-15 S-16 317 S-18 S-19 S-20 1.098 1.232 0.362 1.150 1.194 0.345

-0.052 0.038 0.017 R-2 -3 4 R-5 1-6 R-7 R-9 -11 R-13 R-15 1-16 1-17 R-18 R-19 R-20 1.177 1.318 1.171 1.276 P-21 0.006 0.042

'-1 N-2 N-3 4 -- N-6 4-7 N-9 N-11 4-13 N-15 4-16 N 17 -18 N-19 N-20 1.087 0.987 1.331 1.043 0.949 1.369 W4-21 0044 0.038 -0.038 L-2 L-3 L4 L-5 6 L-7 L-9 I11 -13 L-15 L-16 L-17 L-18 L-19 L-20 1.284 1.231 1.229 1.303 K-1 1.329 1.194 1.194 1.329 (-21

.0045 0.037 0.035 40.026 J2 J-3 J-4 -5 J-6 J 7 J-9 11 -13 -15 -16 17 -18 -19 -20 0.967 1231

(-1 0.948 1.179 +-21 0.019 0.052 G2 G-3 -4 5 G6 G-7 G-9 G-11 3-13 G-15 3 16 G-17 G-18 G-19 3-20 0.993 1.176 0.946 1.171 0.047 0.005 F-2 F-3 4 F-5 F-6 -7 F9 F-11 F-13 F-15 F-16 F-17 F.18 F-19 P-20 1.124 1.241 1.119 1.159 1.194 1.150

-0.035 0.047 _ -0.031 E-2 E-3 E4 E-5 E6 E-7 .9 . E-11 213 E15 E-16 -17 c-18 -19 E-20 0256 0.246 0.010 0-3 2-5  :-6 2-7 0-13 D-1t 3-16 2-17 D-16 0-19 0.371 1.244 1.206 -I=

1.302 0.358 1248 1.171 1.329 0.013 -0.004 0.035 -0.027

-4 _6 -7 r-9 4-11I_-13 >1is -16 2-18 1.129 1.239 1.143 INOP 1.150 1.199 1.159

-0.021 0.040 -0.016

- I. - - a -a-i-i. - - - a- a -

3-5 1 1-7 B-6 8-9 3-11 3-13 3-15 13-16 13-17 0.258 0.567 0.571 0.246 0.548 0.547 0.012 0.019 0.024 1

- ' - *

  • b * - * -

A034 3 A-12 A-14 Key 0 339 I 0.005 . 131 Core Location

.050571 Measured RPD 105471 Calculated RPD Difference Root Mean Square Deviation for all Core Locations = 2.35 %

Figure 6.3 67% Power Distribution Map All Rods Out, Non-Equilibrium Xenon, 29 MWD/MTU February 2004

i I Serial No. 04-079/Enclosure/Page 15 Y-80t f-12 Y14 0.'215 0.231

_.0.016

- U - U - * - U - U - - (-15

- U-(-16 '(-17 U -

(-5 (-6 K-7 '(-9 X-1 1 X-13 K-16

.INOP x-9 1.150 5x N-17 1.217 INOP

-0.067 W-4 'Us- N-6 N-7 N-11 'N-13 - I5 NV-16 N-I7 wV118 0.358 1.084 1.115 0.359 1.139 1.132

-0.001 *0.055 -0.017

- - .1- - F 999 '/-19 V-3 V43 V-4 /.5 1-6 V4111 V-13 /-is /-16 {-17 V-18 V/-19 1.253 1.198 0.367 1.317 1.170 0.359

-0.064 0.028 0.008 T-2 T3 T-4 T-5 T-6 T-7 T-9 T-11 -13 T-15 r-16 T-17 T-18 T-19 r-20 0.258 1297 1.240 0.250 1.370 1.267 0.008 -0.073 4.027 S-2 34 S-4 3-5 S-6 S-7 S-9 3-11 3-13 S-15 3-16 S-17 3-18 S-19  ;-20 1.072 1.260 0 364 1.132 1.218 0 352

-0.060 0Q042 0.012 11-2 R-3 R4 F-5 R-6 R-7 R-9 R-11 R-13 R-15 R-16 R-17 R-18 1i-19 1-20 1.167 1.330

'-1 1.170 1.292 '-21

-0.003 0.038 N-2 N-3 -4 N-5 J-6 N-7 N-9 11 -13 N-15 4-16 N-17 N8 N-19 N20 1.132 1.026 1.331 IA-1 1.090 0984 1.370 A-21 0.042 0.042 4.039 L*2 L-3 L-4 L-5 L6 .L7 L.9 L-11 L13 L-15 16 L17 L-18 L-19 L-20 1.275 1.247 1.258 1.301 (1-1 1.317 1.218 1.218 1.317 K-21

-0.042 0.029 0.040 *0.016 J-2 J-3 J-4 J-5 J-6 J-7 J-9 J-11 J-13 J-15 16 -17 J-18 J-19 20 0.994 1.258

-I-1 0.984 1.202 1-21 0.010 0.056 G-2 G-3 G4 G-S G-6 3-7 G-9 G-11 1-t3 15 -16 17 G-18 1-19 3-20 1.018 1.203 0.982 1.170 0.036 0.033 F-2 F-3 F-4 F-5 F46 F.7 F-9 F-11 --13 -15 F--16 F-17 F-18 - 9 F-20

.108 1.270 1.114 1.139 1.218 1.132 4.031 0.052 4.018

-2 E-3 E4 E- E- -7 E-9 E-11 E-13 E-15 E-16 E-17 E-18 -19 -20 0:259 0250 0.009 0-3 3.5 3-7 D-9 D-11 0-13 )-15 3-16 [-17 D-18 0-19 0.369 1.216 1.206 1.278 0.359 1.225 1.170 1.317 0.010 -4.009 0.036 -0.039

- I - F - I Y99 T V V V

-5  ;-6 -,7 C-lI r-13 Cat5 ;r16 Z-17 C-18 1.117 1221 1.128 INOP 1.132 1.181 1.139

-0.015 0.040 -0.011

- I -I -, - .9- .9- .9- .9-- I - I - 'I -

3-5 3-6 3-7 8-9 B-11 3-13 3-15 3-16 1B-17 0.258 0.569 0.575 0.250 0.551 0.550 0.008 0.018 0.025

- & - a - a- a- i - . - & a Ar8 r0 12 A14

_0342 _Ke Root Mean Square Deviat ion15 to0 575 M CrLoaion asured RPD for all Core Locations = 2..48 % 0.5 CalculatedRPDre Figure 6.4 100% Power Distribution Map 166 Steps, Equilibrium Xenon, 211 MWD/MTU February 2004