Category:License-Operator
MONTHYEARML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21111A3422021-04-16016 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2482019-04-25025 April 2019 301 ADAMS2A Draft Exam Items ML19115A2522019-04-25025 April 2019 301 ADAMS2B Final Exam Items ML19115A2602019-04-25025 April 2019 301 ADAMS2D Exam Administrative Items ML19115A2552019-04-25025 April 2019 301 ADAMS2C Exam Administrative Items IR 05000269/20193012019-02-21021 February 2019 Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML19014A0282019-01-0909 January 2019 Notification of Licensed Operator Retake Initial Examination 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML18242A6932018-08-30030 August 2018 Exam Administrative Items ADAMS-2D ML18155A4602018-06-0101 June 2018 Operator Licensing Written Examination Approval Letter - 05000269/2018301, 05000270/2018301 and 05000287/2018301 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ML17193A3612017-07-12012 July 2017 302 Final Items 2B - Delay Release 2 Yrs ML17193A3632017-07-12012 July 2017 302 Admin Items 2C - Delay Release 2 Yrs ML17193A3592017-07-12012 July 2017 302 Draft Items 2A - Delay Release 2 Yrs ML17181A2192017-06-30030 June 2017 302 Exam Administrative Items for ADAMS 2D ML17181A2022017-06-30030 June 2017 Exam Administrative Items for ADAMS 2C ML17165A5582017-06-28028 June 2017 302 Draft SRO Written Exam ML17179A1662017-06-28028 June 2017 302 Exam Administrative Items for ADAMS 2D ML17179A5062017-06-28028 June 2017 302 Exam Draft Items for ADAMS 2A ML17179A5622017-06-28028 June 2017 302 Exam Final Items for ADAMS 2B ML17165A5562017-06-28028 June 2017 302 Draft RO Written Exam ML17174B2912017-06-23023 June 2017 302 Exam Administrative Items for ADAMS 2C - Delay Release 2 Yrs ML17174B2892017-06-23023 June 2017 302 Exam Final Items for ADAMS 2B - Delay Release 2 Years ML17174B2882017-06-23023 June 2017 302 Exam Draft Items for ADAMS 2A - Delay 2 Years Release ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3432017-01-19019 January 2017 December 2016 - Oconee NRC Generic Fundamentals Examination Results Letter ML17017A4982017-01-17017 January 2017 302 Post-Exam Comments - Delay Release 2 Yrs ML17017A4932017-01-17017 January 2017 302 Final As-Given SRO Written Exam - Delay Release 2 Yrs ML17017A4502017-01-17017 January 2017 302 Final As-Given RO Written Exam - Delay Release 2 Yrs ML16336A2962016-11-30030 November 2016 Operator Licensing Written Examination Approval 05000269/2016302, 05000270/2016302 and 05000287/2016302 IR 05000269/20163012016-08-17017 August 2016 NRC Operator License Examination Report Nos. 05000269/2016301, 05000270/2016301 and 05000287/2016301 ML16196A0482016-07-14014 July 2016 Initial Examination 2016-301 Final SRO Written Exam - Delay Release 2023-02-14
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2522019-04-25025 April 2019 301 ADAMS2B Final Exam Items ML19115A2602019-04-25025 April 2019 301 ADAMS2D Exam Administrative Items ML19115A2552019-04-25025 April 2019 301 ADAMS2C Exam Administrative Items ML19115A2482019-04-25025 April 2019 301 ADAMS2A Draft Exam Items IR 05000269/20193012019-02-21021 February 2019 Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML19014A0282019-01-0909 January 2019 Notification of Licensed Operator Retake Initial Examination 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML18242A6932018-08-30030 August 2018 Exam Administrative Items ADAMS-2D ML18155A4602018-06-0101 June 2018 Operator Licensing Written Examination Approval Letter - 05000269/2018301, 05000270/2018301 and 05000287/2018301 ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ML17193A3632017-07-12012 July 2017 302 Admin Items 2C - Delay Release 2 Yrs ML17193A3592017-07-12012 July 2017 302 Draft Items 2A - Delay Release 2 Yrs ML17193A3612017-07-12012 July 2017 302 Final Items 2B - Delay Release 2 Yrs ML17181A2022017-06-30030 June 2017 Exam Administrative Items for ADAMS 2C ML17181A2192017-06-30030 June 2017 302 Exam Administrative Items for ADAMS 2D ML17165A5562017-06-28028 June 2017 302 Draft RO Written Exam ML17179A5622017-06-28028 June 2017 302 Exam Final Items for ADAMS 2B ML17179A5062017-06-28028 June 2017 302 Exam Draft Items for ADAMS 2A ML17179A1662017-06-28028 June 2017 302 Exam Administrative Items for ADAMS 2D ML17165A5582017-06-28028 June 2017 302 Draft SRO Written Exam ML17174B2882017-06-23023 June 2017 302 Exam Draft Items for ADAMS 2A - Delay 2 Years Release ML17174B2892017-06-23023 June 2017 302 Exam Final Items for ADAMS 2B - Delay Release 2 Years ML17174B2912017-06-23023 June 2017 302 Exam Administrative Items for ADAMS 2C - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17017A4982017-01-17017 January 2017 302 Post-Exam Comments - Delay Release 2 Yrs ML17017A4932017-01-17017 January 2017 302 Final As-Given SRO Written Exam - Delay Release 2 Yrs ML17017A4502017-01-17017 January 2017 302 Final As-Given RO Written Exam - Delay Release 2 Yrs ML16336A2962016-11-30030 November 2016 Operator Licensing Written Examination Approval 05000269/2016302, 05000270/2016302 and 05000287/2016302 IR 05000269/20163012016-08-17017 August 2016 NRC Operator License Examination Report Nos. 05000269/2016301, 05000270/2016301 and 05000287/2016301 ML16196A0492016-07-14014 July 2016 Initial Examination 2016-301 Final RO Written Exam - Delay Release ML16196A0482016-07-14014 July 2016 Initial Examination 2016-301 Final SRO Written Exam - Delay Release ML16103A3312016-04-11011 April 2016 Notification of Licensed Operator Initial Examination 05000269/2016302, 05000270/2016302, and 05000287/2016302 ML16049A0862016-02-18018 February 2016 Initial Exam 2015-302 General Correspondence ML16013A0572016-01-13013 January 2016 302 as Given SRO Written Exam with References and Answer Key ML16013A0522016-01-13013 January 2016 302 as Given RO Written Exam with References and Answer Key ML17179A1692015-10-28028 October 2015 302 Draft Written Exam RO and SRO - Delay Release 2 Years 2023-02-14
[Table view] |
See also: IR 05000269/2003302
Text
Final Subrnittal
OCONEE JUNE 2003 RETAKE
EXAM 50-26912003-3 02
OCTOBER 17,2003
CRITICAL TASKS
Scenario z :
1. CP-1, Trip All RCPs
2. CT-3, Isolate Possible WCS Leak Paths
3. CT-10, Establish FW FISWand Feed SGs
4. CT-20, RCS Pressure Control TQPrevent Exceeding RV P-T Limits And Comply
With PTS Guidance
5. CT-27, Implementation of Control Room Habitability Guidance
Spare:
1. CT-5, Control HPI
2. CT-10, E~tablishRN Flow and F w d SGS
3. CT-11, Control SG pressure to Maintain WC Temperature Constant.
4. CT-26, Restore Feed Po A Dry SG
Appendix B Scenario Outline Form ES-D-1
Facility: Bconee Scenario No.: 1 RO Op-Test No.: _ .
Examiners: Operators:
Initial Conditions:
45% Reactor Power, (Snap 201 1
Turnover:
o Startup in progress after adding oil to 1B1 RCP
0 SASS in MANUAL for I&E troubleshooting
0 18 MDEFDW Pump 00s
e After turnover, the crew should start 1B1 RCP
Event Malf. No.
No.
Re-Insert
Pre-Insert
MSS2TQ
Pre-lnS?rt
MP1290
Od Pre-Insert
MPS350
1
2 Override
Z342D1 discharge pressure
3 Turbine Header Pressure fails LOW
4
5
6 RCS NR Pressure fails HBGH
7
a
9
g_
(NJomal, (W)eactivity, (I)nstrument, {C)ornponent, (M)ajor
NUREG-4021, Draft Revision 9 Page 1 of 12
Scenario #1 Overview RO
initial Conditions: Unit 1 : 45% power - EOL, Unit 2: 1Q0%, Unit 3: 100%
Turnover:
e Startup in progress after adding oil to 181 RCP
e SASS in MANUAL for !&Etroubleshooting
e 1B MDEFDW Pump 00s
After turnover, the crew should stad 1B I RCP
2 1 Start 4 B1 RCP: (N, OATC)
a9 Reactor power was reduced so oil could be added to the 184 RCP. The oil
addition has been completed and the crew is directed to start the 1E31 RCP per
OPII/AI1103/006.
TIME = 5 minutes
4) 1B1 RCP AC Oil Lift pump wili not develop adequate discharge pressure: (6,
OAK)
a) Prior to stading the I Bf RCP, the RCP AC Oil Lift pump will be started. The
OAC should be monitored and the RCP started after the low oil pressure a8am
clears. The low pressure condition will not clear and the AC Oil Lift pump wilt stop
after three minutes. The operator should follow procedural guidance and use the
DC Oil Lift pump and complete starting the 181 RCP.
a) The crew should utilize Plant Transient Response to stabilize the plant. The
Turbine master will transfer to manual. The O A K should take the Diamond
Panel and the FDW Masters bo manual. FDW, Control Rods, and Turbine Header
pressure should be adjusted to stabilize the plant.
b) The SRO should refer to AP128 (BCS Instrument Failures).
TIME = 10 minutes. TOTAL 20 min.
4) BWST rupture: (C,ALL) (TS)
a) A crane will damage the BWST resulting in level rapidly decreasing to a24 feet.
b) The SRO should refer to TS 3.5.4and determine that a unit shutdown is
required.
TIME = 10 minutes, TOTAL 30 rnin.
Page 1 of 3
Scenario #I Overview RO
5) Manual unit shutdown: (R, BATC)
a9 FDW, Control Rods, and Turbine Header pressure will be controlled to manually
shutdown the unit.
TIME = 28 minutes, TOTAL 40 min.
$1 RCS NR Pressure fails HIGH: (I, O A K )
a) After the manual unit shutdown, RCS NR Pressure will fail high and the crew
should utilize Plant Transient Response to stabilize the plant.
b) The PPK heaters will de-energize and PZR spray (1RC-2 ) will open. The PORV
(1RC-66) will also open. Actual RCS pressure will decrease and the reactor wilt trip
on low pressure in about one minute without operator action.
c) The crew should refer to the ARGs and the SRO should direct the crew to close the
PORV or 1 RC-4 (Spray Block) and 1RC-1 (PZR Spray). The PZR heaters should
be cycled as required to control RCS pressure.
d) The SRO should refer to AP/28 (ICs instrument Failures).
TIME = 5 minutes. TOTAL 45 min.
7) Main FDW pumps trip and Main Turbine Fails to trip (Lockout EHC Pumps): (C,
OAK)
a> Both Main FDW pumps will trip resulting in a reactor trip. The Main Turbine
should trip but does not. This will result in a reduction in steam pressure in both
SGs until actions are taken to trip the turbine. The will result in RCS overcooling
until the Main Turbine is tripped.
b) While performing IMAs, the O A K should diagnose that the turbine did not trip
and then perform the WNO step which will stop both EHC pumps. This wilt cause
the turbine to trip.
TIME = Iminutes, TOTAL 46 min.
8 ) R 6 S leak to SBLQCA (ramp over 10 minutes): (M, ALL)
a ) The RCS leak will require entry into AP/2 (Excessive RCS Leakage). The leak
will increase causing a loss of SCM.
$1 RULE 2 (Loss OB SCM) wiill be implemented and the SRO will transfer to the Loss
of Subcooling Margin (LOSCM) tab of the EO$. The SRO will then transfer to
the LOCA Cosldown (LOCA CD)tab of the EO$.
c> EOP Enclosure 5.1 (ES Actuation) will be implemented. The A RBCU will not
receive an ES signal and will not go to LOW speed. The RO should diagnose this
and place the A RBCU in LOW speed.
TIME = 20 minutes. TOTAL 66 min.
Page 2 of 3
Scenario #I Overview RO
9) RCS leak isolated, SCM increases > 0°F: (U, ALL)
a) After transfer is made to the LBCA CD tab ~f the EO$ the leak will be isolated.
Phis will cause SCM to increase > 0°F and a transfer should then be made to
Subsequent Actions. After the transfer to Subsequent Actions is made the
scenario may be stopped.
TIME = 10 minutes, TOTAL 76 min.
Page 3 of 3
Appendix D Scenario Outline F O S SES-B-1
~
Facility: Qcornee Scenario No.: SPARE RO Op-best No.: __
Examiners: Operators: Tracey Roland (SRO-U)
Kevin Caoley (RO)
Initial Conditions:
e 100% Reactor Power, (16-41)
Turnover:
o ANBSACtDSS bypassed for !&E testing
o Unit 1 TDEFDWP has been out of service for bearing replacement for a b u t
16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />. Expect it to be returned to service within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
Pre-insert I BDERNP fails to start
2 I Override I C.BATC. SRO I Iti-I , LDST SUBPBY.fails O D ~ W(TS)
Failed CLOSED
.... ..
(N)orrnal. (Rjsactivity, (i)ristrurnent, (C)omponent, (k1)ajor
NUREG-1021, Draft Revision 9 Page Iof 13
Scenario Spare Qverview RO
Initial Conditions: Unit 1: 100% power - EOb, Unit 2: 1IO%, Unit 3: 100%
Turnover
6 AMSAClDSS bypassed for I&E testing
6 Unit 1 TBEFWP has been out of sewice for bearing replacement for about 116
hours. Expect it to be returned to sewice within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
1) Pressurize the LDST with H2: (N,OATC)
Statalarm will actuate indicating that the LDST H2 pressure is low. Crew should repr
to the A 8 6 and the LDST Pressure vs bevel curve. The crew should then add H
to the LDST.
TIME = 10 minutes
2) 1H-1 fails OPEN: (C, OATC) (TS)
During the H*addition to the LDST, 1H-1 (LDST Supply) will fail OPEN repiring the
OATC to direct the primary NEO to close the isolation valve to stop the H addition.
Isolation by the NE0 will be delayed and BOTH trains of HPI must be declared
inoperable due to operation outside of permissible Operating Region on the LDST
Pressure vs bevel curve.
TIME = 5 minutes, TOTAL 15 min
3) Phdfails HIGH: (I, QATCJ
a) The crew should diagnose the failure and stabilize the plant by using the Plant
Transient Response process.
b) The BAPC should place both FDW Masters and the Diamond Panel to manual to
mitigate the transient and stabilize the plant.
e) This failure will not be repaired and the ICS will remain in manual.
d) The SWO should refer to AW28 (ICs Instrument Failures).
TIME = 5 minutes, TOTAL 20 min
4) I A CC Pump trips: (C, O A K )
a) The crew should refer to ARG and to AP/(32Q(Loss of Component Cooling). The
O A K should manually start the standby CC pump.
b) The crew should initiate investigation and repair of l A CC pump and 1B CC auto
stakt failure.
TIME = 5 minutes, TOTAL 25 min.
5) iHP-5 Fails closed: (c,ONC) ~ , b R O A-
a) Kecognize that 1HP-5 closed due to high letdown temperature, and refer to the
ARG for stat alarm 1SA-2/C-1, Letdown Temperature High.
b) When the crew recognizes that 1HP-5 has failed closed, the SRO should refer to
AW032, Loss of Letdown.
c) An operator should be dispatched to manually open 1HP-5.
TIME = 10 minutes, TOTAL 35 mln.
~&66(4 n/lv#
Page i o f 2
Scenario Spare Overview RO
6) ID1 Heater Drain Pump oil leak: (C, All)
a9 The basement NE0 will notify the control room that the 1D1 HDP has a severe
oil leak. Crew should refer tcr 8P/1//1106/0028 (Shutdown of the 1D l HDP).
The SWO should direct the crew to reduce CTP to .e 87% and secure the 1D1
HDP.
TIME = I O minutes, TOTAL 45 min.
5 ) Manual reactor power decrease: (R, O A K )
a) The OATC should reduce power with the control rods and the FDW Masters in
manual.
TIME = 15 minutes, TOTAL 60 min.
8 ) Loss of Main Feedwater with 1FDW-316 Failed CLOSED: (M, ALL)
a) After reactor power has been reduced both main FDW pumps will trip and
4 FBW-346 will fail closed. The SRO will refer to the EOP. Rule 3 (boss of Main
or Emergency Feedwater) should be implemented after the completion of lMAs
and symptoms check because of the loss of Main FBW. The failure of IFDW-316
should be diagnosed and ENV aligned through the startup header. Until flow is
aligned through the B startup header no Main OF ENV flow will reach the SGs
due to the 1A MDEFDWP not operating and 1FDW-316 failed closed. If the
alignment through the startup header is delayed HPI Forced cooling must be
initiated.
TIME = 10 minutes, TOTAL 90 min.
9) Loss of Main and Emergency Feedwater, IB MBEFDWP trips (CBP Feed): (M,
ALL)
a) After flaw has been established through the startup header the 1B MDEFBWP
will trip. This results in a total loss of Main and Emergency Feedwater. The SRO
should transfer to the Loss of Heat Transfer (LOHTJtab of the EOP. The OAT@
should feed the OTSGs using the CBPs per the guidance in Rule 3 (Loss of Main
or Emergency Feedwater).
TIME = 10 minutes, TOTAL 80 min. 7
1O)TDEFDWP returned (CBPfeed recovery)
a) After the plant is stable, the crew will be notified that the TDEFDWP has repaired
and is now available. The SRO will direct the crew to recover from CBP feed by
using the TDEFDWP to feed the SGs per EOP guidance. When the TDEFDWP
is feeding the SGs and the unit is stable the scenario may be stopped.
TIME = 10 minutes, TOTAL 90 min.
Page 2 of 2