February 18, 2004
Mr. M. R. Blevins, Senior Vice President
and Principal Nuclear Officer
TXU Energy
ATTN: Regulatory Affairs
Comanche Peak Steam Electric Station
P.O. Box 1002
Glen Rose, Texas 76043
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - NOTIFICATION OF
UPCOMING SUPPLEMENTAL INSPECTION FOR A WHITE FINDING - NRC
INSPECTION REPORT 05000445/2004-006; 05000446/2004-006
Dear Mr. Blevins:
In our letter to you dated February 13, 2004, we provided our conclusion that the failure to
identify and correct an indicated flaw in a steam generator tube during Refueling Outage 1RF08
was appropriately characterized as White because the tube failed in-situ testing. This failure
indicated a higher probability of inservice failure for the tube during postulated initiating events
and core damage sequences. In that letter, we also informed you that, since plant performance
for this issue has been determined to be in the regulatory response band, we intended to use
the NRC Action Matrix to determine the most appropriate NRC response for this event.
Accordingly, the purpose of this letter is to inform you that we plan to perform a Supplemental
Inspection, as provided in NRC Inspection Procedure 95001, during the week of March 1, 2004.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Charles S. Marschall, Chief
Engineering Branch
Division of Reactor Safety
TXU Energy
-2-
Dockets: 50-445; 50-446
cc:
Roger D. Walker
Regulatory Affairs Manager
TXU Generation Company LP
P.O. Box 1002
Glen Rose, TX 76043
George L. Edgar, Esq.
Morgan Lewis
1111 Pennsylvania Avenue, NW
Washington, DC 20004
Terry Parks, Chief Inspector
Texas Department of Licensing
and Regulation
Boiler Program
P.O. Box 12157
Austin, TX 78711
The Honorable Walter Maynard
Somervell County Judge
P.O. Box 851
Glen Rose, TX 76043
Chief, Bureau of Radiation Control
Texas Department of Health
1100 West 49th Street
Austin, TX 78756-3189
Environmental and Natural
Resources Policy Director
Office of the Governor
P.O. Box 12428
Austin, TX 78711-3189
Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
1701 North Congress Avenue
Austin, TX 78711-3326
TXU Energy
-3-
Susan M. Jablonski
Office of Permitting, Remediation and Registration
Texas Commission on Environmental Quality
MC-122
P.O. Box 13087
Austin, TX 78711-3087
-4-
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (DBA)
Branch Chief, DRP/A (WDJ)
Senior Project Engineer, DRP/A (TRF)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
Debby Jackson, OEDO RIV Coordinator (DAJ1)
CP Site Secretary (vacant)
OEMAIL
ADAMS: Yes
No Initials: _CSM_____
Publicly Available Non-Publicly Available
Sensitive
Non-Sensitive
DOCUMENT: R:\\_CPSES\\CP2004-006lt-csm
C:EB
CSMarschall/lmb
/RA/
02/18/04
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax