MONTHYEARML0325802352003-09-0808 September 2003 G20030545 - Alex Matthiessen & David Lochbaum Ltr Re Indian Point Energy Center - Petition Pursuant to 10 CFR 2.206 - PWR Containment Sump Failure Project stage: Request ML0404301322003-09-22022 September 2003 G20030545 - David Lochbaum Ltr. Re Indian Point Energy Center - Supplement 1 to Petition Pursuant to 10 CFR 2.206 Project stage: Supplement ML0327902002003-09-24024 September 2003 Meeting with a Matthiessen, Riverkeepers and D Lockbaum, Union of Concerned Scientists (Ucs) G20030545 Dated September 8, 2003. Pages 1-25 Project stage: Request ML0327316872003-09-26026 September 2003 Memo Record of Phone Call on September 17, 2003 - September 8, 2003, Riverkeeper and Union of Concerned Scientists (Ucs) 2.206 Petition (Tacs. MC0725/MC0726) Project stage: Other ML0329302952003-10-22022 October 2003 G20030545 - (Response 1) David Lochbaum Ltr. Re Indian Point Nuclear Generating, Unit Nos. 2 and 3, 2.206 Acknowledgment Letter, Petition Requesting That NRC Take Immediate Enforcement Actions Against Entergy Nuclear Operations, Inc Project stage: Other ML0329506382003-10-22022 October 2003 G20030545 - (Response 2) Alex Matthiessen Ltr. Re Indian Point Nuclear Generating, Unit Nos. 2 and 3, 2.206 Acknowledgment Letter, Petition Requesting That NRC Take Immediate Enforcement Actions Against Entergy Nuclear Operations, Inc Project stage: Other ML0329402412003-10-23023 October 2003 Federal Register Notice Acknowledgement Letter Under 10 CFR Sec. 2.206 Project stage: Other ML0330702332003-10-29029 October 2003 G20030545 - David Lochbaum Ltr. Indian Point Energy Center - Supplement to Petition Pursuant to 10 CFR 2.206 - PWR Containment Sump Failure Project stage: Request ML0404401812004-02-19019 February 2004 G20030545 - A. Mathiessen, D. Lochbaum Ltr. Re Request for Licensee Comments on Proposed Director'S Decision Ltr Re 2.206 Petition with Respect to Indian Point, Units 2 and 3 Project stage: Other ML0404400662004-02-19019 February 2004 G20030545 - M. Kansler Ltr. Re Request for Licensee Comments on Proposed Director'S Decision Ltr Re 2.206 Petition with Respect to Indian Point, Units 2 and 3 Project stage: Other ML0404401042004-02-19019 February 2004 Proposed Director'S Decision Under 10 CFR 2.206 Project stage: Other 2003-09-22
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
February 19, 2004 Mr. Alex Matthiessen Executive Director Riverkeeper, Inc.
25 Wing & Wing Garrison, NY 10524 Mr. David Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006
Dear Mssrs. Matthiessen and Lochbaum:
Your Petition dated September 8, 2003, as supplemented on September 22 and October 29, 2003, and addressed to Dr. William D. Travers, Executive Director for Operations at the Nuclear Regulatory Commission (NRC), has been reviewed by the NRC staff pursuant to 10 CFR 2.206 of the Commission's regulations. The staffs proposed Directors Decision on the Petition is enclosed. I request that you provide comments to me on any portions of the decision that you believe involve errors or any issues in the Petition that you believe have not been fully addressed. The staff is making a similar request of the licensee. The staff will then review any comments provided by you and the licensee and consider them in the final version of the Directors Decision with no further opportunity to comment.
Please provide your comments by April 5, 2004.
Sincerely,
/RA by LMarsh for/
Eric J. Leeds, Deputy Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
Proposed Director's Decision cc w/o encl: See next page
February 19, 2004 Mr. Alex Matthiessen Executive Director Riverkeeper, Inc.
25 Wing & Wing Garrison, NY 10524 Mr. David Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006
Dear Mssrs. Matthiessen and Lochbaum:
Your Petition dated September 8, 2003, as supplemented on September 22 and October 29, 2003, and addressed to Dr. William D. Travers, Executive Director for Operations at the Nuclear Regulatory Commission (NRC), has been reviewed by the NRC staff pursuant to 10 CFR 2.206 of the Commission's regulations. The staffs proposed Directors Decision on the Petition is enclosed. I request that you provide comments to me on any portions of the decision that you believe involve errors or any issues in the Petition that you believe have not been fully addressed. The staff is making a similar request of the licensee. The staff will then review any comments provided by you and the licensee and consider them in the final version of the Directors Decision with no further opportunity to comment.
Please provide your comments by April 5, 2004.
Sincerely,
/RA by LMarsh for/
Eric J. Leeds, Deputy Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
Proposed Director's Decision cc w/encl: See next page Incoming: ML032580235 Supplement 1: ML040430132 Supplement 2: ML033070233 M. Kansler Letter - Request for Comments: ML040440066 A. Matthiessen, D. Lochbaum Letter - Request for Comments: ML040440181 Proposed Director Decision: ML040440104 Package: ML040440088
- See previous concurrence. ** See email concurrence.
OFFICE PDIV-2/PM* PDI-1/LA** Tech. Ed.* PDI-1/(A)SC* PDI/D* RI**
NAME BBenney SLittle PKleene PMilano CHolden TWalker DATE 02/17/04 02/17/04 02/17/04 02/17/04 02/17/04 02/13/04 OFFICE OGC DSSA/(A)DD* SPLB/BC* DLPM/DD NRR/ADPT NRR/(A)D NAME AFernandez MJohnson JHannon ELeeds BSheron RBorchardt DATE 02/18/04 02/17/04 02/17/04 02/17/04 02/18/04 02/19/04 OFFICIAL RECORD COPY
DISTRIBUTION:
PUBLIC B. Sheron A. Madison, NSIR PDI-1 Reading R. W. Borchardt K. Gibson EDO # G20030545 R. Zimmerman, NSIR R. Palla EDO Reading File M. Webber, NSIR C. Bixler, R-I W. Travers H. Miller, R-I S. Black W. Kane L. Marsh/E. Leeds J. Hannon C. Paperiello C. Holden A. Fernandez, OGC P. Norry R. Laufer OGC J. Craig P. Milano OPA K. Cyr/S. Burns S. Little OCA J. Dyer B. Benney NRR Mail Room (G20030545)
AFernandez L. Cox M. Johnson
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Gary Taylor Ms. Charlene Faison Chief Executive Officer Manager, Licensing Entergy Operations, Inc. Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John Herron Director of Oversight Senior Vice President and Entergy Nuclear Operations, Inc.
Chief Operating Officer 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Mr. Fred Dacimo Entergy Nuclear Operations, Inc.
Vice President, Operations Indian Point Energy Center Entergy Nuclear Operations, Inc. 295 Broadway, Suite 2 Indian Point Energy Center P.O. Box 249 295 Broadway, Suite 2 Buchanan, NY 10511-0249 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Mr. Christopher Schwarz Entergy Nuclear Operations, Inc.
General Manager, Plant Operations Indian Point Energy Center Entergy Nuclear Operations, Inc. 295 Broadway, Suite 2 Indian Point Energy Center P. O. Box 249 295 Broadway, Suite 2 Buchanan, NY 10511-0249 P.O. Box 249 Buchanan, NY 10511-0249 Mr. John M. Fulton Assistant General Counsel Mr. Dan Pace Entergy Nuclear Operations, Inc.
Vice President Engineering 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Randall Edington 475 Allendale Road Vice President Operations Support King of Prussia, PA 19406 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Senior Resident Inspector, Indian Point 2 White Plains, NY 10601 U. S. Nuclear Regulatory Commission 295 Broadway, Suite 1 Mr. John McCann P.O. Box 38 Director, Nuclear Safety Assurance Buchanan, NY 10511-0038 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Senior Resident Inspector, Indian Point 3 Mr. William DiProfio U. S. Nuclear Regulatory Commission PWR SRC ConsultaNT 295 Broadway, Suite 1 139 Depot Road P.O. Box 337 East Kingston, NH 03827 Buchanan, NY 10511-0337 Mr. Dan C. Poole Mr. Peter R. Smith, President PWR SRC Consultant New York State Energy, Research, and 20 Captains Cove Road Development Authority Inglis, FL 34449 Corporate Plaza West 286 Washington Avenue Extension Mr. William T. Russell Albany, NY 12203-6399 PWR SRC Consultant 400 Plantation Lane Mr. Paul Eddy Stevensville, MD 21666-3232 Electric Division New York State Department Alex Matthiessen of Public Service Executive Director 3 Empire State Plaza, 10th Floor Riverkeeper, Inc.
Albany, NY 12223 25 Wing & Wing Garrison, NY 10524 Mr. Charles Donaldson, Esquire Assistant Attorney General Paul Leventhal New York Department of Law The Nuclear Control Institute 120 Broadway 1000 Connecticut Avenue NW New York, NY 10271 Suite 410 Washington, DC, 20036 Mayor, Village of Buchanan 236 Tate Avenue Karl Coplan Buchanan, NY 10511 Pace Environmental Litigation Clinic 78 No. Broadway Mr. Ray Albanese White Plains, NY 10603 Executive Chair Four County Nuclear Safety Committee Jim Riccio Westchester County Fire Training Center Greenpeace 4 Dana Road 702 H Street, NW Valhalla, NY 10592 Suite 300 Washington, DC 20001 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Robert D. Snook Assistant Attorney General State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120