February 17, 2004 Mr. H. L. Sumner, Jr.

Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 RE: REVIEW OF TECHNICAL SPECIFICATION REVISION TO PRIMARY CONTAINMENT LEAKAGE RATE TESTING PROGRAM (TAC NOS. MC1432 AND MC1433)

Dear Mr. Sumner:

By letter dated December 1, 2003 (NL-03-2353), you requested a license amendment to change the peak calculated post accident primary containment internal pressure, Pa, in section 5.5.12, Primary Containment Leakage Rate Testing Program, of the Unit 1 and 2 Technical Specifications. The change was proposed to support a 10 psi increase in the nominal Unit 1 and 2 reactor operating pressure needed to fully implement the Measurement Uncertainty Recapture Power Uprate (MURPU). The MURPU was issued by the Nuclear Regulatory Commission (NRC) in License Amendments 238/180, dated September 23, 2003. In your letter dated December 1, 2003, there was no requested completion date, so a normal one year review was scheduled. By letter dated January 23, 2004 (NL-04-0072), you stated that the license amendment was requested by May 2004, to allow for the full implementation of the MURPU during the low electrical demand period for the Southern Company.

Unfortunately, the NRC is unable to meet your request for an expedited review. The NRC technical staff is working on other planned and scheduled activities that make it impossible for us to revise our schedules to meet your needs.

Sincerely,

/RA/

John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page

ML040440141

  • See previous concurrence NRR-106 OFFICE PDII-1/PM PDII-1/LA SPSB/SC*

PDII-1/SC NAME SBloom CHawes RDennig JNakoski DATE 2/17/04 2/17/04 2/17/04 2/17/04 Edwin I. Hatch Nuclear Plant cc:

Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Mr. R. D. Baker Manager - Licensing Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, Alabama 35201-1295 Resident Inspector Plant Hatch 11030 Hatch Parkway N.

Baxley, Georgia 31531 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, Georgia 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., S. W.

Atlanta, Ga. 30334 Arthur H. Domby, Esq.

Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 Mr. J. B. Beasley, Jr.

Executive Vice President Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, Alabama 35201-1295 Mr. G. R. Frederick General Manager, Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

U.S. Highway 1 North P. O. Box 2010 Baxley, Georgia 31515 Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant P. O. Box 2010 Baxley, Georgia 31515