|
---|
Category:Letter
MONTHYEARBVY 24-028, Pre-Notice of Disbursement from Decommissioning Trust2024-10-31031 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-10-30030 October 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust 2024-09-18
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARBVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization BVY 17-004, Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2017-07-20020 July 2017 Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool BVY 17-022, License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 3162017-07-13013 July 2017 License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 316 BVY 17-005, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement2017-02-0909 February 2017 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement BVY 15-040, License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 3112015-06-24024 June 2015 License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 311 BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 BVY 14-062, Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions2014-09-0404 September 2014 Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions BVY 13-109, Cyber Security Plan Implementation Schedule, Proposed Change No. 3082013-12-19019 December 2013 Cyber Security Plan Implementation Schedule, Proposed Change No. 308 BVY 13-097, Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment2013-11-14014 November 2013 Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 12-084, License Amendment Request; Changes to 10CFR50.63 Licensing Basis2012-12-21021 December 2012 License Amendment Request; Changes to 10CFR50.63 Licensing Basis BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-016, License Amendment Request to Revise License Renewal Commitments2012-03-12012 March 2012 License Amendment Request to Revise License Renewal Commitments BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-085, Proposed Change No. 296, Steam Dryer License Condition Change2011-12-22022 December 2011 Proposed Change No. 296, Steam Dryer License Condition Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 10-036, Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan2010-07-16016 July 2010 Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-063, Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change2009-10-27027 October 2009 Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls ML0912001622009-05-31031 May 2009 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station Supplement 1 BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-079, Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications2008-10-31031 October 2008 Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications BVY 08-055, Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes2008-09-30030 September 2008 Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0806602032008-02-12012 February 2008 Vermont Yankee, Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System ML0804202202008-02-0505 February 2008 Vermont Yankee - License Renewal Application, Amendment 35 ML0736502282007-12-11011 December 2007 (PA-LR) VY Response to RAI 4.3.3-2 BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits BVY 07-018, License Renewal Application, Amendment 262007-03-23023 March 2007 License Renewal Application, Amendment 26 ML0702402042007-01-10010 January 2007 Email: (PA-LR) Other Word File ML0701105042007-01-0404 January 2007 Vermont Yankee - License Renewal Application, Amendment 23 ML0634201782006-12-0404 December 2006 2006/12/04-Vermont Yankee Nuclear Power Station, License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items ML0634004532006-11-0909 November 2006 2006/11/09-E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, Vermont Yankee BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 192006-10-31031 October 2006 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19 ML0627801222006-10-12012 October 2006 Summary of a Telephone Conference Call Held on September 19, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc ML0626800342006-09-19019 September 2006 2006/09/19-Vermont Yankee License Renewal Application, Amendment 13 ML0625504392006-09-0505 September 2006 License Renewal Application, Amendment 12 2023-10-10
[Table view] Category:Technical Specification
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements ML0836500072008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications 2015-03-25
[Table view] Category:Bases Change
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 ML0836500072008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 07-052, Revision of Technical Specification Bases Pages2007-07-31031 July 2007 Revision of Technical Specification Bases Pages BVY 07-043, Revision of Technical Specification Bases Pages2007-06-21021 June 2007 Revision of Technical Specification Bases Pages BVY 07-015, Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages2007-03-14014 March 2007 Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages BVY 06-028, Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers2006-04-22022 April 2006 Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers BVY 06-001, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications2006-01-10010 January 2006 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications BVY 05-099, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure2005-10-26026 October 2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure BVY 05-074, Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information2005-08-0404 August 2005 Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information BVY 05-072, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information2005-08-0101 August 2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information ML0511902932005-04-22022 April 2005 Response to Request for Additional Information - Technical Specification Proposed Change No. 268. One- Time Integrated Leak Rate Test (ILRT) . One-time Integrated Leak Rate Test (ILRT) Interval Extension 2015-03-25
[Table view] |
Text
Entergy Nuclear Vermont Yankee, LLC E n tergy Up2-185 Entergy Nuclear Operations, Inc.
Old Ferry Road Brattleboro, Vr 05302-0500 February 9, 2004 BVY 04-14 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Technical Specification Proposed Change No. 264 - Supplement I Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Response to Reguest for Additional Information By letter dated December 5, 20031, Vermont Yankee 2 (VY) proposed to amend Facility Operating License DPR-28 for the Vermont Yankee Nuclear Power Station by revising the Safety Limit Minimum Critical Power Ratio (SLMCPR) for both single and dual recirculation loop operation.
On January 15, 2004, VY received a draft request for additional information (RAI) from the NRC with three questions concerning our SLMCPR submittal. As a result of a January 21, 2004 teleconference with the NRC staff and Global Nuclear Fuel - Americas, LLC (GNF), it was concluded that VY would provide a written response to NRC.
Attachment I to this letter is a response to the RAI questions and is considered proprietary information by GNF. In accordance with 10CFR2.790(b)(1), an affidavit attesting to the proprietary nature of the enclosed information and requesting withholding from public disclosure is included with Attachment 1. is the same GNF responses to the RAI questions with the proprietary information removed, and is provided for public disclosure.
This supplement to the license amendment request does not change the scope or conclusions in the original application, nor does it change the no significant hazards consideration determination.
'Vermont Yankee letter to U.S. Nuclear Regulatory Commission, "Technical Specification Proposed Change No. 264, "Safety Limit Minimum Critical Power Ratio (SLMCPR) Change," BVY 03-114, December 5,2003.
2 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. are the licensees of the Vermont Yankee Nuclear Power Station.
APD1
BVY 04-14 / Page 2 If you have any questions in this regard, please contact Mr. Jeff Meyer at (802) 2584105.
Sincerely, pay lk. hayer ite Vice President STATE OF VERMONT )
)ss WINDHAM COUNTY )
Then personally appeared before me, Jay K. Thayer, who, being duly sworn, did state that he is Site Vice President of the Vermont Yankee Nuclear Power Station, that he is duly authorized to execute and file the foregoing document, and that the statements therein are true to the best of his knowledge and belief.
)~a J. bo94 Mary J. Dw6, Notary Public My Commission Expires February 10, 2007 cc: USNRC Region I Administrator USNRC Resident Inspector- VYNPS \\/JO /"
USNRC Project Manager - VYNPS Vermont Department of Public Service .IAOTAJ
Docket No. 50-271 BVY 04-14 Attachment I Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 - Supplement 1 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Response to Request for Additional Information (GNF Proprietary Information)
I Affidavit Affidavit 1, Jens G. M. Andersen, state as follows:
(1) 1 am Fellow and project manager, TRACG Development, Global Nuclear Fuel -
Americas, L.L.C. ("GNF-A") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in the attachment, "Request for Additional Information Related to Safety Limit Minimum Critical Power Ratio Amendment Request Vermont Yankee Nuclear Power Station Docket No.
50-271 ," dated February 2, 2004. GNF proprietary information is indicated by enclosing it in double brackets. In each case, the superscript notation 13) refers to Paragraph (3) of this affidavit, which provides the basis for the proprietary determination.
(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4) and 2.790(a)(4) for "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all "confidential commercial information," and some portions also qualify under the narrower definition of "trade secret," within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energ Proiect v. Nuclear Regulatory Commission. 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2d1280 (DC Cir. 1983).
(4) Some examples of categories of information which fit into the definition of proprietary information are:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
- c. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of GNF-A, its customers, or its suppliers;
- d. Information which reveals aspects of past, present, or future GNF-A customer-funded development plans and programs, of potential commercial value to GNF-A;
Affidavit
- e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs .(4)a. and (4)b., above.
(5)To address the 10 CFR 2.790 (b) (4), the information sought to be withheld is being submitted to NRC in confidence; The information is of a sort customarily held in confidence by GNF-A, and is in fact so held. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in (6) and (7) following; The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GNF-A, no public disclosure has ben made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence.
(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge, or subject to the terms under which it was licensed to GNF-A. Access to such documents within GNF-A is limited on a "need to know" basis.
(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GNT-A are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.
(8) The information identified in paragraph (2) is classified as proprietary because it contains details of GNF-A's fuel design and licensing methodology.
The development of the methods used in these analyses, along with the testing, development and approval of the supporting methodology was achieved at a significant cost, on the order of several million dollars, to GNF-A or its licensor.
(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GNF-A's competitive position and foreclose or reduce the availability of profit-making opportunities. The fuel design and licensing methodology is part of GNF-A's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost.
The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to deter-mine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.
Affidavit The research, development, engineering, analytical, and NRC review costs comprise a substantial investment oftime and money by GNF-A or-its licensor.
The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.
GNF-A's competitive advantage will be lost if its competitors are able to use the results of the GNF-A experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
The value of this information to GNF-A would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GNF-A of the opportunity to exercise its competitive advantag6 to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.
Executed at Wilmington, North Carolina, this 2nd day of February, 2004.
Jens G. M. Andersen Global Nuclear Fuel - Americas, LLC
Docket No. 50-271 BVY 04-14 Attachment 2 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 - Supplement 1 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Response to Request for Additional Information
REQUEST FOR ADDITIONAL INFORMATION RELATED TO SAFETY LIMIT MINIMUM CRITICAL POWER RATIO AMENDMENT REQUEST VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 By letter dated December 5, 2003, Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Entergy or the licensee) submitted an amendment request for Vermont Yankee Nuclear Power Station (VYNPS). The proposed amendment would revise the Safety Limit Minimum Critical Power Ratio (SLMCPR) values In Technical Specification 1.1.A.1 to incorporate the results of the cycle-specific core reload analysis for VYNPS Cycle 24 operation.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following Issues to clarify the submittal:
- 1. Please identify the design record file to support this amendment, and provide a summary table or figure to show the number of rods that might experience boiling transition as a function of the nominal MCPR.
Response
This question was addressed in the phone conversation on January 21, 2004. The design record file number Is already provided on the attachment to the submittal and is sufficient for tracking purposes during an audit. A summary table or figure to show the number of rods that might experience boiling transition as a function of the nominal MCPR Is not needed since the SLMCPR is by definition the nominal MCPR value where the number of rods susceptible to boiling transition is 0.1 % of the rods in the core.
- 2. It appears that a 0.04 reduction in the SLMCPR value is on the high end and not a common number according to the conclusion stated in Section 4.2 of NEDC-32694P.
Provide the rationale for your core design to achieve this high reduction of the MCPR value and justify that the proposed SLMCPR reduction is conservative while both the Cycle 24 core MCPR distribution and In-bundle power distribution are much flatter than those for Cycle 23.
Response
The expected reduction in the calculated SLMCPR In going from the GETAB method and uncertainties to the revised method with reduced power distribution uncertainties is ((
)) based on the MCPR distribution and in-bundle power distribution for Cycle 24. The probability that the SLMCPR reduction will be (( )) or larger Is (( )). Usually for a total reduction of (( )) the amount due to the revised method is approximately (( )) and the remaining (( )) is due to the reduced power distribution uncertainties. For this particular application at EOC for Cycle 24, about (( )) of the total (( )) reduction Is attributed to the reduced uncertainties themselves and the remaining [ )) is attributed to the methodology Improvements described in NEDC-32694P-A. The primary factor that causes a larger reduction due to the method is [
)) The approved Monte Carlo process correctly models these distributions but the method that is used to estimate the reduction does not since It presumes a normal distribution of rod CPRs.
((GNF Proprietary Information I of 2 RAI Responses contained within double brackets)) 02 February 2004
A calculated reduction of 0.04 in the Monte Carlo result is well within the range of probable values.
Note that Table 2 in the attachment to the submittal shows the (( )) increase in calculated SLMCPR as a result of the Increase in the R-factor uncertainty from (( ]1 to
)) that was conservatively implemented to accommodate increased uncertainty due to potential channel bow. If one conservatively assumes (as is done here) that this impact does not scale with the bundle power uncertainties, then the overall reduction in the calculated SLMCPR attributed to the application of the revised model and the reduced uncertainties could be as high as (( )). Based on the estimation technique, the probability that the SLMCPR reduction will be (( )) or larger is reduced to (( )). Even at this reduced probability for the calculated change, the requested DLO SLMCPR is appropriate because it includes an additional conservatism that Is discussed Inthe next response.
- 3. There is no penalty (( )) shown in Table 2 of Attachment 5. Provide the rationale of how to apply this penalty in the proposed SLMCPR values.
Response
Table 2 does not show the (( )) penalty (( that is indicated in the paragraph at the bottom of page 4 of the attachment. This Is not called out as a line item InTable 2 because ((
)). Inother words, all the calculated SLMCPR values for Cycle 24 that are shown in Table 2 have at least an additional conservatism of (( )) that is not required. The conservatism is at least this amount because it was obtained from two calculations of the DLO SLMCPR using the revised method and reduced uncertainties in order to obtain the smallest estimate of the impact that is already contained in all the calculated SLMCPR values. The only difference In the two calculations performed for DLO at EOC in order to determine the Impact on SLMCPR was the threshold for discerning the ((
]. The SLMCPR values calculated from the GETAB method and uncertainties contain a larger amount of conservatism (that has not been quantified). This is another reason why the SLMCPR reductions that are calculated relative to the GETAB values and presented in column "4"of Table 2 are overestimated.
((GNF Proprietary Information 2 of 2 RAI Responses contained within double brackets)) 02 February 2004