Florida P1ower &.Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 January 16, 2004 L-2004-004 10 CFR 50.55a 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Unit 2 Docket No. 50-389 Inservice Inspection Program Second Interval Third Period Owner's Activity Report Enclosed are the St. Lucie Unit 2 inservice inspection (ISI) second interval, third period, ASME Section XI Form OAR-1, Owner's Activity Reports. The third period ended on August 7, 2003. The enclosed OAR-1 forms implement Code Case N-532. This code case, approved by the NRC for St. Lucie Units 1 and 2 on November 6,1995, provides an alternative to the requirements of ASME Section XI, Sections IWA-4910 (d); IWA-6210 (c), (d), and (e); IWA-6220 (b), (c), and (d);
and IWA-6240 (b). The OAR-1 reports are prepared and certified upon completion of each refueling outage and submitted following the end of each inspection period. There were two refueling outages in the St. Lucie Unit 2 ISI second interval, third period.
The attached OARs each consist of 3 tables as required by the implementation requirements of Code Case N-532. Table 1 is an abstract of examinations and tests performed during each refueling outage in the third period and identifies the percent of ISI examinations completed as required by ASME Section Xl, Program B and applicable relief requests. Table 2 is a listing of items with flaws or relevant conditions that required evaluation for continued service and that were identified during the performance of ASME Section Xl examinations during each refueling outage in the third period. Table 3 is an abstract of repairs, replacements, or corrective measures required for continued service for each refueling cycle of operation in the third period.
A 1 an FPL Group company
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Page 2 is the OAR-1 report for St. Lucie Unit 2 cycle SL2-12, Refueling Outage SL2-13. Enclosure 2 is the OAR-1 report for St. Lucie Unit 2 cycle SL2-13, Refueling Outage SL2-14.
Please contact George Madden at (772) 467-7155 should there be any questions regarding this information.
mJrson Vice President St. Lucie Plant WJ/GRM Enclosures
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 1 Page 1 Revision 1 Form OAR-1 Owner's Activity Report Report Number:lSI-PSL-2-2001 Owner:
Florida Power and Light Company P.O. Box 529100 Miami, Florida 33152 Plant St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8,1983 Refueling Outage No.: SL2-13 Current Inspection Interval:Second Current Inspection Perlod:Third Edition and Addenda of Section Xl applicable to the Inspection plan: 1969. and for section (WE. 1992 Edition with addenda through 1992 (IWL not applicable to SL Lucie Unit 2).
Date and Revision of Inspection plan: July 23, 2001, Rev. 3 Edition and Addenda of Section Xl applicable to repairs and replacements, II different than the Inspection plan: Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owners Activity Report are correct. and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate o utho' all o;.: N/A Expi Date: N/A Signed X
Date 7
l7 I
Oaner of 19?s Designee. Tt CERTIFICATE OF INSERViCE INSPECTION I, the undersigned holding a vaid commisson issued by the National Board of Boiler and Pressure Vesset Inspectors and the State or Province of Florida and employed by HSBCT of Hartford. Connecticut have inspected the items described hi this Owner's Activity Report, during the period August 8 2000 to December 21,2001 and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report In accordance with the requirements of Section Xl.
I -
I e -
Bysigning this certificate, neither the Inspector nor his employer makes any warranty. expressed orImpiied.
concerning the examinations, tests, repairs, replacements, evaluations, and corrective measures described In this report F rtl rmore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property, marm oross of any kind arising trom or connected with this Inspection.
rlnmmidns
-LZ,
(~'Ins.
tob igroture Natirxl B3oard.
State. Prce,. and Endoumearnts Date 47/-
Revision 1 TABLE I (Post 2001 Outage)
SECOND INSPECTION INTERVAL-THIRD PERIOD ABSTRACT OF EXAMINATIONS AND TESTS
.......h~aton
.Ex..natoh.
,l~tons ExamInation ired for xamint the In I
th p~d6&:
B-A 26 0
0%
100%
RR#14 Applied B-B
- 9 0
0%
10_%
RR#14 Applied B-D 36 0-0%
83%
RR#14 Applied B-E Covered under site pressure test program -
B-F 31 7^-
70% <.-
90-%
RR#14 Applied B-G-1-7 1
50%
85%
RR#27 & 28 (1 of total Items req. only if disassembled)
-- --2--2 44%
77%
RR#14 Applied ---
B-H Code Case N-509 applies. Category B-H items are Included with Category B-K --
B-J 133 l
5 9%
1 71%
totalcountreq.reflectscircweldsonly RRI#14Applied B-K
.1
.100%
_.100%
RR#14 & Code Case N-509 applied B-L-1 2
-2 100%
100%
Code Case N-481 Applied B-L-2 1
0 0%
- 0%
Examination required only N disassembled B-M-1 There are no B-M-1 valve body welds B-M-2 4
0 0%
75%
1 of each group required when disassembled B-N-1i 24, 0
Each item must be examined each period B-N-2 22-0 0%
100%
B-N-3 6
0 0%
100
.B No category B-0 items -
System pressure tests are performed In accordance with plant procedures. Ouantification of the number of tests is not practical.
At the end of the Interval, FPL will ensure that I100% of the systems have been tested.-
B-0 Steam Generator tubing Is examined In accordance with Plant Technic al Specifications. See the NIS-BB for details.
C-A -
0 ° 0%
100%
RR#14Applied C-B
.1-8
- 0 0%
100%- -
RRfil4Appliod C-C 9
1 -
l 33%
1 77%0 -
RRffI4 & Code Case N-509 Applied C-D No category C-D items^
00 17 0D0 0 CaD C 70 0 C U) (0)
- 0) C (0
0)~
Mo Revision 1 TABLE 1 (Post 2001 Outage)
C)
SECOND INSPECTION INTERVAL-THIRD PERIOD
-O Z
D ABSTRACT OF EXAMINATIONS AND TESTS Oo C
8%
89%
total count req. Reflects clrc welds only l
Less than 28 welds would be required if 7.5/0 criteria isX 55%
82%
followed, FPL raised the total count to 28 per note 2, total CO
_~~~~~~~~~~
count req. reflects circ. Welds only
-C
~~~~~~~~~~~~.
Formed In accordance with plant procedures. Quantification of the number of tests is not practical.
will ensure that 100% of the systems have been tested.-
67%
91%
Code Case N-509applied 4^AATGA _AA Ae^A.VA A^A. AX..F ^..A~t.^.,. fla Al AA.
S VA- +
AAA_
I
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 1 Page 4 St. Lucie Unit 2 SECOND INSPECTION INTERVAL-THIRD PERIOD, 2001 REFUELING OUTAGE INSERVICE INSPECTION REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Item Flaw Flaw or Relevant Condition Found Category -
Number Description Characterization During Scheduled Section Xi. -
(IWA-3300)
Examination or Test (Yes or No)
There were no flaws or relevant conditions that required evaluation for continued service.
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 1 Page 5 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2 -2nd Interval, 3rd Periond (Cycle 12)
Class Replacement, condition found Complete Replacement C ode Crrepair, Item FDaeosrlernpDaeiopnr
! roMrecne fDescriptbn ofWork during scheduled Plan Number Measure ecrtonISI exam or test?
- 2 1] Repair CHG PP Replace stud & nut damaged CHECK IF YES E 9115t2000 SL2- 00002 W, Replacement 2B during maintenance.
I
-I E
Corrective Originally tracked as SL2 Interval #2 GJ Con ective
-002 Measure Period #3 2
G Repair V2324 Replace Bellows Seal Assy CHECK IF YES n 9/1/2000
'SL2-' 00003 i
Replacement and Disc Insert. Originally O Corrective tracked as SL-2-t1-096 Interval #2 Measure Period #3 El Repair V1475 VALVE LEAKS BY SEAT->
CHECK IF YES O 12114/2001 SL2- 00006 t
Replacement CR 00-0969 Interval #2 EDCorrective Measure Period #3 2
0 Repair V2169 Replacecheckvalvedisc.
CHECKIFYESI]
2115/2001 SL2- 00009
' 7, Replacement
'Would not blue check to seat.
i Corrective Interval#2 Measure Period #3 12 03 Repair V8213 FYP 1122 MAIN STEAM CHECK IF YESED 12V15t2001 SL2- 01013 R Replacement SAFETY OVERHAUL interval#2 ElCorrective Measure Period #3 2
0 Repair V8211
'FYP1122MAINSTEAM CHECKIFYESED 12112001 SL2- 01014 WS Replacement SAFETY OVERHAUL Ir
- 2 E Corrective Measure Period #3 2
ED Repair
.V8208 FYP 1122 MAINSTEAt CHECKIFYES
,12V1512001 SL2- 01015 Replacement SAFETY OVERHAUL L Corrective Interval #2 Measure Period #3 2
T_ Repair
' V8207 FYP 1122 MAIN STEAtiM CHECK IFYES[] 12V152001 SL2- 01016 7 Replacement
'SAFETY OVERHAUL ElCorrective
,.Interval
- 2 Period #3 1
,jRepair SE-02-4 FYP 3671 VALVE
. CHECKIFYES 12111/2001
,SL2- 01017 91ii Replicement A.
gNSPECTION (SE-02-4)
Interval #2 O Corrective
-2 Measure Period #3 I
Repair V1200 SECT.XIFORSPRING CHECKIFYESLJ 10115t2001 SL2- 01018
., Replacement REPLACEMENT. SIN N84217-El Corrective
~~~00-0007 Interval #2 Measure Period #3 2
i Repair V1466 WELD SUPPORT CHECKIFYESD 12/13t2001 SL2- 01022 Replacement Interval#2 Measure Period #3
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 1 Page 6 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2-2nd Interval, 3rd Periond (Cycle 12)
Code Repair.
Flaw or relevent Date Repairf Class Replacement.
Item Description condition found Complete -
Replacement Mroreasure ecrpon of Work during scheduled Plan Number Measurorree Description od~ork ISI exam or test?
2 E2 Repair SE403-18 WELD SUPPORT CHECK IFYESO 1211312001 SL2- 01023
[ Replacement E Corrective Inlerval#2 Measure Period #3 3
53 Repair V3101 REPLACE VALVE WITH CHECKIFYESC 12I1112001 SL2- 01024 i
Replacement IMPROVED DESIGN 5 Corrective Interval #2 Measure Period #3 2
C Repair V2325 PM02-3615 BENCHTEST CHECKIFYESL 10/812001 SL2- 01026 n Replacement V2325 EC Corrective Interval #2 Measure
--Period #3 3
0 Repair SR21196 Replace SRvalvewith new CHECKIFYESL]
1111612001 SL2- 01027 i
Replacement g Corredive
/
~~~~~~~~~~~~~~~~~Interval
- 2 ElCorrective Measure Period #3 2
E Repair MODIFY PIPING AS REOD -
CHECK IF YES
-12116/2001 SL2- 01028 ii Replacement THERMALUPGRADE,-
El Corrective Interval #2 Measure Period #3 3
0 Repair V09107 REPLACE V09107-SEAT CHECKIFYES{l 12116t2001 SL2- 01030 F Replacement LKG CR#00-1079 G Conective
~~~~~~~~~~~~~~~~~~Interval
- 2 CCorrective Measure Period #3 G Repair V1474 VALVE LEAKS BY SEAT CHECK IF YES El 1211412001 SL2- 01031 W Replacement CR 00-0969 Corrective Measure Period #3 2
C Repair HVS-1C Flange Leak. Replace Bolting CHECK IF YES C 1211/2001 SL2- 01032 601. Replacement EG Corrective Measure Period #3 3
lie Repair
-CW-29 Weld Buildup ID CHECKIFYES L 1217/2001 SL2- 01033 G Replacement O Corrective
-ntervai#2 Measure Period #3 2
1l Repair V3143 REPLACE V3143 PER CR#
CHECK IF YES U 121712001 SL2- 01034 3 Replacement 00821Interval#2 Measure Period #3
!3 Repair CW-3000-ModifyRestrainttoeliminate CHECKIFYESl 12/8/2001 SL2- 01035 iFReplacement
- 7004, corrosion
-corro-son Interval #2 I Corrective Measure Period #3
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure I Page 7 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL2 -2nd interval, 3rd Perlond (Cycle 12)
' Code Repair.
Flaw or relevent Date
-Repair Css Replacement I
Description condition found Complete Replacement or Conectiveof Work during scheduled PlanNumber Measure Desaiption ISI exam or test?
3 6 Repair CW-79 REPAIRDEGRADEDCW-79, CHECKIFYESEl 12/712001 SL 01036
[ Replacement WELD BUILD-UP B Comstive
~~~~~~~~~~~~~~~~~~Interval
- 2 Measure Period #3 3
Repair CW-3000-CR# 01-2885, CW.3000-7006 CHECK IF YES F 1218/2001 SL2- 01037 Gl Repiacemeni 7006 CORROSION Repacem enti Interval #2 Measure bCorrectine
-Period 03 2
El Repair MV-08-19B PM08-5210DISASSEMBLE&
CHECKIFYES 1211112001 SL2- 01038 i
Replacement INSP MV.08-19B Q Corrective Interal #2 Measure Period #3 3
W' Repair CW-13 REPAIR 36-CW-13 AT CHECK IF YES l 121812001 SL2- 01039 O Replacement SH21377 PER IF#4 E Corrective Interval #2 Measure Period #3 2
El Repair MV-08-19A SECTIONXIPLUGASSY.
CHECKIFYESE 12)111/2001 St.2- 01040 F Replacement THREADED ROD I
-2 5 Corrective Measure Period #3 3
F Repair CW-11 REPAIRCW-11 ATCW43000-CHECKIFYESJ 12/812001 SU2- 01042 El Replacement 7004. IF#6 O Corrective Interal#2 Measure Period #3 I
El Repair SG 2A FYP 3521 HAND HOLE CHECK IF YES O 121812001
-SL2-01043 F Replacement STUCK STUD REPAIR I
Q Corrective Measure Period #3 El Repair SG 2A FYP 3521 SIG 2A SEC SIDE CHECK IF YESD 12/182001 SL2- 01044 VE' Replacement OPENICLOSE E Corrective Inleral #2 Measure Period #3 I
r Repair SO 2A FYP 3525 SG 2A PRIM CHECK IF YES [3 1211612001 SL2- 01045
- F Replacement MANWAYS/NOZ DAMS E Corrective Interal #2 Measure Period #3 I
N' Repair V 3260 SEALWELD CHECKIFYESl 12812001 SL2- 01046 Replacement Li Corrective Interval #2 Measure Period #3 3
Repair CW-13 REPAIR CW.13 PER IF#5 CHECKIFYESSI]
121812001 SL2- 01047 Replacement I
- 2 i lCorrective
-eral#
- i. ----
Measure
.Perod#3
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure I Page 8 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2 -2nd Interval, 3rd Periond (Cycle 12)
,Code Repair,.
Flaw or relevent Date Repair/
Class Replacement, Description condition found Complete Replacement or Corrective Item of Work during scheduled Plan Number Measure Descniption
-ISI exam or lest?
1 tN' Repair V3624 V3624 DRY B/A, CR #01-2931 CHECK IF YESI 12/15/2001
'SU- 01048 1' Replacement
'Interval 02 Corrective Measure Period #3 1
Pi Repair V3258 V3258,WELD CHECKIFYESE; 12110/2001 SL2- 01049
[
Replacement-BODYIBONNET JOINT.CR01-i Corrective 2933 Interval #2 Measure Period #3 1
WJ Repair V3481 V3481.CR#01-2971, DRY CHECKIFYES iW 12)1212001 SL2- 01050i
[3 Replacement BORIC ACID
' i Conectrve Interval #2 Measure Period #3 1
Repair V3259 V3259, DRY BtA @ BONNET CHECK IF YES W 12/1012001 SL2- 01051 Replacement CRIe-285s
[i Corrective Interval #2 Measure Period #3 2
G Repair V8201 CR #01-2813. FYP 1122 CHECK IFYES
- 12/1512001 SL2- 01052
- l' i: Replacement MAIN STM SAFETY ii ~~~~~~~~~~~~~~~~~~~ ~~~~Interval #2 1 Conreo.Uve....-.
Measure Period #3 2
FJ Repair BF-36 REWORKSUPPTBF-4001-CHECK IFYES I 12/1612001 SL2- 01054 O Replacement 169 CR 01-3110 I
- 2 O Conective '
- ~~~~~~Interval
- 2 C Corrective Measure Period #3
[ a Repair 009 SUPPORTSNUBBERS CHECKIFYESL 12/1712001 SL2- 01055 Replacement DURING UNIT2 OUTAGE Interval #2 Conrective.-
.i.-
inra#
Measure Period #3 2
0 Repair SO-03-18 BORICACIDBUILD CHECK IFYES, 12112001 SL2- 01057 F Replacement UP/CLEAN & EVALUATE Ir
- 2 F. Conective.
¢
- ~~~~~~~~~~Interval
- 2 '
9; corrective Measure Period #3
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 1 Form OAR-1 Owner's Activity Report Report NumberlSI-PSL2-2003 Owner.
Florida Power and Light Company P.O. Box 529100 Miami. Florida 33152 Plant:
St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Srvice Date: August 8.'1983 Refueling Outage No.: S12-14 Current Inspection Interval:Second Current Inspection Period:Third Edition and Addenda of Section Xl applicable to the inspection plan: 1989. and for section IWE, 1992 Edition with addenda through 1992 (IWL not applicable to St. Lucie Unit 2).
Date and Revision of inspection plan: July 23. 2001. Rev. 3 Edition and Addenda of Section Xi applicable to repairs and replacements. if different than the inspection plan:
Same CERTIFICATE OF CONFORMIANCE I certify that the statements made in this OwnersActivityReport are correct, and that the exauinations, tests, repairs. replacements, evaluations, and corrective measures represented by this report conform to the requiremnents of Section XI.
Certificate of Authorization No.' N/A Expiration Date: NIA Signed CSrz AG '
Date ___7___
Owner or Owner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCr of Hanford Connecticut have inspected the items described in this Owner's Activity Report, during the period December 22,2001 to August 7, 2003 and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section X.
By signing this certificate, neither the Inspector nor his employer makes any warranty. expressed or Implied, concerning the examinations, tests, repairs, replacements, evaluations, and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or t
C*spn io-n' -.
I Board. StMC.Pro i e.- and Endorsemenrts
TABLE 1 (Post 2003 Outage)
SECOND INSPECTION INTERVAL-THIRD PERIOD ABSTRACT OF EXAMINATIONS AND TESTS n..
Toterval.;
-B-A.
26..
0..-
0% --
- 100%
RR#i23, RR#14 applied.l
.. B-B.
9...
0 0%
100%
RR#14 applied
.B-D
-.36.r6 100%
- 100%
RR#14applied B-E Covered under site pressure test program B-F RR#29 was approved for FPL to implement a risk informed Inspection program during the 3rd period. B-F items are included in -..
the Category R-At population.
B-.
5 5
RR#27 & 28 (1 of total examinations required for the
. ---- --1--..... 7:. -- -1 0... l-*
-Interval Is required only if disassembled. This Item was B-G-2 22 9
100%
-. 100%
RR#14 applied B-He Code Case N-d 9 applies:- Categtor B-H items ar included with Category B-K RR#29 was approved for FPL to implement a risk informed inspection program during the 3 period.- B-J items are included in the
- . Category R-A population..
-B-K
..-. 5:..
1
^
. 100%
.100%
. RR#14 & Cod exCasemN-509 apptied B-L-1
- .-2;---.
2
-100%--
100%
Cede CaseoN-481 applied--.-
B-L-2 0
0%
Examination is required only if disassembled.
Noe wer j ____________not disassembled during 2~interval)
B-M-1 Ther ae no B-5-1 valve body waelds gory______emsareIncluded__.h.Category._.
was app;. v.ed I
.spci 1 valve in each group requires examination when
~
.4......
0 0%
-....5
....:.. -.disassembled for maintenance. There are 4 groups (1;-
.. B-M2. -.......
- 4..
0... 0% - 75 h.. :
through 4). No group 2 valves were disassembled during
.__.f__-.__.-___._..____....
the 2rd interval..
B-N-24 8
100%
100%
Each item must be examined each period B-N-2
- 22 0
0%
100%
od-Cas B-N-3
-6 0
0%-
100%
B N
B-O 4
-O items, -
1300
)00 0 5 M
cn, CD
-I CD
-P6 0)W co CD t'3 cn r~
0
_I).
CD c
. I t,,,
TABLE 1 (Post 2003 Outage)
SECOND INSPECTION INTERVAL-THIRD PERIOD ABSTRACT OF EXAMINATIONS AND TESTS hx mlnatflniatlon-s'~
amfhdtj(f%) ~ExerifitaYiR
- Categor,
~ >Rku red foirY. ~NCrbdit~ o.~ Cei~()
':~~~9 t t i31o1 t
1Date (IWE) E.G 8
3 100%
63%
RR# IWE-02. Currently in the 2nd period for IWE, deferral
~~~~~permissible.
F-AF1.10 33 11 100%
100%
Code Case N-491-1 applied to all supports F-AF1.20 73 29,.
100%
100%
Code Case N-491 -1 applied to all supports F-A,F1.30 26 8
100%
100%
Code Case N-491 -1 applied to all supports F-A.F1.40 33 13 100%
100%
Code Case N-491-1 applied to all supports IWL St. Lucie does not have a concrete containment. No examinations are required.
RR# 29 applied, FPL implemented a risk Informed
^
R-A 24 8
- 100%
100%
program In the 3d period of the interval. FPL performed 0:/-
examinations of all items this outage that were not I_____________
previously examined during the Interval.
ICb I~I 00 W C
CD coICD
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 5 St. Lucle Unit 2 SECOND INSPECTION INTERVAL-THIRD PERIOD 2003 REFUELING OUTAGE INSERVICE INSPECTION REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Category Number Description Characterization During Scheduled Section XI (IWA_3300)
Examination or Test (Yes or No)
There were no flaws or relevant conditions that required evaluation for continued service.
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 6 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2. 2nd Interval. 3rd Period Code Repair.
Flaw or relevent Date Repair/
Class Replacement.
Description condition found Complete Replacement or Corrective of Work durIng scheduled Plan Number Measure Description ISI exam or test?
3 El Repair CC-236 Replace swaged reducer due CHECK IF YES E -412212002 SL2- 02060 Ri Replacement to Internal erosion Intenval#2 o CoMrrIve Measure Period #3 2
0 Repair CHG PP Spot-face extension covers CHECK IF YES O 4/2212002' SL2- 02061 iJ Replacement 25 and replace cover nuts.
Corrective
'Interval
- 2 Measure Period #3 2
0 Repair V2324 Replace nozzle. disc. bellows CHECK IF YES O 5r20/2002 S1.2- 02063 R
Replacement Intenval#2 ElCorreciveInevl2 Measure PerIod #3 2
E Repair CHG PP Install flat washers and CHECKIFYES E 11/112002 SL2- 02066 0 Replacement 2A replace nuts o Corrective Interval J2 Measure Period #3 2
E Repair CHGPP Coverstudandnut
' CHECKIFYESO 10125S2002 SL2- 02067 E] Replacement 28 o Corrective Interval J2 Measure Period #3 2
0 Repair CHGPP CoverStud&Nut CHECKIFYESO 1111912002 SU.2-02068 0 Replacement 2A O Corrective Measure Period #3 3
E Repair ICW PP 2A Replace Pump With spare CHECK IF YES O 1212312002 SU- 02070 6 Replacement (CR02-2912)
Interval #2 Q Corective Inbrval#2 Measure Period #3 2
Ea Repair V3427 Remove/Reweld Body-to-CHECK IF YES E 511412003
-SL2-02071 C Replacement Bonnet Seal Weld, OCr re' remove/replace SI-2416-378 Interval #2 Measurree for Interference Measure Pro i 3
E Repair ICW PP Rebuild spare lCW Pump CHECK IF YES E 1212312002 SL2- 02073 2]Replacement.
El Corrective
-Interval
- 2 Measure Period t3 2
0 Repair V2326 Rebuild SRV. Replace CHECK IF YES E 1/1412003 SU1. 02074 Replacement tnalpaIr O corrective-'
tnra#
Measure Period #3 2
E Repair CHG PP Replace Pump Cover Studs CHECK IF YES O
.1212712003 6 02075 Replacement 2B due to Gatting I
- 2 Corrective i'
'ItnaJ Measure PerodJ3 Page 1of9
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 7 TABLE 3 Abstract of Repairs, Replacements, or Correctlve Measures Required for Continued Service PSL 2 -2nd Interval, 3rd Period Code
- Repair, Flaw or relevent Date Repair/
Class Replacement condition found Complete Replacement or Corrective Item of W or during scheduled Plan Number Measure Description ISI exam or test?
1 0 Repair SE-02-1 Valve Inspection Remove CHECK IF YES E sno0o3 SL2- 02076 0 Replacement Reweld Bonnet Seal Weld.
O Corrective R
Interval #2 Lt Comedive Main &PilotDisc Measure Period #3 2
i Repair HCV-3627 Remove/Reweld Bonnet Seal CHECK IF YES 0 5/14/2003 SL2- 02077 oReplacement wl I
I#
O Corrective nerva Measure Period #3 2
0 Repair V07258 Remove/Replace CHECK IF YES 0 51/2003 SL2- 03079 o Replacement Body/Bonnet Seal Weld Interval #2 O Corrective Itr20 Measure Period #3 2
0 Repair HCV-3625 Remove/Replace CHECK IF YES 0 5/12t2003 SL2- 03080
] Replacement Body/Bonnet Seal Weld o Corrective Measure Period #3 2
0 Repair HCV-3615 Remove/Replace CHECK IF YES0 514/2003 SL2- 03081 O Replacement Body/Bonnet seal weld I
- 2 O Corrective Measure Period #3 2
0 Repair LCV-Inspect, rebuild valve:
CHECK IF YES 0 5120/2003 5-S2- 03082 2] Replacement 21100 Replace disc stack and plug, o~i Corrective using new slant design.
Interval #2 Measure Period #3 2
0 Repair CC-38 CuttReweld Une CC-38 for P-CHECK IF YES 0 5/2412003 SI2- 03084 1 Replacement 22 Bellows replacemenL o Correcthe Replace Bolting.
Interval #2 Measure Period #3 2
21 Repair CC CutVReweld Une CC-37 for P-CHECK IF YES 0 5/24/2003 St2- 03085 Replacement 20 Bellows replacement.
a Conective
- Replace Boiting.
Interval #2 Measure Period #3 2
21 Repair V3540 Remove/Reweld Body-to-CHECK IF YES 0 5/1412003 SL2- 03088 o
Replacement Bonnet Seal weld for valve o Corrective Inspection and rebuild Interval #2 Measure Period #3 2
21 Repair SG2A RepiirsecondaryHotleg CHECKIFYESO 5/14/2003 St2- 03087 O Replacement Handhole #2 Stud hole by 0 Conrectife
-Installation of helicoil Interval #2 Measure Period #3 2
0 Repair 2B CHG Replace galled pump cover -
CHECK IF YES 0 2/24/2003 SL2- 03090 0 Replacement PP studs andn-Intervaln#2 o Corrective Measure Period #3 Pagc 2 or
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 8 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2-2nd Interval 3rd Period Code Repair.
Flaw or relevent Date Repaid Class Replacement, D
i condition found Complete Replacement or Corrective Item oJQor during scheduled -
Plan Number Measure scrion ISI exam or test?
2 21 Repair V3133 -
Remove/Reweld bodylbonnet CHECK IF YES 59/2003 SL2- 03093 o Replacement seal weld Interal#2 O
Corrective Measure Period #3 2
21 Repair SE-03-1A Remove/Reweld bodyhbonnet CHECK IF YES U 5/2o003 SU2- 03094 o Replacement seal weld 0 Corrective
~~~~~~~~~~~~~~~~~~Interval
- 2 o Corrective Measure Period #3 3
0 Repair.
SR21243 Remove relief valve SR21243 CHECK IF YES O 3/2612003 SU2- 03097 0 Replacement and replace vlth a blind on Coerectiveflange.
(Re: ARP PCM Interval #2 Corrective 02097)
Measure Period #3 3
0 Repair CW-90 FLANGE STUD CHECK IFYES0 5/29203 SIU- 03098 Replacement REPLACEMENT PER CR 02-o Corrective 3035, Includes size change In Interval #2 LJ Corrective scope change 1B Measure s
Period #3 3
E Repair CW-12 CLEAN/REPAIR/COAT CHECK IF YES 0 6/9/2003 SL2- 03099 21 Replacement SUPPORT/RESTRAINT CWV El Corrective
~~~3000-60
.Interval
- 2 Measure Perlod#3 3
21 Repair CW-1 REPR PIPE LEAK & SUPT CHECK IF YES0 5/29/2003 SU2- 03100 21 Replacement 7004 I
- 2 o Corrective Measure
-Period
- 3 2
0 Repair V8204 FYP 1122 MS SAFETY CHECK IFYESU 5/2912003 SU2- 03101 21 Replacement OVERHAUL CR03-1227 0 corrective
~~~~~~~~~~~~~~~~~~Interval 02 o Corrective Measure Period 03 2
0 Repair V8205 FYP 1122 MAIN STEAM CHECK IF YESU 5/292003 SU2- 03102 21 Replacement SAFETY OVERHAUL Interal 2 O Corrective Measure Period #3 2
0 FRepair V8206 FYP 1122 MAIN STEAM CHECKIFYES[
512912003 SL2- 03103 21 Replacement SAFETY OVERHAUL Interal#
Corrective Measure
- -Period #3 3
0 Repair CW-16 CLNIINSP/REPR/COArATR CHECK IF YES 0 5U1012003 SU2- 03104 21 Replacement AIN PIPE&SUPT.
Interval #2 o Corrective Measure Period #3 3
0Repair CW-90 CR 03.0169 REPAIR CHECKIFYESE0 51012003 SL2- 03105 21 Replacement SUPT.CW-i600-8097 Interval#2 0 Corrective Measure Period 3 Page 3 of 9.
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 9 TABLE 3 Abstract ol Repalr, Replacements or Corrective Measuresl Required for Continued Service PSL 2.2nd Interval, 3rd Period Code
- Repair, Flaw or relevent Date Repair/
Class Replacement.
'item Description v, condition found Compiete Replacement or Corrective Item during scheduled Plan Number Measure Descrption o
r ISI exam or test?
3 0 Repair
'CW-9 REPAIR LOC#12.3.4,5.9&
CHECKIFYESO 5110/2003 SL2- 03106 0 Replacement 11 'TRAIN interval#2 O Corrective Measure Period #3 3
0 Repair CW-16 CR 02-2978, PIPE I-LEAKAGE CHECK IF YES 0 5/10/2003 Si-2 03107 0 Replacement ioi Corre ctive Interval #2 Measure Period #3 3
0 Repair CCW HX Replace defective tubes CHECKIFYES0 517/2003 1SL2-03108 0 Replacement 2A z Conective
' ~~~~~~~~~Interval 02 E]Corrective Measure Period #3 3
0 Repair MV-21-3 Replace Valve '
CHECK IF YES O 5110/2003 S62- 03109 2] Replacement o Corrective Interval #2 Measure Period #3 3
0 Repair CW-9 CR 0-87, REPAIR CHECK IF YES0 5/10/203
_L.2.
03110 0 Replacement SUPPORTS ICWATRAIN O Coective Interval #2 Measure Period *3 3
0Repair S814530 VALVELEAKSBYSEAT. 10' CHECKIFYESO 58/2003 SL2-03111 0 Replacement BOLTED PRATT D Corrective
-~~~~~~~~~~~~Interval
- 2 ol Corrective Measure Period #3 3
'0O Repair TCV.14-4A ReplaoeTCV.14-4Awlth CHECKIFYESO 5/8/2003 612- 03112 0 Replacement rebuilt valve o Corrective intrval #2 Measure Period#3 I
El Repair V1235 Replace Loop Drain Valve, CHECKIFYESO 5/13/2003 S' 03113 0 Replacement modify restraint per CRN O Corective 0Z083-10775 Interval#2 Measure Period 43 2
0 Repair V18195 Replace cherclvalve disc.
CHECKIFYES0 4/2n203 SL2- 03114 0 Replacement V18195 Isa Ctrnt (sol valve at o Corrective P-9.
Interval #2.
Measure
~~~~~~~~~Period 43 2
0 Repair HCV-3616 Replace Valve HCV-3616 CHECKIFYES S/8/2003 SL2- 03115 0 Replacement HPSl ar to Lop 2A2 0OCorrective inevl#
iMieasure 2Period
- 3 2
0Repair HCV-3817 Replace Valve HCV-3617A CHECK IF YES 0 5/1012003 SL.2- 03116 0 Replacement HPSI hdr to Loop 2A2 O Corrective Interval #2 Measure Period #3 Page 4 of 9
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 10 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2 -2nd Interval, 3rd Period Code
- Repair, Flaw or relevent Date Repair/
Class Replacement, condition found Complete Repicement oCorrective Item Description cn~oon onit elcmn or Comctive cIptenn of Work during scheduled Plan Numaber Me asune Dexcription
°ISI exam or test?
3 E0 Repair 5821166 ReplacevalveS821166 CHECKIFYESD 51012003 SL2- 03117 1 Replacement Interval#2 O Corrective Measure Period #3 3
RI Repair CW-21 REPAIRLOC#12,13AND21 CHECKIFYESO 5/1012003 SL 03118 O Replacement K TRAIN O Conective
~~~~~~~~~~~~~~~~~~Interval
- 2 o corrective Measure Period #3 2
0 Repair MV-09-9 Replace Valve Plug CHECKIFYESO 5/812003 S12- 03119 0 Replacement Ir
- 2 o Corrective Measure Period #3 2
0 Repair V09123 Replace valve plugs CHECK IF YES O 4129/2003 SL2- 03120 21 Replacement Itv
- 2 O Comctive -
~~~~~~~~~~~~~~~~Interval 02 o corrective Measure Period #3 2
ERepair MV409-12 Replace MV9-12 plug and CHECK IF YES 5/ua2003 SL 03121 0 Replacement seat due to normal wear l Corrective
-Interval
- 2 Measure Period #3 2
E Repair V09151 Replace valve bonnel studs CHECK IF YESE 5Q212003 SL2- 03122 0 Replacement D Corrective
~~~~~~~~~~~~~~~~~Interval
- 2 El Corrective Measure Period #3 2
E Repair V3427 Replace stop-check valve disc CHECK IF YES 5/612003 SL2- 03123 0 Replacement Interval#2 O Conective Measure
-Period
- 3 2
0 Repair SI-112 Sl-112-FW7 WELD REPAIR CHECKIFYES0 5/812003
-L2- 03124 E Replacement CR03-1429 0 Conlve t~~~~~~~~~~~~~nterval#2 R] corrective Measure Perod#3 1
0 Repair 09B Replace snubber 2-098 on CHECK IF YES 5/3012003 SL2- 03125 0 Replacement SupportS1420349C 21 Replacement
~~~~~~~~~~~~~~Interval
- 2 E Corrective Measure Period #3 2
2]Repair 214 REWORK SNUSER 2-211412.
CHECK IF YES0 5/25/2003 SL2- 03126 E Replacement 215 IAWCR03-1251 I
-2 El Corrective Measure
- iPeriod
- 3 3
21 Repair CW-10 PERFORM REPAIRS C CHECK IF YES El 5112/2003 51 03127 E Replacement TRAIN 30CW-n10 D Conerfflve
~~~~~~~~~~~~~~~~~Interval
- 2 e Corrective Measure
~~~~~~~~~~~~~~~~Period
- 3 Page S of 9
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 11 TABLE 3 Abstract of Repalrs, Replacements, or Corrective Measures Required for Continued Service PSL 2 -2nd Interval, 3rd Period Code Repair.
Flaw or relevent Dale Repair/
Class Replacement, Item Description condition found Complete Replacement or Corrective Itmduring scheduled Plan Number Measure Descipt of Work SI exam or test?
Repair V2433 Remove/Reweld Body to CHECK IF YES O 5/92003 SL2- 03128 O Replacement Bonnet seal weld I
2 O Corrective Interval #2 Measure Period #3 3
0 Repair CW-9 Replace degraded structural CHECK IF YESE 510/2003 SL2- 03129 i Replacement members of CW43000-77 o Corrective Interval #2 Measure Period #3 3
0l Repair CW-12 CR-03-1199 SUPPORT CHECKIFYESO 5/27/2003 SL2- 03130 i
Replacement REPAIR CW-70i6 o Corrective P
nervod #3 1 E0 Repair v13480 SECTXI-REPLACEVLV --
CHECKIFYESO 5/1112003 SU2- 03131 i
Replacement DISCInterval
- 2 O Corrective Measure Period #3 I
0 Repair RX REPAiRCEDMNOT18&
CHECKIFYES i 5/17n2003 SL2- 03132 O Replacement 72ICR 03148911538)
Includes second repair of
~~Interval #2
] Corrective Nozle72perCR03-1915 Measure WO 33009252 03 Period #3 1
0 Repair V2433 RepaceVaveDisc due to CHECK IF YESE 519/2003 SL2- 03133 i
Replacement wear Interval5#2 I
Correcive Interval #2
-Measure Period #3 3
0 Repair CW-12 CLEANIREPRICOAT SUPT CHECK IF YES O 6//2003 SL2- 03134 O Replacement CW400046 CR4169 E Corrective Interval #2 Measure Period #3 3
E Repair FIS-219A ReplaeFiane Bolting CHECKIFYESO E/10/2003 SIU- 03136 i Replacement Intev-al
-2 El Corrective Interal #2 Measure Period #3 1
E Repair V13525 Replace valve dcdueito CHECK IF YESE 5111/2003 SI2- 03137 RI Replacement reroded seating surfac 0 Corrective Intrval #2 Measure Period #3 1
0 Repair V3247 Replace valve disc -
CHECK IF YES E 5/14/2003 SL2- 03138 OR ace Interval #2 Ol Corrective Ibvl#
iMeasure Period #3 El Repair
-V3260 Replace tudsendiNuts CHECK IF YES 0 5)14)2003 SL2- 03139
> Replacement O Corrective Interval #2 Measure Period #3 Page 6 of 9
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 12 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2.2nd Interval, 3rd Period Code
- Repair, Flworrelevent Date Repaid Class Replacement.
scptn condition found Complete Replacement or Corrective Itm during scheduled Plan Number Measure Description of Work ISI exam or test?
2 0 Repair V2340 Replace valve CHECKIFYESO 5m1112003
-SL2- 03140
> Replacement O Corrective interval#2 Measure Period #3 2
0 Repair MS4100-Replace damp bolts In CHECKIFYES 0 5/1412003 SL2- 03142 7 Replacement 16A restraint Restraint removed o Conrective for ISI of adjacent weld.
Interval #2 Measure Period #3 2
0 RepaIr V3766 Replace valve V3766 and CHECK IF YES 0 5/12/2003 SL2- 03143 i
Replacement portions of restraint SI-2-R1 O Corrective
-Interval
- 2 Measure Period #3 1
0 Repair V3258 Replace bonnet stud/nut CHECK IF YES 0 511212003 SL2- 03144 1 Replacement 0 Corrective Interval#2 Measure Period #3 3
0 Repair CW-90 Instasl 3him plate on support CHECK IF YES 0
/1112003 SL2- 03145 O Replacement CW-3000-8097 Interval#2 O Corrective Measure Period #3 2
7 Repair CH-104 Shorten strut on Ci-72-RI CHECK IF YES 0 5/1412003 SI.2- 03146 O Replacement O Corrective Interval #2 Measure Perbd#3 1
0 Repair PZR Replace PZR Manway stud CHECK IF YES 0 5127R2003 SU2- 03147 2
Replacement damaged during removal Interal #2 O Corrective Measure Period #3 2
7 Repair HCV-3625 Seal Weld body to Bonnet CHECKIFYESO 5/1312003 SU-2 03148 O Replacement Intenval#2 o Corrective Measure
-Period
- 3 2
JRepair 126 Weld ExtensionTube for CHECKIFYESi 1s2412003 SL2- 03149 0
Replacement snubber 2.126 CH-146 PRR ROConeplacete Aux Spray Interval #2 0 Corrective Pro#
Measure -
~~~~~~~~~~~~Period
- 3 2
g Repair 206 Weld Extension Tube Snubber CHECK IF YES El 512412003 SU2- 03150 O Replacement 2206 Main Steam Corrective Instruments LT-9013B Interval 02 Measure Period#3 2 -
Repair Snubber 2-Weld Extension Tube Snubber CHECK IF YES 0 5124/2003 SU2- 03151 O Replacement 208 2-208 Main Steam o Corrective Instruments LT-9011 Interal #2 Measure Period #3 Pagc 7 of9
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 13
- TABLE 3
't' Abstract of Repairs, Replacements. or Corrective Measures Required for Continued Service PSL 2 -2nd Interval, 3rd Period Code
- Repair, Flaw or relevent Date Repaid Class Replacement.
Item Description condition found Complete Replacement or Corrective Itm n
ofWork during scheduled Plan Number Measure Description ISI exam or test?.
3 0 Repair CW-10 REPLACEMEMBER ON CW-CHECKIFYESO 511812003
-L2S 03152 RI Replacement 3000.46 RESTRAINT o Corrective Interval #2 Measure Period #3 3
0 Repair CW-10 REPLACE BOLTING ON ICW CHECKIFYESO 58i12003 S1-2 03153 0 Replacement SUPPORTS 54&7002 l Corrective
'Interval #2 Measure Period #3 I
0 Repair SG2A FYP 3521 SEC MANWAY CHECK IFYES El 5/16/2003 SU2- 03154 2 Replacement STUCK STUD REPAIR O Correc~~~~~~ve
~~~~~~~~
Interval #2 El Corrective Measure Period #3 2
0 Repair SI-4200
- Replace missing Load Pin, CHECK IF YES 0 562712003 SU2- 03155 2 Replacement 6373 lost during disassembly for o Corrective Inspection Intrval#2 Measure Period #3 3
0 Repair CW-21 Install Shim In restraint CW-CHECK IF YES 0 5/2312003 SU2- 03156 Replacement 3000-8097
'n-Corrective Interval #2 Measure Period #3 3
0 Repair CW-9 Addilionalweldrequiredper, CHECKIFYESO 52412003 SU2- 03157 O Replacement calculation on restraint CW-Q Corrective
'3000-77 Interval #2 Measure Period #3 3
0 Repair CW-9 Weld end cap on CW-3000-CHECKIFYES E 512712003 SL2- 03158 RI Replacement 7010 o Corrective
' 'Interval
- 2 Measure
-Perod
- 3 3
0 Repair V2345 Replace relief valve Inlet CHECK IF YES E 5/1712003 "SL2- 03159 0 Replacement bolting O Corrective '
Interval #2 Measure Period #3 2
0 Repair MS-1 I CR 03-14521LOOSE CHECKIFYESO 5/30/2003 SL2- 03161 Replacement SUPPORT/REPAIRMS-I
-2 Corrective 3023-78. 85, 89. 91 Interval 2 Measure
\\
(
' ' \\ ' '
Period #3 2
0Repair SE-03-1B Remove4Reweild bonnet seal CHECK IF YESE 5/1912003 SL2- 03162 O Replacement weld' Ol Corrective Interval #2 Measure Period #3 3
0 Repair CW-11 CLEAN/COAT SUPPORT CW*
CHECK IFYES El 5/2912003 SL2- 03163 21 Replacement 3000.7001 Interval#2 Macorrective-Measure
~~~~~~~~~~~~~~~~~'Period
- 3 Page 8 of 9
St. Lucie Unit 2 Docket No. 50-389 L-2004-004 Enclosure 2 Page 14 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2 -2nd Interval, 3rd Period Code
- Repair, Flaw or relevent Date Repair/
Class Replacement, Item Description condition found Complete Replacement or Corrective of Work during scheduled Plan Number Measure Description ofW
~ISI exam or test?
2 0 Repair SO-03-17 Fabricate new restricting CHECK IF YES E 5/3112003 SL2- 03164 2
Replacement orifice plates for SO-03-15 &
o Correctie 0S-03-17. This is rough fab Interval #2 Measure Task IA documents final Period #3 1
a Repair 068 Replace snubber 068 on CHECK IF YES E 512512003 S12- 03165 E5 Replacement Restraint SI-4201-7541B due D Corrective to functional test failure Interval #2 Measure Period #3 2
0 Repair MS-10 CORROSIONICLEAN CLAMP CHECKIFYESE 5r3012003 S 03166 9J Replacement REPLACE BOLTING, MS-El Corrective
~~~3023-11816.16,171888,30, Interval #2 O Corrective 35, 48, 79, &k 71 Itra Measure Period #3 2
0 Repair MV-08-17 SECTXI,VLVDISC CHECK IF YES E5/28/2003 S12- 03167 0 Replacement REPLACEMENT E Corrective Interval #2 Measure Period #3 2
E Repair MV-1 4-16 Replace Bolting on CCW CHECK IF YES E 6/1/2003 S12- 03168 2 Replacement CTMTCOOLERHVS-1D E Corrective outlet at P-17.
Interval #2 Measure Period #3 2
0 Repair MV-08-18B DOCUMENT SECTION XI CHECK IF YES E 67/2003 S12- 03170 2J Replacement PARTS REPLACEMENT E Corrective Interval #2 Measure Period #3 2
g Repair MV-08-16 MV-08-16,SL WELD PLUGS; CHECK IF YES E 617/2003 S12- 03171 O Replacement MSP03075 E Corrective Interval #2 Measure Period #3 2
0 Repair CHG PP Replace Block Cover Studs CHECK IF YES E 6t20/2003 S12- 03172 RI Replacement 2B and Nuts due to galling upon E Corrective removal.
Interval #2 Measure Period #3 2
0 Repair CHG PP Replace Crosshead studs and CHECK IF YES E 7/11/2003 S12- 03173
- Replacement 2A nuts due to galling during E Corrective maintenance Interval #2 Measure Period #3 2
0 Repair V2325 Replace RetiefValve Nozzle CHECK IF YES E 7/3112003 S12- 03174 2e Replacement and Disc Insert a Corrective Interval#2 Measure Period #3 Page 9 of 9