Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
|
MONTHYEARML0334503982003-11-24024 November 2003 Submittal of Yankee Nuclear Power Station'S License Termination Plan and Proposed Revision to Possession Only License Project stage: Request ML0335301472003-12-10010 December 2003 RESRAD-Build Calculation for License Termination Plan (Ltp) Project stage: Request ML0411102612003-12-16016 December 2003 Letter Submitting Yankee Atomic Electric Company (Rowe) Resrad Calculations for License Termination Plan Project stage: Request ML0402800242004-01-19019 January 2004 Transmittal of Derived Concentration Guidelines Level (Dcgl) and Area Factor Calculations for License Termination Plan (Ltp) Project stage: Request ML0402800282004-01-19019 January 2004 Calculation No. YA-CALC-00-004-03 Building Surface-Derived Concentration Guideline Levels (Dcgl). Project stage: Request ML0402800312004-01-19019 January 2004 Calculation No. YA-CALC-00-005-03, Building Surface Area Factors. Project stage: Request ML0402800362004-01-19019 January 2004 Calculation No. YA-CALC-00-006-03 Determination of Area Factors for Soil at Ynps Site. Project stage: Request ML0402801402004-01-19019 January 2004 Calculation No. YA-CALC-01-002-03, Derived Concentration Guideline Levels for Soil at the Yankee Rowe Site. Project stage: Request ML0403307772004-01-20020 January 2004 Groundwater Sampling Results for Yankee Nuclear Power Station Project stage: Request ML0404203882004-02-0202 February 2004 Groundwater Sampling Results for Ynps - Correction Project stage: Request ML0411006392004-02-10010 February 2004 Yankee Atomic Electric Company (Rowe) License Termination Plan Update - Section 6 Appendices (A-N) Project stage: Request ML0406900342004-03-0404 March 2004 Transmittal of Contaminated Concrete Calculation for the License Termination Plan (Ltp) Project stage: Request ML0411804942004-04-27027 April 2004 Memo to M. Lesar, Fr Notice Yankee Nuclear Power Station - Acceptance Review of License Termination Plan (TAC No. L52095) Project stage: Acceptance Review ML0415605572004-06-0404 June 2004 6/4/04 - Memo to M. Lesar, Yankee Nuclear Power Station - Notice of Public Meeting on License Termination Plan (TAC No.L52095) Project stage: Meeting ML0416900172004-06-16016 June 2004 Ltr to R. Kacich Yankee (Rowe) Nuclear Power Station - Request for Additional Information License Termination Plan (TAC No. L52095) Project stage: RAI ML0428603532004-08-0303 August 2004 Responses to NRC Requests for Additional Information - Ynps License Termination Plan (Ltp) Project stage: Response to RAI ML0510400192005-05-23023 May 2005 Yankee Nuclear Power Station - Environmental Assessment and Finding of No Significant Impact Related to the License Termination Plan (TAC No. L52095) Project stage: Other ML0525002192005-08-30030 August 2005 Yankee Station - NRC Safety Evaluation Related to License Amendment No. 158 Project stage: Other 2004-02-02
[Table View] |
|
---|
Category:Letter
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) ML18136A5552018-04-10010 April 2018 Yankee Nuclear Power Station, and Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2017 2024-03-11
[Table view] |
Text
YANKEE ATOMIC ELECTRIC COMPANY Telephone (413) 424-5261 49 Yankee Road, Rowe, Massachusetts 01367 AKEE January 19, 2004 BYR 2004-004 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Reference:
(a) License No. DPR-3 (Docket No. 50-29)
Subject:
Derived Concentration Guidelines Level (DCGL) and Area Factor Calculations for License Termination Plan (LTP)
This letter provides a copy of calculations in support of the LTP for the Yankee Nuclear Power Station (YNPS). A hardcopy of each calculation is enclosed as well as a CD which contains an electronic copy of the attachment files. The specific calculations provided are as follows:
(1) YA-CALC-01-002-03, "DCGLs for Soil at the Yankee Rowe Site" (2) YA-CALC-00-004-03, "Building Surface DCGLs" (3) YA-CALC-00-005-03, "Building Surface Area Factors" (4) YA-CALC-00-006-03, "Determination of Area Factors for Soil at YNPS Site" (5) YA-CALC-00-010-03, "Evaluation of Dose Integration Parameter in RESRAD-BUILD These calculations are provided for your review. If you have any questions, please contact us.
Sincerely, YANKEE ATOMIC ELECTRIC COMPANY es A. Kay Principal Licensing Engineer cc: J. Hickman, NRC, Senior Project Manager, NMSS (2 copies)
R. Gallaghar, MA DPH D. Howland, MA DEP M. Rosenstein, EPA, Region 1 W. Perlman, Executive Committee Chair, FRCOG T. W. Hutcheson, Chair, Franklin Regional Planning Board PM1¶S5O I D. Katz, CAN