ML040070086
| ML040070086 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/30/2003 |
| From: | O'Connor W DTE Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BL-03-004, NRC-03-0103 | |
| Download: ML040070086 (3) | |
Text
W\\illiam T. O'Connor, Jr.
Vice Prcsi(dent, Nuclear Generation Fermi 2 6400 North Dixie Hwsy., NewTort, Michigan 48166 Tel: 734-5S6-5201 Fax: 734-586-4172 DTE Energy-7 10 CFR 73.21 December 30, 2003 NRC-03-0103 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
- 2) NRC Bulletin 2003-04, "Rebaselining of Data in the Nuclear Materials Management and Safeguards System,"
dated October 8, 2003
Subject:
NRC Bulletin 2003-04 Response The NRC provided guidance in Reference 2 for submitting one-time data to the Nuclear Materials Management and Safeguard System (NMMSS) for rebaselining of the data in the NMMSS. This guidance was supplemented by NMMSS stating that "If a licensee reports material balance/inventory information to the NMMSS contractor, the licensee may send a letter to the NRC referencing their most recent submittal -and indicating that that submittal should be considered their response to the Bulletin request." Detroit Edison confirmed this guidance with the NRC Staff by telephone on December 22, 2003.
Detroit Edison submits material balance/inventory information to the NMMSS contractor on a regular basis for the Fermi 2 plant under Reporting Identification Symbol (RIS) - XHM. As prescribed in NUREG/BR-0007, "Instructions for the Preparation and Distribution of Material Status Reports," these submittals consist of
USNRC NRC-03-0103 Page 2 of 3 Department of Energy/U.S. Nuclear Regulatory Commission (DOE/NRC) Forms 742 and 742c. Detroit Edison also submits DOE/NRC Form 741 as prescribed in NUREGJBR-0006, "Instructions for Completing Nuclear Material Transaction Reports." These forms are submitted by encrypted email rather than by diskette as agreed to by the contractor.
Our most recent submittal, for the period ending March 31, 2003, was made on April 28, 2003, and was supplemented by revised forms DOE/NRC 742 and 741 on November 26, 2003. These submittals should be considered our response to the Bulletin request (Reference 2).
Should you have any questions or require additional information, please contact Mr. Norman K. Peterson of my staff at (734) 586-5248.
Sincerely, (IJ De eC cc:
H. K. Chernoff M. A. Ring NRC Resident Office Regional Administrator, Region m Supervisor, Electric Operators, Michigan Public Service Commission U. S. Nuclear Regulatory Commission Attention: Larry Harris Mail Stop T-4-D-8 Washington D C 20555-0001 Donna Hinton NAC International NMMSS Program Control P. 0. Box 922088 Norcross, GA 30010
USNRC NRC-03-0103 Page 3 of 3 bcc:
G. D. Cerullo D. K. Cobb R. W. Libra N. K. Peterson M. A. Philippon L. D. Sanders S. Stasek Electronic Licensing Library (ELL) (200 TAC)
Information Management (140 NOC)
Michigan Department of Environmental Quality Hazardous Waste and Radiological Protection Section NSRG Administrator (200 TAC)
NRR Chron File G. S. Cashell R. A. Gailliez T. C. Hsieh P. W. Smith J. D. Wines