December 2003 Monthly Operating Report for Watts Bar, Unit 1
ML040220484
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/14/2004
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040220484 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 JAN 1 4 2O04 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555 Gentlemen:

In' the Matter of

)

Docket No.50-390 Tennessee Valley Authority

)

WATTS BAR NUCLEAR PLANT (WBN) -

DECEMBER 2003 MONTHLY OPERATING REPORT Enclosure provides the December 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.

There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.

Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report -

December 2003 cc:

See page 2 Pwted crecydoipape

U.S. Nuclear Regulatory Commission Page 2 JAN 1 4i 2004 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT DECEMBER 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Doc Unit Date Con Tele Repi ket No.

50-390 Name:

WBN Unit 1 January 7, 2004 ipleted By:

P. P. Salkeld phone:

(423) 365-3635 orting Period:

December 2003 Design Electrical Rating (MWe-Net):

Maximum Dependable Capacity (MNMe-Net):

1.

2.

1155 1121

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MnI)

Month 744 744 0.0 869036 Year-to-Date Cumulative 7598 60763 7552 60452 0.0 0.0 8549615 67015683 E-2

UNIT SHUTDOWNS DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 January 7, 2004 P. P. Salkeld (423) 365-3635 REPORT PERIOD: Decemnber 2003 iNo.

Datc:;

Typ 1 - iDuration l:ReasOn 2 M-etho-d-Li enee:

System t:

Component

> Caue: ard Coretv cint E

u

O vent Code4 CO

reet1ecre

i~ii iii i
:.

(Ho:.

~~~~~Sl:>: ::Ni

.. :Suttijig Renot.N.

i_

R e acio r i

w :*.,.*.'...

6

{; ; ; iiiiiii
>>>>>:: N :: >- { >. ~~~~~~~~~~~~HI Vn

>>4 saii iiii giiiiii i t h~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.N..............

e letu~si w N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100 percent p w em on D e er 20 0 3.

F: Forced S: Scheduled 2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG-1022)

Summary:

The unit operated at or near 100 percent power for the entire month of December 2003.