-p Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy. Tennessee 37384-2000 December 18, 2003 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-327 50-328 SEQUOYAH NUCLEAR PLANT SQN)
ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION (TS)
CHANGE 00-14, "PRESSURE TEMPERATURE LIMITS REPORT (PTLR)
AND REQUEST FOR EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50, APPENDIX G" (TAC NOS. MB6436 AND MB6437)-
Reference:
TVA letter to TVA dated March 28, 2003,
."Sequoyah Nuclear Plant (SQN) -- Response to Request for Additional Information (RAI)
Regarding Technical Specification (TS) Change 00-14, 'Pressure Temperature Limits Report (PTLR) and Request for Exemption From the Requirements of 10 CFR 50, Appendix G,'
(TAC Nos. MB6436 and MB6437)"
Enclosed is additional-information to support NRC review of SQN TS Change 00-14.
The additional information supplements the information provided in the reference letter and responds to two NRC follow-up questions from a September 16, 2003 telephone conferece call with your staff.
- 1. ~~
~
~
~
+
Prhted ar recyded per
U.S. Nuclear Regulatory Commission Page 2 December 18, 2003 There are no commitments contained in this submittal.
Please direct questions concerning this issue to me at (423) 843-7 70 or J. D. Smith at (423) 843-6672.
as Lic ng and Industry Affairs Manager I declare under penalty of perjury that t regoing.s tru and correct.
Executed on this V day of Enclosure cc (Enclosure):
Framatome ANP, Inc.
P. 0. Box 10935 Lynchburg, Virginia 24506-0935 ATTN:
Mr. Frank Masseth Mr. Michael J. Marshall, Jr., Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-8G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Lawrence E. Nanney, Director Division of Radiological Health Third Floor L&C Annex 401 Church Street Nashville, Tennessee 37243-1532
- s ENCLOSURE SEQUOYAH NUCLEAR PLANT (SQN)
ADDITIONAL INFORMATION FOR TECHNICAL SPECIFICATION (TS)
CHANGE NO.
00-14, DOCKET NOS.
50-327 AND 50-328 The following additional information is provided in response to NRC staff questions from review of Westinghouse Topical Report WCAP-15984-P, Revision 1, "Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Sequoyah Units 1 and 2."
NRC Question 1 Provide a more precise estimate of when (in minutes into the heatup transient) the stress intensity factor (SIF) for the 0.1T outside diameter flaw at the location to which Figure 4-2 applies will exceed 33.2 ksi-inA0.5.
TVA Response Figure 4-2 of WCAP-15984-P, Revision 1, provides a summary of all the time steps in the heatup/cooldown transient for the governing location in the head.
For a postulated flaw of depth equal to 0.1T, the stress intensity factor exceeds the value of 33.2 ksi-in^0.5 at a time of 344 minutes into the transient, which is at the end of the heatup.
Other time steps where the stress intensity factor exceeds 33.2 ksi-in^0.5 include 355, 375, and 405 minutes.
For these times, the reactor vessel is at least 500 degrees Fahrenheit, so the toughness is on the upper shelf, at least 200 ksi-in^0.5.
This value is far above the minimum lower-shelf toughness, thus, fracture could not occur in this region.
This provides a simple and conclusive demonstration that there is no need for a flange requirement.
NRC Question 2 Identify whether or not a 0.1T outside diameter flaw at any location other than that to which Figure 4-2 applies will exceed a SIF of 33.2 ksi-inA0.5 at a time step earlier in the heatup transient.
If so, provide the time (in minutes into the heatup transient) when the other location exceeds 33.2 ksi-inA0.5.
E-1
4 TVA Response As stated in the report, the location covered by Figure 4-2 of WCAP-15984, Revision 1, is the governing location for the heatup/cooldown transient.
Therefore, there are no other locations in the head where the stresses could be higher at a given temperature.
E-2