July 23, 2003 Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT REGARDING EXEMPTIONS TO THE REQUIREMENTS OF TITLE 10 OF THE CODE OF FEDERAL REGULATIONS, PART 50, APPENDIX G (TAC NOS. MB6436 AND MB6437)

Dear Mr. Scalice:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to one of the two exemptions in your application dated September 6, 2002, as supplemented on December 19, 2002. The proposed exemptions would permit the use of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, Code Case N-640, Alternative Requirement Fracture Toughness for Development of P-T Limit Curves for ASME B&PV Code,Section XI, Code Case N-640, in lieu of Title 10 of the Code of Federal Regulations, Part 50, Appendix G, Paragraph IV.A.2.b. The other exemption in your application dated September 6, 2002, as supplemented on December 19, 2002 is still undergoing review by the U.S. Nuclear Regulatory Commission staff.

The assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Michael L. Marshall, Jr., Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosure:

Environmental Assessment cc w/encl: See next page

ML032040305 OFFICE PDII-2/PM PDII-2/LA EMCB/SC RLEP/SC OGC PDII-2/SC NAME MMarshall BClayton SCoffin JTappert SCole A Howe DATE 07/14/03 07/14/03 07/14/03 07/15/03 07/18/03 07/23/03 7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION TENNESSEE VALLEY AUTHORITY DOCKET NOS. 50-327 AND 50-328 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.60 for Facility Operating License Nos. DPR-77 and DPR-79, issued to the Tennessee Valley Authority (TVA, the licensee), for operation of the Sequoyah Nuclear Plant (SQN), Units 1 and 2, located in Hamilton County, Tennessee. Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.

ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action:

The proposed action would permit the use of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI Code Case N-640, Alternative Requirement Fracture Toughness for Development of P-T Limit Curves for ASME B&PV Code,Section XI, Code Case N-640, in lieu of 10 CFR 50, Appendix G, paragraph IV.A.2.b.

The regulation at 10 CFR Part 50, Section 50.60(a), requires, in part, that except where an exemption is granted by the Commission, all light-water nuclear power reactors must meet the fracture toughness requirements for the reactor coolant pressure boundary set forth in Appendix G to 10 CFR Part 50. Appendix G of 10 CFR Part 50 requires the establishment of pressure-temperature (P-T) limits for specific material fracture toughness requirements of the reactor coolant pressure boundary materials and mandates the use of the ASME B&PV Code,Section XI, Appendix G. The requirements in 10 CFR 50, Appendix G, establish an adequate

margin to brittle failure during normal operation, anticipated operational occurrences, and system hydrostatic tests.

ASME B&PV Code,Section XI, Code Case N-640 permits the use of an alternate reference fracture toughness curve for reactor pressure vessel materials for use in determining the P-T limits. ASME Code Case N-640 permits the use of alternate reference fracture toughness (i.e., use of KIC fracture toughness curve instead of KIA fracture toughness curve, where KIC and KIA are Reference Stress Intensity Factors, as defined in ASME Code,Section XI, Appendices A and G, respectively) for reactor vessel materials in determining the P-T limits.

Since the KIC fracture toughness curve shown in ASME Code,Section XI, Appendix A, Figure A-2200-1, provides greater allowable fracture toughness than the corresponding KIA fracture toughness curve of ASME Code,Section XI, Appendix G, Figure G-2210-1, using ASME Code Case N-640 to establish the P-T limits would be less conservative than the methodology currently endorsed by 10 CFR Part 50, Appendix G. Therefore, an exemption to apply ASME Code Case N-640 is required.

The proposed action is in accordance with the licensees application dated September 6, 2002, as supplemented by letter dated December 19, 2002 and June 24, 2003.

The Need for the Proposed Action:

The proposed exemption is needed to allow the licensee to implement ASME Code Case N-640 in order to revise the method used to determine the P-T limits because continued use of the present method for determining P-T limits unnecessarily restricts the P-T operating window. The two primary benefits to the licensee from the use of Code Case N-640 are:

 Challenges to the operators would be reduced since the requirements for maintaining high-vessel temperature during pressure testing would be lessened.

 Enhanced personnel safety would result because of the lower temperatures which would exist during the conduct of inspections in primary containment.

Environmental Impacts of the Proposed Action:

The NRC has completed its evaluation of the proposed action and concludes that there are no significant environmental impacts associated with the use of the alternative analysis method to support the revision of the reactor coolant system P-T limits.

The proposed action will not significantly increase the probability or consequences of accidents, no changes are being made in the types or significant increase in the amounts of effluents that may be released offsite, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.

With regard to potential nonradiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect nonradiological plant effluents and has no other environmental impact. Therefore, there are no significant nonradiological environmental impacts associated with the proposed action.

Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.

Environmental Impacts of the Alternatives to the Proposed Action:

As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the no-action alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.

Alternative Use of Resources:

The action does not involve the use of any different resource than those previously considered in the Final Environmental Statement for SQN, dated February 13, 1974.

Agencies and Persons Consulted:

On July 15, 2003, the staff consulted with the Tennessee State official, Ms. Elizabeth Flannagan, regarding the environmental impact of the proposed action. The State official had no comments.

FINDING OF NO SIGNIFICANT IMPACT On the basis of this environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.

For further details with respect to the proposed action, see the licensees letter dated September 6, 2002, as supplemented by letter dated December 19, 2002. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to pdr@nrc.gov.

Dated at Rockville, Maryland, this 23rd day of July 2003.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Allen G. Howe, Chief, Section 2 Project Directorate 2 Division of Licensing Project Management Office of Nuclear Reactor Regulation

Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT cc:

Mr. Karl W. Singer, Senior Vice President Mr. Pedro Salas, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority Sequoyah Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Soddy Daisy, TN 37379 Mr. James E. Maddox, Vice President Mr. D. L. Koehl, Plant Manager Engineering & Technical Services Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Soddy Daisy, TN 37379 Chattanooga, TN 37402-2801 Senior Resident Inspector Mr. Richard T. Purcell Sequoyah Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Tennessee Valley Authority Soddy Daisy, TN 37379 P.O. Box 2000 Soddy Daisy, TN 37379 Mr. Lawrence E. Nanney, Director Division of Radiological Health General Counsel Dept. of Environment & Conservation Tennessee Valley Authority Third Floor, L and C Annex ET 11A 401 Church Street 400 West Summit Hill Drive Nashville, TN 37243-1532 Knoxville, TN 37902 County Executive Mr. Robert J. Adney, General Manager Hamilton County Courthouse Nuclear Assurance Chattanooga, TN 37402-2801 Tennessee Valley Authority 6A Lookout Place Ms. Ann P. Harris 1101 Market Street 341 Swing Loop Road Chattanooga, TN 37402-2801 Rockwood, Tennessee 37854 Mr. Mark J. Burzynski, Manager Heinz Mueller [5 copies]

Nuclear Licensing Environmental Review Coordinator Tennessee Valley Authority US EPA Region 4 4X Blue Ridge 61 Forsyth Street, SW.

1101 Market Street Atlanta, Georgia 30303-3104 Chattanooga, TN 37402-2801