|
---|
Category:License-Operator
MONTHYEARRA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML1133404102011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative Documents ML1133404292011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative JPMs ML1133404252011-11-28028 November 2011 Initial Exam 2011-301 Final Sim/In-Plant JPMs ML1133404222011-11-28028 November 2011 Initial Exam 2011-301 Final Simulator Scenarios ML1133404202011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative Documents ML1133404182011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative JPMs ML1133404172011-11-28028 November 2011 Initial Exam 2011-301 Draft Sim/In-Plant JPMs ML1133404162011-11-28028 November 2011 Initial Exam 2011-301 Draft Simulator Scenarios ML1133404142011-11-28028 November 2011 Initial Exam 2011-301 Draft SRO Written Exam ML1133404122011-11-28028 November 2011 Initial Exam 2011-301 Draft RO Written Exam IR 05000302/20113012011-10-24024 October 2011 Er 05000302-11-301; Operating Test September 12 - 16 & Written Exam September 22, 2011; Crystal River Unit 3; Operator License Examinations ML1128705742011-10-13013 October 2011 Initial Exam 2011-301 Final RO Written Exam ML1128705722011-10-13013 October 2011 Initial Exam 2011-301 Final SRO Written Exam ML1020106232010-07-16016 July 2010 NRC Generic Fundamentals Examination Results ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML0932702122009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative JPMs ML0932702032009-11-18018 November 2009 Initial Exam 2009-301 Final Sim/In - Plant JPMs ML0932701962009-11-18018 November 2009 Initial Exam 2009-301 Final Simulator Scenarios ML0932701912009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative Documents ML0932701852009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative JPMs ML0932701812009-11-18018 November 2009 Initial Exam 2009-301 Draft Sim/IN-Plant JPMs ML0932701572009-11-18018 November 2009 Initial Exam 2009-301 Draft Simulator Scenarios ML0932701452009-11-18018 November 2009 Initial Exam 2009-301 Draft SRO Written Exam ML0932701412009-11-18018 November 2009 Initial Exam 2009-301 Draft RO Written Exam ML0932701322009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative Documents ML0928906372009-10-16016 October 2009 Initial Exam 2009-301 Final RO Written Exam ML0928906422009-10-16016 October 2009 Initial Exam 2009-301 Final SRO Written Exam ML0928906472009-09-28028 September 2009 2009 Reactor Operator and Senior Reactor Operator Written Examination Package and Post-Exam Comments ML0926104592009-09-17017 September 2009 Operator Licensing Written Examination Approval 05000302/2009301 3F0609-04, Initial Exam 2009-301 General Correspondence2009-06-10010 June 2009 Initial Exam 2009-301 General Correspondence ML0806704722008-02-14014 February 2008 Retake Exam - 05000302-08-301 Draft Admin JPMs ML0806704472008-02-14014 February 2008 Rtk Exam - 05000302-08-301 Final Admin JPMs ML0806704152008-02-14014 February 2008 Retake Exam - 05000302-08-301 Administrative Documents 3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays2008-01-23023 January 2008 Summary of Ultrasonic Examination Results of Structural Weld Overlays ML0733212682007-11-29029 November 2007 October Exam 05000302-07-301 Licensee Post-Exam Comments ML0733212782007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAs ML0733212742007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam List of References ML0610802472006-04-17017 April 2006 Senior Reactor Operator Initial Retake Examination - Crystal River Nuclear Plant 05000302/2006301 ML0601000342006-01-0505 January 2006 Requalification Program Inspection - Crystal River Plant ML0607502602005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft RO Written Exam IR 05000302/20053012005-10-31031 October 2005 NRC Examination Report 05000302-05-301 ML0528000302005-10-31031 October 2005 October 2005 Exam, 05000302/2005-301 Final RO Written Exam ML0607502482005-10-31031 October 2005 September 2005 Exam 05000302/2005301 Administrative Documents ML0607502512005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Scenarios & Outlines ML0607502542005-10-31031 October 2005 October 2005 Exam 05000302/2005301, Draft JPMs & Outlines ML0607502572005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Written Exam Quality Checklist (ES-401-6) & Written Exam Sample Plan ML0528000322005-10-31031 October 2005 October 2005 Exam 0500302/2005301 Final SRO Written Exam ML0607502612005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft SRO Written Exam ML0607502702005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Jpms 2014-06-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML1133404102011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative Documents ML1133404292011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative JPMs ML1133404252011-11-28028 November 2011 Initial Exam 2011-301 Final Sim/In-Plant JPMs ML1133404222011-11-28028 November 2011 Initial Exam 2011-301 Final Simulator Scenarios ML1133404202011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative Documents ML1133404182011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative JPMs ML1133404172011-11-28028 November 2011 Initial Exam 2011-301 Draft Sim/In-Plant JPMs ML1133404162011-11-28028 November 2011 Initial Exam 2011-301 Draft Simulator Scenarios ML1133404142011-11-28028 November 2011 Initial Exam 2011-301 Draft SRO Written Exam ML1133404122011-11-28028 November 2011 Initial Exam 2011-301 Draft RO Written Exam IR 05000302/20113012011-10-24024 October 2011 Er 05000302-11-301; Operating Test September 12 - 16 & Written Exam September 22, 2011; Crystal River Unit 3; Operator License Examinations ML1128705742011-10-13013 October 2011 Initial Exam 2011-301 Final RO Written Exam ML1128705722011-10-13013 October 2011 Initial Exam 2011-301 Final SRO Written Exam ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML0932702122009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative JPMs ML0932702032009-11-18018 November 2009 Initial Exam 2009-301 Final Sim/In - Plant JPMs ML0932701962009-11-18018 November 2009 Initial Exam 2009-301 Final Simulator Scenarios ML0932701912009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative Documents ML0932701852009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative JPMs ML0932701812009-11-18018 November 2009 Initial Exam 2009-301 Draft Sim/IN-Plant JPMs ML0932701572009-11-18018 November 2009 Initial Exam 2009-301 Draft Simulator Scenarios ML0932701452009-11-18018 November 2009 Initial Exam 2009-301 Draft SRO Written Exam ML0932701412009-11-18018 November 2009 Initial Exam 2009-301 Draft RO Written Exam ML0932701322009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative Documents ML0928906372009-10-16016 October 2009 Initial Exam 2009-301 Final RO Written Exam ML0928906422009-10-16016 October 2009 Initial Exam 2009-301 Final SRO Written Exam ML0928906472009-09-28028 September 2009 2009 Reactor Operator and Senior Reactor Operator Written Examination Package and Post-Exam Comments ML0926104592009-09-17017 September 2009 Operator Licensing Written Examination Approval 05000302/2009301 3F0609-04, Initial Exam 2009-301 General Correspondence2009-06-10010 June 2009 Initial Exam 2009-301 General Correspondence ML0806704472008-02-14014 February 2008 Rtk Exam - 05000302-08-301 Final Admin JPMs ML0806704152008-02-14014 February 2008 Retake Exam - 05000302-08-301 Administrative Documents ML0806704722008-02-14014 February 2008 Retake Exam - 05000302-08-301 Draft Admin JPMs 3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays2008-01-23023 January 2008 Summary of Ultrasonic Examination Results of Structural Weld Overlays ML0733212782007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAs ML0733212742007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam List of References ML0733212682007-11-29029 November 2007 October Exam 05000302-07-301 Licensee Post-Exam Comments ML0610802472006-04-17017 April 2006 Senior Reactor Operator Initial Retake Examination - Crystal River Nuclear Plant 05000302/2006301 ML0601000342006-01-0505 January 2006 Requalification Program Inspection - Crystal River Plant ML0607502782005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Sample Plans/Outlines ML0607502482005-10-31031 October 2005 September 2005 Exam 05000302/2005301 Administrative Documents ML0607502512005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Scenarios & Outlines ML0607502542005-10-31031 October 2005 October 2005 Exam 05000302/2005301, Draft JPMs & Outlines ML0607502572005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Written Exam Quality Checklist (ES-401-6) & Written Exam Sample Plan ML0607502602005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft RO Written Exam ML0607502612005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft SRO Written Exam ML0607502702005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Jpms ML0607502732005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Scenarios ML0607502832005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Written Outlines, Combined Ro/Sro with Kas, Answers, References & Analysis ML0528000252005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Post-Exam Comments 2014-06-03
[Table view] |
Text
December 18, 2003 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing &
Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER
Dear Mr. Young:
In a telephone conversation on December 18, 2003, Mr. George T. Hopper, Senior Operations Engineer, and Mr. David DeMontfort, Operations Training Manager, made arrangements for the NRC to inspect the licensed operator requalification program at the Crystal River Nuclear Power Plant. The inspection is planned for the week of January 26, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC has requested that you submit (two weeks prior to the inspection/make ready upon arrival), the material as specified in the Enclosure, in order to support the NRCs inspection program needs. Mr. DeMontfort has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
FPC
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. George T. Hopper at (404) 562-4645 or myself at (404) 562-4638.
Sincerely,
/RA/
Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-302 License No. DPR-72
Enclosure:
Materials Request List cc w/encl:
Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Richard L. Warden Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Donald L. Taylor Manager Support Services Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 cc w/encl contd - See next page
FPC
cc w/encl contd:
R. Alexander Glenn Associate General Counsel (MAC - BT15A)
Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Jim Mallay Framatome Technologies Electronic Mail Distribution Ronald W. Davis, Training Manager Crystal River Nuclear Plant 8200 W Venable Street Crystal River, FL 34429
FPC
Distribution w/encl:
B. Mozafari, NRR C. Evans (Part 72 Only)
L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/
NAME GHopper MErnstes JMunday DATE 12/17/2003 12/18/2003 12/18/2003 1/ /2004 1/ /2004 1/ /2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML033630279.wpd
Materials Request List The items listed below are being requested per telephone conversation on December 18, 2003, to support the upcoming IP-71111.11 B inspection in January 2004 at Crystal River Nuclear Power Plant. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by January 15, 2004. Please have the items listed in paragraph "B" ready for our review upon arrival on January 26, 2004.
A. In-office inspection material:
- 1. Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
- 2. A copy of the last biennial requal written examination. (2RO/SRO exams)
- 3. List of personnel scheduled for requal testing the week of 1/26/04.
- 4. Copies of simulator scenarios for this exam.
- 5. Program evaluation for the previous 2 years training cycle.
- 6. A list of all personnel that reactivated their licenses since the last requal inspection.
- 7. Simulator:
List of all open simulator discrepancies (DRs).
Copy of the Simulator Management and Configuration Procedures.
List of all closed simulator DRs for last 12 months.
List of Simulator Performance tests.
B. On-site inspection material:
- 1. Condition Reports and LERs resulting from human performance errors since the last requal inspection.
- 2. All training feedback forms since the last requal inspection.
- 3. All remedial training packages since the last requal inspection.
- 4. Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.
- 5. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.
Enclosure
2
- 6. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
- 7. All Medical Exam Records with a copy of the individuals license available. A list for review will be presented during the inspection week.
- 8. Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
- 9. Copy of an Organizational Chart for the training department including the simulator group.
- 10. Complete list of all Licensed individuals complete with license restrictions.
- 11. Security procedures for the simulator.