I Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 DEC 12 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of
)
Docket No.50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN) -
NOVEMBER 2003 MONTHLY OPERATING REPORT provides the November 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4. provides a revision to the October 2003 report correcting errors that have been identified.
These corrections are indicated by a revision bar.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely,
~P.L. Pace 1KManager, Site Licensing and Industry Affairs Enclosures
- 1. Monthly Operating Report -
November 2003
- 2. Corrected Page for October 2003 MOR cc:
See page 2 9&
}
U.S. Nuclear Regulatory Commission Page 2 DEC 12 2003 cc (Enclosures):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT NOVEMBER 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 El-l
OPERATING DATA REPORT Doc Unit Date Con Tele Repi 1.
2.
ket No.
50-390 Name:
WBN Unit 1 e1:
-December 5, 2003 ipleted By:
P. P. Salkeld phone:
(423) 365-3635 orting Period:
November 2003 Design Electrical Rating (MWe-Net):
Maximum Dependable Capacity (MN~e-Net):
1155 1121
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month 720 720 0.0 839063 Year-to-Date Cumulative 6854 60019 6808 59708 0.0 0.0 7680579 66146647 E1-2
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-390 WBN-1 November 5, 2003 P. P. Salkeld (423) 365-3635
- 1 REPORT PERIOD: November 2003
':~~~~~~~~~~~~~~~~.:'B.;;.'.-;.....
e
' s
,,,..v.;..:...
v.j-v
......--..... *..... :2'v o
, :ev.;
.u B ;B:; e'::. t.
,Ha.e'...........
~~~~~~~~..:'::'.:';..-.-.¢.'.{...- e..-N.
,;v:
..5d............{ -,'.
- B
-*{ ;v:'I;
~
,{,e i,
A:..........
,s*.
... v...:;....,,. B:'.:::.
- 'u.t
.v."IeNt.-
.;,{*..M.
{-......... ns : ; *-'.
{.........
- , t:,:;,,,;;s
{g,
- ~....
.... ;;.N..
.;;....;.-.e.....u-
,~~...........
- on::
X{:X-;:
'Rasonif.:
....{ii..,.........
..j,..e N.. ;.....
B.;:. ::-:-'-:::-'-..-.-..
N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100 percent power for the entire month of November 2003.
_J
_I_
_I_
_I_
IF: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
Summary:
The unit operated at or near 100 percent power for the entire month of November 2003. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month of November 2003.
E1-3
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
REVISED PAGE FOR MONTHLY OPERATING REPORT OCTOBER 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E2-1
OPERATING DATA REPORT Docket No.
50-390 Unit Name:
WBN Unit 1 Date:
November 5, 2003 Completed By:
P. P. Salkeld Telephone:
(423) 365-3635 Reporting Period:
October 2003
- 1. Design Electrical Rating (MWe-Net):
1155
- 2.
Maximum Dependable Capacity (MWVe-Net):
1121
- Month Year-to-Date
- 3.
Number of Hours Reactor was Critical 288.3 6133.8
- 4.
Hours Generator On-Line 269.8 6088
- 5.
Unit Reserve Shutdown Hours 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 251039 6841516
- Adjusted based on seasonal conditions experienced during Cycle 5.
Cumulative 59299 58988 0.0 65307584 E2-2