ML033500150
| ML033500150 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/17/2003 |
| From: | Chamberlain D Division of Reactor Safety IV |
| To: | Blevins M TXU Electric |
| References | |
| Download: ML033500150 (5) | |
Text
November 17, 2003 M. R. Blevins, Senior Vice President and Principal Nuclear Officer TXU Energy ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043
Subject:
REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY
Dear Mr.Blevins:
The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.
The Divisions inspection duties were formerly divided among three branches:
Operations Branch Operator licensing Identification and Resolution of Problems (PI&R)
Plant Support Branch Security Radiological Controls Emergency Preparedness Engineering & Maintenance Branch Safety System Design and Performance Capability Permanent Plant Modifications Inservice Inspection Activities Evaluation of Changes, Tests or Experiments Fire Protection Heat Sink Performance Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:
Operations Branch Initial Operator Licensing Operator Requalification Program Emergency Preparedness PI&R Support Performance Evaluation Branch PI&R Lead Responsibility Fire Protection Heat Sink Performance Maintenance Effectiveness
TXU Engergy Engineering Branch Safety System Design and Performance Capability Permanent Plant Modifications Inservice Inspection Activities Evaluation of Changes, Tests or Experiments PI&R Support Plant Support Branch Security Radiological Controls PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.
Sincerely,
/RA/
Dwight D. Chamberlain, Director Division of Reactor Safety
Enclosure:
as stated Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 cc w/enclosure:
Roger D. Walker Regulatory Affairs Manager TXU Generation Company LP P.O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq.
Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711
TXU Engergy The Honorable Walter Maynard Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Chief, Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087
TXU Engergy Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (DBA)
Branch Chief, DRP/A (WDJ)
Senior Project Engineer, DRP/A (TRF)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
ADAMS: G Yes G No Initials: ______
G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive C:EMB C:OB C:PSB C:PBA C:DRS CSMarschall/lmb ATGody TWPruett WDJohnson DDChamberlain
/RA/
/RA/
/RA/
/RA/
/RA/
11/13/03 11/10/03 11/13/03 11/13/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax