FENOC FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, Ohio 43449 Low W. emrs Chief Operating Officer 419-321-7599 Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3007 November 20, 2003 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001
Subject:
Davis-Besse Nuclear Power Station Re-transmittal of Final Report on Examination of the Reactor Vessel Head Degradation Ladies and Gentlemen:
Enclosed for your information is Framatome ANP, Inc. Document 31-5029337-02, "Examination of the Reactor Vessel (RV) Head Degradation at Davis-Besse," November 2003, which was prepared by BWX Technologies, Inc., BWXT Services, Inc. on behalf of the FirstEnergy Nuclear Operating Company (FENOC). This report describes the laboratory examinations performed on a portion of the degraded reactor vessel head and two control rod drive mechanism (CRDM) nozzles removed from the Davis-Besse Nuclear Power Station, Unit No. 1. This document is identical to the document previously transmitted as Enclosure to the letter dated August 13, 2003 (FENOC Serial Number 2968), with the exception that the above-referenced Framatome ANP Document Number has been indicated on a new cover sheet and the BWXT Services, Inc.
warranty and liability statement on the first page following the cover sheet has been removed.
~~~~~~~ADO )
Docket Number 50-346 License Number NPF-3 Serial Number 3007 Page 2 No formal response to this letter is required or requested. However, should you have any questions or require additional information, please contact Mr. Kevin L. Ostrowski, Manager -
Regulatory Affairs, at (419) 321-8450.
Very truly yours, MKL Enclosures cc: