ML033230179
| ML033230179 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/17/2003 |
| From: | Chamberlain D Division of Reactor Safety IV |
| To: | Venable J Entergy Operations |
| References | |
| Download: ML033230179 (5) | |
Text
November 17, 2003 Joseph E. Venable Vice President Operations Waterford 3 Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
Subject:
REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY
Dear Mr. Venable:
The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.
The Divisions inspection duties were formerly divided among three branches:
Operations Branch
Operator licensing
Identification and Resolution of Problems (PI&R)
Plant Support Branch
Security
Radiological Controls
Emergency Preparedness Engineering & Maintenance Branch
Safety System Design and Performance Capability
Permanent Plant Modifications
Inservice Inspection Activities
Evaluation of Changes, Tests or Experiments
Fire Protection
Heat Sink Performance
Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:
Operations Branch
Initial Operator Licensing
Operator Requalification Program
PI&R Support Performance Evaluation Branch
Fire Protection
Heat Sink Performance
Maintenance Effectiveness
Engergy Operations, Inc. Engineering Branch
Safety System Design and Performance Capability
Permanent Plant Modifications
Inservice Inspection Activities
Evaluation of Changes, Tests or Experiments
PI&R Support Plant Support Branch
Security
Radiological Controls
PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.
Sincerely,
/RA/
Dwight D. Chamberlain, Director Division of Reactor Safety
Enclosure:
as stated Docket: 50-382 License: NPF-38 cc w/enclosure:
Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
Engergy Operations, Inc. Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70821-9154 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, LA 70821-4313 Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502
Engergy Operations, Inc. Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (MCH)
Branch Chief, DRP/E (WBJ)
Senior Project Engineer, DRP/E (VGG)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
ADAMS: Yes
No Initials: ______
Publicly Available Non-Publicly Available
Sensitive
Non-Sensitive C:EMB C:OB C:PSB C:PBE D:DRS CSMarschall/lmb ATGody TWPruett WBJones DDChamberlain
/RA/
/RA/
/RA/
/RA/
/RA/
11/13/03 11/10/03 11/13/03 11/13/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax