ML033160564

From kanterella
Jump to navigation Jump to search
Rev 0 to Oconee, Unit 1, Fourth Ten-Year Inservice Inspection Interval Plan, General Requirements
ML033160564
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/23/2003
From: Keith L
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML033160564 (297)


Text

FOURTH TEN-YEAR INTERVAL INSERVICE INSPECTION PLAN DUKE POWER COMPANY OCONEE NUCLEAR STATION GENERAL REQUIREMENTS ADuke WPowerS M A Duke Energy Company

FOURTH INTERVAL INSERVICE INSPECTION PLAN OCONEE NUCLEAR STATION UNIT 1 GENERAL REQUIREMENTS REVISION 0 Duke P)owerm A Duke Energy Company Prepared By: (AeapU C. k Date / By'0o3 L/

Reviewed B.: Date /g9- ZZ-o 3

-I Approved By: Date ANII Review:

6' Date 'o/ 3 Inservice Inspection Plan L. C. Keith Phone: (704)382-3141 Email: Ickeith @duke-energy.com Oconee Nuclear Station General Requirements

OCONEE NUCLEAR STATION GENERAL INFORMATION Oconee Nuclear Station's Inservice Inspection Plan is comprised of two separate volumes, the first is Oconee Nuclear Station's Inservice Inspection Plan is comprised of two separate volumes, the first is General Requirements; the second is identified as Unit 1.

Plant Location: Highway 130/183 Seneca, South Carolina 29672 Commercial Service Date: Oconee Unit 1 July 15,1973 Fourth Interval Start Date: Oconee Unit 1 January 1, 2004 Fourth Interval End Date: Oconee Unit 1 July 15, 2013 Note: The Oconee Unit 1 Fourth Interval ISI plan covers a time period of 9 years and 7.5 months. The reason it does not cover 10 years is because Duke Energy is trying to recapture 4.5 months of grace period that was used in the Oconee Unit 1 Third Interval ISI Plan.

Owner: Duke Energy Corporation 526 South Church St.

Mail Code EC07J Charlotte, N. C. 28201-1006 Inservice Inspection Plan General Information Oconee Nuclear Station Revision 0 General Requirements Page 1 of 1

TABLE OF CONTENTS GENERAL REQUIREMENTS SECTION TITLE REVISION

1. Applicable Codes and Standards for Inservice Inspection 0
2. System Boundaries Subject to Inspection 0
3. Inspection Methods and Procedures to be Used for Inservice 0 Inspection
4. Description of Inservice Inspection Plan for ASME Class 1 Items 0
5. Description of Inservice Inspection Plan for ASME Class 2 Items 0
6. Description of Inservice Inspection Plan for ASME Class 3 Items 0
7. Description of Augmented and Elective Inservice Inspection Plan 0
8. Description of Examination Listings 0
9. Requests for Relief From ASME Code Requirements 0
10. Calibration Standards 0 Inservice Inspection Plan Table of Contents Oconee Nuclear Station Revision 0 General Requirements Page 1 of 2

TABLE OF CONTENTS Oconee Unit 1 Section Title Revision 1 Oconee Unit 1 Inservice Inspection Examination Listing and Schedule 0 Tab 1 = Examination Listing for Outage 1 (EOC 22) 0 Tab 2 = Examination Listing for Outage 2 (EOC 23) 0 Tab 3 = Examination Listing for Outage 3 (EOC 24) 0 Tab 4 = Examination Listing for Outage 4 (EOC 25) 0 Tab 5 = Examination Listing for Outage 5 (EOC 26) 0 Tab 6 = Examination Listing for Outage 6 (EOC 27) 0 2 Oconee Unit 1 Inservice Inspection - List of Reference Drawings 0 Inservice Inspection Plan Table of Contents Oconee Nuclear Station Revision 0 General Requirements Page 2 of 2

1.0 Applicable Codes and Standards for Inservice Inspection In accordance with the requirements of Paragraph 50.55a(g) of 10CFR Part 50 (August 7, 2003 publication), the inservice inspection of Unit I of the Oconee Nuclear Station will be performed in accordance with Inspection Program B of the 1998 Edition of ASME Section Xl, thru the 2000 addenda, hereafter referred to as Section Xl, subject to the following limitations and modifications:

Paragraph IWB-1220, shall be performed in accordance with 1989 Edition of ASME Section Xl as required per Paragraph 50.55a(b)(2)(xi) of 10CFR Part 50.

Paragraph IWB-2500-1, Examination Category B-D (items B3.120 and B3.140) shall be performed in accordance with 1998 Edition of ASME Section Xl as required per Paragraph 50.55a(b)(2)(xxi)(A) of 10CFR Part 50. This paragraph allows a VT examination with enhanced magnification to be performed in lieu of the UT examination.

Paragraph IWB-2500-1, Examination Category B-G-2 (items B7.80) shall be performed in accordance with 1995 Edition of ASME Section Xl as required per Paragraph 50.55a(b)(2)(xxi)(B) of 10CFR Part 50.

Paragraph IWB-2500-1, Examination Category B-K (items B10.10) shall be performed in accordance with 1995 Addenda of ASME Section Xl as required per Paragraph 50.55a(b)(2)(xxi)(C) of OCFR Part 50.

All examinations will be performed to the extent practicable within the limitations of design, geometry and materials of construction of the component.

Y& 1.1 Additional Codes and Standards Used Inspections performed in addition to those required by Section Xl are described in Section 7 of this Plan. The following codes and standards apply to these inspections:

1.1.1 Reactor coolant pump flywheels will be inspected as required by the Oconee Improved Technical Specifications for Oconee Nuclear Station.

1.1.2 Steam generator tubing will be inspected as required by ASME Section Xl and the Oconee Improved Technical Specifications for Oconee Nuclear Station. The Nuclear Support Division, Nuclear Technical Services Section have overall responsibility for this inspection.

1.1.3 Augmented (regulator required) examinations on certain systems or components shall be performed in accordance with other editions or addenda of ASME Section Xl, as identified in the governing commitment.

_J> Inservice Inspection Plan Section 1 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 3

1.2 Code Cases Applicable to the ASME Boiler and Pressure Code Section Xl The following Code Cases will be used for the Fourth Interval Inservice Inspection Program at Oconee Unit 1:

1.2.2 Code Case N-460 uAlternative Examination Coverage For Class 1 and Class 2 Welds". (This Code Case is approved for use under Regulatory Guide 1.147, Revision 13.)

1.2.9 Code Case N-648-1 Alternate Requirements for Inner Radius Examinations of Class 1 Reactor Vessel Nozzles, Section Xl, Division 1. (This Code Case is approved for use under Regulatory Guide 1.147, Revision 13.)

1.3 Applicable Duke Power Administrative Procedures The following Duke Power procedures will be used to control preservice and inservice inspection activities and inservice inspection plans and reports:

PROCEDURE NO. TITLE NSD-300 "ASME Section Xl Program" NSD-701 "Records Management" NSD-702 "Document Management" NSD-800 "Software and Data Quality Assurance (SDQA) Program" QA-502 "Digitization and Optical Storage of Records QA-513 "Preparation and Implementation of ASME Section Xl Inservice Inspection Plans Including Requirements for Augmented and Elective Examinations" QA-516 "Evaluation of IS Indications" QA-520 "Preparation and Distribution of Inservice Inspection Reports" QAL-5 "Control Of Preservice And Inservice Inspection Activities" SDQA-30177-NGO "ISIDBMS (Inservice Inspection Database Management System)

J} Inservice Inspection Plan Section 1 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 3

1.4 License Renewal This plan is part of an aging management program credited for license renewal, as described in the ONS license renewal basis specification OSS-0274.00-00-0016.

When making changes to this plan, refer to the ONS Updated Final Safety Analysis Report (UFSAR), Section 18.3.12.

f, J) Inservice Inspection Plan Section 1 Oconee Nuclear Station Revision 0 General Requirements Page 3 of 3

2.0 System Boundaries Subject to Inspection The boundaries of Class 1,2 and 3 non-exempt systems are shown on ISI NDE Boundary Drawings listed in Section 2 of the unit specific volumes. Unless otherwise noted, systems designated as ISI Class 1 are equivalent to Class 1, ISI Class 2 are equivalent to Class 2, and ISI Class 3 are equivalent to Class 3.

2.1 Class 1 Components Exempted From Volumetric and Surface Examinations 2.1.1 Components that are connected to the reactor coolant system and part of the reactor coolant pressure boundary, and that are of such a size and shape so that upon postulated rupture the resulting flow of coolant from the reactor coolant system under normal plant operating conditions is within the capacity of make up systems which are operable from on site emergency power. Reference Section Xl, paragraph IWB-1220(a).

2.1.2 Piping of NPS 1" and smaller, except for steam generator tubing. Reference Section Xl, paragraph IWB-1220(b) (1).

2.1.3 Components and their connections in piping of NPS 1"and smaller. Reference Section Xl, paragraph IWB-1220(b) (2).

2.1.4 Reactor vessel head connections and associated piping, NPS 2" and smaller, made inaccessible by control rod drive penetrations. Reference Section Xl, paragraph IWB-1220(c).

2.2 Class 2 Components Within RHR, ECC, and CHR Exempted From Volumetric and Surface Examination 2.2.1 Vessels, piping, pumps, valves, and their connections in piping NPS 4" and smaller in all systems except high pressure safety injection systems. Reference Section Xl, Paragraph WC-1 221(a) (1) (2).

2.2.2 Vessels, piping, pumps, valves, and their connections in piping NPS 11/2" and smaller in high pressure safety injection systems. Reference Section Xl, Paragraph IWC-1 221 (b) (1) (2).

2.2.3 Vessels, piping, pumps, valves, and other components and their connections of any size in statically pressurized, passive (i.e., no pumps) safety injection systems.

Reference Section Xl, Paragraph WC-1 221 (c).

2.2.4 Piping and other components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operation. Reference Section Xl, Paragraph IWC-1 221 (d).

Inservice Inspection Plan Section 2 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 3

2.3 Class 2 Components Within Systems Other Than RHR, ECC, And CHR Exempted From Volumetric and Surface Examination 2.3.1 For systems except auxiliary feedwater systems: vessels, piping, pumps, valves, and their connections in piping NPS 4" and smaller. Reference Section Xl, paragraph IWC-1222(a) (1) (2).

2.3.2 For auxiliary feedwater systems: vessels, piping, pumps, valves, and their connections in piping NPS 11/2" and smaller. Reference Section Xl, Paragraph IWC-1222(b) (1) (2).

2.3.3 Vessels, piping, pumps, valves, other components, and component connections of any size in systems or portions of systems that operate (when the system function is required) at a pressure equal to or less than 275 psig and at a temperature equal to or less than 200 0 F. Reference Section Xl, Paragraph WC-1222(c).

2.3.4 Piping and other components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions.

Reference Section XI, Paragraph IWC-1 222(d).

2.4 Class 2 Inaccessible Welds Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe are exempted from examination requirements. Reference Section Xl, Paragraph IWC-1223.

2.5 Class 3 Items Exempted From VT-1 Examination Requirements 2.5.1 Vessels, piping, pumps, valves, and their connections in piping NPS 4" and smaller.

Reference Section Xl, paragraph IWD-1220(a) (b).

2.5.2 Components that operate at a pressure of 275 psig or less and at a temperature of 200OF or less components that are located in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling. Reference Section XI, Paragraph IWD-1220(c).

2.5.3 Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe are exempted from examination requirements. Reference Section XI, Paragraph IWD-1220(d).

2.6 Class 1, 2, and 3 Supports Exempted From VT-3 Examination Requirements Supports exempt from the examination requirements of IWF-2000 are those connected to piping and other items exempted from volumetric, surface, or VT-1 or VT-3 visual examination by IWB-1220, IWC-1220, and IWD-1220. In addition, portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe. Reference Section XI, Paragraph IWF-1230.

Inservice Inspection Plan Section 2 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 3

2.7 Examination Boundaries Section 2 of the Unit specific volumes contain a listing of flow diagrams that are color-coded to identify the NDE examination required on each portion of the system. The code used for NDE examinations are described below:

Red Class 1 system, not exempted Yellow Class 2 system, not exempted Green Class 3 system, not exempted Blue System (or portions of systems) exempt from examination Black System (or portions of systems) that is not ASME Class 1, 2, or 3.

This system is not subject to ASME Section Xl Requirements.

Revisions to the plant system flow diagrams are reviewed for additions/changes to the ISI boundaries. These additions/changes are incorporated into the ISI NDE Boundary Drawings and the ISI Plan as necessary. These ISI NDE Boundary Drawings are stored electronically and can be found in the Nuclear Electronic Document Library (NEDL). The original marked-up SI NDE Boundary Drawings are maintained in the General Office. Controlled copies will be issued as required by Document Management.

2.8 Inspection Interval and Inspection Periods Reference Section 8.0 for a matrix of end of cycle vs. outage nomenclature.

Fourth Inspection Interval Unit 1 Start Date End Date 01/01/2004 01/01/2007 07/15/2010 7-15-2013 1ST Period 2ND Period 3RD Period Outage 1 (EOC 22) Outage 3 (EOC 24) Outage 5 (EOC 26)

Outage 2 (EOC 23) Outage 4 (EOC 25) Outage 6 (EOC 27)

Note: The Oconee Unit 1 Fourth Interval ISI plan covers a time period of 9 years and 7.5 months. The reason it does not cover 10 years is because Duke Energy is trying to recapture 4.5 months of grace period that was used in the Oconee Unit 1 Third Interval ISI Plan.

kJ Inservice Inspection Plan Section 2 Oconee Nuclear Station Revision 0 General Requirements Page 3 of 3 I

3.0 Inspection Methods and Procedures to be used for Inservice Inspection Inservice inspection of Oconee Unit 1 will be performed using procedures which comply with the requirements of the applicable codes referenced in Section 1 of this plan. Volumetric, surface, and visual methods of inspection will be used as required. Each inspection will be performed under the QA Program of the organization performing the inspection.

A specific examination procedure is referenced for each inspection method listed in Section 8 of this Plan. Procedures beginning with "54 ISI" are found in the Framatome Technologies' Inservice Inspection Manual for Oconee Nuclear Station. All other procedures are found in the Duke Power Company Procedure Manuals.

3.1 Volumetric Inspection Volumetric inspection will be performed by manual and/or automated ultrasonic methods, except in some cases where ultrasonic methods are not practical. Radiographic examinations will be used in these cases in lieu of ultrasonic examinations. Inspection of reactor vessel welds will be performed using an automated ultrasonic inspection device.

Steam generator tubing will be examined using eddy current inspection methods as outlined in the Oconee Technical Specifications. The Nuclear Support Division, Nuclear Technical Services Section have overall responsibility for implementing and reporting any inspections pertaining to the Steam Generator Tubes.

3.2 Surface Inspection Surface inspection will be performed using either liquid penetrant or magnetic particle methods.

The liquid penetrant method will be used for all surface inspections on austenitic steels and may also be used on ferritic steel. The magnetic particle method will only be used on ferritic steel.

3.3 Visual Inspection Inservice visual inspections will be performed using direct methods where practical. Remote visual examinations may be used in some cases.

3.4 Pressure Testing Inservice inspection pressure testing requirements will be addressed in the Duke Energy Corporation Inservice Inspection Pressure Test Plan.

3.5 Snubber Testing The Inservice Testing and Inspection of Snubbers (IWF-5000) will be performed per Selected Licensee Commitments, Section 16.9.18. The site Mechanical/Civil Engineering Section will be responsible for all testing, inspecting, and reporting under this program.

Inservice Inspection Plan Section 3 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 4

3.6 Inspection Procedures K), The following procedures will be used for the inservice inspection of Oconee Unit 1:

PROCEDURE NO. TITLE EPRI-NDEC-UT-X Ultrasonic Examination of Small Diameter Piping Butt Welds and Components for Thermal Fatigue NDE-12 General Radiography Procedure for Preservice and Inservice Inspection NDE-25 Magnetic Particle Examination NDE-35 Liquid Penetrant Examination NDE-105 Radiography Procedure For The Examination Of Oconee Nuclear Station Thermal Sleeves NDE-600 Ultrasonic Examination of Similar Metal Piping Welds in Wrought Ferritic and Austenitic Material NDE-620 Ultrasonic Examination of Welds in Wrought Ferritic Pressure Vessels Greater than 2 Inches in Thickness NDE-640 Straight Beam Ultrasonic Examination of Welds and Base Material in Pressure Vessels and Piping K)

NDE-660 Ultrasonic Examination of Reactor Pressure Vessel Closure Head Welds NDE-670 Ultrasonic Sizing of Planar Flaws in Ferritic and Austenitic Steels NDE-680 Ultrasonic Examination of Nozzle Inner Radii in Ferritic Pressure Vessels NDE-690 Ultrasonic Examination of the High Pressure Injection System Nozzle Inner Radius at Oconee Nuclear Station.

NDE-820 Ultrasonic Examination of Welds in Ferritic Pressure Vessels Greater than 2 Inches in Thickness NDE-900 Ultrasonic Examination of Reactor Coolant Pump Flywheels NDE-946 Ultrasonic Thickness Measurement For Erosion/Corrosion Examinations NDE-960 Ultrasonic Examination of High Pressure Injection System Piping Welds and Base Material at Oconee Nuclear Station Y..,/ Inservice nspection Plan Section 3 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 4

PROCEDURE NO. TITLE NDE-970 Ultrasonic Examination Of Ferritic Pressure Vessel Welds Greater Than 7 /2 Inches In Thickness at 06nee Nuclear Station NDE-3630 Ultrasonic Examination of Similar Metal Welds in Wrought Ferritic and Austenitic Pressure Vessels and Valve Bodies at Oconee Nuclear Station NDE-3650 Ultrasonic Examination of Reactor Vessel Flange to Shell Welds NDE-3680 Ultrasonic Examination of Steam Generator Inlet and Outlet Nozzle Inner Radius NDE-3945 Ultrasonic Examination of Main Steam Stop Valve Studs at Oconee Nuclear Station NDE-3952 Ultrasonic Examination of Steam Generator Support Skirt Welds at Oconee Nuclear Station NDE-3960 Ultrasonic Examination of High Pressure Injection System Piping Welds and Base Material at Oconee Nuclear Station QAL-13 ISI Visual Examination, VT-1 QAL-14 ISI Visual Examination, VT-3 PDI-UT-1 PDI Generic Procedure for the Ultrasonic Examination of Ferritic Pipe Welds PDI-UT-2 PDI Generic Procedure for the Ultrasonic Examination of Austenitic Pipe Welds PDI-UT-4 PDI Generic Procedure for the Ultrasonic Examination of Studs and Bolts From the Bore PDI-UT-5 Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs PDI-UT-6 Generic Procedure for the Manual Ultrasonic Examination of Reactor Pressure Vessel Welds (Note: The following procedure may be used for examination of pressure vessels in lieu of procedure NDE-620. Use of this procedure will require that the UT inspector be qualified specifically to PDI-UT-6.)

PDI-UT-1 0 PDI Generic Procedure for the Ultrasonic Examination of Dissimilar Metal Piping Welds Inservice Inspection Plan Section 3 Oconee Nuclear Station Revision 0 General Requirements Page 3 of 4

PROCEDURE NO. TITLE 54-ISI-106 Procedure for the Remote Ultrasonic Examination of Reactor Vessel and Associated Piping Welds using Remote Manipulators and the Accusonex TM Acquisition and Analysis System 54-ISI-364 Remote Underwater In-Vessel Visual Inspection of Reactor Pressure Vessels, Vessel Internals, and Components in Pressurized Water Reactors 54-lSI-800 Remote Ultrasonic Examination of Reactor Vessel Welds in Accordance with ASME Section XI, Appendix VilI, Supplements 4 and 6 (includes CA's # FTI-00-002, DB-00-003, DB-00-004, and 97-001)

The latest revision of each procedure that has been approved by Duke Power Company for Oconee Nuclear Station Unit 1 will be used. Duke Power approval of Framatome Technologies procedures will be indicated by the signature of the Manager QA Technical Services, or his designee, on the title page of the Framatome Technologies Inservice Inspection Manual for Oconee Nuclear Station.

QJ Inservice Inspection Plan Section 3 Oconee Nuclear Station Revision 0 General Requirements Page 4 of 4

4.0 Description of Inservice Inspection Plan for ASME Class 1 Items The inservice inspection of ASME Class 1 Items shall be performed in accordance with the requirements of Article IWB-2000 of Section XI. A description of examination listings and schedules are found in Section 8 of this Plan. Class 1 examinations were scheduled for the Fourth Inspection Interval in accordance with the following table from ASME Section Xl Inspection Program B:

Table IWB-2412-1 Inspection Inspection Period, Minimum Maximum Interval Calendar Years of Examinations Examinations Plant Service Within Completed, % Credited, %

the Interval 4th 3 16 50 7 50 Note 1 75 10 100 100 Note 1: If the first period completion percentage for any examination category exceeds 34%, at least 16% of the required examinations shall be performed in the second period.

4.1 Examination Categories and Requirements The examination categories to be used are those listed in Table IWB-2500-1 of Section XI.

Specific examinations will be identified by an Item Number similar to those listed in Table IWB-2500-1 of Section XI, plus an additional number to uniquely identify that examination.

(Example: B01.01 1.001)

Class 1 Items to be inspected includes:

Category B-A Pressure Retaining Welds In Reactor Vessel IWB-2500-1 Component To Be Examined Comments Item No.

B1.10 Shell Welds B1.11 Circumferential B1.12 Longitudinal B1.20 Head Welds B1.21 Circumferential Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 14

Category B-A (c ont.)

IWB-2500-1 Component To Be Examined Comments Item No.

813.22 Meridional N/A for Oconee 1 B1.30 Shell-to-Flange Weld 813.40 Head-to-Flange Weld B1.50 Repair Welds 813.51 Beitline region N/A for Oconee 1 Category B-B Pressure Retaining Welds In Vessels Other Than Reactor Vessels IWB-2500-1 Component To Be Examined Comments Item No.

Pressurizer B2.10 Shell-to-Head B2.11 Circumferential B2.12 Longitudinal B2.20 Head Welds B2.21 Circumferential N/A for Oconee 1 B2.22 Meridional N/A for Oconee 1 Steam Generators (Primary Side)

B2.30 Head Welds B2.31 Circumferential N/A for Oconee 1 B2.32 Meridional N/A for Oconee 1 B2.40 Tubesheet-to-Head Weld Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 14

Category B-B (cont.)

IWB-2500-1 Component To Be Examined Comments Item No.

Heat Exchangers (Primary Side) - Head B2.50 Head Welds B2.51 Circumferential B2.52 Meridional N/A for Oconee 1 Heat Exchangers (Primary Side) - Shell B2.60 Tubesheet-to-Head Welds B2.70 Longitudinal Welds N/A for Oconee 1 B2.80 Tubesheet-to-Shell Welds N/A for Oconee 1 Category B-D Full Penetration Welded Nozzles In Vessels - Inspection Program B IWB-2500-1 Component To Be Examined Comments Item No.

Reactor Vessel B3.90 Nozzle-to-Vessel Welds B3.1 00 Nozzle Inside Radius Section Pressurizer B3.110 Nozzle-to-Vessel Welds B3.120 Nozzle Inside Radius Section Reference General Requirements Section 1.0 Steam Generators (Primary Side)

B3.130 Nozzle-to-Vessel Welds B3.140 Nozzle Inside Radius Section Reference General Requirements Section 1.0 Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 3 of 14

Category B-D (cont.)

IWB-2500-1 Component To Be Examined Comments Item No.

Heat Exchangers (Primary Side)

B3.150 Nozzle-to-Vessel Welds B3.160 Nozzle Inside Radius Section Category B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles IWB-2500-1 Component To Be Examined Comments Item No.

Reactor Vessel B5.10 NPS 4 or Larger Nozzle-to-Safe End Butt Welds B5.20 Less Than NPS 4 N/A for Oconee 1 Nozzle-to-Safe End Butt Welds B5.30 Nozzle-to-Safe End Socket Welds N/A for Oconee 1 Pressurizer B5.40 NPS 4 or Larger Nozzle-to-Safe End Butt Welds B5.50 Less Than NPS 4 Nozzle-to-Safe End Butt Welds B5.60 Nozzle-to-Safe End Socket Welds N/A for Oconee 1 Steam Generator B5.70 NPS 4 or Larger N/A for Oconee 1 Nozzle-to-Safe End Butt Welds B5.80 Less Than NPS 4 N/A for Oconee 1 Nozzle-to-Safe End Butt Welds B5.90 Nozzle-to-Safe End Socket Welds N/A for Oconee 1 Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 4 of 14

Category B-F (c ont.)

IWB-2500-1 Component To Be Examined Comments Item No.

Heat Exchangers B5.100 NPS 4 or Larger N/A for Oconee 1 Nozzle-to-Safe End Butt Welds 65.110 Less Than NPS 4 N/A for Oconee 1 Nozzle-to-Safe End Butt Welds 15.120 Nozzle-to-Safe End Socket Welds N/A for Oconee 1 Category B-G-1 Pressure Retaining Bolting, Greater Than 2 in. In Diameter IWB-2500-1 Component To Be Examined Comments Item No.

Reactor Vessel B6.10 Closure Head Nuts 66.20 Closure Studs, in place Closure studs are examined when removed, see B6.30 B6.30 Closure Studs, when removed B6.40 Threads in Flange 86.50 Closure Washers, Bushings Pressurizer B6.60 Bolts and Studs 66.70 Flange Surface, when connection disassembled 66.80 Nuts, Bushings, and Washers Steam Generators 66.90 Bolts and Studs N/A for Oconee 1 B6.1 00 Flange Surface, when connection N/A for Oconee 1 disassembled 66.110 Nuts, Bushings, and Washers N/A for Oconee 1 Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 5 of 14

Category B-G-1 (cont.)

IWB-2500-1 Component To Be Examined Comments Item No.

Heat Exchangers B6.120 Bolts and Studs N/A for Oconee 1 B6.130 Flange Surface, when connection N/A for Oconee 1 disassembled 136.140 Nuts, Bushing, and Washers N/A for Oconee 1 Piping B6.150 Bolts and Studs N/A for Oconee 1 B6.160 Flange Surface, when connection N/A for Oconee 1 disassembled B6.170 Nuts, Bushing, and Washers N/A for Oconee 1 Pumps B6.180 Bolts and Studs B6.1 90 Flange Surface, when connection disassembled B6.200 Nuts, Bushings, and Washers N/A for Oconee 1 Valves B6.210 Bolts and Studs N/A for Oconee 1 B6.220 Flange Surface, when connection N/A for Oconee 1 disassembled B6.230 Nuts, Bushings, and Washers N/A for Oconee 1 Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 6 of 14

Category B-G-2 Pressure Retaining Bolting, 2 in. And Less In Diameter IWB-2500-1 Component To Be Examined Comments Item No.

Reactor Vessel B7.1 0 Bolts, Studs, and Nuts N/A for Oconee 1 Pressurizer B7.20 Bolts, Studs, and Nuts Steam Generators B7.30 Bolts, Studs, and Nuts Heat Exchangers B7.40 Bolts, Studs, and Nuts N/A for Oconee 1 Piping B7.50 Bolts, Studs, and Nuts Pumps B7.60 Bolts, Studs, and Nuts Valves B7.70 Bolts, Studs, and Nuts CRD Housing B07.80 Bolts, Studs, and Nuts Reference General Requirements Section 1.0 Category B-J Pressure Retaining Welds In Piping IWB-2500-1 Component To Be Examined Comments Item No.

B9.1 0 NPS 4 or Larger B9.11 Circumferential Welds B9.20 Less Than NPS 4 B9.21 Circumferential Welds Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 7 of 14

Category B-J (cont.)

IWB-2500-1 Component To Be Examined Comments Item No.

B9.30 Brar ich Pipe Connection Welds B9.31 NPS 4 or Larger B9.32 Less Than NPS 4 B9.40 Socket Welds Category B-K Welded Attachments For Vessels, Piping, Pumps, And Valves IWB-2500-1 Component To Be Examined Comments Item No.

Pressure Vessels B10.10 Welded Attachments Reference General Requirements Section 1.0 Piping B1 0.20 Welded Attachments Pumps 810.30 Welded Attachments N/A for Oconee 1 Valves B1 0.40 Welded Attachments N/A for Oconee 1 Catlegory B-L-1 Pressure Retaining Welds In Pump Casings B-M-1 Pressure Retaining Welds In Valve Bodies B-L-2 Pump Casings B-M-2 Valve Bodies lM/B-2500-1 Component To Be Examined Comm( mnts Item No.

Pumps B1 2.10 Pump Casing Welds (B-L-1) 8312.20 Pump Casing (B-L-2)

Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 8 of 14

Category B-L-1, B-M-1, B-L-2, and B-M-2 (cont.)

IWB-2500-1 Component To Be Examined Comments Item No.

Valves B12.30 Valves, Less Than NPS 4 Valve Body Welds (B-M-1)

B12.40 Valves, NPS 4 or Larger N/A for Oconee 1 Valve Body Welds (B-M-1)

B12.50 Valve Body, Exceeding NPS 4 (B-M-2)

Category B-N-1 Interior Of Reactor Vessel B-N-2 Welded Core Support Structures And Interior Attachments To Reactor Vessels B-N-3 Removable Core Support Structures IWB-2500-1 Component To Be Examined Comments Item No.

Reactor Vessel B13.10 Vessel Interior (B-N-1) Each Inspection Period Reactor Vessel (PWR)

B1 3.50 Interior Attachments Within Beltline Region (B-N-2)

B1 3.60 Interior Attachments Beyond N/A for Oconee 1 Beltline Region (B-N-2)

B1 3.70 Core Support Structure (B-N-3)

Category B-0 Pressure Retaining Welds In Control Rod Housings IWB-2500-1 Component To Be Examined Comments Item No.

Reactor Vessel B1 4.10 Welds in CRD Housing Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 9 of 14

Category B-P All Pressure Retaining Components IWB-2500-1 Component To Be Examined Comments Item No.

Reactor Vessel B15.10 Pressure Retaining Boundary Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Pressurizer B1 5.20 Pressure Retaining Boundary Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Steam Generators B1 5.30 Pressure Retaining Boundary Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Heat Exchangers B1 5.40 Pressure Retaining Boundary Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Piping B1 5.50 Pressure Retaining Boundary Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Pumps B1 5.60 Pressure Retaining Boundary Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Valves B1 5.70 Pressure Retaining Boundary Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 10 of 14

Category B-Q Steam Generator Tubing IWB-2500-1 Component To Be Examined Comments Item No.

B1 6.10 Steam Generator Tubing in Straight Tube Steam Generator Tubing is IDesign examined and documented by the Nuclear Support Division, Nuclear Technical Services Section as required by the Oconee Improved Technical Specifications.

B1 6.20 Steam Generator Tubing in U-Tube Design N/A for Oconee 1 CATEGORY F-A Supports IWF-2500-1 Component To Be Examined Comments Item No.

F1.10 Class 1 Piping Supports (Category A)

F1.11 Class 1 Piping Supports (Category B)

F1.12 Class 1 Piping Supports (Category C)

F1.40 Supports Other Than Piping Supports (Class 1)

Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 11 of 14

4.2 Examination Category B-J Stress Weld Selection for Inservice Inspection Welds shall be selected for inservice inspection in accordance with Article IWB-2000 of Section XI. The selection criteria for each category of Table IWB-2500-1 will be applied. Class 1 welds that exceed the stress criteria given in Table IWB-2500-1 are listed below:

4.2.1 Oconee 1 Item Number Weld Number Piping Isometric Flow Diagram B09.011.020 1-PDB1-2 ISI-OCN1 -013 O-ISIN4-100A-1.1 B09.011.022 1-PDB2-2 ISI-OCN1-014 O-ISIN4-10OA-1.1 B09.011.030 1-PIA1 -1 ISI-OCN1 -007 O-ISIN4-100A-1.1 B09.011.031 1-PIA1 -7 ISI-OCN1 -007 O-ISIN4-10OA-1.1 B09.011.032 1-PIA1 -9 ISI-OCN1 -007 O-ISIN4-10OA-1.1 B09.011.033 1-PIA2-1 ISI-OCN1 -008 O-ISIN4-100A-1.1 B09.011.034 1-PIA2-7 ISI-OCN1 -008 O-ISIN4-10OA-1.1 B09.011.035 1-PIB1-1 ISI-OCN1 -009 O-ISIN4-100A-1.1 B09.011.036 1-PIB1-7 ISI-OCN1 -009 O-ISIN4-10OA-1.1 B09.011.037 1-PIB1-9 ISI-OCN1 -009 O-ISIN4-100A-1.1 B09.011.038 1-PIB2-1 ISI-OCN1 -010 O-ISIN4-10OA-1.1 B09.011.039 1-PIB2-7 ISI-OCN1 -010 O-ISIN4-10OA-1.1 B09.011.040 1-PSL-1 ISI-OCN1 -015 O-ISIN4-10OA-1.1 B09.011.041 1-PSL-10 ISI-OCN1 -015 O-ISIN4-100A-1.1 B09.011.042 1-PSL-2 ISI-OCN1 -015 O-ISIN4-10OA-1.1 B09.011.043 1-PSL-3 ISI-OCN1 -015 O-ISIN4-10OA-1.1 B09.011.044 1-PSL-4 ISI-OCN1 -015 O-ISIN4-100A-1.1 B09.011.045 1-PSL-5 ISI-OCN1 -015 O-ISIN4-10OA-1.1 B09.011.046 1-PSL-6 ISI-OCN1 -015 O-ISIN4-100A-1.1 Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 12 of 14

Item Number Weld Number Piping Isometric Flow Diagram B09.011.047 1-PSL-7 ISI-OCN1 -015 0-ISIN4-10OA-1.1 B09.011.048 1-PSL-8 ISI-OCN1 -015 0-ISIN4-100A-1.1 B09.011.049 1-PSL-9 ISI-OCN1 -015 0-ISIN4-10OA-1.1 B09.011.051 1-PSP-2 ISI-OCN1 -016 0-ISIN4-10OA-1.2 B09.01 1.052 1-PSP-3 ISI-OCN1-016 0-ISIN4-100A-1.2 B09.011.054 1-PIA1-4 ISI-OCN1 -007 0-ISIN4-10OA-1.1 B09.011.055 1-PIA1 -2 ISI-OCN1 -007 0-ISIN4-10OA-1.1 B09.011.056 1-PIA2-2 ISI-OCN1 -008 0-ISIN4-100A-1.1 B09.011.057 1-PIA2-4 ISI-OCN1 -008 0-ISIN4-10OA-1.1 B09.011.058 1-PIA2-9 ISI-OCN1 -008 0-ISIN4-100A-1.1 B09.011.059 1-PIB1-4 ISI-OCN1 -009 0-ISIN4-10OA-1.1 B09.011.060 1-PIB2-4 ISI-OCN1 -010 0-ISIN4-100A-1.1 B09.011.061 1-PIB2-9 ISI-OCN1 -010 0-ISIN4-100A-1.1 B09.021.028 1-PSP-1 1 ISI-OCN1 -016 0-ISIN4-10OA-1.2 B09.021.029 1-PSP-12 ISI-OCN1 -016 0-ISIN4-10OA-1.2 B09.021.030 1-PSP-1 3 ISI-OCN1 -016 0-ISIN4-100A-1.2 B09.021.031 1-PSP-1 4 ISI-OCN1 -016 0-ISIN4-10OA-1.2 B09.021.032 1-PSP-4 ISI-OCNI -016 0-ISIN4-100A-1.2 B09.021.033 1-PSP-5 ISI-OCN1 -016 0-ISIN4-100A-1.2 B09.021.034 1-PSP-6 ISI-OCN1 -016 0-ISIN4-10OA-1.2 B09.021.035 1-PSP-8 ISI-OCN1 -016 0-ISIN4-10OA-1.2 B09.021.036 1-PSP-9 ISI-OCN1 -016 0-ISIN4-100A-1.2 B09.021.037 1HP-190-16 1HP-190 0-ISIN4-101 A-1.4 B09.021.041 1HP-277-52 1 HP-277 0-ISIN4-101 A-1.4 Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 13 of 14

Item Number Weld Number Piping Isometric Flow Diagram B09.021.043 1HP-278-24 1HP-278 O-ISIN4-101A-1.4 B09.021.044 1 HP-279-24 1HP-279 O-ISIN4-101A-1.4 B09.021.046 1RC-1 99-149 1RC-199 O-ISIN4-101A-1.4 B09.021.047 1 RC-1 99-150 1RC-199 O-ISIN4-10OA-1.1 B09.021.048 1RC-200-160 1RC-200 O-ISIN4-10OA-1.1 B09.021.049 1RC-200-161 1RC-200 O-ISIN4-10OA-1.1 B09.021.050 1RC-200-166 1RC-200 O-ISIN4-100A-1.1 B09.021.051 1RC-201 -101 1RC-201 O-ISIN4-101A-1.4 B09.021.052 1RC-201 -105 1RC-201 O-ISIN4-101A-1.4 B09.021.053 1RC-201-91 1RC-201 O-ISIN4-101A-1.4 B09.021.054 1RC-201-92 1RC-201 O-ISIN4-101 A-1.4 B09.021.055 1RC-201-96 1RC-201 O-ISIN4-101A-1.4 609.021.056 1RC-201-97 1RC-201 O-ISIN4-101A-1.4 B09.021.057 1RC-230-53 1RC-230 O-ISIN4-100A-1.2 B09.021.058 1 RC-230-54 1RC-230 O-ISIN4-100A-1.2 B09.031.001 1-PHA-16 ISI-OCN1 -005 O-ISIN4-100A-1.1 B09.032.001 1-PDA1 -10 ISI-OCN1 -011 O-ISIN4-100A-1.1 B09.032.002 1-PDA1 -12 ISI-OCN1 -011 O-ISIN4-10OA-1.1 B09.032.003 1-PDA2-1 0 ISI-OCN1 -012 O-ISIN4-10OA-1.1 B09.032.004 1-PDB1 -10 ISI-OCN1 -013 O-ISIN4-10OA-1.1 B09.032.005 1-PDB2-1 0 ISI-OCN1 -014 O-ISIN4-10OA-1.1 Inservice Inspection Plan Section 4 Oconee Nuclear Station Revision 0 General Requirements Page 14 of 14

5.0 Description of Inservice Inspection Plan for ASME Class 2 Items The inservice inspection of ASME Class 2 Items shall be performed in accordance with the requirements of Article IWC-2000 of Section Xi. A description of examination listings and schedules are found in Section 8 of this Plan. Class 2 examinations were scheduled for the Fourth Inspection Interval in accordance with the following table from ASME Section XI Inspection Program B:

Tables IWC-2412-1 Inspection Inspection Period, Minimum Maximum Interval Calendar Years of Examinations Examinations Plant Service Within Completed, % Credited, %

the Interval 4th 3 16 50 7 50 Note 1 75 10 100 100 Note 1: If the first period completion percentage for any examination category exceeds 34%, at least 16% of the required examinations shall be performed in the second period.

5.1 Examination Categories and Requirements The examination categories to be used are those listed in Table IWC-2500-1 of Section XI.

Specific examinations will be identified by an Item Number, similar to those listed in Table IWC-2500-1 of Section Xl, plus an additional number to uniquely identify that examination. (Example C01.010.001)

Class 2 Items to be inspected includes:

Category C-A Pressure Retaining Welds In Pressure Vessels IWC-2500-1 Component To Be Examined Comments Item No.

C1.10 Shell Circumferential Welds C1.20 Head Circumferential Welds C1.30 Tubesheet-to-Shell Weld Inservice Inspection Plan Section 5 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 5

Category C-D Pressure Retaining Nozzle Welds In Vessels IWC-2500-1 Component To Be Examined Comments Item No.

C2.10 Nozzles in Vessels < 1/2 in. Nominal Thickness C2.11 Nozzle-to-Shell (Nozzle to Head or Nozzle N/A for Oconee 1 to Nozzle) Weld C2.20 Nozzles Without Reinforcing Plate in Vessels > 1/2 in. Nominal Thickness C2.21 Nozzle-to-Shell (Nozzle to Head or Nozzle to Nozzle) Weld C2.22 Nozzle Inside Radius Section C2.30 Nozzles With Reinforcing Plate in Vessels > 1/2 in. Nominal Thickness C2.31 Reinforcing Plate Welds to Nozzle and Vessel C2.32 Nozzle-to-Shell (Nozzle to Head or Nozzle N/A for Oconee 1 to Nozzle) Welds When Inside of Vessel is Accessible C2.33 Nozzle-to-Shell (Nozzle to Head or Nozzle Reference Duke Energy to Nozzle) Welds When Inside of Vessel is Corporation Inservice Inspection Inaccessible Pressure Test Plan Category C-C Welded Attachments For Vessels, Piping, Pumps, And Valves IWC-2500-1 Component To Be Examined Comments Item No.

Pressure Vessels C3.10 Welded Attachments Piping C3.20 Welded Attachments Pumps C3.30 Welded Attachments Inservice Inspection Plan Section 5 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 5

Category C-C (cont.)

Valves C3.40 Welded Attachments N/A for Oconee 1 Category C-D Pressure Retaining Bolting Greater Than 2 in. In Diameter IWC-2500-1 Component To Be Examined Comments Item No.

Pressure Vessels C4.10 Bolts and Studs N/A for Oconee 1 Piping C4.20 Bolts and Studs N/A for Oconee 1 Pumps C4.30 Bolts and Studs Valves C4.40 Bolts and Studs Category C-F-1 Pressure Retaining Welds In Austenitic Stainless Steel Or High Alloy Piping IWC-2500-1 Component To Be Examined Comments Item No.

C5.10 Piping Welds 2 3/8 in. Nominal Wall Thickness for Piping > NPS 4 C5.11 Circumferential Weld C5.20 Piping Welds >11/5 in. Nominal Wall Thickness for Piping > NPS 2 and

<NPS4 C5.21 Circumferential Weld C5.30 Socket Welds Inservice Inspection Plan Section 5 Oconee Nuclear Station Revision 0 General Requirements Page 3 of 5

Category C-F-1 (cont.)

C5.40 Pipe Branch Connections of Branch Piping NPS 2 C5.41 Circumferential Weld Category C-F-2 Pressure Retaining Welds In Carbon Or Low Alloy Steel Piping IWC-2500-1 Component To Be Examined Comments Item No.

C5.50 Piping Welds > 3/8 in. Nominal Wall Thickness for Piping > NPS 4 C5.51 Circumferential Weld C5.60 Piping Welds >1/5 in. Nominal Wall Thickness for Piping > NPS 2 and

< NPS 4 C5.61 Circumferential Weld N/A for Oconee 1 C5.70 Socket Welds C5.80 Pipe Branch Connections of Branch Piping 2 NPS 2 C5.81 Circumferential Weld Category C-G Pressure Retaining Welds In Pumps And Valves IWC-2500-1 Component To Be Examined Comments Item No.

Pumps C6.10 Pump Casing Welds N/A for Oconee 1 Valves C6.20 Valve Body Welds Inservice Inspection Plan Section 5 Oconee Nuclear Station Revision 0 General Requirements Page 4 of 5

Category C-H All Pressure Retaining Components IWC-2500-1 Component To Be Examined Comments Item No.

C7.10 Pressure retaining components Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan CATEGORY F-A SUPPORTS IWF-2500-1 Component To Be Examined Comments Item No.

F1.20 Class 2 Piping Supports (Category A)

F1 .21 Class 2 Piping Supports (Category B)

F1.22 Class 2 Piping Supports (Category C)

F1 .40 Supports Other Than Piping Supports (Class 2)

Inservice Inspection Plan Section 5 Oconee Nuclear Station Revision 0 General Requirements Page 5 of 5

6.0 Description of Inservice Inspection Plan for ASME Class 3 Items The inservice inspection of ASME Class 3 Items shall be performed in accordance with the requirements of Article IWD-2000 of Section Xl. A description of examination listings and schedules are found in Section 8 of this Plan. Class 3 examinations were scheduled for the Fourth Inspection Interval in accordance with the following table from ASME Section Xl Inspection Program B:

Tables IWD-2412-1 Inspection Inspection Period, Minimum Maximum Interval Calendar Years of Examinations Examinations Plant Service Within Completed, % Credited, %

the Interval [Note 1]

4th 3 16 50 7 50 Note 75

_____________ 10 100 100 Note 1: If the first period completion percentage for any examination category exceeds 34%, at least 16% of the required examinations shall be performed in the second period.

6.1 Examination Categories and Requirements The examination categories to be used are those listed in Table IWD-2500-1 of Section Xl.

Specific examinations will be identified by an Item Number, similar to those listed in Table IWD-2500-1 of Section Xl, plus an additional number to uniquely identify that examination; example, (D01.010.001).

Class 3 Items to be inspected includes:

Category D-A Welded Attachments for Vessels, Piping, Pumps, and Valves IWD-2500-1 Component to be Examined Comments Item No.

Pressure Vessels D1.10 Welded Attachments Piping D1.20 Welded Attachments Pumps D1 .30 Welded Attachments N/A for Oconee 1 Inservice Inspection Plan Section 6 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 2

Category D-A (cont.)

IWD-2500-1 Component to be Examined Comments Item No.

Valves D1.40 Welded Attachments Category D-B All Pressure Retaining Components IWD-2500-1 Component To Be Examined Comments Item No.

D2.10 Pressure retaining components Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan D2.20 Pressure retaining components Reference Duke Energy Corporation Inservice Inspection Pressure Test Plan Category F-A Supports IWF-2500-1 Component to be Examined Comments Item No.

F1.30 Class 3 Piping Supports (Category A)

F1.31 Class 3 Piping Supports (Category B)

F1.32 Class 3 Piping Supports (Category C)

F1.40 Supports Other than Piping Supports (Class 3)

Inservice Inspection Plan Section 6 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 2

7.0 Description of Augmented and Elective Inservice Inspection Plan Augmented inservice inspections (regulator required) shall be performed as required in Section 1 of this Plan. Elective inservice inspections are performed for Duke Power Company (owner) defined reasons. A description of examination listings and schedules are found in Section 8 of this Plan.

Augmented and elective examination information found within this Inservice Inspection Plan is not required by the ASME Section Xl Code; therefore, it is exempt from ANII review, verification and/or record certification.

7.1 Examination Categories and Requirements Items requiring augmented inservice inspection are described in the following paragraphs.

Each inspection will be assigned a unique Item Number.

7.1.1 Reactor Coolant Pump Flywheels (Item Number Series GO1.001)

At approximately three-year intervals, the bore and keyway of each reactor coolant pump flywheel shall be subjected to an in place, volumetric examination. Whenever maintenance or repair activities require flywheel removal, a surface examination of exposed surfaces and a complete volumetric examination shall be performed, if the interval measured from the previous such inspection is greater than 6 2/3 years.

Results of the examination will be evaluated by the original acceptance criteria and compared with the original examination data to ensure the absence of unacceptable defects. Reference Oconee Improved Technical Specification 5.5.8.

7.1.2 HPI Nozzle Safe End Examinations (Item Number Series G02.001)

Volumetric examinations shall be performed on all HPI Safe Ends as a result of NRC Generic Letter 85-20, Generic Issue 69. These items shall be scheduled for every other outage for the duration of the plant's operation. This schedule cannot be changed. The specific areas to be examined are as described below and are assigned a unique item number:

Ultrasonic examination on the Nozzle Inside Radius (knuckle area). Item Numbers are as follows:

Oconee Unit 1 G02.001.005A for 1A1 G02.001.005B for 1A2 G02.001.005C for 1BI G02.001.005D for 1B2 Inservice Inspection Plan Section 7 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 4

Ultrasonic examination on the Nozzle to Safe End weld. Item Numbers are as follows:

Oconee Unit 1 G02.001.006A for 1Al G02.001.006B for 1A2 G02.001.006C for 1Bi G02.001.006D for 1B2 Ultrasonic examination on the Safe End base metal (from the Nozzle to Safe End weld to the Safe End to Pipe weld. Item Numbers are as follows:

Oconee Unit 1 G02.001.007A for 1Al G02.001.007B for 1A2 G02.001.007C for 1B1 G02.001.007D for 1B2 Ultrasonic examination on the Safe End to Pipe Weld and adjacent piping base metal out to the block valve weld. Item Numbers are as follows:

Oconee Unit 1 G02.001.008A for 1Al G02.001.008B for 1A2 G02.001.008C for 1B1 G02.001.008D for 1B2 Inservice Inspection Plan Section 7 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 4

Ultrasonic examination on the Pipe weld to block valve. Item Numbers are as follows:

Oconee Unit 1 G02.001.01 OA for 1Al G02.001.010B for 1A2 G02.001.010C for 1BI G02.001.01 OD for 1B2 Radiography shall be performed between the Nozzle to Safe End and Safe End to Pipe weld in the Thermal Sleeve expansion area. Item Numbers are as follows:

Oconee Unit 1 G02.001.011 A for 1Al G02.001.011 B for 1A2 G02.001.011 C for 1B1 G02.001.011 D for 1B2 The inspection techniques, areas of interest, and acceptance criteria are defined in the applicable inspection procedures for these items. The inspection procedure numbers are referenced with the items to be inspected in the outage specific portion of the ISI Plan.

7.1.3 Pressurizer Surge Line Examinations (Item Number Series G03.001)

The surface of the drain nozzle weld shall be examined by the liquid penetrant method. The one inch diameter nozzle welds exceed the stress criteria given in Table IWB-2500-1. Also, volumetrically examine the two most highly stressed surge line elbows. Examine the entire circumference of the elbow at the midpoint of the elbow. The inspection band width around the circumference is 3".These examinations shall be continued for the duration of the plant's operation. These examinations are required by USNRC Bulletin 88-11.

Inservice Inspection Plan Section 7 Oconee Nuclear Station Revision 0 General Requirements Page 3 of 4

7.1 .4 Thermal Stress Piping Examinations (Item Number Series G04.001)

Volumetric examinations (UT) shall be performed on the weld and base material.

The UT shall be performed once each inspection period (i.e., three inspections per ten year interval). These examinations shall be continued for the duration of the plant's operation. These examinations are required by USNRC Bulletin 88-08.

7.1.5 Pressurizer Sensing/Sampling Nozzle Safe Ends (Item Number Series G08.001)

The surface of the Pressurizer Sensing and Sampling Nozzle-to-Safe End welds shall be examined by the liquid penetrant method. These examinations are being performed due to cracking problems on the dissimilar metal safe ends at Palo Verde and Palisades nuclear stations. These examinations will continue to be performed until such time that Engineering provides directions on when to remove them from the Augmented Section of the ISI Plan.

7.1.6 Class 1 RTE Mounting Bosses (Item Number Series G10.001)

A surface examination shall be performed during the fourth interval on the branch connection dissimilar metal weld that attaches each of ten (10) RTE mounting bosses to the reactor coolant system loop piping. This elective examination will be performed at the direction of the GO Engineering, Materials/Aging Management Group.

Inservice Inspection Plan Section 7 Oconee Nuclear Station Revision 0 General Requirements Page 4 of 4

8.0 Description of Examination Listings All ASME Class 1,2, and 3 systems and components have been reviewed to determine the inservice examination requirements for Oconee Unit 1. Examination Listing and Schedules referenced by this section were written in accordance with the criteria found in Sections 3, 4, 5, 6 and 7 of this Plan.

For administrative purposes, the printouts identifying NDE examinations to be performed during each Refueling Outage that accompany this ISI Plan will reflect the refueling outages as shown below. These numbers will correlate back to the End of Cycles Number for Unit 1.

Unit 1 Outage No. 1 2 3 4 5 6 End of Cycle No. 22 23 24 25 26 27 8.1 Examination Information The following information is listed for each examination where applicable:

8.1.1 Item Number The Item Number for each examination is composed of three sections. The first two sections of the item number for ASME Class 1, Class 2, and Class 3 items are similar to Item numbers assigned in Tables IWB-2500-1, IWC-2500-1 and IWD-2500-1 of Section Xl. Example B09.01 1.001 Item Numbers for Class 1, 2, and 3 supports (IWF-2500-1) are identified as follows:

Class 1 F01.010 = Category A (rods in one direction only)

F01.011 = Category B (multi-directional hangers)

F01.012 = Category C (thermal movement, i.e. springs, snubbers and constant supports)

Inservice Inspection Plan Section 8 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 7

Class 2 F01.020 = Category A (rods in one direction only)

F01.021 = Category B (multi-directional hangers)

F01.022 = Category C (thermal movement, i.e. springs, snubbers and constant supports)

Class 3 F01.030 = Category A (rods in one direction only)

F01.031 = Category B (multi-directional hangers)

F01.032 = Category C (thermal movement, i.e. springs, snubbers and constant supports)

The last section of the Item Number is made up by a three or four character sequence to uniquely identify that inspection. Example F01.020.001.

8.1.2 ID Number The ID Number is selected so that, by using the specified reference drawing(s) and any applicable comments, the area to be examined can be accurately identified.

Several different weld identification systems were used by various equipment vendors. A consistent system of weld or component identification has been developed and is described below:

8.1.2.1 The first character of each ID Number indicates the Unit to which the examination applies.

8.1.2.2 The Unit Number is followed by two or three letters to indicate the component or system to be examined.

The abbreviations used are:

RPV Reactor Pressure Vessel PZR Pressurizer SGA Steam Generator A SGB Steam Generator B RCP Reactor Coolant Pump PHA Reactor Coolant Piping Hot Leg to SGA Inservice Inspection Plan Section 8 Oconee Nuclear Station Revision 0 General Requirements Page 2 of 7

PHB Reactor Coolant Piping Hot Leg to SGB PIAl Reactor Coolant Suction Piping to RCP Al PIA2 Reactor Coolant Suction Piping to RCP A2 PIBl Reactor Coolant Suction Piping to RCP Bi P132 Reactor Coolant Suction Piping to RCP B2 PDAI Reactor Coolant Discharge Piping from RCP Al PDA2 Reactor Coolant Discharge Piping from RCP A2 PDBl Reactor Coolant Discharge Piping from RCP Bi PDB2 Reactor Coolant Discharge Piping from RCP B2 PSL Pressurizer Surge Line Piping PSP Pressurizer Spray Piping DT Decay Tank DHRC Decay Heat Removal Cooler LDCA Letdown Cooler A LDCB Letdown Cooler B BWST Borated Water Storage Tank LPCA Low Pressure Injection Cooler A LPCB Low Pressure Injection Cooler B SSF Stand-by Shutdown Facility Make-Up Pump EFDW-MD-PU Emergency Feedwater Motor Driven Pump EFDW-PT Emergency Feedwater Pump Turbine EFDW-TD-PU Emergency Feedwater Turbine Driven Pump LS Letdown Storage JWHX Jacket Water Heat Exchanger RB-CC Reactor Building Cooling Coils HPI High Pressure Injection Inservice Inspection Plan Section 8 Oconee Nuclear Station Revision 0 General Requirements Page 3 of 7

LPI Low Pressure Injection Cs Coolant Storage Quench Tank ESVP Essential Siphon Vacuum Pump LO Lube Oil MCD Main Condenser UST Upper Surge Tank RBS-PU Reactor Building Spray Pump RCSR Reactor Coolant Seal Return STR Strainer SF Spent Fuel 01A, MS, SD Main Steam 03, FDW Feedwater Pumps Discharge 03A Emergency Feedwater, Emergency Pump Discharge 07A Condensate, Low Pressure 08 Vents and Exhaust 13 Condenser Circulating Water (CCW) 14 Low Pressure, High Pressure Service Water 14B, LPSW, Low Pressure Service Water System LPS 20B-21 Penetration, Room Vent, and Reactor Bldg. Purge 50, RC Reactor Coolant System 51, HP High Pressure Injection 51A, HP HP Injection and Let Down 53A, LP LP Injection; Core Flood, and Decay Heat Removal 53B, LP LP Injection; and Decay Heat Removal Inservice Inspection Plan Section 8 Oconee Nuclear Station Revision 0 General Requirements Page 4 of 7

54A Reactor Building Spray Pumps; Suction and Discharge 55, CC Component Cooling; Closed System 56, SF Spent Fuel Cooling 57 Vents Reactor Bldg. Components 59 Drains Reactor Bldg. Components 8.1.2.3 The remainder of the ID Number will indicate the exact weld or component to be examined, as shown on the reference drawings.

Additional information will be included in the comments space when necessary to positively identify the area to be examined.

8.1.3 Drawing Numbers At least one Duke Drawing Number is listed for each examination, if available.

Drawing numbers beginning with OM" are vendor's component drawings (i.e., OM-201-597). Drawing numbers beginning with "OFD", and "KFD" followed by a four digit number are system flow diagrams (i.e., O-ISIN4-100A-1.1). Drawing numbers beginning with O-ISIN4" are ISI boundary drawings (i.e., O-ISIN4-100A-1.1).

8.1.4 Location (Optional)

Location of Item: building, degree, elevation, axis, etc.

8.1.5 Inspection Required / Configuration (Pipe to Elbow, Valve to Pipe, Flange to Tee, etc.)

The following abbreviations are used to describe the type of inspection required for each item:

EVT-1 Enhanced VT-1 Inspection (ISI Visual Inspection)

PT Liquid Penetrant Inspection MT Magnetic Particle Inspection RT Radiographic Inspection UT Ultrasonic Inspection VT-1 ISI Visual Inspection VT-3 ISI Visual Inspection (General Condition of Components and Supports)

Inservice Inspection Plan Section 8 Oconee Nuclear Station Revision 0 General Requirements Page 5 of 7

8.1.6 Procedure The procedures to be used for the examinations were selected by the NDE Level IlIl, for the inspection methods discussed in Section 3 of this plan. The designation TBD" (to be determined) is used to indicate cases where the procedure is in the process of being written.

8.1.7 Material Type/Grade The following abbreviations are used to indicate the type of material to be examined:

CS Carbon Steel SS Stainless Steel IN Inconel 8.1.8 Diameter The nominal pipe size (NPS) is listed for all valves and piping welds up to 24-inch NPS. The nominal inside diameter is listed for all vendor supplied piping larger than 24-in NPS. The actual outside diameter is listed for all other piping welds.

The nominal outside diameter is listed for examinations of bolts and studs.

8.1.9 Thickness The dimension listed for component or piping welds is the nominal thickness at the weld.

The overall length of bolts or studs is listed in this category when applicable.

The dimension listed for support attachment welds is the thickness of the attachment base material.

8.1.10 Calibration Block The calibration block(s) to be used for the UT examinations were selected by the NDE Level IlIl, from the calibration block listing shown in Section 10 of this plan. The designation TBD" is used to indicate cases where the calibration block is still being designed and / or fabricated.

8.1.11 Comments Additional information about the specified examination will be included here when needed.

Inservice Inspection Plan Section 8 Oconee Nuclear Station Revision 0 General Requirements Page 6 of 7

8.2 Examination Listings The detailed examination listing and schedule are found in the Unit 1 volume of this plan.

Inservice Inspection Plan Section 8 Oconee Nuclear Station Revision 0 General Requirements Page 7 of 7

9.0 Requests for Relief from ASME Code Requirements Each request for relief from a requirement of the ASME Code specified in Section 1 of this Plan will be submitted to the Nuclear Regulatory Commission for approval.

The following is a listing of the Requests for Relief submitted for use:

Serial Description Units Date RFR Date SER Comments Number Affected Submitted Approved 03-006 Request for Alternative 1 Pending to IWF-5000 OM -

1987, Part 4, snubber examinations.

Inservice Inspection Plan Section 9 Oconee Nuclear Station Revision 0 General Requirements Page 1of 1

10.0 Calibration Standards 10.1 Ultrasonic Calibration Standards 10.1.1 Calibration standards are prepared for each UT inspection listed in the detailed inspection listings (Volume Unit 1) of this plan. All calibration standards are designed in accordance with the requirements of ASME Section Xi.

10.1.2 Calibration standards for UT inspection shall be selected per the Calibration Block Listing. The number of the calibration standard used shall be recorded on the inspection data.

10.1.3 Procedure NDE-600 is written to meet the requirements of Appendix VIII and does not require the use of a calibration block. In cases where NDE-600 is specified for use, the calibration block field will be empty. NDE-600 is for the examination of similar metal piping welds e.g., stainless to stainless pipe welds and carbon to carbon pipe welds.

10.2 Eddy Current Calibration Standards Eddy Current calibration standards are maintained by the Nuclear Services Division, Nuclear Technical Services Section. Eddy Current Examinations for Steam Generator tubing are scheduled and performed per Oconee Technical Specifications.

<'ZJ 1 0.3 Calibration Standard Description The Oconee Calibration Block Listing found in this section contains information concerning each calibration standard to be used for the inservice inspection of Oconee Unit 1.

Inservice Inspection Plan Section 10 Oconee Nuclear Station Revision 0 General Requirements Page 1 of 1

C C Code Year 1998 DUKE ENERGY CORPORATION Run E QUALITY ASSURANCE TECHNICAL SERVICES Page of 3 Report order: Block no. Inservice Inspection Database Management System Plant(s): ON1 1011412003 Calibration Block Listing MATERIAL DIAM THICKNESS RLOCK NO. TYPE DESCRIPTION CODE REO TYPE/GRADE SIZE (LENGTH) COMMENTS 40338 PLATE 36.5" x 6" x 7' SA 515 GR.70 98/A00 CS 0.000 7.000 SS Clad 40339 PLATE 26.5' x 6' x 5" SA 516 GR.70 98/AOO CS 0.000 5.000 SS Clad 40350 PLATE 11.5" x 6" x 3" SA 516 GR.70 98/AOO CS 0.000 3.000 SS Clad 40354 PIPE 10' SCH. 160 SA 376 TYPE 98/AOO CS 10.750 1.125 304H 40378 PIPE 2.5' SCH. 160 SA 240 TYPE 98/AOO Ss 2.880 0.375 304 40385 PLATE 3' X 6" X .75" SA 240 TYPE 98/AOO SS 0.000 0.750 Heat# 818934 304 40387 PLATE 6' x 7' x 28' SA508 CL.2 98/AOO CS 0.000 7.000 Heat # 158025C-1 SS Clad 40388 PIPE 15.43' x 1.715' SA 508 98/AOO CS 15.280 1.724 Heat# 5P7199 SS Clad 40389 PIPE 14" SCH. 140 SA 376 TYPE 98/AOO SS 13.930 1.250 Heat# 26004 316 40390 URSULA 12.13'x 37.25'x 6" SA 508 98/A00 CS 0.000 12.125 170 in. ID Radius SS Clad CL.2 40393 URSULA 9' x 6' x 36' SA 533 GR. B 98/AOO CS 0.000 9.000 SS Clad 40394 PLATE 5" x 65 x 21" SA 515 GR.70 98/AOO CS 0.000 5.000 SS Clad 40397 PLATE 3' x 6' x 12' SA 240 TYPE 98/AOO CS 0.000 3.000 Heat # 28316 316

( 1 C C Code Year 1998 DUKE ENERGY CORPORATION Run E QUALITY ASSURANCE TECHNICAL SERVICES Page 2 of 3 Report order: Block no. Inservice Inspection Database Management System Plant(s): ONI 10114/2003 Calibration Block Listing MATERIAL DIAM THICKNESS BLOCK NO. TYPE DESCRIPTION CODE REQ TYPE/GRADE SIZE (LENGTH) COMMENTS 40399 PIPE 10 SCH. 140 SA 376 TYPE 98/AOO SS 10.780 1.000 316 40406 PIPE 4' SCH. 160 SA 376 Type 98/AOO SS 4.000 0.531 Heat # M0351 304 40410 PLATE 2.99'x 6.04'x 18.08' SA515 98/A00 CS 0.000 2.990 SS Clad 40411 PIPE SA 182 TYPE 316L 98/A00 SS 8.750 0.875 Heat# 82253 40413 PIPE SA 376 TYPE 316 98/A00 SS 12.000 1.125 40414 PIPE 12" X 1.50' SA 105 98/A00 CS 12.000 1.500 Heat# T1807 40416 PIPE SA 479 TYPE 316 98/A00 SS 3.500 0.750 Heat# 1G3875 40417 STUD 14.131' x2.230" SA 193 ID 98/A00 CS 2.230 14.131 B16 40420 STUD 63.25 x 6.5' SA 540 GR. 98/AOO CS 6.500 63.250 Reactor Vessel Stud B23 Heat# 159628 40422 STUD 12.028 x 2.574' SA 193 GR. 98/A00 SS 2.574 12.028 HPI Stud B7 40425 STUD 14.87 x 2.74' SA 320-L43 98/A00 CS 2.740 14.870 Pressurizer Manway Studs Heat# 116316 50236 PLATE 6.125'x 15.123'x 6.060' 98/AOO CS 0.000 6.125 Heat# 123L418 SS Clad SA508 50237E Forging SA508 CARBON STEEL 98/AOO CS 14.000 3.937 Heat # 123L418 Pressurizer Sensing and Sample Nozzle Cal block for inner radius exams.

Carbon Steel forging with .25 Inch SS cladding.

C (

Code Year 1998 DUKE ENERGY CORPORATION Run E QUALITY ASSURANCE TECHNICAL SERVICES Page 3 of 3 Report order: Block no. Inservice Inspection Database Management System Plant(s): ON1 10/14/2003 Calibration Block Listing MATERIAL DIAM THICKNESS BLOCK NO. TYPE DESCRIPTION CODE RFO TYPE/GRADE SIZE (LENGTH) COMMENTS 50237F Forging SA508 CS 3" X 6' X 10" 98/AOO CS 0.000 3.000 Heat # 123L418 Pressurizer Sensing and Sample Nozzle Cal block for inner radius exams.

Carbon Steel forging with .25 Inch SS cladding.

50256 Pipe SA-312 TYPE 304 SS Pipe 98/AOO SS 4.000 0.237 4" Schedule 40 Heat # 623116 50304 PLATE 9' x 36.65" x 37" SA 508 981A00 CS 0.000 9.000 Heat # CCR801 SS Clad CL.2 Heat #L3541 50306 Pipe SA-376 TYPE 304 SS Pipe 98/A00 SS 3.000 0.438 3" Schedule 160 Heat # B8200 50373 PIPE SB 167 98/AOO Inconel 4.500 0.625 Heat# NX4862 50424 PIPE 4' SCH 120 SA312 T304 98/AOO SS 4.500 0.438 SEAL WATER INJECTION FILTER 1A 50437 PIPE 2.50 SCH 40 SA376/312 98/A00 SS 2.870 0.203 T304 50502 STUD 30.6" X 4.375" SA 540 GR. 98/AOO CS 4.375 30.600 Heat # 99137 RCP Stud (Hex-Head)

B24 6002348 CORE FLOOD AXIAL A 240 TYPE 316 98/AOO SS 0.000 1.253 Heat# 805001-1A Trace# 14781 Drawing Number 6002348.B-0 Borrowed from Davis Besse 95001 FORGING 11.88'x 6'x 36.06" SA 508 98/AOO CS 6.000 11.880 Heat # 123-Y-317 SS Clad CL.2 Framatome Block FTI-RPV-95001 PDIUT1 0 PLATE 2" X 9.5" X 2" SA 516 Grade 98/AOO CS 0.000 2.000 HEAT# 54091 70 The ID for this Cal Block should be PDI-UT-1-0. It is abbreviated in the Cal block listing due to limited fields in the data base.

PDIUT20 PLATE 2UX 9.5' X 2" SA 240 type 98/AOO SS 0.000 2.000 HEAT# 804036 316 The ID for this Cal Block should be PDI-UT-2-0. It is abbreviated in the Cal block listing due to limited fields in the data base.

FOURTH TEN-YEAR INTERVAL INSERVICE INSPECTION PLAN DUKE POWER COMPANY OCONEE NUCLEAR STATION UNIT 1 ADuke U PowerM A Duke Enery Company

FOURTH INTERVAL INSERVICE INSPECTION PLAN OCONEE NUCLEAR STATION UNIT 1 REVISION 0 Duke PDower.m A Duke Energy Company

.lnservice 3 Inspection Plan L. C. Keith Phone: (704)382-3141 Email: Ickeith©duke-energy.com Oconee Nuclear Station Unit 1

Oconee Unit 1 Inservice Inspection Examination Listing and Schedule Section 1 Revision 0 The detailed inspection plans for Inservice Inspection of Oconee Unit 1 are maintained in this volume. Section 1 contains the examination listing and Section 2 contains a listing of reference drawings.

Inservice Inspection Plan Section 1 Oconee Nuclear Station Revision 0 Unit 1 Page 1 of 1

Duke Power Company Inservice Inspection Management Inservice Inspection Plan For:

Oconee Unit 1 Interval 4 ISI Outage 1 Refueling Outage EOC 22 ISI Examination Listing and Schedule Revision 0

C ( C(

EOC 22 DUKE ENERGY CORPORATION CATEGORY B-A. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Reactor Vessel Inservice Inspection Database Management System Plan Report Shell-to-Flange Weld Oconee 1 Page 1 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B01.030.001A l-RPV-WR19 ISI-OCN1-001 NDE-3650 UT CS 171.000 50304 Reactor Vessel Flange Pc. 7 to Nozzle Belt Upper Circumferential 50 OM-201-1877 12.000 Course Pc. 8. UT from Flange Surface. (manual Class A Flange to scan)

Nozzle Belt Total B01.030 Items: 1 Total B01 Items: 1

C c ( Ce EOC 22 DUKE ENERGY CORPORATION CATEGORY B-B, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Vessels Other Than Reactor Vessels Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 2 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG INUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Shell-to-Head; Circumferential B02.011.001 1-PZR-WP76 ISI-OCN1-002 NDE-640 UT CS 84.000 40387 Pressurizer Upper Shell Course Pc.1 to Upper Circumferential 50 OM.201-1878 NDE-820 6.500 Head Pc. 5. Material thickness ranges from 6.50 to Class A Shell to 4.7500 due to taper of material.

Head Total B02.011 Items: 1

        • Shell-to-Head; Longitudinal B02.012.001 1-PZR-WP1-1 ISI-OCN1-002 NDE-640 UT CS 84.000 40387 Pressurizer Upper Shell Course Pc.1 to Upper Shell Longitudinal 50 OM-201-1878 NDE-820 6.188 Course Pc. 1.

Class A Shell to Shell Total B02.012 Items: 1 Total B02 Items: 2

EOC 22 (j Q DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 3 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle-to-Vessel Welds ****

B03.110.002 1-PZR-WP34 ISI-OCN1-002 NDE-640 UT CS 7.750 40394 Pressurizer Spray Nozzle Pc. 9 to Upper Head Pc.

Circumferential 50 OM-201-1026 NDE-820 4.750 5.

Class A Nozzle to Head B03.110.003 1-PZR-WP33-3 ISI-OCN1-002 NDE-640 UT CS 6.875 40394 Pressurizer Relief Nozzle Pc. 31 to Upper Head Pc.

Circumferential 50 OM-201-1878 NDE-820 4.750 5.

Class A OM-201-1026 Nozzle to Z-W Quadrant.

Head B03.110.004 1-PZR-WP33-2 ISI-OCN1-002 NDE-640 UT CS 6.875 40394 Pressurizer Relief Nozzle Pc. 31 to Upper Head Pc.

Circumferential 50 OM.201-1878 NDE-820 4.750 5. X-Y Quadrant.

Class A OM-201 -1026 Nozzle to Head B03.110.005 1-PZR-WP33-1 ISI-OCN1-002 NDE-640 UT CS 6.875 40394 Pressurizer Relief Nozzle Pc. 31 to Upper Head Pc.

Circumferential 50 OM-201-1878 NDE-820 4.750 5. W-X Quadrant.

Class A OM-201-1026 Nozzle to Head Total B03.110 Items: 4

EOC 22 C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 4 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

  • t** Nozzle Inside Radius Section B03.120.002 1-PZR-WP34 ISI-OCN1.002 NDE-680 UT CS 7.750 TBD Pressurizer Spray Nozzle Pc. 9 to Upper Head Pc.

50 OM-201-1878 4.750 5.(Inside Radius Section)

Class A OM-201-1026 Nozzle to Head B03.120.003 1-PZR-WP33-3 ISI-OCN1-002 NDE-680 UT CS 6.875 TBD Pressurizer Relief Nozzle Pc. 31 to Upper Head Pc.

50 OM-201-1878 4.750 5.W-Z Quadrant. (Inside Radius Section)

Class A OM-201-1026 Nozzle to Head B03.120.004 1-PZR-WP33-2 ISI-OCN1-002 NDE-680 UT CS 6.875 TBD Pressurizer Relief Nozzle Pc. 31 to Upper Head Pc.

50 OM-201-1878 4.750 5.Y-X Quadrant. (Inside Radius Section)

Class A OM.201-1026 Nozzle to Head B03.120.005 1-PZR-WP33-1 ISI-OCN1-002 NDE-680 UT CS 6.875 TBD Pressurizer Relief Nozzle Pc. 31 to Upper Head Pc.

50 OM-201-1026 4.750 5.W-X Quadrant. (Inside Radius Section)

Class A OM-201-1878 Nozzle to Head Total 603.120 Items: 4

EOC 22 C I DUKE ENERGY CORPORATION CATEGORY B-D. Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report

  • Steam Generators (Primary Side) Oconee 1 Page 5 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWCI'NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Nozzle-to-Vessel Welds B03.130.001 1-SGA-WG50-2 ISI.OCN1-003 NDE-820 UT CS 38.380 40393 Steam Generator 1A Outlet Nozzle Pc. 65 to Lower Circumferential 50 OM-201-1873 NDE-640 8.500 Head Pc. 7. W-Z Quadrant.

Class A 146467E Nozzle to Head B03.130.002 1-SGA-WG50-1 ISI-OCN1-003 NDE-820 UT CS 38.380 40393 Steam Generator 1A Outlet Nozzle Pc. 65 to Lower Circumferential 50 OM-201-1873 NDE-640 8.500 Head Pc. 7. Y-Z Quadrant.

Class A 146467E Nozzle to Head Total B03.130 Items: 2

EOC 22

(. ( C.

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report

  • Steam Generators (Primary Side) Oconee 1 Page 6 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWCINUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Nozzle Inside Radius Section ****

B03.140.001 I-SGA-WG50-2 ISI-OCN1 -003 TBD VT-1 CS 38.380 40393 Steam Generator A Outlet Nozzle Pc. 65 to Lower 50 OM-201-1873 8.500 Head Pc. 7. W-Z Quadrant. (Inside Radius Section)

Class A 146467E Nozzle to Enhanced VT-1 Inspection Is required in lieu of UT Head inspection.

B03.140.002 1-SGA-WG5O-1 ISI-OCN1-003 TBD VT-i CS 38.380 40393 Steam Generator 1A Outlet Nozzle Pc. 65 to Lower 50 OM-201-1873 8.500 Head Pc. 7. Y-Z Quadrant. (inside Radius Section)

Class A 146467E Nozzle to Enhanced VT-1 Inspection Is required In lieu of UT Head Inspection.

Total B03.140 Items: 2 Total B03 Items: 12

EOC 22

( c DUKE ENERGY CORPORATION CATEGORY B-F, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Dissimilar Metal Welds In Vessel Nozzles Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 7 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DVAIG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Less Than NPS 4; Nozzle-to-Safe End Butt Welds ****

B05.050.002 1-PZR-WP91-2 ISI-OCN1002 NDE-35 PT SS-CS 2.500 Pressurizer Relief Nozzle Pc. 31 to Relief Nozzle Circumferential 50 O-ISIN4-10OA-1.2 0.000 Safe End Pc. 32. X-Y Quadrant.

Class A Term end OM-201-1026 Nozzle to Dissimilar Safe End B05.050.003 1-PZR-WP91-3 ISI-OCN1-002 NDE-35 PT SS-CS 2.500 Pressurizer Relief Nozzle Pc. 31 to Relief Nozzle Circumferential 50 O-ISIN4-10OA-1.2 0.000 Safe End Pc. 32. Z-W Quadrant.

Class A Term end OM-201-1026 Nozzle to Dissimilar Safe End Total B05.050 Items: 2 Total B05 Items: 2

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 8 Inservice Inspection Plan for Interval 4 Outage 1 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Closure Head Nuts ***

B06.010.001 1-RPV-26-203-01 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201 2271 RPV Instruction Manual.

Class A B06.010.002 1-RPV-26-203-02 OM.201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.003 1-RPV-26-203-03 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.004 1-RPV-26-203-04 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.005 1-RPV-26-203-05 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.006 1-RPV-26-203-06 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.007 1-RPV-26-203-07 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM.201-2271 RPV Instruction Manual.

Class A B06.010.008 1-RPV-26-203-08 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A

EOC 22 C C -

DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 9 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOtDWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS B06.010.009 1-RPV-26-203-09 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.010 1-RPV-26-203-10 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.011 1-RPV-26-203-11 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.012 1-RPV-26-203-12 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM.201-2271 RPV Instruction Manual.

Class A B06.010.013 1-RPV-26-203-13 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&WI28723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.014 1-RPV-26-203-14 OM-201 -2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM.201-2271 RPV Instruction Manual.

Class A B06.010.015 1-RPV-26-203-15 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A 806.010.016 1-RPV-26-203-16 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.017 1-RPV-26-203-17 OM.201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM.201-2271 RPV Instruction Manual.

Class A

EOC 22 C C (I DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report

  • Reactor Vessel Oconee 1 Page 10 M Inservice Inspection Plan for Interval 4 Outage 1 1U /141ZUU3 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS B06.010.018 1-RPV-26-203-18 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.019 1-RPV-26-203-19 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.020 1-RPV-26-203-20 OM-201 -2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A Total B06.010 Items: 20

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaininq INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 In. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 11 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIAITHK CAL BLOCKS COMMENTS

    • t Closure Studs, when removed B06.030.001 1-RPV-25-203-01 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&WI28723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.002 1-RPV-25-203-02 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.003 1-RPV-25-203-03 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.004 1-RPV-25-203.04 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.005 1-RPV-25-203-05 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.006 1-RPV-25-203-06 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.007 1-RPV-25-203-07 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDIUT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.008 1-RPV-25-203.64 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PD1-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 12 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.030.009 1-RPV-25-203-09 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.010 1-RPV-25-203-10 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.011 1-RPV-25-203-11 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.012 1-RPV-25-203-12 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.013 1-RPV-25-203-13 OM-201-2271 See Coin UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.014 1-RPV-25-203-14 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

806.030.015 1-RPV-25-203-15 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.016 1-RPV-25-203-62 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.017 1-RPV-25-203-17 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

EOC 22 C

DUKE ENERGY CORPORATION CATEGORY B-G-1. Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 13 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DATHK CAL BLOCKS COMMENTS B06.030.018 1-RPV-25-203-18 OM-201-2271 SeeCom UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.019 1-RPV-25-203-19 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PD1-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.020 1-RPV-25-203-20 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PD1-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

Total B06.030 Items: 20

EOC 22 (1 C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 14 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO))DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

B06.050.001 1-RPV-WASH-BUSH OM-201-2271 QAL-13 VT-1 CS 9.750 Reactor Vessel Closure Washers and Bushings.

B&W128723E 0.214 Stud Holes 1 - 20. Reference OM-201-2271 RPV Class A Instruction Manual.

Total B06.050 Items: 1

EOC 22 C, C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Re taining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 15 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Flange Surface, when connection disassembled ****

B06.070.001 1-PZR-MW-FLANGE OM-201-1026 OAL-13 VT-1 CS 28.000 Pressurizer Manway Flange Surface. Examination 0.000 Includes 1 Annular Surface Surrounding Each Stud.

Class A (Inspect when connection disassembled)

Total B06.070 Items: 1

EOC 22 (I C DUKE ENERGY CORPORATION CATEGORY B-G3-1. Pressure Reftainingq INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Dilameter Inservlce Inspection Database Management System Plan Report WEresurizer Oconeel1 Page 16 Inservlce Inspection Plan for Interval 4 Outage 1 1011412003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

  • B06.080.001 1-PZR-MW-NUTS OM-201-9 QAL-13 VT-i Cs 2.750 Pressurizer Manway Nuts Pc. 68. Examination 0.000 Includes bushings and washers.

Class A Total B06.080 Items: 1

EOC 22 ci C DUKE ENERGY CORPORATION CATEGORY B-G-1. Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 17 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO)flWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Flange Surface, when connection disassembled ****

B06.190.001 1-RCP-1A1-FLANGE OM-201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump Al Main Flange.

OM-201.D-38 0.000 Examination Includes V annular surface of flange Class A OM-201-1 148 surrounding each stud. (Inspect when connection disassembled)

B06.190.002 1-RCP-1A2-FLANGE OM-201.D-35 QAL-13 VT-1 Ss 77.000 Reactor Coolant Pump 1A2 Main Flange.

OM-201.D-38 0.000 Examination includes 1*annular surface of flange Class A OM-201-1 148 surrounding each stud. (Inspect when connection disassembled)

B06.190.003 1-RCP-1B1-FLANGE OM-201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump 1B1 Main Flange.

OM-201.D-38 0.000 Examination includes 1 annular surface of flange Class A OM-201.1 148 surrounding each stud. (Inspect when connection disassembled)

B06.190.004 1-RCP-1B2-FLANGE OM-201.D-35 QAL-13 VT-i SS 77.000 Reactor Coolant Pump 1B2 Main Flange.

OM-201.D-38 0.000 Examination includes 1* annular surface of flange Class A OM-201-1 148 surrounding each stud. (Inspect when connection disassembled)

Total B06.190 Items: 4 Total B06 Items: 47

EOC 22 c C DUKE ENERGY CORPORATION CATEGORY B-G-2. Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diameter Inservice Inspection Database Management System Plan Report Steam Generators Oconee 1 Page 18 Inservice InspectIon Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.030.002 1-SGA-LMW-STUDS OM-201-550 OAL-13 VT-1 SS 2.000 Steam Generator 1A Lower Head Manway Studs OM-201-352 0.000 Pc. 111 and Nuts Pc. 109. 16 Studs, Length Class A =11.500. Examine all studs and nuts.

B07.030.006 1-SGA-LHIC-STUDS OM-201-550 OAL-13 VT-1 SS 1.000 Steam Generator 1A Lower Head Inspection Cover OM-201-352 0.000 Studs Pc. 112 and Nuts Pc. 110. 12 Studs, Length =

Class A 6.000. Examine all studs and nuts.

Total B07.030 Items: 2

C C EOC 22 DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 19 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO) /DWG NUMBERS PROC INSP REQ MAT/SCH DIANTHK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.050.003 1-PZR-RC67-STUDS OM-254-204 QAL-13 VT-1 CS 1.125 Pressurizer Relief Valve RC-67 Inlet Flange Bolting.

OM-254-205 0.000 W-X Quadrant. 8 Studs and 16 Nuts, Length =

Class A 8.750. Examine all studs and nuts.

807.050.004 1-PZR-RC68-STUDS OM.254.204 QAL-13 VT-1 CS 1.125 Pressurizer Relief Valve RC-68 Inlet Flange Bolting.

OM-254-205 0.000 X-Y Quadrant. 8 Studs and 16 Nuts, Length = 8.750.

Class A Examine all studs and nuts.

Total B07.050 Items: 2

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Rektaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting 2 In. And Less In Diami 3ter Inservice Inspection Database Management System Plan Report Oconee 1 Page 20 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.060.003 1-RCP-1B1-SEAL OM-201D-0062 QAL-13 VT-1 CS 2.000 Reactor Coolant Pump BI Lower Seal Housing 0.000 Bolts Pc. 117. 12 Cap Screws, Length = 8.000.

Class A Inspect lower seal housing bolting on one Reactor Coolant Pump only.

Total 807.060 Items: 1

EOC 22

( C (.

DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diameter Inservice Inspection Database Management System Plan Report WRD Housings Oconee 1 Page 21 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO)'DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.080.001 1-RPV-CRD-HOUSING OM-201-2186 OAL-13 VT-1 CS 1.250 CRD Housing includes Bolts (8bolts on each DPS 706599-1056 0.000 connection) and Housing Rings (1pair per housing.)

Class A B&W152006E Inspect only if disassembled.

Inspect only bolting that Is to be reused.

Total B07.080 Items: 1 Total B07 Items: 6

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Lagrer Oconee 1 Page 22 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential Welds **

B09.011.030 1-PIA1-1 ISI-OCN1-007 NDE-600 UT CS 33.500 40350 Steam Generator IA Outlet Nozzle to Pump 1Al Circumferential 50 O-ISIN4-10OA-1.1 2.330 Suction Piping.

Class A Term end/ Stress weld B&W 131914E6 Nozzle to Procedure PDI-UT-1 may be used.

Pipe B09.011.030A 1-PIA1-1 ISI-OCN1-007 NDE-25 MT CS 33.500 Steam Generator 1A Outlet Nozzle to Pump 1A1 Circumferential 50 O-ISIN4-100A-1.1 2.330 Suction Piping.

Class A Term end / Stress weld B&W 131914E6 Nozzle to Pipe B09.011.031 1-PIAI -7 ISI-OCN1 -007 See Coin UT SS-CS 33.500 40350 Reactor Coolant Pump 1Al Suction Piping.

Circumferential 50 O-ISIN4-100A-1.1 2.330 40397 Transition Pc. 210 to Salvaged Pipe Pc. 215.

Class A Stress weld OM-201-1845 Transition Piece to Procedure PDI-UT-10 Dissimilar Pipe B09.011.031A 1-PIA1-7 ISI-OCN1-007 NDE-35 PT SS-CS 33.500 Reactor Coolant Pump Al Suction Piping.

Circumferential 50 O-ISIN4-10OA-1.1 2.330 Transition Pc. 210 to Salvaged Pipe Pc. 215.

Class A Stress weld OM-201-1845 Transition Piece to Dissimilar Pipe B09.011.032 1-PIA1-9 ISI-OCN1-007 NDE-600 UT SS 36.500 40397 Reactor Coolant Pump Al Inlet Nozzle to Safe End Circumferential 50 O-ISIN4-10OA-1.1 2.330 Pc. 211.

Class A Term end/ Stress weld OM-201-1846 Nozzle to Procedure PDI-UT-2 may be used.

Safe End B09.011.032A 1-PIA1-9 ISI-OCN1-007 NDE-35 PT SS 36.500 Reactor Coolant Pump 1Al Inlet Nozzle to Safe End Circumferential 50 O-ISIN4-100A-1.1 2.330 Pc. 211.

Class A Term end / Stress weld OM-201-1846 Nozzle to Safe End B09.011.054 1-PIAl-4 ISI-OCN1-007 NDE-600 UT CS 33.500 40350 Procedure PDI-UT-1 may be used.

Circumferential 50 B&W 131914E6 2.330 Class A Stress weld Pipe to Elbow B09.011.054A 1-PIA1-4 ISI OCN1-007 NDE-25 MT CS 33.500 Circumferential 50 B&W 131914E6 2.330 Class A Stress weld Pipe to Elbow

C C EOC 22 DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Reta ining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 23 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.011.055 1-PIA1-2 ISI-OCN1-007 NDE-600 UT CS 33.500 40350 Procedure PDI-UT-1 maybe used.

Circumferential 50 B&W 131914E6 2.330 Class A Stress weld Pipe to Elbow B09.011.055A 1-PIA1-2 ISI-OCN1-007 NDE-25 MT CS 33.500 Circumferential 50 B&W 131914E6 2.330 Class A Stress weld Pipe to Elbow Total B09.011 Items: 10

C c EOC 22 DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaininq Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report Less Than NPS 4 Oconee 1 Page 24 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential Welds B09.021.002 1-50-01-34 1-50-01(1) NDE-35 PT SS-Inconel 1.500 Reactor Coolant Pump 1 Al Circumferential 50 O-ISIN4-100A-1.1 0.281 Suction Piping. Safe End Pc. 65 to Elbow.

Class A ISI-OCN1-007 Safe End to Dissimilar Elbow B09.021.003 1-51A-04-11C 1-51A-04 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.4 0.375 Class A Pipe to Elbow B09.021.004 1-51A-04-14C 1-51A-04 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A- 1.4 0.375 Class A Elbow to Pipe B09.021.020 1-PDA1-11 ISI-OCN1-011 NDE-35 PT SS-CS 3.500 Reactor Coolant Pump Al Discharge Piping.

Circumferential 50 O-ISIN4-10OA-1.1 0.750 Pressure Injection Nozzle Pc. 46 to Safe End Pc. 47.

Class A OM-201-1845 Nozzle to Dissimilar Safe End B09.021.024 1-PIA1-11 ISI-OCN1-007 NDE-35 PT CS-lnconel 3.500 Reactor Coolant Pump Al Suction Piping. Drain Circumferential 50 O-ISIN4-10OA-1.1 0.816 Nozzle Pc. 64 to Safe End Pc. 65.

Class A OM-201-1870 Nozzle to Dissimilar Safe End B09.021.037 1HP-190-16 1HP-190 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.4 0.375 Class A Stress weld Pipe to Valve 1HP-488 B09.021.042 1HP-278-23C 1HP-278 NDE-35 PT SS 2.500 This weld was listed previously as 1-51A-04-23C Circumferential 51A O-ISIN4-101A-1.4 0.375 until iso 1-51A-04 was redrawn.

Class A Elbow to Pipe B09.021.043 1HP-278-24 1HP-278 NDE-35 PT SS 2.500 This item number was insPected in outaae 1 of the Circumferential 51A 0-1SIN4-101A-1.4 0.375 third Interval and was with weld # 1-51A-04.25C .

Class A Stress weld Pipe to The weld 1-51A-04-25C was deleted in outage 2 of Valve 1HP-487 the third interval so we assigned a new weld number to this item number (weld 1HP-278-24). This weld Is not to be examined in the third interval.

C C EOC 22 DUKE ENERGY CORPORATION CATEGORY B-J. Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report Less Than NPS 4 Oconee 1 Page 25

  • Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIArrHK CAL BLOCKS COMMENTS B09.021.059 1RC-261-266 1RC-261 NDE-35 PT SS-Inconel 1.500 Reactor Coolant Pump 1B2 Circumferential 50 O-ISIN4-100A-1.1 0.281 Suction Piping. Safe End Pc. 65 to Elbow.

Class A ISI.OCN1-010 Safe End to Dissimilar Elbow Total B09.021 Items: 9 Total B09 Items: 19

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY B-L-2, Pump Casings INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 26 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SY"S ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Pump Casino ****

B12.020.001 1RCP-1A1-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump lA Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only If pump is disassembled for Class A ISl-OCN1-007 maintenance, repair, or volumetric examination)

B12.020.002 1RCP-1A2-CASING OM-201.D-35 QAL-14 VT-3 SS 77.000 Reactor Coolant Pump 1A2 Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump Is disassembled for Class A ISI-OCN1-008 maintenance, repair, or volumetric examination)

B12.020.003 1RCP-1B1-CASING OM-201.D-35 QAL-14 VT-3 SS 77.000 Reactor Coolant Pump IB1 Casing Internal 50 OM-201 -1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCNI-009 maintenance, repair, or volumetric examination)

B12.020.004 1RCP-1B2-CASING OM-201.D-35 QAL-14 VT-3 SS 77.000 Reactor Coolant Pump 1B2 Casing Intemal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI.OCN1 -010 maintenance, repair, or volumetric examination)

Total B12.020 Items: 4

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY B-M-2. Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 27 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 1 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • Valve Body, Exceeding NPS 4
  • B12.050.001 1-53A-CF- 1 OM-245-0001 QAL-14 VT-3 SS 14.000 A-Side Core Flood Valve Body CF-1 1 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: 1CF-1 1, 1CF-12, 1CF-1 3, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.002 1-53A-CF-12 OM-245-0001 OAL-14 VT-3 SS 14.000 A- Side Core Flood Valve Body 1CF-12 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: 1CF-1 1,1CF-12, 1CF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.003 1-53A-CF-13 OM-245-0001 OAL-14 VT-3 SS 14.000 B- Side Core Flood Valve Body 1CF-13 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: 1CF-1 1, 1CF-12, 1CF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.004 1-53A-CF-14 OM-245-0001 OAL-14 VT-3 SS 14.000 B-Side Core Flood Valve Body 1CF-14 Intemat 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: 1CF-1 1, 1CF-12, 1CF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.005 1-53A-LP-47 OM-245-0001 OAL-14 VT-3 SS 10.000 B-Side LP1 Valve Body 1LP-47 Intemal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: 1LP-47 or Class A 1LP-48 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.006 1-53A-LP-48 OM-245-0001 OAL-14 VT-3 SS 10.000 B-Side LP1 Valve Body 1LP-48 Internal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: 1LP-47 or Class A 1LP-48 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.007 1-53A-LP-1 OM-245-2054 OAL-14 VT-3 SS 12.000 Decay Heat Suction Valve Body 1LP-1 Internal 53A O-ISIN4-102A-1.1 0.000 Surfaces. Inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve Is disassembled for maintenance, repair, or volumetric examination.

c c-EOC 22 DUKE ENERGY CORPORATION CATEGORY B-M-2, Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Eyalves Oconee 1 Page 28 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS B12.050.008 1-53A-LP-2 OM-245-2055 OAL-14 VT-3 SS 12.000 Decay Heat Suction Valve Body 1LP-2 Internal 53A O-ISIN4-102A-1.1 0.000 Surfaces. Inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve Is disassembled for maintenance, repair, or volumetric examination.

Total B12.050 Items: 8 Total B12 Items: 12

EOC 22

( C C DUKE ENERGY CORPORATION CATEGORY B-N-1, Interior Of Reactor Vessel INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 29 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • Vessel Interior ****

B13.010.001 1-RPV-INT-SURFACE OM.201-1008 QAL-14 VT-3 SS 0.000 Reactor Vessel Interior. Areas to be examined shall 50 ISI-OCN1-001 See Coin 0.000 include the spaces above and below the reactor Class A core that are made accessible for examination by removal of components during normal refueling outages.

Reference Framatome Procedure 54-ISI-364.

Total B13.010 Items: 1 Total B13 Items: 1

EOC 22 C C C DUKE ENERGY CORPORATION CATEGORY B-O. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Control Rod Housings Inservice Inspection Database Management System Plan Report

  • Reactor Vessel Oconee 1 Page 30 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Welds In CRD Housing
  • B14.010.001 1-RPV-CRD-47WH9 OM-201-2186 NDE-35 PT SS-Inconel 4.025 CRDM #47 Housing Body to Adapter.

50 O-ISIN4-100A-1.1 0.650 Class A OM-201 -1059 Housing Body to Adapter B14.010.004 1-RPV-CRD-47W60 OM-2201-1085 NDE-35 PT SS-CS 5.000 CRDM #47 Base to Motor Tube.

50 O-ISIN4-100A-1.1 0.500 Class A Base to Motor Tube B14.010.007 1-RPV-CRD-47 OM-2201-1085 NDE-35 PT SS-CS 4.300 CRDM #47 Motor Tube to Extension.

50 O-ISIN4-100A-1.1 0.400 Class A Motor Tube to Extension B14.010.010 1-RPV-CRD-47W61 OM-2201-1085 NDE-35 PT SS 4.190 CRDM #47 Extension to 50 O-ISIN4-100A-1.1 0.380 Cap.

Class A Extension to Cap Total B14.010 Items: 4 Total B14 Items: 4

EOC 22 C C (

DUKE ENERGY CORPORATION CATEGORY C-B, Pressure Retaining Nozzle INSERVICE INSPECTION PLAN MANAGEMENT Welds In Vessels Inservice Inspection Database Management System Plan Report INozzles Without Reinforcina Plate In Vessels >

M1/2 In. Nom. Thickness Oconee 1 Inservice Inspection Plan for Interval 4 Outage 1 Page 31 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NNUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • Nozzle-to-Shell (Nozzle to Head or Nozzle to Nozzle) Weld ****

C02.021.002 1-SGB-WG23-2 ISI-OCN1-004 NDE-640 UT CS 29.000 40338 Steam Generator B Outlet Nozzle Pc. 14 to Shell Circumferential 03 OM-201-1873 NDE-820 6.750 Pc. 03. X-Y Quadrant.

Class B OM-201-0034 Nozzle to Shell C02.021.002A 1-SGB-WG23-2 ISI-OCN1-004 NDE-25 MT CS 29.000 Steam Generator lB Outlet Nozzle Pc. 14 to Shell Circumferential 03 OM-201-1873 6.750 Pc. 03. X-Y Quadrant.

Class B OM.201 -0034 Nozzle to Shell Total C02.021 Items: 2

        • Nozzle Inside Radius Section
  • C02.022.002 1-SGB-WG23-2 ISI.OCN1-004 TBD VT-1 CS 29.000 40338 Steam Generator 1B Outlet Nozzle Pc. 14 to Shell 03 OM-201-1873 6.750 Pc. 03 (Inside Radius Section). X-Y Quadrant.

Class B Nozzle to Enhanced VT-1 inspection will be performed In lieu Shell of UT Inspection.

Total C02.022 Items: 1 Total C02 Items: 3

EOC 22 C (

DUKE ENERGY CORPORATION CATEGORY C-C. Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels. Piping. Pumps, And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 32 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

C03.020.004 1-01A-0-480A-H10A 1-01-07/sht.1 NDE-25 MT NA 0.000 Calculation No. OSC-1296-06.

Constant Support 01A O-ISIN4-122A-1.1 1.500 Class B C03.020.031 1-14-0-479A-H20D 1-14-17/sht.1 NDE-25 MT NA 0.000 Calculation No. OSC-1306-06. paae 6(5)-43. Insoec't Rigid Support 14 -ISIN4-124B-1.2 1.000 with F01.020.023.

Class B C03.020.042 1-14B-0-479A-H5F 1-14-12 NDE-25 MT NA 0.000 Calculation No. OSC-1306-06, page 6(3)-42. Inspect Rigid Support 14B O-ISIN4-124B-1.2 0.500 with F01.020.031.

Class B C03.020.056 1-51A-0-439C-H91 1-51-04/sht.3 NDE-35 PT NA 0.000 Calculation No. OSC-1639, page 32.2. High Rigid Restraint 51A O-ISIN4-101A-1.4 0.750 Pressure Injection.

Class B O-1AB-15104-03 C03.020.093 1-53B-2-0-436E-H1 1-53-01/sht.2 NDE-35 PT NA 0.000 Calculation No. OSC-407, page 105.1. Inspect with Rigid Support 53B O-ISIN4-102A-1.1 0.216 F01.020.094.

Class B 0-1AB-15301-02 Total C03.020 Items: 5 Total C03 Items: 5

EOC 22 C (

DUKE ENERGY CORPORATION CATEGORY C-D, Pressure Retaining Bolting INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 33 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts and Studs ****

C04.030.001 1-HPI-PUMP-A OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump 1A Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A, 1B, C) Is required to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

C04.030.002 1-HPI-PUMP-B OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump 1B Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(IA, B, C) Is required to be examined. Due to inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

C04.030.003 1-HPI-PUMP-C OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump 1C Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A,1 B, 1C) Is required to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

Total C04.030 Items: 3 Total C04 Items: 3

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PlDIna Welds >= 318 In. Nominal Wall Thickness Oconee 1 Page 34 Wor PIDInc > NPS 4 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NU JMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.011.003 1-53A-01-30L 1.53A-01 (3) NDE-600 UT SS 10.000 40399 Procedure PDI.UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.2 1.125 Class B Valve 1LP-48 to Pipe C05.011.003A 1-53A-01-30L 1-53A-01(3) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.2 1.125 Class B Valve 1LP.48 to Pipe Total C05.011 Items: 2

EOC 22

( C C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • Piina Welds > 115 In. Nom Wall for Piping >= Oconee 1 Page 35 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.021.001 1-51A-01-79A 1-51A-01(3) NDE.600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Valve 1HP-148 C05.021.001A 1-51A-01-79A 1-51A-01(3) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Valve 1HP-148 C05.021.002 1-51A-02-15B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI.UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Tee C05.021.002A 1-51A-02-15B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Tee C05.021.007 1HP-192-32 1HP-192 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Valve 1HP-410 C05.021.007A 1HP-192-32 1HP-192 NDE-35 PT SS 4.000 Circumferential 51A OISIN4-101A-1.4 0.531 Class B Pipe to Valve 1HP-410 C05.021.012 1-51A-123-12 1-51A-123 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.012A 1-51A-123-12 1-51A-123 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe

EOC 22

( C (.

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PiDinq Welds > 1/5 In. Nom Wall for PiPing >= Oconee 1 Page 36

_NPS2and<=NPS4 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS C05.021.018 1-51A-124-10 1-51A-124 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.018A 1-51A-124-10 1-51A-124 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.024 1HP-178-13 1HP-178 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.024A 1HP-178-13 1HP-178 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.030 1-51A-127-4 1-51A-127 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.030A 1-51A-127-4 1.51A-127 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.038 1HP-367-19 1HP-367 NDE-600 UT SS 3.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51B O-ISIN4-101A-1.1 0.216 Class B Tee to Pipe C05.021.038A 1HP-367-19 1HP-367 NDE-35 PT SS 3.000 Circumferential 51B O-ISIN4-101A-1.1 0.216 Class B Tee to Pipe C05.021.045 1-51A-01-89A 1-51A-01(4) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A -ISlN4-101A-1.3 0.531 Class B Tee to Tee

EOC 22 c C' DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PoIDno Welds > 1/5 In. Nom Wall for Plplng >= Oconee 1 Page 37 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS C05.021.045A 1-51A-01-89A 1-51A-01(4) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Tee C05.021.051 1-51A-02-16BA 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.051A 1-51A-02-16BA 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.061 1HP-193-1 1HP-193 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.061A 1HP-193-1 1HP-193 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.068 1-51A-136-24 1-51A-136 NDE-600 UT SS 2.500 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.552 Class B Pipe to Elbow C05.021.068A 1-51A-136-24 1-51A-136 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.1 0.552 Class B Pipe to Elbow C05.021.074 1-51A-01-71A 1.51A.01(3) NDE.600 UT SS 3.000 50306 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.438 Class B Elbow to Valve 1HP-114 C05.021.074A 1-51A-01-71A 1-51A-01(3) NDE-35 PT SS 3.000 Circumferential 51A 0-IS1N4-101A-1.3 0.438 Class B Elbow to Valve IHP-114

EOC 22 C K?

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report Pl ina Welds > 1/5 In. Nom Wall for Piping >= Oconee 1 Page 38 ENPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 1 10114/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.076 1-51A-01-13A 1-51A-01(1) NDE-600 UT SS 3.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.216 Class B Pipe to Elbow C05.021.076A 1-51A-01-13A 1-51A-01(1) NDE-35 PT SS 3.000 Circumferential 51A O-ISIN4-1O1A-1.3 0.216 Class B Pipe to Elbow C05.021.082 1-51A-01-106A 1-51A-01(4) NDE.600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Pipe to Valve 1HP-115 C05.021.082A 1-51A-01-106A 1.51A.01(4) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Pipe to Valve 1HP-115 C05.021.088 1-51A-02-21B 1.51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Tee C05.021.088A 1.51A.02-21B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Tee C05.021.094 1-51A-02-7B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Elbow C05.021.094A 1-51A-02-7B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Elbow C05.021.103 1-RCP-FTR1A-SH-1 1-51A-02 NDE-12 RT SS 4.000 Reactor Coolant Pump Seal Supply Filter 1A Pc. 10 Circumferential 51A O-ISIN4-101A-1.4 0.531 to Pc. 1 Outlet End.

Class B Term end OM-201 -0473 Filter Hub to Filter Housing

(. C f7 EOC 22 DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PIpIna Welds > 1/5 In. Nom Wall for Pipinq >= Oconee 1 Page 39 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 1 I IFIQZUU3 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.103A 1-RCP-FTR1A-SH-1 1-51A-02 NDE-35 PT SS 4.000 Reactor Coolant Pump Seal Supply Filter 1A Pc. 10 Circumferential 51A O-ISIN4-101A-1.4 0.531 to Pc. 1 Outlet End.

Class B Term end OM-201-0473 Filter Hub to Filter Housing C05.021.104 1-RCP-FTR1A-SH-2 1-51A-02 NDE-12 RT SS 4.000 Reactor Coolant Pump Seal Supply Filter 1A Pc. 10 Circumferential 51A O-ISIN4-101A-1.4 0.531 to Pc. 1 Inlet End.

Class B Term end OM-201-0473 Filter Hub to Filter Housing C05.021.104A 1-RCP-FTR1A-SH-2 1-51A-02 NDE-35 PT SS 4.000 Reactor Coolant Pump Seal Supply Filter IA Pc. 10 Circumferential 51A O-ISIN4-101A-1.4 0.531 to Pc. 1 Inlet End.

Class B Term end OM-201-0473 Filter Hub to Filter Housing Total C05.021 Items: 38

C r7 EOC 22 DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or Hlqh Alloy Piping Inservice Inspection Database Management System Plan Report Socket Welds Oconee 1 Page 40 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUIMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.030.001 1-51 B-66-9 1-51 B-66 NDE-35 PT SS 2.000 Socket 51B O-ISIN4-101A-1.2 0.154 Class B Pipe to Elbow C05.030.007 1HP-367-26 1HP-367 NDE-35 PT SS 4.000 Socket 51B O-ISIN4-101A-1.1 0.237 Class B Pipe to Full Coupling Total C05.030 Items: 2

EOC 22 C C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • Pie Branch Connections of Branch PiDing >= Oconee 1 Page 41 iMNPS 2 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBERID NUMBER SYS___.

ISOIDWG NL~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

IMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential Weld C05.041.002 1-53B-01-87BA 1-53B.01(2) NDE-35 PT SS 8.000 Reinforcing collar at weld 87B.

Branch 53B O-ISIN4-102A-1.2 0.250 Class B Reinforcing collar to Pipe C05.041.011 1-53B-06-21 KA 1-53B-06(1) NDE-35 PT SS 8.000 Branch 53B O-ISIN4-102A-1.2 0.148 Class B Pipe to Pipe C05.041.012 1-53B-06-21KB 1-53B.06(1) NDE-35 PT SS 10.000 Reinforcing collar forweld 21KA.

Branch 53B O-ISIN4-102A-1.2 0.165 Class B Reinforcing collar to Pipe Total C05.041 Items: 3

EOC 22 c C DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • P1Dinn Welds >= 3/8 In. Nominal Wall Thickness Oconee 1 Page 42 for Ppin > NPS4 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NLJMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.051.006 1-MS17B-A 1MS-001 NDE-600 UT CS 34.000 Grinnell subassembly MS-17B.

Circumferential 01A 1.164 Note: This weld sub assembly was on so Class B Elbow to 1-01 A-1 (1) prior to the iso being redrawn.

Pipe Procedure PDI-UT-1 may be used. If procedure PDI-UT-1 is used, calibration block PDI-UT-1 -0 shall be used.

C05.051.006A 1-MS17B-A 1MS-001 NDE-25 MT CS 34.000 Grinnell Subassembly MS-17B Circumferential 01A 1.164 Note: This weld sub assembly was on so Class B Elbow to 1-01 A-1 (1) prior to the Iso being redrawn.

Pipe C05.051.009 1MS-064-9 lMS-064 NDE-600 UT CS 12.000 This weld was previously listed as 1-01 A-01 -29C Circumferential 01A 0-IS1N4-122A-1.1 0.562 before the Iso was redrawn.

Class B Pipe to Procedure PDI-UT-1 may be used. If procedure Elbow PDI-UT-1 is used, calibration block PDI-UT-1 -0 shall be used.

C05.051.009A 1MS-064-9 1MS-064 NDE-25 MT CS 12.000 This weld was previously listed as 1-01A-01-29C Circumferential 01A O-ISIN4-122A-1.1 0.562 before the so was redrawn.

Class B Pipe to Elbow C05.051.012 1MS-076-11BA 1MS-076 NDE-600 UT CS 24.000 This weld was previously listed as 1-01A-02-11BA Circumferential 01A 0-1S1N4-122A-1.1 0.969 before the Iso was redrawn.

Class B Term end Reducer to Procedure PDI-UT-1 may be used. If procedure Nozzle SG 1A PDI-UT-1 is used, calibration block PDI-UT-1-O shall be used.

C05.051.012A 1MS-076-11 BA 1MS-076 NDE-25 MT CS 24.000 This weld was previously listed as 1-01 A-02-1 1BA Circumferential 01A O-ISIN4-122A-1.1 0.969 before the Iso was redrawn.

Class B Term end Reducer to Nozzle SG 1A C05.051.017 1MS-063-26 1MS-063 NDE-600 UT CS 8.000 This weld was reviouslv listed as 1-01A-1-99 Circumferential 01A 0-1S1N4-122A-1.3 0.500 before the Iso was redrawn.

Class B Elbow to Procedure PDI-UT-1 may be used. If procedure Pipe PDI-UT-1 is used, calibration block PDI-UT-1 -0 shall be used.

C C K-EOC 22 DUKE ENERGY CORPORATION CATEGORY C-F-2. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report WiPiing Welds >= 318 In. Nominal Wall Thickness Oconee 1 Page 43 for Piping > NPS 4 Inservice Inspection Plan for Interval 4 Outage 1 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.051.017A 1MS-063-26 1MS-063 NDE-25 MT CS 8.000 This weld was previously listed as 1-O1A-1-99 Circumferential 01A O-ISIN4-122A-1.3 0.500 before the Iso was redrawn.

Class B Elbow to Pipe C05.051.030 1-FWD88-C 1*03-3(1) NDE-600 UT CS 14.000 Grinnell subassembly FWD-88.

Circumferential 03 0.750 Procedure PDI-UT-1 may be used. If procedure Class B Elbow to PDI-UT-1 is used, calibration block PDI-UT-1-0 shall Pipe be used.

C05.051.030A 1-FWD88-C 1-03-3(1) NDE-25 MT CS 14.000 Grinnell subassembly FWD-88.

Circumferential 03 0.750 Class B Elbow to Pipe C05.051.033 1-20B-21-16-2 1-20B-21-16 NDE-600 UT CS 48.000 Procedure PDI-UT-1 may be used. If rocedure Circumferential 20B O-ISIN4-116A-1.1 0.500 PDI-UT-1 is used, calibration block PDI-UT-1-O shall Class B Valve 1PRV-1 to be used.

Pipe C05.051.033A 1-20B-21-16-2 1-20B-21-16 NDE-25 MT CS 48.000 Circumferential 20B O-ISIN4-116A-1.1 0.500 Class B I Valve 1PRV-1 to Pipe C05.051.036 1-LPSW-344-21 1-LPSW-344 NDE-600 UT CS 8.000 Procedure PD1-UT-1 may be used. If procedure Circumferential 14B O-ISIN4-124B-1.2 0.500 PDI-UT-1 is used, calibration block PDI-UT-1-O shall Class B Pipe to be used.

Elbow C05.051.036A 1-LPSW-344-21 1-LPSW-344 NDE-25 MT CS 8.000 Circumferential 14B O-ISIN4-124B-1.2 0.500 Class B Pipe to Elbow C05.051.040 1LPSW-345-17 1LPSW-345 NDE-600 UT CS 8.000 This weld was listed reviouslv as 1-LPSW-345-17 Circumferential 14B O-ISIN4-124B-1.2 0.500 until iso 1-LPSW-345 was redrawn. This weld was Class B Flange to listed previously as 1-LPS-345-17 until so Pipe 1-LPS-345 was deleted.

Procedure PDI-UT-1 may be used. If procedure PI-UT-1 Is used, calibration block PDI-UT-1-O shall be used.

EOC 22 c( C KI DUKE ENERGY CORPORATION CATEGORY C-F-2. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Pipina Welds >= 3/8 In. Nominal Wall Thickness Oconee 1 Page 44 Inservice nspection Plan for Interval 4 Outage 1 10/14/2003 nor Ppin > NPS 4 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.051.040A 1LPSW-345-17 1LPSW-345 NDE-25 MT CS 8.000 This weld was listed previously as 1-LPSW-345-17 Circumferential 14B O-ISIN4-124B-1.2 0.500 until so -LPSW-345 was redrawn. This weld was Class B Flange to listed previously as 1-LPS-345-17 until so Pipe 1-LPS-345 was deleted.

C05.051.049 1-LPSW-346-21 1-LPSW-346 NDE-600 UT CS 8.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 14B -1S1N4.124B-1.2 0.500 PDI-UT-1 is used, calibration block PDI-UT-1-O shall Class B Elbow to be used.

Pipe C05.051.049A 1-LPSW-346-21 1-LPSW-346 NDE-25 MT CS 8.000 Circumferential 14B O-ISIN4-124B-1.2 0.500 Class B Elbow to Pipe C05.051.060 1-14-230-1 1-14-230 NDE-600 UT CS 6.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 14B -1SIN4-121D-1.1 0.432 PDI-UT-1 is used, calibration block PDI-UT-1-O shall Class B Tee to be used.

Reducer C05.051.060A 1-14-230-1 1-14-230 NDE-25 MT CS 6.000 Circumferential 14B O-ISIN4-121D-1.1 0.432 Class B Tee to Reducer Total C05.051 Items: 20

EOC 22 C. C <7 DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report Socket Welds Oconee 1 Page 45 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NLJMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.070.001 1-03A-4-3E 1-03A-4(2) NDE-35 PT CS 2.000 Socket 03A O-ISIN4-121D-1.1 0.218 Class B Half Coupling to Pipe Total C05.070 Items: 1

EOC 22 C c KI DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Pioe Branch Connections of Branch Piping >= Oconee 1 Page 46 MNPS 2 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NU IMBERS PROC INSP REQ MAT/SCH DAtTHK CAL BLOCKS COMMENTS Circumferential Weld C05.081.004 1-MS17B-B 1MS-001 NDE-25 MT CS 12.000 Grinnell Subassembly MS-17B.

Branch 01A O-ISIN4-122A-1.1 0.562 Class B Pipe to Pipe C05.081.005 1-FWD67-A 1-03.3(1) NDE-25 MT CS 20.000 Grinnell subassembly FWD-67.

Branch 03 1.031 Class B Pipe to Pipe Total C05.081 Items: 2 Total C05 Items: 68

C C EOC 22 DUKE ENERGY CORPORATION CATEGORY C-G, Pressure Rete Ining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Pumps And Valves Inservice Inspection Database Management System Plan Report EM Oconee 1 Inservice Inspection Plan for Interval 4 Outage 1 Page 47 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/rHK CAL BLOCKS COMMENTS

        • Valve Body Welds ****

C06.020.001 1FDW-345 OM-245-659 NDE-25 MT CS 6.000 Valve No. 1 FDW-345 Valve Body Weld.

Circumferential 03A O-ISIN4-121D-1.1 1.136 Class B Valve Body Neck to Valve Body Total C06.020 Items: 1 Total C06 Items: 1

EOC 22 C C K?

DUKE ENERGY CORPORATION CATEGORY D-A, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels. Piping. Pumps. And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 48 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME :RS _ .

PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

D01.020.011 1-03-0-439A-H63 1-03-01/sht.1 OAL-13 VT-1 NA 24.000 Calculation No. OSC-336, page 45a.1. Inspect with Spring Hgr 03 O-ISIN4-121 B-1.3 0.187 F01.032.017.

Class C D01.020.028 1-03A-1-0-439A-SR39 1-03A-06/sht.1 OAL-13 VT-1 NA 6.000 Calculation No. OSC-340, page 88. Inspect with Rigid Support 03A O-ISIN4-121D-1.1 1.000 F01.030.044.

Class C D01.020.029 1-03A-1-0-439B-H28 1-03A-06/sht.1 OAL-13 VT-1 NA 6.000 Calculation No. OSC-340, page 88. Inspect with Rigid Support 03A O-ISIN4-121D-1.1 0.216 F01.030.045.

Class C D01.020.036 1-04A-2-0-439B-R12 1-04A-06 QAL-13 VT-1 NA 6.000 Calculaton No. OSC-1404, page 77. Inspect with Constant Support 04A O-ISIN4-121B-1.5 0.437 F01.032.041.

Class C D01.020.061 1-14B-0-400B-SR35 1-14-06/sht.2 QAL-13 VT-1 NA 24.000 CalculationNo.OSC-1541,page101. Inspectwith Rigid Restraint 14B O-ISIN4-124A-1.1 3.500 F01.031.073.

Class C D01.020.083 1-56-5-0-437B-H17 4-56-07/sht.1 OAL-13 VT-1 NA 8.000 Calculaton No. OSC-1359-02, page 28. Inspect with Rigid Support 56 O-ISIN4-104A-1.1 0.125 F01.030.132.

Class C D01.020.091 1-57-0-481A-H1 1-57-01/sht.1 OAL-13 VT-1 NA 12.000 Calculaton No. OSC-1313-06, page 41.1. Inspect Rigid Support 57 O-ISIN4-10OA-1.2 0.750 with F01.030.141.

Class C 0-491 C-2A(S)

Total D01.020 Items: 7 Total D01 Items: 7

C EOC 22 DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Class 1 Pipina Supports Oconee 1 Page 49 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 N

ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS

        • Category A, One-Directional ****

F01.010.005 1-51A-0-478A-H6228 1-55-03/sht.1 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1660-11, page 65 Rigid Support 51A O-ISIN4-101A-1.1 0.000 High Pressure Injection.

Class A Total F01.010 Items: 1

        • Category C, Thermal Movement F01.012.002 1-50-0-479A-H2A QAL-14 VT-3 NA 10.000 Pressurizer Surge Lines. No Calculation Number.

Hyd Snubber 50 O-ISIN4-100A-1.1 0.000 Inspect with F01.050.014.

Class A F01.012.008 1-53A-0-479A-H6200 1-53-07/sht.1 OAL-14 VT-3 NA 3.000 Calculation No. OSC-1301-06, page 91.

Spring Hgr 53A O-ISIN4-102A-1.1 0.000 Class A F01.012.011 1-57-0-481A-H13-A 1-57-01/sht.1 OAL-14 VT-3 NA 4.000 Calculation No. OS-1313-06, page 44.1.

Hyd Snubber 57 O-ISIN4-100A-1.2 0.000 Inspect with F01.050.015.

Class A Total F01.012 Items: 3

EOC 22 (I C C DUKE ENERGY CORPORATION CATEGORY F-A. Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report WCass 2 Pipin Suports Oconee 1 Page 50

  • Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS
        • Category A, One-Directional F01.020.004 1-01A-0-481A-H2B 1-01-08/sht.1 OAL-14 VT-3 NA 24.250 Calculation No. OSC-1296-06.

Rigid Support 01A O-ISIN4-122A-1.1 0.500 Class B F01.020.023 1-14-0-479A-H20D 1-14-17/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-1306-06, page 6(5)-43.

Rigid Support 14 O-ISIN4-124B-1.2 1.000 Inspect with C03.020.031.

Class B F01.020.031 1-14B-0-479A-H5F 1-14-12 QAL-14 Vl-3 NA 8.000 Calculation No. OSC-1306-06, page 6(3)-42.

Rigid Support 14B O-ISIN4-124B-1.2 0.500 Inspect with C03.020.042.

Class B F01.020.032 1-14B-0-479A-H18 1-14-15/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-1409.

Rigid Support 14B O-ISIN4-124B-1.2 0.000 Class B 0-1 RB-1 1415-01 F01.020.061 1-51A-0-439A-H100 1-51-04/sht.3 OAL-14 VT-3 NA 4.000 Calculation No. OSC-1639, page 32.2. High Rigid Support 51A O-ISIN4-101A-1.4 0.000 Pressure Injection.

Class B O-lAB-15104-03 F01.020.071 1-51 B-2-0-437A-DE051 1-51-07/sht.4 QAL-14 VT-3 NA 4.000 Calculation No. OSC-1539, page 73.

Rigid Support 51B O-ISIN4-101A-1.4 0.000 Class B F01.020.094 1-53B-2-0-436E-H1 1-53-01/sht.2 QAL-14 VT-3 NA 14.000 Calculation No. OSC-407, page 105.1. Inspect with Rigid Support 53B O-ISIN4-102A-1.1 0.216 C03.020.093.

Class B O-1AB-15301-02 F01.020.113 1-54A-3-0-439A-H23 1-54-03/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-416, page 58.1.

Rigid Support 54A O-ISIN4-103A-1.1 0.000 Class B Total F01.020 Items: 8 t*** Category B, Multi-Directional

EOC 22

( C C DUKE ENERGY CORPORATION CATEGORY F-A. Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Cass 2 PiPin-q Supports Oconee 1 Page 51 Inservice Inspection Plan for Interval 4 Outage 1 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.021.042 1-14B-0-479A-H6 1-14-15/sht.1 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1409.

Rigid Restraint 14B O-ISIN4-124B-1.2 0.216 Class B F01.021.063 1-51A-0-439C-H91 1-51-04/sht.3 QAL-14 VT-3 NA 4.000 Calculation No. OSC-1639, page 32.2. High Rigid Restraint 51A O-ISIN4-101A-1.4 0.750 Pressure Injection.

Class B O-1AB-15104-03 F01.021.072 1-51B-436H-H5176 1-51-01/sht.3 OAL-14 VT-3 NA 2.500 Calculation No. OSC-400, page 52.

Rigid Restraint 518 O-ISIN4-101A-1.2 0.000 Class B O-1AB-15101-03 F01.021.121 1-56-439C-DE001 4-56-02/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 93.

Rigid Restraint 56 O-ISIN4-104A-1.1 0.000 Class B Total F01.021 Items: 4

        • Category C, Thermal Movement F01.022.062 1-51A-1-0-444-H3 1-51-05/sht.2 OAL-14 VT-3 NA 4.000 Calculation No. OSC-1537, page 56.1. High Spring Hgr 51A O-ISIN4-101A-1.3 0.500 Pressure Injection.

Class B F01.022.102 1-53B-3-0-444-H1 1-53-01/sht.2 QAL-14 VT-3 NA 12.000 Calculation No. OSC-407, page 105.1.

Spring Hgr 53B O-ISIN4-102A-1.1 1.000 Class B 0-1AB-15301-02 F01.022.103 1-53B-4-0-435B-H10 1-53-01/sht.1 QAL-14 VT-3 NA 14.000 Calculation No. OSC-407, page 104.

Spring Hgr 53B O-ISIN4-102A-1.1 0.237 Class B O-1AB-15301-01 F01.022.113 1-54A-3-0-435B-R5 1-54-01/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-1628, page 60. Inspect with Hyd Snubber 54A O-ISIN4-103A-1.1 0.000 F01.050.057.

Class B Total F01.022 Items: 4

EOC 22 C C <

DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Cass 3 ping Supports Oconee 1 Page 52 Inservice Inspection Plan for Interval 4 Outage 1 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMEIERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Category A, One-Directional ****

F01.030.042 1-03A-401A-DE003 1-03A-05/sht.1 OAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 79.

Rigid Support 03A O-ISIN4-121D-1.1 0.000 Class C F01.030.043 1-03A-1-0-437A-H67 1-03A-05/sht.4 OAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 82.

Rigid Support 03A O-ISIN4-121D-1.1 0.500 Class C F01.030.044 1-03A-1-0-439A-SR39 1-03A-06/sht.1 OAL-14 VT-3 NA 6.000 Calculation No. OSC-340, page 88.

Rigid Support 03A O-ISIN4-121D-1.1 1.000 Class C F01.030.045 1-03A-1-0-439B-H28 1-03A-06/sht.1 QAL-14 VT-3 NA 6.000 Calculation No. OSC-340, page 88. Inspect with Rigid Support 03A O-ISIN4-121D-1.1 0.216 D01.020.029.

Class C F01.030.056 1-04A-2-0-439B-H17 1-04A-06 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1404, page 77.

Rigid Support 04A O-ISIN4-121B-1.5 0.000 Class C F01.030.057 1-04A-2-0-439B-H16 1-04A-06 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1404, page 77.

Rigid Support 04A O-ISIN4-121B-1.5 0.000 Class C F01.030.063 1-07A-400B-GTE-1901 1-07A-02/sht.2 QAL-14 VT-3 NA 8.000 Calculation No. OSC-362, page 56.

Rigid Support 07A O-ISIN4-121A-1.8 0.000 Class C F01.030.064 1-07A-400B-SR8 1-07A-02/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-362. nace 55.

Rigid Support 07A -ISIN4-121A-1.8 0.000 Class C

EOC 22

( C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report CIass 3 Pping upports Oconee 1 Page 53 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.030.071 1-08-400A-H4050 1-08-01/sht.2 OAL-14 VT-3 NA 10.000 Calculation No. OSC-1902.

Rigid Support 08 O-ISIN4-122A-1.4 0.000 Class C F01.030.102 1-14B-0-439A-SR59 1-14-06/sht.1 QAL-14 VT-3 NA 14.000 Calculation No. OSC-1541 pg. 100.

Rigid Support 14B O-ISIN4-124B-1.2 0.500 Class C F01.030.131 1-56-438C-DE009 4-56-02/sht.2 OAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 94.

Rigid Support 56 O-ISIN4-104A-1.1 0.000 Class C F01.030.132 1-56-5-0-437B-H17 4-56-07/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-1359-02, page 28. Inspect with'.

Rigid Support 56 O-ISIN4-104A-1.1 0.125 D01.020.083.

Class C F01.030.136 1-56-4-0-443-H65 4-56-02/sht.2 OAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 94.

Rigid Support 56 O-ISIN4-104A-1.1 1.000 Class C F01.030.141 1-57-0-481A-H1 1-57-01/sht.1 QAL-14 VT-3 NA 12.000 Calculation No. OSC-1313-06, page 41.1. Inspect Rigid Support 57 O-ISIN4-100A-1.2 0.750 with F01.030.141.

Class C 0-491C-2A(S)

Total F01.030 Items: 14

        • Category B, Multi-Directional F01.031.011 1-03-480A-H6175 1-03A-14/sht.1 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1224-16, page 41.

Rigid Restraint 03 O-ISIN4-121D-1.1 0.000 Class C F01.031.035 1-04A-2-0-439B-R5 1-04A-06 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1404, page 77.

Rigid Restraint 04A O-ISIN4-121B-1.5 1.000 Class C

EOC 22 C C C DUKE ENERGY CORPORATION CATEGORY F-A, SuPPorts INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Class 3 Pping uports Oconee 1 Page 54 Inservice Inspection Plan for Interval 4 Outage 1 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.031.036 1-04A-2-0-439B-R6 1-04A-06 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1404, page 77.

Rigid Restraint 04A O-ISIN4-121B-1.5 0.375 Class C F01.031.042 1-07A-400B-SR22 1-07A-01/sht.4 QAL-14 VT-3 NA 30.000 Calculation No. OSC-361, page 88.1.

Rigid Restraint 07A O-ISIN4-121A-1.7 0.000 Class C F01.031.051 1-08-400A-H4055 1-08-01/sht.2 OAL-14 VT-3 NA 10.000 Calculation No. OSC-1902, page 39.

Rigid Restraint 08 O-ISIN4-122A-1.4 0.000 Class C F01.031.073 1-14B-0-400B-SR35 1-14-06/sht.2 OAL-14 VT-3 NA 24.000 Calculation No. OSC-1541, page 101. Inspect with Rigid Restraint 14B O-ISIN4-124A-1.1 3.500 F01.031.073.

Class C F01.031.074 1-14B-0-437A-SR51 1-14-06/sht.2 QAL-14 VT-3 NA 14.000 Calculation No. OSC-1541, page 101.

Rigid Restraint 14B O-ISIN4-124B-1.1 1.625 Class C Total F01.031 Items: 7

        • Category C, Thermal Movement*

F01.032.017 1-03-0-439A-H63 1-03-01/sht.1 OAL-14 VT-3 NA 24.000 Calculation No. OSC-336, page 45a.1. Inspect with Spring Hgr 03 O-ISIN4-121B-1.3 0.187 D01.020.011.

Class C F01.032.018 1-03-479F-H6068 1-03A-14/sht.2 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1224-16, page 42. Inspect with Mech Snubber 03 O-ISIN4-121D-1.1 0.000 F01.050.099.

Class C F01.032.041 1-04A-2-0-439B-R12 1-04A-06 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1404. page 77. nsrpect with Constant Support 04A 0-IS1N4-121B-1.5 0.437 D01.020.036.

Class C

EOC 22 C C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report CIass 3 Pping Supports Oconee 1 Page 55 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS F01.032.052 1-07A-6-0-400A-H41 1-07A-01/sht.1 OAL-14 VT-3 NA 24.000 Calculation No. OSC.361, page 85.1. Inspect with Mech Snubber 07A OISIN4-121A-1.8 0.000 F01.050.102.

Class C Total F01.032 Items: 4

EOC 22 C C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Sunports Other Than Piping Supports Oconee 1 Page 56 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYES ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

      • Class 1, 2, and 3 ****

F01.040.006 1-DHRC-A-SUPPORT OM 201.286 OAL-14 VT-3 NA 0.000 Decay Heat Removal Cooler 1A. Support located 14B O-ISIN4-102A-1.2 0.000 on Class C side of HX.

Class C Total F01.040 Items: 1 Total F01 Items: 46

EOC 22 c C c DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservlce Inspection Database Management System Plan Report

  • Reactor Coolant Pump Flywheels Oconee 1 Page 57 Inservice Inspection Plan for Interval 4 Outage 1 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G01.001.001A 1-RCP-lAl OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump Al Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

G01.001.002A 1-RCP-1A2 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump 1A2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such Inspection is greater than 6 2/3 years.

Reference Section 7 of the SI Plan, General Requirements.

GO1.001.003A 1-RCP-1B1 OM-201D-38 NDE-25 MT CS 72.000 ReactorCoolant Pump 1Bi Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

G01.001.004A 1-RCP-1B2 OM-201D-38 NDE-25 MT CS 72.000 ReactorCoolant Pump 1B2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

Total GO1.001 Items: 4 Total G01 Items: 4

EOC 22 C C c DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress Piping Examinations Oconee 1 Page 58 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 1 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G04.001.007 1HP-255-6 1HP-255 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51 A O-ISIN4-101 A-1.4 0.375 circumferential). This weld was 1-51 A-10-6 until so Class A Elbow to 1*51 A-10 was deleted and welds were transferred to Pipe iso 1HP-255. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.012 1HP-190-12 1HP-190 See Com UT SS 2.500 Inspect 100% of weld & 1' of base material (axial &

Circumferential 51A 0.375 circumferential). This weld was 1-51 A-5-77C until Class A Pipe to iso 151 A-5 was deleted and welds transferred to iso Elbow 1HP-190. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.015 1HP-190-16 IHP-190 See Corn UT SS 2.500 Inspect 100% of weld & 1V of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Pipe to Plan, Volume 1.

Valve 1HP-488 Procedure EPRI-NDEC-UT-X G04.001.016 IHP-190-13 1HP-190 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Elbow to Plan, General Requirements.

Pipe Procedure EPRI-NDEC-UT-X G04.001.017 1HP-279-4 1HP-279 See Corn UT SS 2.500 Inspect 100% of weld & 1' of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-10-4 until iso Class A Elbow to 1-51 A-10 was deleted and welds tranferred to iso Pipe 1HP-279. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.018 IHP-279-3 1HP-279 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-10-3 until iso Class A Elbow to 1-51 A-10 was deleted and welds tranferred to iso Pipe 1HP-279. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.019 1HP-279-24 1HP-279 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A 0-1S1N4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Pipe to Plan, General Requirements.

Valve 1HP-489 Procedure EPRI-NDEC-UT-X

EOC 22 CI C C DUKE ENERGY CORPORATION CATEGORY AUG, Augmented 1inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress Piping Examinatloins Oconee 1 Page 59 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 1 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS G04.001.021 1HP-277-42C 1HP-277 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-04-42C until Class A Pipe to iso 1-51A-04 was deleted and welds transferred to Elbow iso 1HP-277. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.022 1HP-277-43C 1HP-277 See Com UT SS 2.500 Inspect 100% of weld & 1 of. base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-04-43C until Class A Elbow to iso 1-51 A-04 was deleted and welds tranferred to Pipe iso 1-HP-277. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.023 1HP-277-52 1HP-277 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A 0-1S1N4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Pipe to Plan, General Requirements.

Valve 1HP-486 Procedure EPRI-NDEC-UT-X G04.001.025 1HP-278-22C 1HP-278 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51 A-04-22C until Class A Pipe to Iso 1-51 A-04 was deleted welds tranferred to Elbow 1-HP-278. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.026 1HP-278-23C 1HP-278 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-04-230 until Class A Elbow to iso 1-51A-04 was deleted and welds transferred to Pipe Iso 1-HP-278. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.027 1HP-278-24 1HP-278 See Corn UT SS 2.500 Inspect 100% of weld & 1" of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Pipe to Plan, General Requirements.

Valve 1HP-487 Procedure EPRI-NDEC-UT-X Total G04.001 Items: 13 Total G04 Items: 13

Duke Power Company Inservice Inspection Management Inservice Inspection Plan For:

Oconee Unit 1 Interval 4 ISI Outage 2 Refueling Outage EOC 23 ISI Examination Listing and Schedule Revision 0

. ....,=.......

, " 7 v-7 :- - - . _ I

EOC 23 c 3 c (

DUKE ENERGY CORPORATION CATEGORY B-A, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Reactor Vessel Inservice Inspection Database Management System Plan Report IHead Welds Oconee 1 Page 1 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential ****

B01.021.001 1-RPV-WH5 ISI-OCN1-001 NDE-660 UT CS 0.000 40387 Reactor Vessel Upper Head Cap Section Pc. 24 to Circumferential 50 OM.201 -1122 6.625 Upper Head Ring Section Pc. 23.

Class A Cap Section to Ring Section Total B01.021 Items: 1

EOC 23

( J C (

DUKE ENERGY CORPORATION CATEGORY B-A. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Reactor Vessel Inservice Inspection Database Management System Plan Report Head-to-Flanpe Weld Oconee 1 Page 2 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NIUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS B01.040.001 1-RPV-WH7 ISI-OCN1-001 PDI-UT-6 UT CS 147.000 40387 Reactor Vessel Upper Head Ring Section Pc. 23 to Circumferential 50 OM-201-1122 6.625 50236 Upper Head Flange Pc. 22. Requires personnel Class A Ring Section to with single sided qualification. If such examiners are Flange not available, use procedures NDE-640 and NDE-820.

B01.040.001A 1-RPV-WH7 ISI-OCN1-001 NDE-25 MT CS 147.000 Reactor Vessel Upper Head Ring Section Pc. 23 to Circumferential 50 OM-201-1122 6.625 Upper Head Flange Pc. 22.

Class A Ring Section to Flange Total B01.040 Items: 2 Total B01 Items: 3

EOC 23 C C DUKE ENERGY CORPORATION CATEGORY B-B, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Vessels Other Than Reactor Vessels Inservice Inspection Database Management System Plan Report Steam Generators (Primary Side Oconee 1 Page 3 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIArTHK CAL BLOCKS COMMENTS

        • Tubesheet-to-Head Weld ****

B02.040.001 1-SGA-WG58-1 ISI-OCN1-003 NDE-820 UT CS 119.000 40393 Steam Generator 1A Upper Head to Upper Circumferential 50 OM-201-1873 NDE-640 8.500 Tubesheet.

Class A Head to Pc. 8to Pc. 51.

Tubesheet Total B02.040 Items: 1 Total B02 Items: 1

( ) C (

EOC 23 DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Pressurlzer Oconee 1 Page 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWC INUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Nozzle-to-Vessel Welds

  • B03.110.001 1-PZR-WP15 ISI-OCN1.002 NDE-640 UT CS 15.250 40394 Pressurizer Surge Nozzle Pc. 8 to Lower Head Pc.

Circumferential 50 OM-201-287 NDE-820 4.750 6.

Class A OM-201-1878 Nozzle to The pressurizer LOCA restraint will require removal Head for inspection of Weld No. 1PZR-WP15.

Total B03.110 Items: 1

EOC 23

( C C DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspectlon Program B Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 5 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG3NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle Inside Radius Section ****

B03.120.001 1-PZR-WP15 ISI-OCN1-002 NDE-680 UT CS 15.250 TBD Pressurizer Surge Nozzle Pc. 8 to Lower Head Pc.

50 OM-201-287 3.375 6. (Inside Radius Section). The pressurizer LOCA Class A OM.201.1 878 Nozzle to restraint will require removal for inspection of Weld Head No. 1-PZR-WP15.

Total B03.120 Items: 1

EOC 23

(/1 C (j DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Heat Exchangers (Primary Sde) Oconee 1 Page 6 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWCI'NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle-to-Vessel Welds ****

B03.150.001 1-LDCA-IN-V2 18792-1 NDE-3630 UT SS 3.000 40411 Letdown Cooler 1A Tubeside Inlet Nozzle Pc. 5 to Circumferential 51A OM-201-3107 0.875 Channel Body Pc. 3.

Class A Nozzle to Channel Body B03.150.002 1-LDCA-OUT-V6 18792-1 NDE-3630 UT SS 3.000 40411 Letdown Cooler ATubeside Outlet Nozzle Circumferential 51A OM-201-3107 0.875 Pc. 5 to Channel Body Pc. 3.

Class A Nozzle to Channel Body Total B03.150 Items: 2

EOC 23

( C c DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Heat Exchangers (Primary Side) Oconee 1 Page 7 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWC !NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Nozzle Inside Radius Section ****

B03.160.001 1-LDCA-IN-V2 18792-1 TBD UT Ss 3.000 TBD Letdown Cooler 1ATubeside Inlet Nozzle Pc. 5 to 51A OM-201-3107 0.875 Channel Body Pc. 3. (Inside Radius Section). This Class A Nozzle to item will not be examined, reference Section 9 for Channel Body Request for Relief.

B03.160.002 1-LDCA-OUT-V6 18792-1 TBD UT SS 3.000 TBD Letdown Cooler 1ATubeside Outlet Nozzle 51A OM-201-3107 0.875 Pc. 5 to Channel Body Pc. 3. (Inside Radius Class A Nozzle to Section). This item will not be examined, reference Channel Body Section 9 for Request for Relief.

Total B03.160 Items: 2 Total B03 Items: 6

C C EOC 23 DUKE ENERGY CORPORATION CATEGORY B-G-1. Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 In. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 8

  • Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

B06.040.001 1-RPV-LIGAMENTS OM-201-1007 NDE-640 UT CS 200.000 40387 Reactor Vessel Flange Threads. (0-180 Degrees) 12.500 Class A Total B06.040 Items: I

EOC 23 C C C, DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report

  • Pressurlzer Oconee 1 Page 9 N Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Flange Surface, when connection disassembled ****

B06.070.001 1-PZR-MW-FLANGE OM-201-1026 OAL-13 VT-1 CS 28.000 Pressurizer Meinway Flange Surface. Examination 0.000 Includes 1 Annular Surface Surrounding Each Stud.

Class A (Inspect when connection disassembled)

Total B06.070 Items: 1

EOC 23 C C C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 10 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS SOJ(DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Flange Surface, when connection disassembled ****

B06.190.001 1-RCP-1A1-FLANGE OM-201.D-35 OAL-13 VT-1 SS 77.000 Reactor Coolant Pump Al Main Flange.

OM-201.D-38 0.000 Examination includes 1' annular surface of flange Class A OM-201 -1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.002 1-RCP-1A2-FLANGE OM-201.D-35 QAL-13 VT-i SS 77.000 Reactor Coolant Pump 1A2 Main Flange.

OM-201.D-38 0.000 Examination includes 1V annular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.003 1.RCP-1B1-FLANGE OM-201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump Bi Main Flange.

OM.201.D-38 0.000 Examination includes 1' annular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.004 1-RCP-1B2-FLANGE OM-201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump 1B2 Main Flange.

OM-201.D-38 0.000 Examination includes 1 annular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

Total B06.190 Items: 4 Total B06 Items: 6

EOC 23

(. C C DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaininq INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 In. And Less In Diameter Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 11 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.020.001 1-PZR-UHB-STUDS OM-201-9 QAL-13 VT-1 CS 2.000 Pressurizer Upper Heater Bundle Studs Pc. 75 and OM-201-1262 0.000 nuts. 16 Studs, Length = 17.875. Examine all studs Class A and nuts.

Total B07.020 Items: 1

EOC 23 (j C C DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Restaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diami Ater Inservice Inspection Database Management System Plan Report Oconee 1 Page 12 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIArTHK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.070.005 1-53A-LP47-STUDS OM.245-001 QAL-13 VT-1 CS 1.000 A-Side LPI 10 Valve 1LP-47 Bolting. Inspect one 53A O-ISIN4-102A-1.2 0.000 of the following valves: 1LP-47 or 1LP-48. Examine Class A all studs and nuts.

Total B07.070 Items: 1

EOC 23

( c C DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Re taining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In DiamcAter Inservice Inspection Database Management System Plan Report CRD Housings Oconee 1 Page 13 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.080.001 1-RPV-CRD-HOUSING OM-201-2186 OAL-13 VT-1 CS 1.250 CRD Housing includes Bolts (8bolts on each DPS 706599-1056 0.000 connection) and Housing Rings (1pair per housing.)

Class A B&W152006E Inspect only if disassembled.

Inspect only bolting that is to be reused.

Total B07.080 Items: 1 Total B07 Items: 3

EOC 23 (I C (

DUKE ENERGY CORPORATION CATEGORY B-J. Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 14 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Crcumferential Welds B09.011.008 1-53A-02-50L 1.53A-02(3) NDE.600 UT Ss 14.000 40389 Procedure PDI-UT-2 maybe used.

Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Elbow to Pipe B09.011.008A 1-53A-02-50L 1-53A-02(3) NDE-35 PT Ss 14.000 Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Elbow to Pipe B09.011.009 1-53A-02-54LB 1-53A-02(2) NDE-600 UT Ss 10.000 40399 Procedure PDIUT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.009A 1-53A-02-54LB 1-53A.02(2) NDE-35 PT Ss 10.000 Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.010 1-53A-02-56L 1-53A-02(2) NDE-600 UT SS 10.000 40399 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Elbow to Pipe B09.011.010A 1-53A.02.56L 1-53A-02(2) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Elbow to Pipe B09.011.011 1-53A-02-57L 1-53A.02(2) NDE-600 UT SS 10.000 40399 Procedure PDIUT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.011A 1-53A-02-57L 1-53A-02(2) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow

C (.

EOC 23 DUKE ENERGY CORPORATION CATEGORY B-J. Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT PipinQ Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 15 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.011.012 1-53A-02-59LA 1-53A.02(2) NDE-600 UT SS 10.000 40399 Procedure PDI.UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Elbow to Pipe B09.011.012A 1-53A-02-59LA 1-53A.02(2) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Elbow to Pipe B09.011.013 1-53A-02-60L 1-53A.02(2) NDE-600 UT SS 10.000 40399 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.013A 1-53A-02-60L 1-53A.02(2) NDE-35 PT SS 10.000 Circumferential 53A OISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.015 1-53A-02.68L 1-53A.02(3) NDE-600 UT SS 14.000 40389 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Pipe to Valve 1CF-11 B09.011.015A 1-53A-02-68L 1-53A.02(3) NDE-35 PT SS 14.000 Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Pipe to Valve 1CF-11 B09.011.016 1-PDA1-2 ISI-OCN1-011 See Coin UT SS-CS 33.500 40350 Reactor Coolant Pump 1Al Discharge Piping. Safe Circumferential 50 O-ISIN4-100A-1.1 2.330 40397 End Pc. 213 to 13 Degree Elbow Pc. 212.

Class A OM-201-1844 Safe End to Procedure PDI-UT-10 Dissimilar Elbow B09.011.016A 1-PDA1-2 ISI-OCN1-011 NDE-35 PT SS-CS 33.500 Reactor Coolant Pump 1Al Discharge Piping. Safe Circumferential 50 O-ISIN4-100A-1.1 2.330 End Pc. 213 to 13 Degree Elbow Pc. 212.

Class A OM-201 -1844 Safe End to Dissimilar Elbow B09.011.026 1-PHA-17 ISI-OCN1-005 See Coin UT SS-lnconel 10.750 40354 Steam Generator 1A Hot Lea Surge Nozzle Pc. 25 Circumferential 50 O-ISIN4-100A-1.1 1.000 40414 to Inconel Buttering. Rescheduled 04/08/03 to align Class A Nozzle to with B09.011.041.

Dissimilar Buttering Procedure PDI-UT-10

EOC 23 C C C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 16 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.011.026A 1-PHA-17 ISI-OCNI-005 NDE-35 PT SS-Inconel 10.750 Steam Generator 1A Hot Leg Surge Nozzle Pc. 25 Circumferential 50 O-ISIN4-100A-1.1 1.000 to Inconel Buttering. Rescheduled 04/08/03 to align Class A Nozzle to with B09.011.041A Dissimilar Buttering B09.011.041 1-PSL-10 ISI-OCN1-015 SeeCom UT SS-CS 10.750 40399 Pressurizer Surge Piping. Surge Nozzle Pc. 25to Circumferential 50 O-ISIN4-100A-1.1 140 1.000 40414 Pipe 10* NPS Pc. 85.

Class A Stress weld OM-201-594 Nozzle to Procedure PDI-UT-10 Dissimilar Pipe Procedure PDI-UT-2 may be used.

B09.011.041A 1-PSL-10 ISI-OCN1-015 NDE-35 PT SS-CS 10.750 Pressurizer Surge Piping. Surge Nozzle Pc. 25 to Circumferential 50 O-ISIN4-100A-1.1 140 1.000 Pipe 101 NPS Pc. 85.

Class A Stress weld OM-201-594 Nozzle to Dissimilar Pipe B09.011.047 1-PSL-7 ISI-OCN1-015 NDE-600 UT SS 10.750 40399 Pressurizer Surge Piping. Elbow Pc. 80 to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 140 1.000 84.

Class A Stress weld Elbow to Procedure PDI-UT-2 may be used.

Pipe B09.011.047A 1-PSL-7 ISI-OCN1-015 NDE-35 PT SS 10.750 Pressurizer Surge Piping. Elbow Pc. 80 to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 140 1.000 84.

Class A Stress weld Elbow to Pipe B09.011.048 1-PSL-8 ISI-OCN1-015 NDE-600 UT SS 10.750 40399 Pressurizer Surge Piping. Elbow Pc. 80to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 140 1.000 84.

Class A Stress weld Elbow to Procedure PDl-UT-2 may be used.

Pipe B09.011.048A 1-PSL-8 ISI-OCN1-015 NDE-35 PT SS 10.750 Pressurizer Surge Piping. Elbow Pc. 80 to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 140 1.000 84.

Class A Stress weld Elbow to Pipe B09.011.049 1-PSL-9 ISI-OCN1-015 NDE-600 UT SS 10.750 40399 Pressurizer Surge Piping. Elbow Pc. 80to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 140 1.000 85.

Class A Stress weld Elbow to Procedure PDI-UT-2 may be used.

Pipe B09.011.049A 1-PSL-9 ISI-OCN1 *015 NDE-35 PT SS 10.750 Pressurizer Surge Piping. Elbow Pc. 80 to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 140 1.000 85.

Class A Stress weld Elbow to Pipe

EOC 23 C C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Pipincq Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 17 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS 809.011.051 1-PSP-2 ISI-OCN1-016 NDE-600 UT SS 4.000 50424 Pressurizer Spray Piping. Elbow Pc. 91 to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 120 0.438 90.

Class A Stress weld Elbow to Procedure PDI-UT-2 may be used.

Pipe B09.011.051A 1-PSP-2 ISI-OCN1-016 NDE-35 PT SS 4.000 Pressurizer Spray Piping. Elbow Pc. 91 to Pipe Pc.

Circumferential 50 O-ISIN4-100A-1.1 120 0.438 90.

Class A Stress weld Elbow to Pipe B09.011.052 1-PSP-3 ISI-OCN1-016 NDE-600 UT SS 4.000 50424 Pressurizer Spray Piping. Elbow Pc. 91 to Reducer Circumferential 50 O-ISIN4-100A-1.1 120 0.438 Pc. 102.

Class A Stress weld Elbow to Procedure PDI-UT-2 may be used.

Reducer B09.011.052A 1-PSP-3 ISI-OCN1-016 NDE-35 PT SS 4.000 Pressurizer Spray Piping. Elbow Pc. 91 to Reducer Circumferential 50 O-ISIN4-10OA-1.1 120 0.438 Pc. 102.

Class A Stress weld Elbow to Reducer B09.011.060 1-PIB2-4 ISI-OCN1-010 NDE-600 UT CS 33.500 40350 Procedure P0l-UT-1 may be used.

Circumferential 50 OM-201-1845 2.330 Class A Stress weld Pipe to Elbow B09.011.060A 1-PIB2-4 ISI-OCN1-010 NDE-25 MT CS 33.500 Circumferential 50 OM-201-1845 2.330 Class A Stress weld Pipe to Elbow Total B09.011 Items: 32

EOC 23

( C C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT PipinQ Inservice Inspection Database Management System Plan Report Less Than NPS 4 Oconee 1 Page 18 Inservice Inspection Plan for Interval 4 Outage 2 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

    • t* Circumferential Welds ****

B09.021.030 1-PSP-13 ISI.OCN1-016 NDE-35 PT SS 2.875 Circumferential 50 O-ISIN4-100A-1.2 160 0.375 Class A Stress weld Pipe to Elbow B09.021.033 1-PSP-5 ISI-OCN1-016 NDE-35 PT SS 2.875 Circumferential 50 O-ISIN4-100A-1.2 160 0.375 Class A Stress weld Pipe to Elbow B09.021.036 I-PSP-9 ISI-OCNI-016 NDE-35 PT SS 2.875 Circumferential 50 O-ISIN4-10OA-1.2 160 0.375 Class A Stress weld Valve 1RC-3 to Pipe B09.021.044 1HP-279-24 1HP-279 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.4 0.375 Class A Stress weld Pipe to Valve 1HP-489 B09.021.046 1RC-199-149 1RC-199 NDE-35 PT SS 2.500 This weld was listed previously as 151A-1 1-3 until Circumferential 51A O-ISIN4-101A-1.4 160 0.375 iso1-51A-l1wasredrawn. Revision2toiso Class A Stress weld Pipe to changed weld number to 1-RC-1 99-149.

Valve 1HP-127 B09.021.047 1RC-199-150 1RC-199 NDE-35 PT SS 2.500 Circumferential 51A OISIN4-101A- 1.4 160 0.375 Class A Stress weld Valve 1HP- 127to Valve 1HP-487 B09.021.048 1RC-200-160 1RC-200 NDE-35 PT SS 2.500 This weld was listed previously as 1-51A-1 1-26 until Circumferential 51A O-ISIN4-101A-1.4 160 0.375 iso 1-51A-11 was redrawn. Revision 2 to isometric Class A Stress weld Pipe to changed weld number from 1RC-200.8.

Valve 1HP-126 B09.021.050 1RC-200-166 1RC-200 NDE-35 PT SS 2.500 Circumferential 51A 0-IS1N4-101A-1.4 160 0.375 Class A Stress weld Valve 1HP-486 to Valve 1HP-126

EOC 23 C C c DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Pining Inservice Inspection Database Management System Plan Report Less Than NPS 4 Oconee 1 Page 19 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.021.053 1RC-201-91 1RC-201 NDE-35 PT Ss 2.500 Circumferential 51A O-ISIN4-101A-1.4 0.375 Class A Stress weld Valve 1HP-489 to Valve 1HP-152 B09.021.055 1RC.201-96 1RC-201 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.4 0.375 Class A Stress weld Valve 1HP-488 to Valve 1HP-153 B09.021.056 1RC-201-97 1RC-201 NDE-35 PT Ss 2.500 This weld was listed previously as 1-51A-11.90 until Circumferential 51A O-ISIN4-101A-1.4 0.375 iso 1-51A-11 was redrawn. Revision 2 to Isometric Class A Stress weld Pipe to changed weld number from 1RC-201-4.Weld Valve 1HP-153 1-51A1 1-90 was deleted and weld 1RC.201-97 replaced it.

Total B09.021 Items: 11

EOC 23 C C c DUKE ENERGY CORPORATION CATEGORY B-J. Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report Branch Pipe Connection Welds Oconee 1 Page 20 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NU MBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • NPS 4 or Larger ****

609.031.001 1-PHA-16 ISI-OCN1-005 NDE-600 UT CS 23.000 40350 36* IDPipe Pc. 23 to Surge Nozzle Pc. 25. The Branch 50 O-ISIN4-100A-1.1 2.875 NPS of the branch piping is 10 inches.

Class A Stress weld OM-201-594 Pipe to Procedure PD0-UT-1 may be used.

Nozzle B09.031.001A 1-PHA-16 ISI-OCN1-005 NDE-25 MT CS 23.000 36' IDPipe Pc. 23 to Surge Nozzle Pc. 25. The Circumferential 50 O-ISIN4-100A-1.1 2.875 NPS of the branch piping Is 10 Inches.

Class A Stress weld OM-201-594 Pipe to Nozzle Total B09.031 Items: 2

        • Less Than NPS 4 ***

B09.032.002 1-PDA1-12 ISI-OCN1-011 NDE-35 PT SS 12.000 Safe End Pc. 213 to Pressure Spray Nozzle Pc. 51.

Branch 50 O-ISIN4-100A-1.1 2.500 The NPS of the branch piping is 2.5 Inches.

Class A Stress weld OM-201-603 Safe End to Nozzle Total B09.032 Items: 1

EOC 23 C- C (

DUKE ENERGY CORPORATION CATEGORY B-J. Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report Socket Welds Oconee 1 Page 21 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS B09.040.005 1-51A-07-93 1-51A-07(1) NDE-35 PT SS 1.500 Socket 51A O-ISIN4-100A-1.1 0.281 Class A Pipe to Valve 1RC43 B09.040.006 1-51A-07-99 1-51A-07(1) NDE-35 PT SS 1.500 Socket 51A O-ISIN4-100A-1.1 0.281 Class A Elbow to Pipe B09.040.007 1-51A-134A-39 1-51A-134A NDE-35 PT SS 2.500 Socket 51A O-ISIN4-101A-1.1 0.375 Class A Pipe to Full Coupling B09.040.009 1-51A-135-28 1-51A-135 NDE-35 PT SS 2.500 Socket 51A O-ISIN4-101A-1.1 3.750 Class A Pipe to Reducer Coupling Total 809.040 Items: 4 Total B09 Items: 50

EOC 23 C C (:

DUKE ENERGY CORPORATION CATEGORY B-K, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report Pressure Vessels Oconee 1 Page 22 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBEI .R SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

B10.010.010 1-RPV-HD-LUG-A ISI-OCN1-001 NDE-25 MT CS 0.000 Reactor Vessel Closure Head Lug. X-Y Quadrant at Circumferential 50 OM-201-1122 5.625 Y Axis.

Class A Lifting Lug to Head B10.010.011 1-RPV-HD-LUG-B ISI-OCN1-001 NDE-25 MT CS 0.000 Reactor Vessel Closure Head Lug. W-X Quadrant Circumferential 50 OM-201-1122 5.625 at X Axis.

Class A Lifting Lug to Head B10.010.012 1-RPV-HD-LUG-C ISI-OCN1-001 NDE-25 MT CS 0.000 Reactor Vessel Closure Head Lug. W-Z Quadrant Circumferential 50 OM-201-1122 5.625 at Z Axis.

Class A Lifting Lug to Head B10.010.013 1-LDCA-SUPPORTS OM-201-3107 NDE-25 MT CS 0.000 Letdown Cooler 1A Circumferential 51A O-ISIN4-101A-1.1 0.000 Support Pc. 12 to Casing Shell Pc. 8.

Class A Support to Casing Shell Total B10.010 Items: 4

EOC 23

( C (I DUKE ENERGY CORPORATION CATEGORY B-K, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels. Piping. Pumps. And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 23 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG3NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ***

B10.020.001 1-50-0-481A-H6 1-50-01/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-1314 06, page 129. Inspect Spring Hgr 50 O-ISIN4-100A-1.2 0.154 with F01.012.003.

Class A B10.020.017 1-53A-0-479A-H8B 1-53-08 NDE-35 PT NA 0.000 Calculation No. OSC-1300. Inspect with Spring Hgr 53A O-ISIN4-102A-1.3 1.500 F01.012.010.

Class A Total B10.020 Items: 2 Total B10 Items: 6

EOC 23 C C C DUKE ENERGY CORPORATION CATEGORY B-L-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Pump Casings Inservice Inspection Database Management System Plan Report Oconee 1 Page 24 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUIMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Pump Casing Welds ****

B12.010.001 1RCP-1A1 OM-201.D-35 QAL-13 VT-i Ss 77.000 Reactor Coolant Pump Al Casing Weld.

50 OM-201-1148 0.000 Class A ISI-OCN1-007 Casing to Casing Total B12.010 Items: 1

EOC 23 c C (I

-DUKE ENERGY CORPORATION CATEGORY B-L-2. Pump Casings INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 25 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Pump Casing ****

B12.020.001 1RCP-1A1-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump A Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump Is disassembled for Class A ISI-OCN1-007 maintenance, repair, or volumetric examination) 812.020.002 1RCP-1A2-CASING OM-201.D-35 QAL-14 VT-3 SS 77.000 Reactor Coolant Pump 1A2 Casing Intemal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCN1-008 maintenance, repair, or volumetric examination)

B12.020.003 1RCP-1B1-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump 11 Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump Is disassembled for Class A ISI-OCN1-009 maintenance, repair, or volumetric examination)

B12.020.004 1RCP-1B82-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump 12 Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump Is disassembled for Class A ISI-OCN1-010 maintenance, repair, or volumetric examination)

Total B12.020 Items: 4

EOC 23 C C c DUKE ENERGY CORPORATION CATEGORY B-M-1. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Valve Bodies Inservice InspectIon Database Management System Plan Report Oconee 1 Page 26 Inservice Inspection Plan for Interval 4 Outage 2 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Valves, Less Than NPS 4; Valve Body Welds ****

B12.030.001 1-51A-HP-126 OM-245-1910 NDE-35 PT SS 2.500 Valve 1HP-126 Body to Bonnet Extention Weld.

Circumferential 51A O-ISIN4-101A-1.4 0.000 Inspect one of the following valves: 1HP-126, Class A Body to 1HP-127, 1HP-152, or 1HP-153.

Bonnet Extention Total B12.030 Items: 1

EOC 23 C C {

DUKE ENERGY CORPORATION CATEGORY B-M-2, Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Ivalves Oconee 1 Page 27 W- Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBE:RS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Valve Body, Exceeding NPS 4 ****

B12.050.001 1-53A-CF-1 OM-245-0001 QAL-14 VT-3 Ss 14.000 A- Side Core Flood Valve Body 1CF-1 1 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: I1CF-I1, 1CF-12, 1CF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.002 1-53A-CF-12 OM-245-0001 OAL-14 VT-3 SS 14.000 A-Side Core Flood Valve Body 1CF-12 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: 1CF-1 1,1CF-12, ICF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.003 1-53A-CF-13 OM-245-0001 OAL-14 VT-3 SS 14.000 B-Side Core Flood Valve Body 1CF-13 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: I1CF-11,1CF-12, 1CF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.004 1-53A-CF-14 OM-245-0001 OAL-14 VT-3 SS 14.000 B-Side Core Flood Valve Body 1CF-14 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: 1CF-1 1,1CF-12, 1CF-13, or 1CF-14 only If valve Is disassembled for maintenance, repair, or volumetric examination.

B12.050.005 1-53A-LP-47 OM-245-0001 OAL-14 VT-3 SS 10.000 B-Side LP1 Valve Body 1LP-47 Internal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: 1LP-47 or Class A 1LP-48 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.006 1-53A-LP-48 OM-245-0001 QAL-14 VT-3 SS 10.000 B-Side LP1 Valve Body 1LP-48 Internal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: 1LP-47 or Class A 1LP-48 only if valve Is disassembled for maintenance, repair, or volumetric examination.

B12.050.007 1-53A-LP-1 OM-245-2054 OAL-14 VT-3 SS 12.000 Decay Heat Suction Valve Bodv LP-1 Intemal 53A O-ISIN4-102A-1.1 0.000 Surfaces. Inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve Is disassembled for maintenance, repair, or volumetric examination.

EOC 23 C C cI DUKE ENERGY CORPORATION CATEGORY B-M-2, Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Wyaives Oconee 1 Page 28 N Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B12.050.008 1-53A-LP-2 OM-245-2055 OAL-14 VT-3 Ss 12.000 Decay Heat Suction Valve Body 1LP-2 Internal 53A O-ISIN4-102A-1.1 0.000 Surfaces. Inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve is disassembled for maintenance, repair, or volumetric examination.

Total B12.050 Items: 8 Total B12 Items: 14

C c EOC 23 DUKE ENERGY CORPORATION CATEGORY C-A, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Pressure Vessels Inservice Inspection Database Management System Plan Report Head Circumferential Welds Oconee 1 Page 29 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG INUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS C01.020.001 1-LPCB-HD-SH OM-201-286 NDE-3630 UT SS 0.000 40385 Decay Heat Cooler 1B Stainless Steel Head to Circumferential 53B O-ISIN4-102A-1.2 0.625 Shell.

Class B Head to Shell Total C01.020 Items: 1

EOC 23 C C DUKE ENERGY CORPORATION CATEGORY C-A. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Pressure Vessels Inservice Inspection Database Management System Plan Report Tubesheet-to-Shell Weld Oconee 1 Page 30 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG INUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C01.030.003 1-LPCB-SH-TUBE OM-201-286 NDE-3630 UT Ss 0.000 40385 Decay Heat Cooler B Stainless Steel Shell to Circumferential 53B O-ISIN4-102A-1.2 0.625 Tubesheet.

Class B Shell to Tubesheet Total C01.030 Items: 1 Total C01 Items: 2

EOC 23 C (

DUKE ENERGY CORPORATION CATEGORY C-C, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report Pressure Vessels Oconee 1 Page 31 Inservice Inspection Plan for Interval 4 Outage 2 10/1412003 ITEM NUMBER ID NUMBER SYS ISO/DWCI'NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

C03.010.001 1-SGA-WG84-XY OM-201-176 NDE.25 MT CS 0.000 Steam Generator A Feedwater Header Support 03 OM-201 -0006 1.000 Attachment Pc. 152/153 to Pc. 3. X-Y Quadrant Class B Attachment to Nearest to X-Axis.

Shell C03.010.009 1-RCSR-COOLER-A OM-201-0086 NDE-35 PT SS 0.000 Reactor Coolant Seal Return Cooler A.

51B O-ISIN4-101A-1.1 0.000 Class B Attachment to Shell Total C03.010 Items: 2

EOC 23 C C (

DUKE ENERGY CORPORATION CATEGORY C-C, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 32 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWC'NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

C03.020.051 1-51 436H-SR15 1.51-02/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-1535, page 135-1. Inspect with Rigid Restraint 51 -ISIN4-101A-1.2 1.000 F01.021.053.

Class B O-1AB-15102-01 Total C03.020 Items: 1 Total C03 Items: 3

EOC 23 DUKE ENERGY CORPORATION CATEGORY C-D. Pressure Retaining Bolting INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 33 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

    • t* Bolts and Studs ****

C04.030.001 1-HPI-PUMP-A OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump 1A Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A,1 B, 1C) Is required to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

C04.030.002 1-HPI-PUMP-B OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump 1B Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A, 1B,1C) is required to be examined. Due to inaccessibility disassembly is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

C04.030.003 1-HPI-PUMP-C OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump 1C Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A, 1B, 1C) is required to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

Total C04.030 Items: 3 Total C04 Items: 3

EOC 23 C C C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PiDIna Welds >= 318 In. Nominal Wall Thickness Oconee 1 Page 34

_for Pin > NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NLJMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential Weld ****

C05.011.004 1-53A-01-31LD 1.53A-01(3) NDE.600 UT SS 10.000 40399 Procedure PDI.UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.2 1.125 Class B Pipe to Dissimilar Pipe C05.011.004A 1-53A-01-31LD 1-53A-01(3) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.2 1.125 Class B Pipe to Pipe Total C05.011 Items: 2

EOC 23 C C.

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • Pipina Welds > 1/5 In. Nom Wall for Piping >= Oconee 1 Page 35 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 1014/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld C05.021.005 1HP-192-8 1HP-192 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.005A 1HP-192-8 1HP-192 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.008 1HP-192-22 1HP-192 NDE-600 UT SS 4.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.674 Class B Pipe to Elbow C05.021.008A 1HP-192-22 1HP-192 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.674 Class B Elbow to Pipe C05.021.013 1.51 A-1 23-16 1-51A-123 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.013A 1-51A-123-16 1-51A-123 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.019 1-51A-124-12 1-51A-124 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.019A 1-51A-124-12 1-51A-124 NDE-35 PT SS 4.000 Circumferential 51A -1S1N4-101A-1.3 0.531 Class B Elbow to Pipe

EOC 23

( C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PiDlno Welds > 1/5 In. Nom Wall for Plping >= Oconee 1 Page 36 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.025 1HP-178-15 1HP-178 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.025A 1HP-178-15 1HP-178 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.031 1HP-200-20 1HP-200 NDE-600 UT SS 4.000 TBD Procedure PDI.UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.674 Class B Elbow to Reducer C05.021.031A 1HP-200-20 1HP-200 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.1 0.674 Class B Elbow to Reducer C05.021.035 1HP-180-89E 1HP-180 NDE-600 UT SS 2.500 40378 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Elbow to Pipe C05.021.035A 1HP-180-89E 1HP-180 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Elbow to Pipe C05.021.039 1HP-367-20 1HP-367 NDE-600 UT SS 3.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51B O-ISIN4-101A-1.1 0.216 Class B Pipe to Elbow C05.021.039A 1HP-367-20 1HP-367 NDE-35 PT SS 3.000 Circumferential 51B O-ISIN4-101A-1.1 0.216 Class B Pipe to Elbow C05.021.040 1-51A-01-85A 1-51A-01(3) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Pipe to Elbow

EOC 23 c C c DUKE ENERGY CORPORATION CATEGORY C-F-1. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report NP Ina Welds > 15 In. Nom Wall for Piping >= Oconee 1 Page 37 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS C05.021.040A 1-51A-01-85A 1-51A.01(3) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Pipe to Elbow C05.021.046 1-51A-01-98A 1-51A-01(4) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Pipe C05.021.046A 1-51A-01-98A 1-51A-01(4) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Pipe C05.021.052 1-51A-02-17B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDIUT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Tee to Elbow C05.021.052A 1-51A-02-17B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Tee to Elbow C05.021.062 1HP-193-11 1HP-193 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Tee C05.021.062A 1HP-193-11 1HP-193 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Tee C05.021.075 1-51A-01-93A 1-51A01(3) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Pipe to Elbow C05.021.075A 1-51A-01-93A 1-51A 01(3) NDE-35 PT SS 4.000 Circumferential 51A 0-1SIN4-IOIA-1.3 0.531 Class B Pipe to Elbow

EOC 23 C C C(

DUKE ENERGY CORPORATION CATEGORY C-F-1 Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report NPloina Welds > 1/5 In. Nom Wall for phinq >= Oconee 1 Page 38 MNPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.079 1HP-282-75A 1HP-282 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Pipe C05.021.079A 1HP-282-75A 1HP-282 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Pipe C05.021.085 1-51A-02-12B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI.UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.085A 1-51A-02-12B 1.51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.091 1-51A-02-51B 1-51A-02 NDE-12 RT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Valve 1HP-29 to Tee C05.021.091A 1-51A-02-51B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Valve 1HP-29 to Tee C05.021.097 1HP-179-118 1HP-179 NDE-600 UT SS 2.500 TBD Procedure PDl-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.552 Class B Elbow to Reducer C05.021.097A 1HP-179-118 1HP-179 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.1 0.552 Class B Elbow to Reducer C05.021.107 1-51A-01-100A 1.51A-01(4) NDE-600 UT SS 3.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.438 Class B Pipe to Elbow

EOC 23 C (

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Re taining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy 3iping Inservice Inspection Database Management System Plan Report

  • Plpina Welds > 15 In. Nom Wall fc)r Pipng >= Oconee 1 Page 39 ENPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.107A 151A-01-100A 1-51A-01(4) NDE-35 PT SS 3.000 Circumferential 51A O-ISIN4-101A-1.3 0.438 Class B Pipe to Elbow Total C05.021 Items: 36

EOC 23 C (.

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PIne Branch Connections of Branch Piping >= Oconee 1 Page 40 MPS 2 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld C05.041.003 1LP-107-7 1LP-107 NDE-35 PT SS 8.000 This weld was previously listed as 1-53B-01-101B Branch 53B O-ISIN4-102A-1.2 0.250 before the so was redrawn.

Class B Pipe to Pipe C05.041.004 1LP-107-7Z 1LP-107 NDE-35 PT SS 8.000 Reinforcing collar at weld 101 B.

Branch 53B O-ISIN4-102A-1.2 0.250 This weld was previously listed as 1-53B-01-101BA Class B Reinforcing collar to before the Iso was redrawn.

Pipe C05.041.013 1-53B-06-26KC 1-53B.06(2) NDE-35 PT SS 6.000 Branch 53B O-ISIN4-102A-1.2 0.134 Class B Pipe to Pipe C05.041.014 1-53B-06-26KI 1-53B-06(2) NDE-35 PT SS 6.000 Branch 53B O-ISIN4-102A-1.2 0.134 Class B Pipe to Pipe C05.041.026 1LP-94-15 1LP-94 NDE-35 PT SS 6.000 Branch 53B O-ISIN4-102A-1.2 0.280 Class B Pipe to 10x6 weldolet Total C05.041 Items: 5

EOC 23 C (

DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Plpina Welds >= 3/8 in. Nominal Wall Thickness Oconee 1 Page 41 for Ppin > NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.051.001 1MS-070-1 B 1MS-070 NDE-600 UT CS 36.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 01A 0-ISIN4-122A-1.1 1.164 PD1-UT-1 is used, calibration block PDI-UT-1-0 shall Class B Pipe to be used.

Pipe C05.051.001A 1MS-070-1B 1MS-070 NDE-25 MT CS 36.000 Circumferential 01A O-ISIN4-122A-1.1 1.164 Class B Pipe to Pipe C05.051.013 1MS-069-29B 1MS-069 NDE-600 UT CS 24.000 Procedure PD1-UT-1 may be used. If procedure Circumferential 01A O-ISIN4-122A-1.1 0.969 PD1-UT-1 is used, calibration block PDI-UT-1-O shall Class B Term end Reducer to be used.

Nozzle SG B C05.051.013A 1MS-069-29B 1MS-069 NDE-25 MT CS 24.000 Circumferential 01A O-ISIN4-122A-1.1 0.969 Class B Term end Reducer to Nozzle SG 1B C05.051.018 1MS-064-16 1MS-064 NDE-600 UT CS 6.000 This weld was previously listed as 1-01A-01-27C Circumferential 01A 0-ISIN4-122A-1.2 0.432 before the Iso was redrawn.

Class B Tee to Procedure PD1-UT-1 may be used. If procedure Pipe PDI-UT-1 is used, calibration block PDI-UT-1-O shall be used.

C05.051.018A 1MS-064-16 1MS-064 NDE-25 MT CS 6.000 This weld was previously listed as 1-01A-01-27C Circumferential 01A O-ISIN4-122A-1.2 0.432 before the Iso was redrawn.

Class B Tee to Pipe C05.051.028 1-FWD83-A 1-03-3(1) NDE-600 UT CS 24.000 Grinnell subassembly FWD-83.

Circumferential 03 1.218 Procedure PD1-UT-1 may be used. If procedure Class B Pipe to PD1-UT-1 Is used, calibration block PDI-UT-1 -0 shall Elbow be used.

C05.051.028A 1-FWD83-A 1-03-3(1) NDE-25 MT CS 24.000 Grinnell subassembly FWD-83.

Circumferential 03 1.218 Class B Pipe to Elbow

EOC 23 C

DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report Piplina Welds >= 3/8 in. Nominal Wall Thickness Oconee 1 Page 42 for Piping > NPS 4 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.051.035 1-03-3-30B 1-03-3(1) NDE-600 UT CS 14.000 Procedure PDl-UT-1 may be used. If procedure Circumferential 03 O-ISIN4-121B-1.3 0.750 PDI-UT-1 is used, calibration block PDl-UT-1 -0 shall Class B Elbow to be used.

Reducer C05.051.035A 1-03-3-30B 1-03-3(1) NDE-25 MT CS 14.000 Circumferential 03 O-ISIN4-121B-1.3 0.750 Class B Elbow to Reducer C05.051.042 1LPSW-345-21 1LPSW-345 NDE-600 UT CS 8.000 This weld was listed previously as -LPSW-345-21 Circumferential 14B O-ISIN4-124B-1.2 0.500 until so 1-LPSW-345 was redrawn. This weld was Class B Elbow to listed previously as 1-LPS-345-21 until iso Pipe 1-LPS-345 was deleted.

Procedure PD1-UT-1 may be used. If procedure PD0-UT-1 Isused, calibration block PDI-UT-1-0 shall be used.

C05.051.042A 1LPSW-345-21 1LPSW-345 NDE-25 MT CS 8.000 This weld was listed previously as 1-LPSW-345-21 Circumferential 14B O-ISIN4-124B-1.2 0.500 until iso -LPSW-345 was redrawn. This weld was Class B Elbow to listed previously as 1-LPS-345-21 until iso Pipe 1-LPS-345 was deleted.

C05.051.046 1-LPSW-346-17 1-LPSW-346 NDE-600 UT CS 8.000 Procedure PD0-UT-1 may be used. If procedure Circumferential 14B O-ISIN4-124B-1.2 0.500 PD0-UT-1 is used, calibration block PDI-UT-1-O shall Class B Pipe to be used.

Flange C05.051.046A 1-LPSW-346-17 1-LPSW-346 NDE-25 MT CS 8.000 Circumferential 14B O-ISIN4-124B-1.2 0.500 Class B Pipe to Flange Total C05.051 Items: 14 Total C05 Items: 57

EOC 23 C C K?

DUKE ENERGY CORPORATION CATEGORY D-A, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels. Piping, Pumps. And Valves Inservice Inspection Database Management System Plan Report Mining Oconee 1 Page 43 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

D01.020.001 1-O1A-4-2-0-400A-R1 1 1-01-06/sht.3 OAL-13 VT-1 NA 6.000 Calculation No. OSC-325, page 91. Inspect with Mech Snubber 01A O-ISIN4-122A-1.4 0.250 F01.032.002.

Class C D01.020.026 1-03A-1-0-400B-SR86 1-03A-09/sht.4 QAL-13 VT-1 NA 6.000 Calculation No. OSC-342, page 104. Inspect with Rigid Restraint 03A O-ISIN4-121D-1.1 1.000 F01.031.024.

Class C D01.020.027 1-03A-1-0-439A-H72 1-03A-05/sht.3 OAL-13 VT-1 NA 6.000 Calculation No. OSC-339, page 81. Inspect with Spring Hgr 03A O-ISIN4-121D-1.1 0.500 F01.032.022.

Class C D01.020.041 1-07A-400B-SR17 1-07A-01/sht.4 QAL-13 VT-1 NA 24.000 Calculation No. OSC-361, page 88.1. Inspect with Rigid Support 07A O-ISIN4-121A-1.7 0.375 F01.030.065.

Class C Total D01.020 Items: 4 Total D01 Items: 4

EOC 23 C, C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report mcass 1 Piping SuDports Oconee 1 Page 44 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

_Cateorv A. One-Directional F01.010.006 1-51A-0-479A.H9B 1-51-26/sht.1 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1304-06, page 6(1)31 Rigid Support 51A O-ISIN4-101A-1.4 0.000 High Pressure Injection.

Class A Total F01.010 Items: 1

        • Category C, Thermal Movement F01.012.001 1-50-0-480A-H1 1 1-50-01/sht.1 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1314-06, page 129. Inspect Hyd Snubber 50 O-ISIN4-100A-1.1 0.000 with F01.050.013.

Class A F01.012.003 1-50-0-481A-H6 1-50-01/sht.1 QAL-14 VT-3 NA 2.500 Calulation No. OSC-1314-06, page 129. Inspect Spring Hgr 50 O-ISIN4-10OA-1.2 0.154 with B10.020.001.

Class A F01.012.010 1-53A-0-479A-H8B 1-53-08 OAL-14 VT-3 NA 10.000 Calculation No. OSC-1300. Inspect with Spring Hgr 53A O-ISIN4-102A-1.3 1.500 B10.020.017.

Class A Total F01.012 Items: 3

EOC 23 C C DUKE ENERGY CORPORATION CATEGORY F-A, SUpOrts INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report CIass Pping 2 Supports Oconee 1 Page 45 Inservice Inspection Plan for Interval 4 Outage 2 1014/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Cateaorv

_ _ A.,_One-Directional F01.020.044 1-51-0-436H-H57 1-51-01/sht.1 OAL-14 VT-3 NA 4.000 Calculation No. OSC-400, page 50.

Rigid Support 51 O-ISIN4-101A-1.1 0.750 Class B O-1AB-15101-01 F01.020.045 1-51-0-436D-SR1O 1-51-01/sht.1 OAL-14 VT-3 NA 4.000 Calculation No. OSC-400, page 50.

Rigid Support 51 O-ISIN4-101A-1.1 0.750 Class B O-1AB-15101-01 F01.020.049 1-51-0-436D-SR7 1-51-06/sht.2 OAL-14 VT-3 NA 4.000 Calculation No. OSC-1538, page 94.

Rigid Support 51 O-ISIN4-101A-1.1 0.750 Class B O-1AB-15106-02 F01.020.062 1-51A-0-435C-H138 1-51-04/sht.1 OAL-14 VT-3 NA 4.000 Calculation No. OSC-1639, page 30.5. High Rigid Support 51A O-ISIN4-101A-1.3 0.000 Pressure Injection.

Class B 0-1AB-15104-01 F01.020.067 1-51A-1-0-444-H1 1-51-04/sht.1 OAL-14 VT-3 NA 4.000 Calculation No. OSC-1639, page 30.5.

Rigid Support 51A O-ISIN4-101A-1.4 0.500 Class B O-1AB-15104-01 F01.020.068 1-51A-0-478A-Hl8C 1-55-03/sht.2 QAL-14 VT-3 NA 2.500 Calculation No. OSC-1660-11, page 66. High Rigid Support 51A O-ISIN4-101A-1.1 0.000 Pressure Injection.

Class B F01.020.069 1-51A-0-439C-H81 1-51-04/sht.4 QAL-14 VT-3 NA 4.000 Calculation No. OSC-1639, page 33.

Rigid Support 51A O-ISIN4-101A-1.4 0.000 Class B F01.020.073 1-51B-436H-DE010 1-51-01/sht.2 QAL-14 VT-3 NA 2.500 Calculation No. OSC-400, page 51.

Rigid Support 51B O-ISIN4-101A-1.2 0.000 Class B 1O-1AB-15101-02

C C.

EOC 23 DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Class 2 PiPinq upports Oconee 1 Page 46 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.020.081 1-53-438C-TWE-2879 1-53-01/sht.3 OAL-14 VT-3 NA 14.000 Calculation No. OSC-407, page 106.

Rigid Support 53 O-ISIN4-102A-1.1 0.000 Class B O-1AB-15301-03 F01.020.091 1-53B-435B-DE026 1-53-02/sht.1 OAL-14 VT-3 NA 10.000 Calculation No. OSC-408.

Rigid Support 53B O-ISIN4-102A-1.2 0.000 Class B O-1AB-15302-01 F01.020.095 1-53B-2-0-436E-H1O 1-51-02/sht.2 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1535, page 136.

Rigid Support 53B O-ISIN4-101A-1.3 0.216 Class B O-1AB-15102-02 F01.020.114 1-54A-3-0-436-H3 1-54-01/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-1628, page 60.

Rigid Support 54A O-ISIN4-103A-1.1 0.125 Class B F01.020.116 1-54A-0-444-R15 1-54-03/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-416, page 58.1.

Rigid Support 54A O-ISIN4-103A-1.1 0.500 Class B Total F01.020 Items: 13 t*** Category B, Multi-Directlonal F01.021.032 1-14-478E-H6016 1-03A-14/sht.3 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1224-16, page 44.

Rigid Restraint 14 O-ISIN4-121D-1.1 0.000 Class B F01.021.051 1-51-0-436H-SR3 1-51-02/sht.1 QAL-14 VT-3 NA 4.000 Calculation No. OSC-1535, page135-1.

Rigid Restraint 51 O-ISIN4-101A-1.2 0.000 Class B O-1AB-15102-01 F01.021.052 1-51-0-439C-SR45 1-51 -05/sht.1 QAL-14 VT-3 NA 4.000 Calculation No. OSC-1537, page 55.1.

Rigid Restraint 51 O-ISIN4-101A-1.3 0.000 Class B 0-1AB-15105-01

EOC 23

( C C DUKE ENERGY CORPORATION CATEGORY F-A, Sup orts INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report C ass 2 Piping Supports Oconee 1 Page 47

  • Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.021.053 1-51-0-436H-SR15 1-51-02/sht.1 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1535, page 135-1. Inspect Rigid Restraint 51 O-ISIN4-101A-1.2 1.000 with C03.020.051.

Class B O-1AB-15102-01 F01.021.101 1-54A-3-0-439A-H19 1-54-03/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-416, page 58.1.

Rigid Restraint 54A O-ISIN4-103A-1.1 0.500 Class B Total F01.021 Items: 5

        • Category C, Thermal Movement F01.022.002 1-01A-0-401A.FAC-1203 1-01-05/sht.2 OAL-14 VT-3 NA 8.000 Calculation No. OSC-324.

Spring Hgr 01A O-ISIN4-122A-1.3 0.000 Class B F01.022.012 1-03-0-479A-H2A 1-03-06/sht.1 OAL-14 VT-3 NA 14.000 Calculation No. OSC-1297-06.

Constant Support 03 O-ISIN4-121 B-1.3 0.000 Class B 0-490B-2S F01.022.021 1-03A-480A-H6202 1-03A-14/sht.4 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1224-16, page 43.:

Spring Hgr 03A O-ISIN4-121B-1.3 0.000 Class B F01.022.063 1-51A-0-439C-H80 1-51-04/sht.4 OAL-14 VT-3 NA 4.000 Calculation No. OSC-1 639, page 33. High Pressure Mech Snubber 51A O-ISIN4-101A-1.4 0.000 Injection. Inspect with F01.050.053.

Class B Total F01.022 Items: 4

EOC 23 (I C. C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Cass 3 piing Suports Oconee 1 Page 48 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Category A, One-Directional ****

F01.030.016 1-02A-4-403A-TR7 1-01-06/sht.3 QAL-14 VT-3 NA 6.000 Calculation No. OSC-325, page 91.

Rigid Support 02A O-ISIN4-122A-1.4 0.000 Class C F01.030.031 1-03A-401A-DE015 1-03A-10/sht.3 QAL-14 VT-3 NA 6.000 Calculation No. OSC-343, page 51.

Rigid Support 03A O-ISIN4-121D-1.1 0.000 Class C F01.030.036 1-03A-1-0-439B-H19 1-03A-05/sht.2 QAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 80.

Rigid Support 03A O-ISIN4-121 D-1.1 0.000 Class C F01.030.038 1-03A-1-0-400B-H62 1-03A-09/sht.4 OAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 104.

Rigid Support 03A O-ISIN4-121 D-1.1 0.000 Class C F01.030.039 1-03A-1-0-439B-H80 1-03A-09/sht.2 OAL-14 VT-3 NA 6.000 Calculation No. OSC-342 Rigid Support 03A O-ISIN4-121D-1.1 0.000 Class C F01.030.065 1-07A-400B-SR17 1-07A-01/sht.4 QAL-14 VT-3 NA 24.000 Calculation No. OSC-361, page 88.1. Inspect with Rigid Support 07A O-ISIN4-121A-1.7 0.375 D01.020.041.

Class C Total F01.030 Items: 6

        • Category B, Multi-Directional F01.031.021 1-03A-1-0-439B-H82 1-03A-06/sht.2 OAL-14 VT-3 NA 6.000 Calculation No. OSC-340, page 89.

Rigid Restraint 03A O-ISIN4-121D-1.1 0.500 Class C F01.031.023 1-03A-1-0-439C-H102 1-03A-09/sht.3 QAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 103.

Rigid Restraint 03A -ISIN4.121D-1.1 0.200 Class C

EOC 23 C C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Cass 3 Plpng SUpports Oconee 1 Page 49 Inservice Inspection Plan for Interval 4 Outage 2 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS F01.031.024 1-03A-1-0-400B-SR86 1-03A-09/sht.4 OAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 104. Inspect with Rigid Restraint 03A O-ISIN4-121 D-1.1 1.000 D01.020.026.

Class C Total F01.031 Items: 3

      • Category C, Thermal Movement F01.032.002 1-01A-4-2-0-400A-R11 1-01-06/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-325, page 91. Inspect with Mech Snubber 01A O-ISIN4-122A-1.4 0.250 D01.020.001 and F01.050.098.

Class C F01.032.022 1-03A-1-0-439A-H72 1-03A-05/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 81. Inspect with Spring Hgr 03A O-ISIN4-121D-1.1 0.500 D01.020.027.

Class C F01.032.081 1-14B-437A-DE060 1-14-05/sht.1 OAL-14 VT-3 NA 16.000 Calculation No. OSC-393, page 78.

Spring Hgr 14B O-ISIN4-124B-1.1 0.000 Class C F01.032.082 1-14B-0-436F-H25 1-14-06/sht.2 OAL-14 VT-3 NA 16.000 Calculation No. OSC-1541, page 101.

Spring Hgr 14B O-ISIN4-124B-1.1 0.258 Class C Total F01.032 Items: 4

EOC 23 C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report SuDorts Other Than Plping Supports Oconee 1 Page 50 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Class 1, 2, and 3 ****

F01.040.004 1-LDCA-SUPPORT OM 201-3107 OAL-14 VT-3 NA 0.000 Letdown Cooler Support A.

51A O-ISIN4-101A-1.1 0.000 Class A F01.040.008 1-DIESEL ENG -A OM 351-164 OAL-14 VT-3 NA 0.000 Diesel Engine A Support.

O-ISIN4-135B-1.4 0.000 (Drawing found in manual)

Class C F01.040.009 1-UST-A OM 149-0001 OAL-14 VT-3 NA 0.000 Upper Surge Tank A Support Legs.

07A O-ISIN4-121A-1.7 0.000 Class C F01.040.013 1-LPI-PU-A OM 1201-1121 QAL-14 VT-3 NA 0.000 LPI Pump 1A Support Pad & Legs. Refer to Pump 53A O-ISIN4-102A-1.2 0.000 Manual.

Class B F01.040.015 1-LPSW-STR-A OM 240-0002 QAL-14 VT-3 NA 0.000 Low Pressure Service Water Strainer IA, Support 14B O-ISIN4-124A-1.1 0.000 Legs.

Class C F01.040.021 1-JWHX-A OM 351-164 OAL-14 VT-3 NA 0.000 Jacket Water Heat Exchanger 1A.

O-ISIN4-138A-1.1 0.000 (Drawing found in manual)

Class C F01.040.022 1-RCSR-COOLER-A OM 201-0086 QAL-14 VT-3 NA 0.000 Reactor Coolant Seal Return Cooler 1A.

51B O-ISIN4-101A-1.1 0.000 Class B F01.040.029 1-MAIN-LO.FTR-A OM 351-164 OAL-14 VT-3 NA 0.000 Main Lube Oil Filter Suport. Diesel Enaine A.

0-1S1N4-1 35B-1 .4 0.000 (Drawing found in manual)

Class C

EOC 23 C C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Supports Other Than Piping Supports Oconee 1 Page 51

  • InservIce Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.040.033 1-50-0-66A-RCPM-S1 0-66A QAL-14 VT-3 NA 5.000 Calculation No. OSC-0971-01-0001, Reactor Hyd Snubber 50 O-ISIN4-100A-1.1 0.000 Coolant Pump 1Al Motor Snubbers. Reference PIP Class A 0-66B 0-096.1575. Inspect with F01.050.112.

F01.040.037 1-50-RCPM-H6598 OM 201.D-003 OAL-14 VT-3 NA 0.000 Reactor Coolant Pump Al Motor Constant Spring Constant Support 50 O-ISIN4-10OA-1.1 0.000 Supports.

Class A F01.040.038 1-LO-COOLER-A OM 351-164 QAL-14 Vr-3 NA 0.000 Lube Oil Cooler 1A.

O-ISIN4-138A-1.1 0.000 (Drawing found in manual)

Class C Total F01.040 Items: 11 Total F01 Items: 50 I

EOC 23 C C Cl DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Reactor Coolant Pum_Flywheels Oconee 1 Page 52 Inservice Inspection Plan for Interval 4 Outage 2 1014/2003 ITEM NUMBER ID NUMBER

. _ . . _ . . ._ _ . . SYS ISOIDWG NUMEIERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS GO1.001.001 1-RCP-1A1 OM-201 D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump 1Al Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the SI Plan, General Requirements.

G01.001.001A 1-RCP-1A1 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump Al Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such Inspection Is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.002 1-RCP-1A2 OM-201 D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump 1A2 Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.002A 1-RCP-1A2 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump 1A2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection Isgreater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.003 1-RCP-1B1 OM-201D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump IBI Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.003A 1-RCP-1B1 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant PumD 1B1 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection isgreater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

EOC 23 C c DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Reactor Coolant Pump Flywheels Oconee 1 Page 53 Inservice Inspection Plan for Interval 4 Outage 2 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS GO1.001.004 1-RCP-1B2 OM-201D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump 1B2 Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the SI Plan, General Requirements.

G01.001.004A 1-RCP-1B2 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump 1B2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the SI Plan, General Requirements.

Total Ga1.001 Items: 8 Total G01 Items: 8

EOC 23 (I C {

DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report HPI Nozzle Safe End Examinations Oconee 1 Page 54 Inservice Inspection Plan for Interval 4 Outage 2 10114/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMI 3ERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS G02.001.005A 1-PDA1-46 ISI OCN1-01 1 NDE-690 UT CS 3.500 40410 lAl Make-Up Nozzle Pc. 46. Perform UT on the 51A OM-201-597 2.500 40350 nozzle inside radius (knuckle area). This schedule Class A cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.005B 1-PDA2-46 ISI OCN1-012 NDE-690 UT CS 3.500 40410 1A2 Make-Up Nozzle Pc. 46. Perform UT on the 51A OM-201-597 2.500 40350 nozzle Inside radius (knuckle area). This schedule Class A cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.005C 1-PDB1-46 ISI OCN1-013 NDE-690 UT CS 3.500 40410 1B1 HPI Nozzle Pc. 46. Perform UTon the nozzle 51A OM-201-597 2.500 40350 inside radius (knuckle area). This schedule cannot Class A be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.005D 1-PDB2-46 ISI OCN1-014 NDE-690 UT CS 3.500 40410 1B2 HPI Nozzle Pc. 46. Perform UT on the nozzle 51A OM-201-597 2.500 40350 inside radius (knuckle area). This schedule cannot Class A be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.006A 1-PDA1-11 ISI OCN1-01 1 See Corn UT SS-Inconel 3.500 Component lAl Make-Up Nozzle Pc. 46 to Safe End Pc. 47.

Circumferential 51A OM-201-597 0.750 40416 Perform UT on the nozzle to safe end weld. This Class A Nozzle to schedule cannot be changed. Reference Section 7 Safe End of the ISI Plan, General Requirements.

Procedure PDI-UT-10 G02.001.006B 1-PDA2-11 ISI OCN1-012 See Com UT SS-Inconel 3.500 Component 1A2 Make-Up Nozzle Pc. 46 to Safe End Pc. 47.

Circumferential 51A OM-201-597 0.750 40416 Perform UT on the nozzle to safe end weld. This Class A Nozzle to schedule cannot be changed. Reference Section 7 Safe End of the ISI Plan, General Requirements.

Procedure PDI-UT-10 G02.001.006C 1-PDB1-11 ISI OCN1-013 See Corn UT SS-Inconel 3.500 Component 1B1 HPI Nozzle Pc. 46 to Safe End Pc. 47. Perform Circumferential 51A OM-201-597 0.750 40416 UT on the nozzle to safe end weld. This schedule Class A Nozzle to cannot be changed. Reference Section 7 of the ISI Safe End Plan, General Requirements.

Procedure PDI-UT-10

EOC 23 (I C DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Itnlspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • HPI Nozzle Safe End Examinations Oconee 1 Page 55 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS G02.001.006D 1-PDB2-11 ISI OCN1-014 See Corn UT SS-Inconel 3.500 Component 1B2 HPI Nozzle Pc. 46to Safe End Pc.47. Perform Circumferential 51A OM-201-597 0.750 40416 UT on the nozzle to safe end weld. This schedule Class A Nozzle to cannot be changed. Reference Section 7 of the ISI Safe End Plan, General Requirements.

Procedure PDI-UT-10 G02.001.007A 1-PDA1-47 ISI OCN1-011 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining Make-Up Nozzle Al.

51A OM-201-597 0.750 Perform UT on the Safe End base metal (between Class A the nozzle to safe end weld and the safe end to pipe weld). This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.007B 1-PDA2-47 ISI OCN1-012 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining Make-Up Nozzle 1A2.

51A OM-201-597 0.750 Perform UT on the Safe End base metal (between Class A the nozzle to safe end weld and the safe end to pipe weld). This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.007C 1-PDB1-47 ISI OCN1-013 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining HPI Nozzle IB1. Perform 51A OM-201-597 0.750 UT on the Safe End base metal (between the nozzle Class A to safe end weld and the safe end to pipe weld).

This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.007D 1-PDB2-47 ISI OCN1-014 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining HPI Nozzle 1B2. Perform 51A OM-201-597 0.750 UT on the Safe End base metal (between the nozzle Class A to safe end weld and the safe end to pipe weld).

This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.008A 1RC-199-154 1RC-199 NDE-960 UT SS 2.500 ComDonent Safe End Pc. 47 adiolning Make-UD Nozzle lAl.

Circumferential 51A 0-ISIN4-100A-1.1 0.375 Perform UT on weld 1RC-199-154 and adjoining Class A Safe End to base metal out to weld 1RC-1 99-149 (at valve Pipe 1HP-127). This schedule cannot be changed.

Revision 2 changed weld number from 1-RC-199-94.

Inspect with G04.001.029.

The inspection performed for the G02 item number meets the requirements for the G04 Inspection.

Reference Section 7 of the ISI Plan, General Requirements.

EOC 23

( C C DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report WHPI Nozzle Safe End Examinations Oconee 1 Page 56 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G02.001.008B 1RC-200-161 1RC-200 NDE-960 UT Ss 2.500 Component Safe End Pc. 47 adjoining Circumferential 51A O-ISIN 100A-1.1 0.375 Make-Up Nozzle 1A2. Perform UT on weld Class A Safe End to 1RC-200-161 and adjoining base metal out to weld Pipe 1RC-200-160 (at valve 1HP-1 26). This schedule cannot be changed. Revision 2 changed weld number from 1RC-200-7.

Inspect with G04.001.031.

The inspection performed for the G02 item number meets the requirements for the G04 Inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.008C 1RC-201-101 1RC-201 NDE-960 UT SS 2.500 Component Safe End Pc. 47 adjoining 51A O-ISIN4-100A-1.1 0.375 HPI Nozzle 151. Perform UT on weld 1RC-201-101 Class A Safe End to and adjoining base metal out to weld RC-201-97 Pipe (at valve 1HP-1 53). This schedule cannot be changed. Revision 2 changed weld number from 1-51A-11-89.

Inspect with G04.001.003.

The Inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the SI Plan, General Requirements.

G02.001.008D 1RC-201-105 1RC-201 NDE-960 UT SS 2.500 Component Safe End Pc. 47 adjoining HPI Nozzle1B2.

Circumferential 51A O-ISIN4-10OA-1.1 0.375 Perform UT on weld 1RC-201-105 and adjoining Class A Safe End to base metal out to weld 1RC-201-92 (at valve Pipe 1HP-152). This schedule cannot be changed.

Revision 2 changed weld number from 1-51 A-1 1-87. Inspect with G04.001.001.

The Inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.010A IRC-199-149 1RC-199 NDE-960 UT SS 2.500 Component Make-Up Nozzle 1Al. Perform UT on weld Circumferential 51A 0-1S1N4-100A-1.1 0.375 1RC-199-149 (at valve 1HP-127). This schedule Class A Pipe to cannot be changed. Inspect with G04.001.028. The Valve inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

EOC 23 c C c DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

.HPI Nozzle Safe End Examinations Oconee 1 Page 57 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS SO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G02.001.010B 1RC-200-160 1RC-200 NDE-960 UT SS 2.500 Component Make-Up Nozzle 1A2. Perform UT on weld Circumferential 51A O-ISIN 10OA-1.1 0.375 1RC-200-160 (at valve HP-126). This schedule Class A Pipe to cannot be changed. Revision 2 changed weld Valve number from 1RC-200-8 to 1RC-200-160. Inspect with G04.001.030. The inspection performed for the G02 item number meets the requirements for the G04 inspection. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.010C 1RC-201-97 1RC-201 NDE-960 UT SS 2.500 Component HPI Nozzle BI. Perform UT on weld RC-201-97 Circumferential 51A O-ISIN4-10OA-1.1 0.375 (at valve I HP-1 53). This schedule cannot be Class A Pipe to changed. Revision 2 changed weld number from Valve 1-51 A-1 1-90. Inspect with G04.001.004.

The Inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.010D 1RC-201-92 1RC-201 NDE-960 UT SS 2.500 Component HPI Nozzle B2. Perform UT on weld 1RC-201-92 Circumferential 51A O-ISIN4-100A-1.1 0.375 (at valve 1HP-1 52). This schedule cannot be Class A Pipe to changed. Revision 3 changed weld number from Valve 1-51A-11-88. Inspect with G04.001.002.

The inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.011A 1Ai-THERMSLEEVE ISI OCN1-011 NDE-105 RT SS 3.500 Make-Up Nozzle 1Al. Perform RTbetween the Circumferential 51A O-ISIN4-10OA-1.1 0.750 nozzle to safe end and safe end to pipe weld in the Class A thermal sleeve expansion area as described in procedure NDE-105. This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.011B 1A2-THERMSLEEVE ISI OCN1-012 NDE-105 RT SS 3.500 Make-Up Nozzle A2. Perform RTbetween the Circumferential 51A -1S1N4-10OA-1.1 0.750 nozzle to safe end and safe end to pipe weld in the Class A thermal sleeve expansion area as described in procedure NDE-105. This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

EOC 23 C y1 DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report WHPI Nozzle Safe End Examinations Is Oconee 1 Page 58 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS G02.001.011C 1B1-THERM SLEEVE ISI OCN1-013 NDE-105 RT SS 3.500 HPI Nozzle I B1. Perform RT between the nozzle to Circumferential 51A O-ISIN4-100A-1.1 0.750 safe end and safe end to pipe weld In the thermal Class A sleeve expansion area as described in procedure NDE-105. This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.011D 1B2-THERMSLEEVE ISI OCN1-014 NDE-105 RT SS 3.500 HPI Nozzle B2. Perform RT between the nozzle to Circumferential 51A O-ISIN4-100A-1.1 0.750 safe end and safe end to pipe weld in the thermal Class A sleeve expansion area as described In procedure NDE-105. This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

Total G02.001 Items: 24 Total G02 Items: 24

6 C.

EOC 23 DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress Piping Examinations Oconee 1 Page 59 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 2 ITEM NUMBER ID NUMBER SYS ISO/DWCANUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G04.001.001 IRC-201-105 1RC-201 NDE-960 UT SS 2.500 Inspect 100% of weld & I* of base material (axial &

Circumferential 51A -ISIN4-10OA-1.1 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1-51A-11-87. InspectwithG02.001.008D.

Safe-End The inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.002 1RC-201-92 IRC-201 NDE-960 UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Revision 3 changed weld number Class A Pipe to from 1-51 A-1 1-88. Inspect with G02.001.010D. The Valve 1HP-152 inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.003 1RC-201 -101 1RC-201 NDE-960 UT SS 2.500 Inspect 100% of weld & 1" of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1-51 A-1 1-89. Inspect with G02.001.008C. The Safe-End Inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.004 1RC-201-97 1RC-201 NDE-960 UT SS 2.500 Inspect 100% of weld & of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1-51A-1 1-90. Inspect with G02.001.01OC. The Valve 1HP-153 Inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.013 IRC-201-91 1RC-201 See Com UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A O-ISIN4-101A-1.4 NDE-12 0.375 circumferential scan of the weld and one half inch of Class A Valve 1HP-489 to base metal on each side of the weld as access Valve 1HP-152 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the ISI Plan,

EOC 23

( C C DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress Piping Examinations Oconee 1 Page 60 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 2 ITEM NUMBER ID NUMBER SYS ISO/DWCGNUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS General Requirements.

G04.001.014 1RC-201-96 1RC-201 See Coin UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A 0-ISIN4-101A-1.4 NDE-12 0.375 circumferential scan of the weld and one half inch of Class A Valve 1HP-488 to base metal on each side of the weld as access Valve 1HP-153 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter Inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the ISI Plan, General Requirements.

G04.001.020 1RC-200-166 1RC-200 See Coin UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A NDE-12 0.375 circumferential scan of the weld and one half Inch of Class A Valve 1HP-486 to base metal on each side of the weld as access Valve 1HP-126 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter Inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the ISI Plan, General Requirements.

G04.001.024 1RC-199-150 1RC-199 See Com UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A NDE-12 0.375 circumferential scan of the weld and one half inch of Class A Valve 1HP-127 to base metal on each side of the weld as access Valve 1HP-487 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter Inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the ISI Plan, General Requirements.

G04.001.028 1RC-199-149 1RC-199 NDE-960 UT Ss 2.500 Inspect 100% of weld & I' of base material (axial &

Circumferential 51A 0-ISIN4-10OA-1.1 0.375 circumferential). Inspect with G02.001.01OA. The Class A Pipe to inspection performed for the G02 item number Valve 1HP-127 meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General

EOC 23 C C DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress PiDing Examinations Oconee 1 Page 61 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 2 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMEIERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Requirements.

G04.001.029 1RC-199-154 1RC-199 NDE-960 UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-100A-1.1 0.375 circumferential). Revision 2 changed weld number Class A Safe End Pc. 47 to from 1-RC-199-94. Inspect with G02.001.008A.

Pipe The Inspection performed for the G02 item number meets the requirements for the G04 Inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.030 1RC-200-160 1RC-200 See Coin UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-100A-1.1 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1RC-200-8 to 1RC-200-160. Inspect with Valve IHP-126 G02.001.01 OB. The inspection performed for the G02 item number meets the requirements for the G04 inspection. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.031 1RC-200-161 1RC-200 NDE-960 UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN 100A-1.1 0.375 circumferential). Revision 2 changed weld number Class A Safe End Pc. 47 to from 1RC-200-7. Inspect with G02.001.008B. The Pipe inspection performed for the G02 meets the requirements for the G04 inspection. Reference Section 7 of the ISI Plan, General Requirements.

Total G04.001 Items: 12 12 G04 items:

Total G04 Items: 12

EOC 23 C C C DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Class 1 RTE Mounting Bosses Oconee 1 Page 62 Inservice Inspection Plan for Interval 4 Outage 2 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWCI'NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS G10.001.007 1-PIA1-12 ISI-OCN1007 NDE-35 PT CS-lnconel 8.750 RTE Mounting Pipe. This weld covers the Z-W Branch 50 OM-201-1845 2.250 Quadrant. The diameter of hole that penetrates the Class A Salvaged Pipe to nozzle into the RCP Al Suction Piping = .613'.

Dissimilar Pipe Reference Section 7 of the SI Plan, General Requirements.

Total G10.001 Items: 1 Total G10 Items: 1

EOC 24 C, ! C C DUKE ENERGY CORPORATION CATEGORY B-B, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Vessels Other Than Reactor Vessels Inservice Inspection Database Management System Plan Report

  • Heat Exchangers (Primary Side)-Shell Oconee 1 Page 1 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG I NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS
        • Tubesheet-to-Head Welds ****

B02.060.001 1-LDCA-IN-V3 18792-1 NDE-3630 UT SS 8.620 40411 Letdown Cooler A Inlet Tubesheet Pc. 2 to Circumferential 51A OM.201-3107 0.875 Channel Body Pc. 3.

Class A Tubesheet to Head B02.060.002 1-LDCA-OUT-V5 18792-1 NDE-3630 UT SS 8.620 40411 Letdown Cooler 1A Outlet Tubesheet Pc. 2 to Circumferential 51A OM-201-3107 0.875 Channel Body Pc. 3.

Class A Tubesheet to Head Total B02.060 Items: 2 Total B02 Items: 2

EOC 24

( ) C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 2 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWGI NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle-to-Vessel Welds ****

B03.110.006 1-PZR-WP26-4 ISI.OCNI-002 NDE-640 UT CS 5.750 40387 Pressurizer Sensing and Sampling Nozzle Pc. 30 to Circumferential 50 OM.201-91 NDE-820 6.187 Upper Shell Course Pc. 1. W-X Quadrant.

Class A OM-201-1878 Nozzle to Shell B03.110.007 1-PZR-WP26-5 ISI-OCN1-002 NDE-640 UT CS 5.750 40387 Pressurizer Sensing and Sampling Nozzle Pc. 30 to Circumferential 50 OM-201-91 NDE-820 6.187 Upper Shell Course Pc. 1. Z-Y Quadrant.

Class A OM-201-1878 Nozzle to Shell B03.110.008 1-PZR-WP26-6 ISI.OCN1-002 NDE-640 UT CS 5.750 40387 Pressurizer Sensing and Sampling Nozzle Pc. 30 to Circumferential 50 OM-201-91 NDE-820 6.187 Upper Shell Course Pc. 1. W-Z Quadrant.

Class A OM-201-1878 Nozzle to Shell Total 903.110 Items: 3

EOC 24 C

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 3 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOtDWG 3NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS Nozzle Inside Radius Section

  • B03.120.006 1-PZR-WP26-4 ISI OCN1-002 NDE-680 UT CS 5.750 50237E Pressurizer Sensing and Sampling Nozzle Pc. 30 to 50 OM.201-91 2.531 50237F Shell Pc.1. W-X Quadrant. (Inside Radius Section)

Class A OM-201-1878 Nozzle to Cal Block 40338 Shell 803.120.007 1-PZR-WP26-5 ISI-OCN1-002 NDE-680 UT CS 5.750 50237E Pressurizer Sensing and Sampling Nozzle Pc. 30 to 50 OM.201-91 2.531 50237F Shell Pc.1. Z-Y Quadrant. (nside Radius Section)

Class A OM-201-1878 Nozzle to Cal Block 40338 Shell B03.120.008 1-PZR-WP26-6 ISI-OCN1-002 NDE-680 UT CS 5.750 50237E Pressurizer Sensing and Sampling Nozzle Pc. 30 to 50 OM-201-91 2.531 50237F Shell Pc.1. W-Z Quadrant. (Inside Radius Section)

Class A OM-201-1878 Nozzle to Cal Block 40338 Shell Total B03.120 Items: 3 Total B03 Items: 6

C C 'C EOC 24 DUKE ENERGY CORPORATION CATEGORY B-F, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Dissimilar Metal Welds In Vessel Nozzles Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 4 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • NPS 4 or Larger; Nozzle-to-Safe End Butt Welds tttt B05.040.001 1-PZR-WP23 ISI-OCN1-002 NDE-35 PT SS-CS 11.375 Pressurizer Surge Nozzle Pc. 8 to Surge Nozzle Circumferential 50 O-ISIN4-10OA-1.2 1.930 Safe End Pc. 37.

Class A Term end OM.201-287 Nozzle to Dissimilar Safe End B05.040.001A 1-PZR-WP23 ISI-OCN1-002 See Coin UT SS-CS 11.375 40354 Pressurizer Surge Nozzle Pc. 8 to Surge Nozzle Circumferential 50 O-ISIN4-100A-1.2 1.930 40414 Safe End Pc. 37.

Class A Term end OM-201-287 Nozzle to Procedure PDIUT-10 Dissimilar Safe End B05.040.002 1-PZR-WP45 ISI-OCN1-002 NDE-35 PT SS-CS 4.000 Pressurizer Spray Nozzle Pc. 9 to Spray Nozzle Circumferential 50 O-ISIN4-100A-1.2 0.438 Safe End Pc. 45.

Class A Term end OM-201-1026 Nozzle to Dissimilar Safe End B05.040.002A 1-PZR-WP45 ISI-OCN1-002 See Coin UT SS-CS 4.000 50373 Pressurizer Spray Nozzle Pc. 9 to Spray Nozzle Circumferential 50 O-ISIN4-100A-1.2 0.438 Safe End Pc. 45.

Class A Term end OM.201-1026 Nozzle to Procedure PDI-UT-10 Dissimilar Safe End Total B05.040 Items: 4 Total B05 Items: 4

EOC 24

-I

{ {7 DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 5 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Closure Head Nuts ****

B06.010.021 1-RPV-26-203-21 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.022 1-RPV-26-203-22 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.023 1-RPV-26-203-23 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.024 1-RPV-26-203-24 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.025 1-RPV-26-203-25 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.026 1-RPV-26-203-26 OM-201 -2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.027 1-RPV-26-203-62 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.028 1-RPV-26-203-28 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A

EOC 24

( C (.

DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaininq INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 6 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS 806.010.029 1-RPV-26-203-29 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.030 1-RPV-26-203-30 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.031 1-RPV-26-203-61 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.032 1-RPV-26-203-32 OM201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.033 1-RPV-26-203.33 OM.201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.034 1-RPV-26 203-65 OM.201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM.201-2271 RPV Instruction Manual.

Class A B06.010.035 1-RPV-26-203.35 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.036 1-RPV-26-203-36 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A 806.010.037 1-RPV-26-203.37 OM-201-2271 QAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A

EOC 24 C (.

DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Boltinq, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report

  • Reactor Vessel Oconee 1 Page 7 M Inservice Inspection Plan for Interval 4 Outage 3 1jUlqrZUu3 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.010.038 1-RPV26-203-38 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.039 1-RPV-26-203-39 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A B06.010.040 1-RPV-26-203-40 OM-201-2271 OAL-13 VT-1 CS 9.250 Reactor Vessel Closure Nut. Reference B&W128723E 1.300 OM-201-2271 RPV Instruction Manual.

Class A Total B06.010 Items: 20

C (

C-EOC 24 DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 8 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBE'RS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • Closure Studs, when removed ***

B06.030.021 1-RPV-25-203.21 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM.201-2271 RPV Instruction Manual.

B06.030.022 1-RPV-25-203-22 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.023 1-RPV-25-203-23 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.024 1-RPV-25-203.24 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDIUT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.025 1-RPV-25-203-25 OM.201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PD1-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.026 1-RPV-25-203-26 OM.201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.027 1-RPV-25-203-27 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

806.030.028 1-RPV-25-203-63 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&WI28723E 0.000 Length = 63.250. Procedure # PD1-UT-5. Reference Class A OM.201-2271 RPV Instruction Manual.

EOC 24

( C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report

  • Reactor Vessel Oconee 1 Page 9 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 N

ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.030.029 1-RPV-25-203-29 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.030 1-RPV-25-203-30 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.031 1-RPV-25-203-61 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.032 1-RPV-25-203-32 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PD-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.033 1-RPV-25-203-33 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.034 1-RPV-25-203-34 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.035 1-RPV-25-203-35 OM-201-2271 See Com UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.036 1-RPV-25-203-36 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.037 1-RPV-25-203-37 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PD-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

EOC 24

(' C. C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 10 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.030.038 1-RPV-25-203-38 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.039 1-RPV-25-203-65 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud- Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

B06.030.040 1-RPV-25-203-40 OM-201-2271 See Corn UT CS 6.500 40420 Reactor Vessel Closure Stud - Removed. Stud B&W128723E 0.000 Length = 63.250. Procedure # PDI-UT-5. Reference Class A OM-201-2271 RPV Instruction Manual.

Total B06.030 Items: 20

EOC 24

( C C DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaininq INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 11 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO,tDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

B06.050.002 1.RPV-WASH-BUSH OM-201-2271 QAL-13 VT-1 CS 9.750 Reactor Vessel Closure Washers and Bushings.

B&W128723E 0.214 Stud Holes 21 - 40. Reference OM-201-2271 RPV Class A Instruction Manual.

Total B06.050 Items: 1

EOC 24

( C (7 DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 12 Inservice Inspection Plan for Interval 4 Outage 3 1011412003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Flange Surface, when connection disassembled ****

B06.070.001 1-PZR-MW-FLANGE OM-201-1026 OAL-13 VT-1 CS 28.000 Pressurizer Manway Flange Surface. Examination 0.000 Includes 1 Annular Surface Surrounding Each Stud.

Class A (Inspect when connection disassembled)

Total B06.070 Items: 1

EOC 24

( C-- K?

DUKE ENERGY CORPORATION CATEGORY B-G-1. Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 13 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO VDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Flange Surface, when connection disassembled ****

B06.190.001 IRCP-lA1-FLANGE OM-201.D-35 OAL-13 VT-1 SS 77.000 Reactor Coolant Pump Al Main Flange.

OM-201.D-38 0.000 Examination Includes P' annular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.002 1-RCP-1A2-FLANGE OM-201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump 1A2 Main Flange.

OM-201.D-38 0.000 Examination Includes 1 annular surface of flange Class A OM-201 -1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.003 1-RCP-1B1-FLANGE OM-201.D-35 QAL-13 VT-i SS 77.000 ReactorCoolant Pump BI Main Flange.

OM-201.D-38 0.000 Examination includes l' annular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.004 1-RCP-1B2-FLANGE OM-201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump 1B2 Main Flange.

OM-201.D-38 0.000 Examination ncludes 1Uannular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

Total B06.190 Items: 4 Total B06 Items: 46

EOC 24 c C c DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting, 2 in. And Less In Diameter Inservice Inspection Database Management System Plan Report Steam Generators Oconee 1 Page 14 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO)'DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.030.001 1-SGA-UMW-STUDS OM-201-550 OAL-13 VT-1 SS 2.000 Steam Generator 1A Upper Head Manway Studs OM-201-352 0.000 Pc. 111 and Nuts Pc. 109. 16 Studs, Length Class A =11.500. Examine all studs and nuts.

B07.030.005 1-SGA-UHIC-STUDS OM-201-550 OAL-13 VT-1 SS 1.000 Steam Generator 1A Upper Head Inspection Cover OM-201 -352 0.000 Studs Pc. 112 and Nuts Pc. 110. 12 Studs, Length =

Class A 6.000. Examine all studs and nuts.

Total B07.030 Items: 2

EOC 24 C / C C DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 15 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.050.001 1-PZR-RC4-STUDS OM-245-2012 QAL-13 VT-1 CS 1.125 Pressurizer EMO Valve RC-4 Inlet Flange Studs Pc.

0.000 19 and Nuts Pc. 20. W-Z Quadrant. Connected to Class A Valve 1RC-66. 8 Studs, Length = 8.750. Examine all studs and nuts.

B07.050.002 1-PZR-RC66-STUDS OM-201-0591 QAL-13 VT-1 CS 1.125 Pressurizer Relief Valve RC-66 Inlet Flange Bolting.

0.000 W-Z Quadrant. 8 Studs and 16 Nuts, Length =

Class A 8.750. Examine all studs and nuts.

Total B07.050 Items: 2

EOC 24 C

DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diameter Inservice Inspection Database Management System Plan Report ICRD Housin s Oconee 1 Page 16 Inservice Inspection Plan for Interval 4 Outage 3 10/1412003 ITEM NUMBER ID NUMBER SYS ISO IDWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ***

B07.080.001 1-RPV-CRD-HOUSING OM-201-2186 OAL-13 VT-1 CS 1.250 CRD Housing Includes Bolts (8 bolts on each DPS 706599.1056 0.000 connection) and Housing Rings (1pair per housing.)

Class A B&W152006E Inspect only if disassembled.

Inspect only bolting that is to be reused.

Total B07.080 Items: 1 Total B07 Items: 5

EOC 24 C c DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 17 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential Welds ****

B09.011.022 1-PDB2-2 ISI-OCN1-014 See Corn UT SS-CS 33.500 40350 Reactor Coolant Pump 1B2 Discharge Piping. Safe Circumferential 50 O-ISIN4-100A-1.1 2.330 40397 End Pc. 213 to 13 Degree Elbow Pc. 212.

Class A Stress weld OM-201-1844 Safe End to Procedure PDI-UT-10 Dissimilar Elbow B09.011.022A 1-PDB2-2 ISI-OCN1-014 NDE-35 PT SS-CS 33.500 Reactor Coolant Pump 1B2 Discharge Piping. Safe Circumferential 50 O-ISIN4-10OA-1.1 2.330 End Pc. 213 to 13 Degree Elbow Pc. 212.

Class A Stress weld OM-201-1844 Safe End to Dissimilar Elbow B09.011.033 1-PIA2-1 ISI-OCN1-008 NDE-600 UT CS 33.500 40350 Steam Generator A Outlet Circumferential 50 O-ISIN4-10OA-1.1 2.330 Nozzle to Pump 1A2 Suction Piping.

Class A Term end / Stress weld B&W 131914E6 Nozzle to Procedure PDI-UT-1 may be used.

Pipe B09.011.033A 1-PIA2-1 ISI-OCN1-008 NDE-25 MT CS 33.500 Steam Generator 1A Outlet Circumferential 50 O-ISIN4-100A-1.1 2.330 Nozzle to Pump 1A2 Suction Piping.

Class A Term end / Stress weld B&W 131914E6 Nozzle to Pipe B09.011.039 1-PIB2-7 ISI-OCN1-010 SeeCom UT SS-CS 33.500 40350 Reactor Coolant Pump 1B2 Suction Piping.

Circumferential 50 O-ISIN4-100A-1.1 2.330 40397 Transition Pc. 210 to Salvaged Pipe Pc. 215.

Class A Stress weld OM-201-1845 Transition Piece to Procedure PDI-UT-10 Dissimilar Pipe B09.011.039A 1.PIB2-7 ISI-OCN1-010 NDE-35 PT SS-CS 33.500 Reactor Coolant Pump 1B2 Suction Piping.

Circumferential 50 O-ISIN4-100A-1.1 2.330 Transition Pc. 210 to Salvaged Pipe Pc. 215.

Class A Stress weld OM-201-1845 Transition Piece to Dissimilar Pipe B09.011.040 1-PSL-1 ISIOCN1-015 NDE-600 UT SS 10.750 40399 Pressurizer Surge Piping. Elbow Pc. 80 to Surge Circumferential 50 O-ISIN4-100A-1.1 140 1.000 Nozzle Safe End Pc. 37.

Class A Stress weld Elbow to Procedure PDIUT-2 may be used.

Safe End B09.011.040A 1-PSL-1 ISIOCN1-015 NDE-35 PT SS 10.750 Pressurizer Surae Pioina. Elbow Pc. 80 to Surqe Circumferential 50 O-ISIN4-100A-1.1 140 1.000 Nozzle Safe End Pc. 37.

Class A Stress weld Elbow to Safe End

EOC 24

(. C (i DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 18 Inservice Inspection Plan for Interval 4 Outage 3 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS 809.011.056 1-PIA2-2 ISI OCN1-008 NDE-600 UT CS 33.500 Circumferential 50 B&W 131914E6 2.330 Class A Stress weld Pipe to Elbow B09.011.056A 1-PIA2-2 ISI-OCN1-008 NDE-25 MT CS 33.500 Circumferential 50 B&W 131914E6 2.330 Class A Stress weld Pipe to Elbow B09.011.057 1-PIA2-4 ISI-OCN1-008 NDE.600 UT CS 33.500 40350 Procedure PDIUT-1 may be used.

Circumferential 50 OM-201-1845 2.330 Class A Stress weld Pipe to Elbow B09.011.057A 1-PIA2-4 ISI-OCN1-008 NDE-25 MT CS 33.500 Circumferential 50 OM-201 -1845 2.330 Class A Stress weld Pipe to Elbow B09.011.061 1-PIB2-9 ISI-OCN1-010 NDE-600 UT SS 36.500 40397 Procedure PDI-UT-2 may be used.

Circumferential 50 OM-201-1844 2.330 Class A Term end / Stress weld Pipe Safe End to RC Pump 1B2 B09.011.061A 1-PIB2-9 ISI-OCN1-010 NDE-35 PT SS 36.500 Circumferential 50 OM-201-1844 2.330 Class A Term end / Stress weld Pipe Safe End to RC Pump 1B2 Total B09.011 Items: 14

EOC 24 C C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaininq Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report iess Than NPS 4 Oconee 1 Page 19 Inservice Inspection Plan for Interval 4 Outage 3 1011412003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential Welds 809.021.009 1-51A.07-14E 1-51A-07(l) NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-10OA-1.1 0.375 Class A Pipe to Elbow B09.021.010 1-51A.07-18E 1-51A.07(1) NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-10OA-1.1 0.375 Class A Pipe to Elbow B09.021.011 1-51A-07-22E 1-51A-07(1) NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-10OA-1.1 0.375 Class A Pipe to Elbow 45 B09.021.012 1-51A.07-24EA 1-51A-07(1) NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-100A-1.1 0.375 Class A Pipe to Pipe 809.021.015 1-51A-134A-6 1-51A-134A NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.1 0.375 Class A Pipe to Reducer 809.021.018 1.51A-137-1B 1-51A-137 NDE-35 PT SS 3.000 Letdown Cooler 1B Outlet Channel Nozzle Pc. 5 to Circumferential 51A O-ISIN4-101A-1.1 0.438 Elbow.

Class A Term end OM-201-2991 Nozzle to Elbow B09.021.019 1.51A-137-27 1-51A-137 NDE-35 PT SS 2.000 Circumferential 51A O-ISIN4-101A-1.1 0.344 Class A Reducer to Pipe B09.021.021 1-PDA2-11 ISI-OCN1-012 NDE-35 PT SS-CS 3.500 Reactor Coolant Pum 1A2 Discharae Pipina.

Circumferential 50 O-ISIN4-100A-1.1 0.750 Pressure Injection Nozzle Pc. 46 to Safe End Pc. 47.

Class A OM-201 -1870 Nozzle to Dissimilar Safe End

EOC 24

(. C C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report Less Than NPS 4 Oconee 1 Page 20

  • Inservice Inspection Plan for Interval 4 Outage 3 lUll4/rZuu ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.021.027 1-PIB2-11 ISIOCN1-010 NDE-35 PT CS-lnconel 3.500 Reactor Coolant Pump 1B2 Circumferential 50 O-ISIN4-100A-1.1 0.816 Suction Piping. Drain Nozzle Pc. 64 to Safe End Pc.

Class A OM.201-1845 Nozzle to 65.

Dissimilar Safe End B09.021.032 1-PSP-4 ISI-OCN1-016 NDE-35 PT SS 2.875 Circumferential 50 O-ISIN4-100A-1.2 160 0.375 Class A Stress weld Reducer to Pipe Total B09.021 Items: 10

EOC 24

( C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report IBranch Ppe Connection Welds Oconee 1 Page 21 Inservice Inspection Plan for Interval 4 Outage 3 10/1412003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUIMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Less Than NPS 4 ****

B09.032.001 1-PDAI-10 ISI-OCN1-011 NDE-25 MT CS 12.000 280 IDPipe Pc. 44 to Pressure Injection Nozzle Pc.

Branch 50 O-ISIN4-100A-1.1 2.250 46. The NPS of the branch piping is 2.5 inches.

Class A Stress weld OM-201-597 Pipe to Nozzle Total B09.032 Items: 1

EOC 24 DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report ESocket Welds Oconee 1 Page 22 N Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.040.015 1RC-127-3 1RC-127 NDE-35 PT SS 1.500 Auxiliary Pressurizer Spray Line.

Circumferential 50 O-ISIN4-100A-1.2 160 0.281 This weld was previously listed as 1.50-127-3 and Class A Pipe to was shown on Isometric 1-50-127.

Full Coupling B09.040.016 1RC-127-8BA 1RC-127 NDE-35 PT SS 1.500 Auxiliary Pressurizer Spray Line.

Socket 50 O-ISIN4-100A-1.2 160 0.281 This weld was previously listed as 1-50-127-8BA Class A Elbow to and was shown on Isometric 1-50-127.

Pipe Total B09.040 Items: 2 Total B09 Items: 27

EOC 24 C C C DUKE ENERGY CORPORATION CATEGORY B-K, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report Pressure Vessels Oconee 1 Page 23 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DAfTHK CAL BLOCKS COMMENTS

        • Welded Attachments ****

B10.010.001 1-PZR-WP82-W ISI-OCN1-002 NDE-25 MT CS 0.000 Pressurizer Support Lug Assembly Pc. 110 to Lower Circumferential 50 3.500 Shell Course Pc. 3. W Axis.

Class A Support Lug to Shell B10.010.002 1-PZR-WP82-WX ISI-OCN1.002 NDE-25 MT CS 0.000 Pressurizer Support Lug Assembly Pc. 110to Lower Circumferential 50 3.500 Shell Course Pc. 3.

Class A Support Lug to W-X Quadrant.

Shell B10.010.003 1-PZR-WP82-X ISI-OCN1-002 NDE-25 MT CS 0.000 Pressurizer Support Lug Assembly Pc. 110 toLower Circumferential 50 3.500 Shell Course Pc. 3. X Axis.

Class A Support Lug to Shell B10.010.004 1-PZR-WP82-XY ISI-OCN1-002 NDE-25 MT CS 0.000 Pressurizer Support Lug Assembly Pc. 110to Lower Circumferential 50 3.500 Shell Course Pc. 3. X-Y Quadrant.

Class A Support Lug to Shell Total B10.010 Items: 4 Ii

EOC 24 C C DUKE ENERGY CORPORATION CATEGORY B-K, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 24 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG3NUMBERS PROC INSP REQ MATISCH DIATHK CAL BLOCKS COMMENTS

        • Welded Attachments ****

B10.020.006 1-51A-0-478A-H3C 1-55-03/sht.4 NDE-35 PT NA 0.000 Calculation No. OSC-1660-11 , page 68 High Rigid Support 51A O-ISIN4-101A-1.1 0.750 Pressure Injection. Inspect with F01.010.004.

Class A Total B10.020 Items: 1 Total B10 Items: 5 dl

EOC 24 C C C DUKE ENERGY CORPORATION CATEGORY B-L-2, Pump Casings INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 25 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Pump Casing ****

B12.020.001 1RCP-lA1-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump Al Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCN1-007 maintenance, repair, or volumetric examination)

B12.020.002 1RCP-1A2-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump 1A2 Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCN1-008 maintenance, repair, or volumetric examination)

B12.020.003 1RCP-IB1-CASING OM-201.D-35 OAL-14 VT-3 Ss 77.000 Reactor Coolant Pump Bi Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCN1-009 maintenance, repair, or volumetric examination)

B12.020.004 1RCP-1B2-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump 1B2 Casing nternal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump Is disassembled for Class A ISI-OCN1-010 maintenance, repair, or volumetric examination)

Total B12.020 Items: 4

EOC 24 CI C c DUKE ENERGY CORPORATION CATEGORY B-M-2, Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 26 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER

_ _ _ _ SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Valve Body, Exceeding NPS 4 ****

B12.050.001 1-53A-CF-i I OM-245-0001 OAL-14 VT-3 SS 14.000 A- Side Core Flood Valve Body 1CF-1I Internal 53A 0-ISIN4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: 1CF-11, CF-12, ICF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.002 1-53A-CF-12 OM-245-0001 OAL-14 VT-3 SS 14.000 A- Side Core Flood Valve Body 1CF-12 Internal 53A 0-1S1N4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: 1CF-11, 1CF-12, ICF-13, or 1CF-14 only if valve Is disassembled for maintenance, repair, or volumetric examination.

B12.050.003 1-53A-CF-13 OM-245-0001 OAL-14 VT-3 SS 14.000 B- Side Core Flood Valve Body 1CF-13 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: 1CF-1 1, CF-12, 1CF-13, or 1CF-14 only if valve Is disassembled for maintenance, repair, or volumetric examination.

B12.050.004 1-53A-CF-14 OM-245-0001 OAL-14 VT-3 SS 14.000 B- Side Core Flood Valve Body 1CF-14 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: 1CF-1 1, 1CF-12, 1CF-13, or CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.005 1-53A-LP-47 OM-245-0001 OAL-14 VT-3 SS 10.000 B-Side LP1 Valve Body 1LP-47 Internal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: LP-47 or Class A 1LP-48 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.006 1-53A-LP-48 OM-245-0001 OAL-14 VT-3 SS 10.000 B-Side LP1 Valve Body 1LP-48 Internal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: 1LP-47 or Class A 1LP-48 only If valve Is disassembled for maintenance, repair, or volumetric examination.

B12.050.007 1-53A-LP-1 OM-245-2054 OAL-14 VT-3 SS 12.000 Decay Heat Suction Valve Body ILP-1 Internal 53A -ISIN4-102A-1.1 0.000 Surfaces. Inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve is disassembled for maintenance, repair, or volumetric examination.

EOC 24 C C C DUKE ENERGY CORPORATION CATEGORY B-M-2, Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Valves Oconee 1 Page 27 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS B12.050.008 1-53A-LP-2 OM-245-2055 OAL-14 VT-3 Ss 12.000 Decay Heat Suction Valve Body 1LP-2 Internal 53A O-ISIN4-102A-1.1 0.000 Surfaces. Inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve is disassembled for maintenance, repair, or volumetric examination.

Total B12.050 Items: 8 Total B12 Items: 12

EOC 24 C} C C DUKE ENERGY CORPORATION CATEGORY B-N-1 Interior Of Reactor Vessel INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 28 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

    • Vessel Interior ***

B13.010.001 1-RPVINTSURFACE OM-201-1008 OAL-14 VT-3 Ss 0.000 Reactor Vessel Interior. Areas to be examined shall 50 ISI-OCN1-001 See Corn 0.000 include the spaces above and below the reactor Class A core that are made accessible for examination by removal of components during normal refueling outages.

Reference Framatome Procedure 54-1SI-364.

Total B13.010 Items: 1 Total B13 Items: 1

,1

EOC 24 C C C DUKE ENERGY CORPORATION CATEGORY C-A, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Pressure Vessels Inservice Inspection Database Management System Plan Report

  • Shell Circumferential Welds Oconee 1 Page 29 Inservice Inspection Plan for Interval 4 Outage 3 1014/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG INUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C01.010.001 1-SGA-WG8-2 ISI-OCN1-003 NDE-640 UT CS 138.000 40339 Steam Generator 1A Shell Pc. 02 to Nozzle Belt Pc.

Circumferential 03 O-ISIN4-121B-1.3 NDE-820 4.188 03.

Class B OM.201-1873 Shell to Nozzle Belt C01.010.002 1-SGA-WG8-3 ISI-OCN1-003 NDE-640 UT CS 138.000 40394 Steam Generator 1A Nozzle Belt Pc. 03 to Shell Pc.

Circumferential 03 O-ISIN4-121B-1.3 NDE-820 4.188 02.

Class B OM-201-1873 Shell to Nozzle Belt Total C01.010 Items: 2

EOC 24 C C C DUKE ENERGY CORPORATION CATEGORY C-A. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Pressure Vessels Inservice Inspection Database Management System Plan Report Tubesheet-to-Shell Weld Oconee 1 Page 30 N Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C01.030.001 1-SGA-WG60 ISI-OCN1-003 NDE-640 UT CS 138.000 40338 Steam Generator A Upper Tubesheet Pc. 51 to Circumferential 03 O-ISIN4-121 B- .3 NDE-820 6.625 Shell Pc. 1.

Class B OM-201-1873 Tubesheet to Shell Total C01.030 Items: 1 Total C01 Items: 3

C (

EOC 24 DUKE ENERGY CORPORATION CATEGORY C-C, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 31 Inservice Inspection Plan for Interval 4 Outage 3 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

  • rn Welded Attachments **

C03.020.002 1-01A-0-550-R7 1-01-01/sht.1 NDE-25 MT NA 0.000 Calculation No. OSC-320, page 131.1. Inspect with Mech Snubber 01A O-ISIN4-122A-1.1 1.000 F01.022.006.

Class B C03.020.014 1-JWC-1 605 OM-201-0176 NDE-25 MT NA 0.000 Main Feedwater A-Loop X-Y Axis. Attachment Rigid Support 03 O-ISIN4-121-1.3 1.000 closest to Y Axis.

Class B C03.020.052 1-51-0-436H-SR17 1-51-01/sht.2 NDE-35 PT NA 0.000 Calculation No. OSC-400, page 51. Inspect with Rigid Restraint 51 O-ISIN4-101A-1.2 0.750 F01.021.054.

Class B O-lAB-15101-02 C03.020.096 1-53B-5-0-444-H6 1-53-02/sht.2 NDE-35 PT NA 0.000 Calculation No. OSC-408. Inspect with F01.020.099.

Rigid Support 53B O-ISIN4-102A-1.2 1.000 Class B O-1AB-15302-02 C03.020.101 1-54A-0-439A-R16 1-54-03/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-416, page 58.1.

Mech Snubber 54A O-ISIN4-103A-1.1 1.000 Class B C03.020.103 1-54A-3-0-436D-R27 1-54-01/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-1628, page 60.

Rigid Support 54A O-ISIN4-103A-1.1 1.000 Class B C03.020.104 1-54A-3-0-439A-R1 1 1-54-03/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-416, page 58.1. Inspect with Rigid Restraint 54A O-ISIN4-103A-1.1 1.000 F01.021.102.

Class B C03.020.121 1-56-4-0-437B-H1 4-56-02/sht.3 NDE-35 PT NA 0.000 Calculation No. OSC-421, page 95.1. Inspect with Rigid Support 56 O-ISIN4-102A-1.1 0.125 F01.020.131.

Class B Total C03.020 Items: 8 Total C03 Items: 8

EOC 24 1(1 C DUKE ENERGY CORPORATION CATEGORY C-D. Pressure Retaining BoltInct INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 n. In Diameter Inservice Inspection Database Management System Plan Report Oconeel1 Page 32 Inservice Inspection Plan for Interval 4 Outage 3 10/1412003 ITEMNUMBER IDNUMBER SYS ISO/DWG NUMI 3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts and Studs ***

C04.030.001 1-HPI-PUMP-A OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HP I Pump A Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 o.ooo Length = 12.000. The bolting on one of the HPI Class B Pumps(1 A, 113, IC) isrequired to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

C04.030.002 1-HPI-PUMP-13 OM-201 -1704 PDI.UT-5 UT NA 2.500 40422 HPI Pump B Bolting on Pump Casing. 20 Studs, 51A 0-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(l1A, 1B, C) Is required to be examined. Due to inaccessibility disassembly s required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly Will be required to complete the examination.

C04.030.003 1-HPI-PUMP-C OM-201 -1704 PDI.UT-5 UT NA 2.500 40422 HPI Pump C Bolting on Pump Casing. 20 Studs, 51A 0-1S1N4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(l1A, B, C) is required to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

Total C04.030 Items: 3 Total C04 Items:3 3

C C EOC 24 DUKE ENERGY CORPORATION CATEGORY C-F-1. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report Welds >= 3/8 in. Nominal Wall Thickness npigWnl Oconee 1 Page 33

_or Piping > NPS4 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NLIMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Circumferential Weld C05.01 1.005 1LP-1 24.21 1LP-124 NDE-600 UT SS 12.000 40413 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.2 1.168 Class B Reducer to Valve 1LP-17 C05.011.005A 1LP-124-21 1LP-124 NDE-35 PT SS 12.000 Circumferential 53A O-ISIN4-102A-1.2 1.168 Class B Reducer to Valve 1LP-17 Total C05.01 1 Items: 2

EOC 24

( CI c.

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • Plpina Welds > 1/5 In. Nom Wall for PIDIncq >= Oconee 1 Page 34 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 3 10/1412003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DATHK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.021.003 1-51 A-03-93BA 1-51 A-03(1) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.003A 1-51A-03-93BA 1-51A-03(1) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.009 1HP-192-4 1HP-192 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.009A 1HP-192-4 1HP-192 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.014 1-51A-124-2 1-51A-124 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.014A 1-51A-124-2 1-51A-124 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.020 1HP-184-2 1HP-184 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.020A 1HP-184-2 1HP-184 NDE-35 PT SS 4.000 Circumferential 51A -IS1N4-101A-1.4 0.531 Class B Elbow to Pipe

EOC 24

( C (

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PlIDna Welds > 1/5 In. Nom Wall for PiDing >= Oconee 1 Page 35 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS C05.021.026 1HP-191-1 IHP-191 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.026A 1HP-191-1 IHP-191 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.032 1HP-200-4 IHP-200 NDE-600 UT SS 4.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.674 Class B Elbow to Pipe C05.021.032A 1HP-200-4 IHP-200 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.1 0.674 Class B Elbow to Pipe C05.021.036 1HP-180-97E IHP-180 NDE-600 UT SS 2.500 40378 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Elbow to Pipe C05.021.036A 1HP-180-97E IHP-180 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Elbow to Pipe C05.021.041 1HP-282-76A 1HP-282 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Valve 1HP-117 C05.021.041A 1HP-282-76A IHP-282 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Valve IHP-117 C05.021.047 1HP-387-116A 1HP-387 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Pipe

EOC 24

( C (

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • Pilina Welds > 1/5 In. Nom Wall for Piping >= Oconee 1 Page 36 NPS 2 and <= NPS 4 Inservice Inspectlon Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.047A 1HP-387-116A 1HP-387 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Tee to Pipe C05.021.053 1-51A-02-64B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Elbow C05.021.053A 1-51A-02-64B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Elbow C05.021.057 1-51A-03-93BB 1-51A-03(1) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.057A 1-51A-03-93BB 1-51A-03(1) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.063 1HP-193-13 1HP-193 NDE-600 UT SS 4.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.674 Class B Valve 1HP-26 to Tee C05.021.063A 1HP-193-13 1HP-193 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.674 Class B Valve 1HP-26 to Tee C05.021.069 1HP-367-21 1HP-367 NDE-600 UT SS 3.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51B O-ISIN4-101A-1.1 0.216 Class B Elbow to Flange C05.021.069A 1HP-367-21 1HP-367 NDE-35 PT SS 3.000 Circumferential 5iB 0-IS1N4-101A-1.1 0.216 Class B Elbow to Flange

EOC 24

( C. C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • Piloin Welds > 1/5 In. Nom Wall for Piping >= Oconee 1 Page 37 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 3 1011412003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS C05.021.070 1-51A-136-10 1-51A-136 NDE-600 UT SS 2.500 40378 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Pipe to Elbow C05.021.070A 1-51A-136-10 1-51A-136 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Pipe to Elbow C05.021.077 1-51A-01-27A 1-51A-01(1) NDE-600 UT SS 4.000 50256 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.237 Class B Elbow to Elbow C05.021.077A 1-51A-01-27A 1-51A-01(1) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.237 Class B Elbow to Elbow C05.021.083 1HP-387-121AA 1HP-387 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.083A 1HP-387-121AA 1HP-387 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.089 1-51A-02-30B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Tee to Pipe C05.021.089A 1-51A-02-30B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Tee to Pipe C05.021.095 1.51A-03-87B 1-51A.03(l) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A -IS1N4-101A-1.4 0.531 Class B Pipe to Elbow I

EOC 24

( C C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Re taining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy I'ising Inservice Inspection Database Management System Plan Report

  • P13ina Welds > 1/5 In. Nom Wall fcor PiDing > Oconee 1 Page 38 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 3 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS C05.021.095A 1-51 A-03-87B 1-51A-03(1) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow Total C05.021 Items: 36

EOC 24

( C C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report Socket Welds Oconee 1 Page 39 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NLJMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS C05.030.002 1-51 B-10-49 1-51 B-10 NDE-35 PT SS 2.000 Socket 51B O-ISIN4-101A-1.1 0.154 Class B Pipe to Valve 1HP21 C05.030.005 1-51A-136-27 1-51A-136 NDE-35 PT SS 2.000 Socket 51A O-ISIN4-101A-1.1 0.344 Class B Pipe to Elbow Total C05.030 Items: 2

EOC 24

(. c DUKE ENERGY CORPORATION CATEGORY C-F-1. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • Pipe Branch Connections of Branch Plping >= Oconee 1 Page 40 MNPS 2 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA)THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.041.005 1LP-136-27E ILP-136 NDE-35 PT SS 8.000 This weld was listed previously as 1-53B-03-27E Branch 53B O-ISIN4-102A-1.2 0.250 until iso 1-53B-03(3) was redrawn.

Class B Pipe to Pipe C05.041.015 1-53B-07-23 1-53B.07(1) NDE-35 PT SS 6.000 Branch 53B O-ISIN4-102A-1.2 0.134 Class B Pipe to Pipe C05.041.030 1-51B-1-12AA 1-51 B-1 NDE-35 PT SS 2.000 Branch Socket Weld.

Branch 51B O-ISIN4-101A-1.2 0.154 Class B Pipe to Half Coupling C05.041.034 1LP-1 36-27Z lLP-136 NDE-35 PT SS 8.000 This weld was listed previously as 1-53B-03-27Z Branch 53B -IS1N4-102A-1.2 0.250 until Iso 1-53B-03(3) was redrawn. Reinforcing collar Class B Pipe to weld at weld 1LP-136-27E.

Pipe C05.041.035 1LP-136-27ZA lLP-136 NDE-35 PT SS 8.000 This weld was listed previously as 1-53B-03-27ZA Branch 53B -1SIN4-102A-1 .2 0.250 until iso 1-53B-03(3) was redrawn. Reinforcing collar Class B Pipe to weld at weld 1LP-136-27E.

Pipe Total C05.041 Items: 5

EOC 24

(. C DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Piina Welds >= 3/8 in. Nominal Wall Thickness Oconee 1 Page 41 Tor PNSnN> NPS 4 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NLIMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS -COMMENTS
        • Circumferential Weld ****

C05.051.002 1MS-073-13B 1MS-073 NDE-600 UT CS 26.000 This weld was previously listed as 1-01A-02-13B Circumferential 01A O-ISIN4-122A-1.1 0.875 before the Iso was redrawn.

Class B Elbow to Procedure PDI-UT-1 may be used. If procedure Pipe PDI-UT-1 Is used, calibration block PDI-UT-1-O shall be used.

C05.051.002A lMS-073-13B 1MS-073 NDE-25 MT CS 26.000 This weld was previously listed as -01A-02-13B Circumferential 01A O-ISIN4-122A-1.1 0.875 before the so was redrawn.

Class B Elbow to Pipe C05.051.004 1-MS1 B-B 1MS-068 NDE-600 UT CS 26.000 Grinnell subassembly MS-1 B.

Circumferential 01A 0.875 Procedure PDI-UT-1 may be used. If procedure Class B Elbow to PDI-UT-1 Is used, calibration block PDI-UT-1-0 shall Pipe be used.

C05.051.004A 1-MSI B-B 1MS-068 NDE-25 MT CS 26.000 Grinnell subassembly MS-1 B.

Circumferential 01A 0.875 Class B Elbow to Pipe C05.051.014 IMS-068-34B 1MS-068 NDE-600 UT CS 24.000 This weld was previously listed as 1-01A-02-34B Circumferential 01A O-ISIN4-122A-1.1 0.969 before the Iso was redrawn.

Class B Term end Reducer to Procedure PD1-UT-1 may be used. If procedure Nozzle SG 1B PDI-UT-1 is used, calibration block PDI-UT-1-O shall be used.

C05.051.014A 1MS-068-34B 1MS-068 NDE-25 MT CS 24.000 This weld was previously listed as 1-01A-02-34B Circumferential 01A O-ISIN4-122A-1.1 0.969 before the Iso was redrawn.

Class B Term end Reducer to Nozzle SG 1B C05.051.015 I-MS21A-D lMS-066 NDE-600 UT CS 24.000 Grlnnell subassembly MS-21A.

Circumferential 01A 0.969 Procedure PDI-UT-1 may be used. If procedure Class B Elbow Y to PDI-UT-1 is used, calibration block PDI-UT-1-O shall Pipe be used.

C05.051.015A 1-MS21A-D I MS-066 NDE-25 MT CS 24.000 Grinnell subassembly MS-21A.

Circumferential 01A 0.969 Class B Elbow Y to Pipe

EOC 24

( C c DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Pilina Welds >= 3/8 In. Nominal Wall Thickness Oconee 1 Page 42 Inservice Inspection Plan for Interval 4 Outage 3 10114/2003 for PPnn > NPS 4 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS C05.051.026 1-FWD64-E 1*03-3(1) NDE-600 UT CS 24.000 Grinnell subassembly FWD-64.

Circumferential 03 1.219 Procedure PDl-UT-1 may be used. If procedure Class B Elbow to PD1-UT-1 Is used, calibration block PI-UT-1 -0 shall Reducer be used.

C05.051.026A 1-FWD64-E 1-03-3(1) NDE-25 MT CS 24.000 Circumferential 03 1.219 Class B Elbow to Reducer C05.051.031 1CC-136-81B 1CC-136 NDE-600 UT CS 8.000 This weld was listed previously as 1-55-3-81B until Circumferential 55 O-ISIN4-144A-1.2 0.500 Iso 1-55-3 was redrawn.

Class B Pipe to Procedure PDI-UT-1 may be used. If procedure Elbow P0I-UT-1 Is used, calibration block PDI-UT-1-O shall be used.

C05.051.031A 1CC-136-81B 1CC-136 NDE-25 MT CS 8.000 This weld was listed previously as 1-55-3-81B until Circumferential 55 O-ISIN4-144A-1.2 0.500 iso 1-55-3 was redrawn.

Class B Pipe to Elbow C05.051.037 1-LPSW-344-18 1-LPSW-344 NDE-600 UT CS 8.000 Procedure PDl-UT-1 may be used. If procedure Circumferential 14B O-ISIN4-124B-1.2 0.500 PDl-UT-1 is used, calibration block PDI-UT-1-O shall Class B Elbow to be used.

Pipe C05.051.037A 1-LPSW-344-18 1-LPSW-344 NDE-25 MT CS 8.000 Circumferential 14B O-ISIN4-124B-1.2 0.500 Class B Elbow to Pipe C05.051.041 1LPSW-345-19 1LPSW-345 NDE-600 UT CS 8.000 This weld was listed previously as 1-LPSW-345-19 Circumferential 14B O-ISIN4-124B-1.2 0.500 until iso 1-LPSW-345 was redrawn. This weld was Class B Elbow to listed previously as 1-LPS-345-19 until iso Pipe 1-LPS-345 was deleted.

Procedure PDI-UT-1 may be used. If procedure PDI-UT-1 is used, calibration block PDI-UT-1-0 shall be used.

C05.051.041A 1LPSW-345-19 1LPSW-345 NDE-25 MT CS 8.000 This weld was listed previously as 1-LPSW-345-19 Circumferential 14B O-ISIN4-124B-1.2 0.500 until iso 1-LPSW-345 was redrawn. This weld was Class B Elbow to listed previously as 1-LPS-345-19 until iso Pipe 1-LPS-345 was deleted.

EOC 24 C c DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Piolnu Welds >= 318 In. Nominal Wall Thickness Oconee 1 Page 43 nor PIng > NPS 4 Inservice Inspection Plan for Interval 4 Outage 3 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NIIMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS C05.051.047 1-LPSW-346-37 1-LPSW-346 NDE-600 UT CS 8.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 14B O-ISIN4-124B -1.2 0.500 PDI-UT-1 Is used, calibration block PDI-UT-1-O shall Class B Pipe to be used.

Elbow C05.051.047A 1-LPSW-346-37 1-LPSW-346 NDE-25 MT CS 8.000 Circumferential 14B O-ISIN4-124B-1.2 0.500 Class B Pipe to Elbow C05.051.061 1-14-232-1-11 1-14-232-1 NDE-600 UT CS 6.000 Procedure PDl-UT-1 may be used. Ifprocedure Circumferential 14B -ISlN4-121D-1.1 0.432 PDI-UT-1 Is used, calibration block PDI-UT-1-O shall Class B Elbow to be used.

Tee C05.051.061A 1-14-232-1-11 1-14-232-1 NDE-25 MT CS 6.000 Circumferential 14B O-ISIN4-121D-1.1 0.432 Class B Elbow to Tee Total C05.051 Items: 20

EOC 24 C C DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • PIpe Branch Connections of Branch Piping >= Oconee 1 Page 44 Inservice Inspection Plan for Interval 4 Outage 3 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NL IMBERS PROC INSP REQ MAT/SCH DlA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.081.003 1-MS23B-C 1MS-063 NDE-25 MT CS 8.000 Grinnell subassembly MS-23B.

Branch 01A 0.500 Class B Pipe to Pipe Total C05.081 Items: 1 Total C05 Items: 66

EOC 24 CAEOYD-.WledAtcmet(o C C DUKE ENERGY CORPORATION CATEGORY D-A, Welded Atachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels. Piping, Pumps, And Valves Inservice InspectIon Database Management System Plan Report Oconee 1 Page 45 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWC a'NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

001.020.030 1-03A-1-0-400B-H59 1-03A-09/sht.4 OAL-13 VT-1 NA 6.000 Calculation No. OSC-342, page 104. Inspect with Rigid Support 03A O-ISIN4-121D-1.1 0.125 F01.030.048.

Class C D01.020.031 1-03A-1-0-438B-SR100 1-03A-09/sht.2 OAL-13 VT-1 NA 6.000 Calculation No. OSC-342, page 102. Inspect with Rigid Support 03A O-ISIN4-121D-1.1 0.500 F01.030.046.

Class C D01.020.051 1-13-0-400B-JEJ-1901 1-13-09/sht.1 OAL-13 VT-1 NA 30.000 Calculation No. OSC-1636. Inspect with Rigid Restraint 13 O-ISIN4-133A-1.1 0.250 F01.031.056.

Class C D01.020.062 1-14B-1-0-400B-H31 1-14A-01/sht.1 OAL-13 VT-1 NA 36.000 Calculation No. OSC-395, page 40. Inspect with Spring Hgr 14B O-ISIN4-124A-1.1 0.187 F01.032.083.

Class C Total D01.020 Items: 4 Total D01 Items: 4

EOC 24

( C C.

DUKE ENERGY CORPORATION CAEGORY F-Spprs INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report mcass pilng Supports Oconee 1 Page 46 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS t*** Category A, One-Directional ****

F01.010.001 1-51A-0-479A-H1B 1-51-26/sht.1 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1304-06, page 6(1)31 High Rigid Support 51A O-ISIN4-101A-1.4 0.000 Pressure Injection.

Class A F01.010.004 1-51A-0-478A-H3C 1-55-03/sht.4 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1660-11, page 68 High Rigid Support 51A O-ISIN4-101A-1.1 0.750 Pressure Injection. Inspect with B10.020.006.

Class A F01.010.007 1-51A-0-479A-H9A 1-51-15/sht.1 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1304-06, page 61 Rigid Support 51A O-ISIN4-101A-1.4 0.375 High Pressure Injection.

Class A Total F01.010 Items: 3

        • Category B, Multi-Directional F01.011.001 1-51A-0-479A-H1OB 1-51-26/sht.1 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1304-06, page 6(1)32 High Rigid Restraint 51A O-ISIN4-101A-1.4 0.000 Pressure Injection.

Class A F01.011.002 1-51A-0-478A-H2C 1-55-03/sht.4 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1 660-11, page 68 Rigid Restraint 51A O-ISIN4-101A-1.1 0.154 High Pressure Injection.

Class A Total F01.011 Items: 2 Category C, Thermal Movement F01.012.006 1-51A-0-478A-H1C 1-55-03/sht.4 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1660-11, page 68 Spring Hgr 51A O-ISIN4-101A-1.1 0.750 High Pressure Injection.

Class A F01.012.009 1-53A-0-478A-H5B 1-53-08 QAL-14 VT-3 NA 10.000 Calculation No. OSC-1300.

Spring Hgr 53A O-ISIN4-102A-1.3 0.000 Class A Total F01.012 Items: 2

EOC 24

< C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Cass 2 Piplng Supports Oconee 1 Page 47 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Cateaorv A. One-Directional ****

F01.020.002 1-01A-0-550-H2 1-01-01/sht.1 OAL-14 VT-3 NA 34.000 Calculation No. OSC-320, page 131.1.

Rigid Support 01A O-ISIN4-122A-1.1 0.000 Class B F01.020.021 1-14-478E-H6014 1-03A-14/sht.3 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1224-16, page 44.

Rigid Support 14 O-ISIN4-121D-1.1 0.000 Class B F01.020.042 1-51-0-435C-SR4 1-51-02/sht.2 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1535, page 136.

Rigid Support 51 O-ISIN4-101A-1.3 0.750 Class B 0-1AB-15102-02 F01.020.043 1-51-0-435C-SR5 1-51-02/sht.2 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1535, page 136.

Rigid Support 51 O-ISIN4-101A-1.3 0.750 Class B 0-1AB-15102-02 F01.020.046 1-51-0-436H-SR19 1-51-01/sht.1 OAL-14 VT-3 NA 4.000 Calculation No. OSC-400, page 50.

Rigid Support 51 O-ISIN4-101A-1.1 0.750 Class B 0-1AB-15101-01 F01.020.099 1-53B-5-0-444-H6 1-53-02/sht.2 QAL-14 VT-3 NA 10.000 Calculation No. OSC-408. Inspect with Rigid Support 53B O-ISIN4-102A-1.2 1.000 C03.020.096.

Class B 0-lAB-15302-02 F01.020.101 1-53B-5-0-439-R14 1-53-02/sht.3 OAL-14 VT-3 NA 10.000 Calculation No. OSC-408.

Rigid Support 53B O-ISIN4-102A-1.2 0.000 Class B 0-1AB-15302-03 F01.020.103 1-53B-6-0-439C-H13 1-53-02/sht.3 QAL-14 VT-3 NA 8.000 Calculation No. OSC-408.

Rigid Support 53B O-ISIN4-102A-1.1 0.322 Class B 0-1AB-15302-03

EOC 24 C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report CIass 2 Pin SDOrts Oconee 1 Page 48 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS F01.020.111 1-54A-435B-DE-05 1-54-02/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-415, page 50.

Rigid Support 54A O-ISIN4-103A-1.1 0.125 Class B F01.020.131 1-56-4-0-437B-H1 4-56-02/sht.3 OAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 95.1. Inspect with Rigid Support 56 O-ISIN4-102A-1.1 0.125 C03.020.121.

Class B Total F01.020 Items: 10

        • Category B, Multi-Directional F01.021.021 1-03A-0-439A-DE068 1-03A-05/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 81.

Rigid Restraint 03A O-ISIN4-121D-1.2 0.000 Class B F01.021.031 1-14-0-480A-H21C 1-14-16/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-1306-06, page 6(2)-43.

Rigid Restraint 14 O-ISIN4-124B-1.2 0.000 Class B F01.021.033 1-14-0-479A-H20A 1-14-13 OAL-14 VT-3 NA 8.000 Calculation No. OSC-1306-06, page 6(4)-44.

Rigid Restraint 14 O-ISIN4-124B-1.2 1.000 Class B F01.021.054 1-51-0-436H-SR17 1-51-01/sht.2 QAL-14 VT-3 NA 4.000 Calculation No. OSC-400, page 51. Inspect with Rigid Restraint 51 O-ISIN4-101A-1.2 0.750 C03.020.052.

Class B O-1AB-15101-02 F01.021.062 1-51A-0-444-H114 1-51-13/sht.2 OAL-14 VT-3 NA 4.000 Calculation No. OSC-1410, page 104. High Rigid Restraint 51A O-ISIN4-101A-1.3 0.000 Pressure Injection Cross Connect Header.

Class B O-1AB-15113-02 F01.021.094 1-53B-2-0-436E-H7 1-51-02/sht.2 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1535, page 136.

Rigid Restraint 53B O-ISIN4-101A-1.3 0.000 Class B O-1 AB-15102-02

EOC 24

( C C DUKE ENERGY CORPORATION CATEGORY F-A, Sup orts INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Class 2 Piping Supports Oconee 1 Page 49 Inservice Inspection Plan for Interval 4 Outage 3 10114t003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.021.096 1-53B-5-0-444-R11 1-53-02tsht.2 OAL-14 VT-3 NA 10.000 Calculation No. OSC-408.

Rigid Restraint 53B O-ISIN4-102A-1.2 0.875 Class B O-1AB-15302-02 F01.021.102 1-54A-3-0-439A-R1 1 1-54-03/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-416, page 58.1. Inspect with Rigid Restraint 54A 0-ISIN4-103A-1.1 1.000 C03.020.104.

Class B Total F01.021 Items: 8

        • Category C, Thermal Movement F01.022.005 1-01A-1-1-0-401A-H7 1-01-02tsht.3 QAL-14 VT-3 NA 12.000 Calculation No. OSC-321.

Spring Hgr 01A O-ISIN4-122A-1.2 0.000 Class B F01.022.006 1-01A-0-550-R7 1-01-01/sht.1 OAL-14 VT-3 NA 34.000 Calculation No. OSC-320, page 131.1. Inspect with Mech Snubber 01A O-ISIN4-122A-1.1 1.000 C03.020.002 and F01.050.050.

Class B F01.022.091 1-53A-0-479A-H5B 1-53-07/sht.2 OAL-14 VT-3 NA 12.000 Calculation No. OSC-1301-06, page 92. Inspect Hyd Snubber 53A O-ISIN4-102A-1.1 0.000 with F01.050.054.

Class B F01.022.112 1-54A-3-0-439A-H25A 1-54-01/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-416, page 58.1.

Spring Hgr 54A O-ISIN4-103A-1.1 0.000 Class B Total F01.022 Items: 4

EOC 24

( C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Cass 3 Piping Supports Oconee 1 Page 50 Inservice Inspection Plan for Interval 4 Outage 3 10/1412003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Category A, One-Directional ****

F01.030.021 1-03-0-551-R11 1-03-01/sht.1 QAL-14 VT-3 NA 24.000 Calculation No. OSC-336, page 45a.1.

Rigid Support 03 O-ISIN4-121B-1.3 0.000 Class C F01.030.046 1-03A-1-0-438B-SR100 1-03A-09/sht.2 QAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 102. Inspect with Rigid Support 03A O-ISIN4-121D-1.1 0.500 D01.020.031.

Class C F01.030.047 1-03A-1-0-400B-H50 1-03A-09/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 103.

Rigid Support 03A O-ISIN4-121D-1.1 0.200 Class C F01.030.048 1-03A-1-0-400B-H59 1-03A-09/sht.4 QAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 104.

Rigid Support 03A O-ISIN4-121D-1.1 0.125 Class C F01.030.049 1-03A-1-0-400A-H34 1-03A-09/sht.5 OAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 105.

Rigid Support 03A O-ISIN4-121D-1.1 0.500 Class C F01.030.052 2-03A-1 401 B-DE007 2-03A-04/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-457, page 43. This support Rigid Support 03A O-ISIN4-121D-2.1 0.000 was moved from Unit 2 due to boundary change.

Class B F01.030.053 2-03A-1-0-1401B-SR16 2-03A-04/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-457, page 43. This support Rigid Support 03A O-ISIN4-121D-2.1 0.000 was moved from Unit 2 due to boundary change.

Class B F01.030.091 1-14B-0-436L-ASR14 4-14-03/sht.4 QAL-14 VT-3 NA 8.000 Calculation No. OSC-394, page 79.

Rigid Support 14B O-ISIN4-121D-1.2 0.000 Class C

EOC 24 C, C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report CIass 3 PiPina SupDorts Oconee 1 Page 51 Inservice Inspection Plan for Interval 4 Outage 3 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.030.092 1-14B-439B-DE009 1-14-06/sht.1 OAL-14 VT-3 NA 10.000 Calculation No. OSC-1541, page 100.

Rigid Support 14B O-ISIN4-124B-1.4 0.000 Class C F01.030.103 1-14B-437A-SR60 1-14-06/sht.1 OAL-14 VT-3 NA 20.000 Calculation No. OSC-1541, page 100.

Rigid Support 14B O-ISIN4-124B-1.1 1.000 Class C F01.030.104 2-14B-1400A-DE144 1-14-06/sht.3 QAL-14 VT-3 NA 12.000 Calculation No. OSC-1541, page 102.

Rigid Support 14B O-ISIN4-124B-1.1 0.000 Class C F01.030.133 1-56-443-H5106 4-56-02/sht.7 OAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 99.

Rigid Support 56 O-ISIN4-104A-1.1 0.000 Class C F01.030.152 0-SSW-448K-H7362 4-SSW-01/sht.1 OAL-14 VT-3 NA 6.000 Calculation No. OSC-6068.

Rigid Support SSWO-ISIN4-129A-1.1 0.000 Class C 0-4RWF-4SSW01-01 Total F01.030 Items: 13

  • - Category B, Multi-Directional F01.031.056 1-13-0-400B-JEJ-1901 1-13-09/sht.1 QAL-14 VT-3 NA 30.000 Calculation No. OSC-1636. Inspect with Rigid Restraint 13 O-ISIN4-133A-1.1 0.250 D01.020.051.

Class C F01.031.071 1-14B-0-444-ASR8 1-03A-05/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 81.

Rigid Restraint 14B O-ISIN4-121 D-1.2 0.500 Class C F01.031.075 1-14B-436D-DE063 4-14-03/sht.4 OAL-14 VT-3 NA 8.000 Calculation No. OSC-394, page 79.

Rigid Restraint 14B O-ISIN4-121D-1.2 0.237 Class C

EOC 24

( C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Cass Piplin 3 Supports Oconee 1 Page 52 Inservice Inspection Plan for Interval 4 Outage 3 1011412003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.031.101 1-56-437B-H5110 4-56-02/sht.7 OAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 99.

Rigid Restraint 56 O-ISIN4-104A-1.1 0.000 Class C Total F01.031 Items: 4

        • Category C, Thermal Movement F01.032.001 1-01A-4-1-0-401A-H2 1-01-06/sht.1 QAL-14 VT-3 NA 6.000 Calculation No. OSC-325, page 88.

Spring Hgr 01A O-ISIN4-122A-1.4 0.000 Class C F01.032.021 1-03A-1-0-439B-H21 1-03A-05/sht.2 QAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 80.

Spring Hgr 03A O-ISIN4-121DD-1.1 0.000 Class C F01.032.083 1-14B-1-0-400B-H31 1-14A-01/sht.1 QAL-14 VT-3 NA 36.000 Calculation No. OSC-395, page 40. Inspect with Spring Hgr 14B O-ISIN4-124A-1.1 0.187 D01.020.062.

Class C Total F01.032 Items: 3

C C C EOC 24 DUKE ENERGY CORPORATION CATEGORY F-A. Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Supports Other Than Plplng Supports Oconee 1 Page 53 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Class 1, 2, and 3 ****

F01.040.003 1-PZR-SUPPORT OM 201 -91 OAL-14 VT-3 NA 0.000 Pressurizer Support. Additional Drawing 50 O-ISIN4-100A-1.1 0.000 ISI-OCN-002.

Class A OM 201-637 F01.040.010 1-EFDW-MD-PU-A OM 206-0036 QAL-14 VT-3 NA 0.000 Emergency Feedwater Motor Driven Pump 1A, 03A O-ISIN4-121D-1.1 0.000 Pump Support & Pad.

Class C F01.040.011 1-EFDW-PT OM 200B-0006 OAL-14 VT-3 NA 0.000 Emergency Feedwater Pump Turbine. Ref. Fig 1 in 03A O-ISIN4-122A-1.4 0.000 Manual Om-200B-0006, Items 12 & 18.

Class C F01.040.012 1-EFDW-TD-PU OM 206A-0001 OAL-14 VT-3 NA 0.000 Emergency Feedwater Turbine Driven Pump, 03A O-ISIN4-121D-1.1 0.000 Support & Pad.

Class C F01.040.023 1-RCSR-FTR OM 201-2135 QAL-14 VT-3 NA 0.000 Reactor Coolant Seal Return Filter. Component 51B O-ISIN4-101A-1.1 0.000 Support number is 1-51 B-2-0-436G-H64. Calc No.

Class B 1-51-06/sht.1 OSC-1538, Page 93.

F01.040.034 1-50-0-66A-RCPM-S6 0-66A QAL-14 VT-3 NA 5.000 Calculation No. OSC-0971-01-0006, Reactor Hyd Snubber 50 O-ISIN4-100A-1.1 0.000 Coolant Pump 1A2 Motor Snubbers. Reference PIP Class A 0-66B 0-096-1575. Inspect with F01.050.113.

Total F01.040 Items: 6 Total F01 Items: 55

EOC 24 C C (

DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Reactor Coolant Pump Flywheels Oconee 1 Page 54 Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWC3 NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G01.001.001A 1-RCP-1A1 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump IA1 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.002A 1-RCP-1A2 OM-201 D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump 1A2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the Interval measured from the previous such Inspection is greater than 6 2/3 years.

Reference Section 7 of the SI Plan, General Requirements.

GO1.001.003A 1-RCP-11B1 OM-201 D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump 1B1 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.004A 1-RCP-1B2 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump 1B2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

Total G01.001 Items: 4 Total G01 Items: 4

EOC 24 C C DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress PiDing Examinations Oconee 1 Page 55 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 3 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME 3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G04.001.007 1HP-255-6 1HP-255 See Corn UT SS 2.500 Inspect 100% of weld & I' of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-10-6 until iso Class A Elbow to 1-51A-10 was deleted and welds were transferred to Pipe iso 1HP-255. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.012 1HP-190-12 1HP-190 See Corn UT SS 2.500 Inspect 100% of weld & of base material (axial &

Circumferential 51A 0.375 circumferential). This weld was 1-51 A-5-77C until Class A Pipe to iso 1-51A-5 was deleted and welds transferred to iso Elbow 1HP-190. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.015 1HP-190-16 1HP-190 See Com UT SS 2.500 Inspect 100% of weld & I' of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Pipe to Plan, Volume 1.

Valve 1HP-488 Procedure EPRI-NDEC-UT-X G04.001.016 1HP-190-13 1HP-190 See Com UT SS 2.500 Inspect 100% of weld & I' of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Elbow to Plan, General Requirements.

Pipe Procedure EPRI-NDEC-UT-X G04.001.017 1HP-279-4 1HP-279 See Corn UT Ss 2.500 Inspect 100% of weld & 1" of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-10-4 until iso Class A Elbow to 1-51 A-10 was deleted and welds tranferred to iso Pipe 1HP-279. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.018 1HP-279-3 1HP-279 See Corn UT SS 2.500 Inspect 100% of weld & 1P of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51 A-1 0-3 until so Class A Elbow to 1-SA-10 was deleted and welds tranferred to so Pipe 1HP-279. Reference Section 7 of the SI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.019 1HP-279-24 1HP-279 See Com UT Ss 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A 0-1SIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the SI Class A Pipe to Plan, General Requirements.

Valve 1HP-489 Procedure EPRI-NDEC-UT-X

C ~~~~~C (

EOC 24 DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report EThermal Stress Piping Examinations Oconee 1 Page 56 E Inservice Inspection Plan for Interval 4 Outage 3 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAJTHK CAL BLOCKS COMMENTS G04.001.021 1HP-277-42C 1HP-277 See Corn UT SS 2.500 Inspect 100% of weld & 1' of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-04-42C until Class A Pipe to iso 1-51 A-04 was deleted and welds transferred to Elbow Iso 1HP-277. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.022 1HP-277-43C 1HP-277 See Coin UT SS 2.500 Inspect 100% of weld & 1' of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51 A-04-43C until Class A Elbow to iso 1-51 A-04 was deleted and welds tranferred to Pipe iso 1-HP-277. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.023 1HP-277-52 1HP-277 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the SI Class A Pipe to Plan, General Requirements.

Valve 1HP-486 Procedure EPRI-NDEC-UT-X G04.001.025 1HP-278-22C 1HP-278 See Corn UT SS 2.500 Inspect 100% of weld & 1' of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was 1-51A-04-22C until Class A Pipe to iso 1-51 A-04 was deleted welds tranferred to Elbow 1-HP-278. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.026 1HP-278-23C 1HP-278 See Com UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). This weld was -51A-04-23C until Class A Elbow to iso 1-51 A-04 was deleted and welds transferred to Pipe iso 1-HP-278. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.027 1HP-278-24 1HP-278 See Corn UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Reference Section 7 of the ISI Class A Pipe to Plan, General Requirements.

Valve 1HP-487 Procedure EPRI-NDEC-UT-X Total G04.001 Items: 13 Total G04 Items: 13

EOC 24 CI C C DUKE ENERGY CORPORATION CATEGORY AUG. Auamented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System IClass 1 RTE Mounting Bosses Oconee 1 Inservice Inspection Plan for Interval 4 Outage 3 Plan Report Page 57 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIAJTHK CAL BLOCKS COMMENTS G10.001.001 1-PHA-13 ISI-OCN1-005 NDE-35 PT CS-lnconel 9.000 RTE Mounting Boss. This weld covers the X axis.

Circumferential 50 OM-201-2296 2.875 The diameter of the hole that penetrates the nozzle Class A Pipe to into the Hot Leg = .613'. Reference Section 7 of the Dissimilar Pipe ISI Plan, General Requirements.

G10.001.002 1-PHA-14 ISI-OCNI-005 NDE-35 PT CS-lnconel 9.000 RTE Mounting Boss. This weld covers the Y-Z Circumferential 50 OM-201-2296 2.875 Quadrant. The diameter of the hole that penetrates Class A Pipe to the nozzle Into the Hot Leg = .613'. Reference Dissimilar Pipe Section 7 of the ISI Plan, General Requirements.

G10.001.003 1-PHA-15 ISI-OCN1-005 NDE-35 PT CS-lnconel 9.000 RTE Mounting Boss. This weld covers the Z-W Circumferential 50 OM-201-2296 2.875 Quadrant. The diameter of hole that penetrates the Class A Pipe to nozzle into the Hot Leg = .613'. Reference Section Dissimilar Pipe 7 of the SI Plan, General Requirements.

G10.001.010 1-PIB2-12 ISI-OCN1-010 NDE-35 PT CS-lnconel 8.750 RTE Mounting Pipe. This weld covers the Z-W Branch 50 OM-201 -1845 2.250 Quadrant. The diameter of hole that penetrates the Class A Salvaged Pipe to nozzle into the RCP 1B2 Suction Piping = .613'.

Dissimilar Pipe Reference Section 7 of the ISI Plan, General Requirements.

Total G10.001 Items: 4 Total G10 Items: 4

Duke Power Company Inservice Inspection Management Inservice Inspection Plan For:

Oconee Unit 1 Interval 4 ISI Outage 4 Refueling Outage EOC 25 ISI Examination Listing and Schedule Revision 0

EOC 25 I C (

DUKE ENERGY CORPORATION CATEGORY B-B, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Vessels Other Than Reactor Vessels Inservice Inspection Database Management System Plan Report Steam Generators (Primary Sde) Oconee 1 Page 1 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Tubesheet-to-Head Weld ****

B02.040.002 1-SGB-WG58-2 ISI-OCN1-004 NDE-820 UT CS 119.000 40393 Steam Generator B Lower Head to Lower Circumferential 50 OM-201-1873 NDE-640 8.500 Tubesheet. Pc. 7 to Pc. 50.

Class A Head to Tubesheet Total B02.040 Items: 1 Total B02 Items: 1 I

EOC 25 C, C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspectlon Program B Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 2 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG! NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle-to-Vessel Welds ****

B03.110.009 1-PZR-WP26-1 ISI-OCN1-002 NDE-640 UT CS 5.750 40338 Pressurizer Sensing and Sampling Nozzle Pc. 30 to Circumferential 50 OM-201-91 NDE-820 6.187 Heater Belt Shell Pc. 4.

Class A OM-201-1878 Nozzle to W-X Quadrant.

Shell B03.110.010 1-PZR-WP26-2 ISI-OCNI002 NDE-640 UT CS 5.750 40338 Pressurizer Sensing and Sampling Nozzle Pc. 30 to Circumferential 50 OM-201.91 NDE-820 6.187 Heater Belt Shell Pc. 4.

Class A OM-201-1878 Nozzle to Y-Z Quadrant.

Shell Total B03.110Items: 2

EOC 25 CI C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 3 Inservice Inspection Plan for Interval 4 Outage 4 10/1412003 ITEM NUMBER IDNUMBER SYS ISO/DWCGNUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle Inside Radius Section ****

B03.120.009 1-PZR-WP26-1 ISI-OCN1-002 NDE-680 UT CS 5.750 50237E Pressurizer Sensing and Sampling Nozzle Pc. 30 to 50 OM-201-91 2.531 50237F Shell Pc. 4. W-X Quadrant. (Inside Radius Section)

Class A OM.201-1878 Nozzle to Cal Bock 40338 Shell B03.120.010 1-PZR-WP26-2 ISI-OCN1-002 NDE-680 UT CS 5.750 50237E Pressurizer Sensing and Sampling Nozzle Pc. 30 to 50 OM-201-91 2.531 50237F Shell Pc. 4. Y-Z Quadrant. (nside Radius Section)

Class A OM.201-1878 Nozzle to Cal Block 40338 Shell Total B03.120 Items: 2

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Steam Generators (Primary Side) Oconee 1 Page 4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG! NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Nozzle-to-Vessel Welds ****

B03.130.003 1-SGB-WG50-2 ISI-OCN1-004 NDE-820 UT CS 38.380 40393 Steam Generator 1B Outlet Nozzle Pc. 65 to Lower Circumferential 50 OM-201-1873 NDE-640 8.000 Head Pc. 7. W-Z Quadrant.

Class A 146467E Nozzle to Head B03.130.004 1-SGB-WG50-1 ISI-OCN1-004 NDE-820 UT CS 38.380 40393 Steam Generator 1B Outlet Nozzle Pc.65 to Lower Circumferential 50 OM-201-1873 NDE-640 8.000 Head Pc. 7. Y-Z Quadrant.

Class A 146467E Nozzle to Head Total B03.130 Items: 2

EOC 25 C- C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Steam Generators Primary Side) Oconee 1 Page 5 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG3NUMBERS PROC INSP REQ MATISCH D/THK CAL BLOCKS COMMENTS

        • Nozzle Inside Radius Section ****

B03.140.003 1-SGB-WG50-2 ISI-OCN1-004 TBD VT-1 CS 38.380 40393 Steam Generator 1B Outlet Nozzle Pc. 65 to Lower 50 OM-201-1873 8.000 Head Pc. 7. W-Z Quadrant. (Inside Radius Section)

Class A 146467E Nozzle to Enhanced VT-1 Inspection Is required in lieu of UT Head inspection.

B03.140.004 1-SGB-WG50-1 ISI-OCN1-004 TBD VT-1 CS 38.380 40393 Steam Generator B Outlet Nozzle Pc. 65 to Lower 50 OM-201-1873 8.000 Head Pc. 7. Y-Z Quadrant. (Inside Radius Section)

Class A 146467E Nozzle to Enhanced VT-1 Inspection Is required in lieu of UT Head inspection.

Total 803.140 tems: 2

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Heat Exchangers (Primar Sde) Oconee 1 Page 6 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWGi NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle-to-Vessel Welds ****

B03.150.003 1-LDCB-IN-V1 1-53755 NDE-3630 UT SS 3.000 40411 Letdown Cooler 1B Tubeside Inlet Nozzle Pc. 5 to Circumferential 51A OM-201-2991 0.875 Channel Body Pc. 3.

Class A Nozzle to Channel Body B03.150.004 1-LDCB-OUT-V2 1-53755 NDE-3630 UT SS 3.000 40411 Letdown Cooler 1B Tubeside Outlet Nozzle Circumferential 51A OM-201-2991 0.875 Pc. 5 to Channel Body Pc. 3.

Class A Nozzle to Channel Body Total 603.150 Items: 2

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY B-D, Full Penetration Welded INSERVICE INSPECTION PLAN MANAGEMENT Nozzles In Vessels - Inspection Program B Inservice Inspection Database Management System Plan Report Heat Exchanqers (Primary Side) Oconee 1 Page 7 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG!NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS

        • Nozzle Inside Radius Section ****

B03.160.003 1-LDCB-IN-V1 1-53755 TBD UT SS 3.000 TBD Letdown Cooler 1B Tubeside Inlet Nozzle Pc. 5 to 51A OM.201-2991 0.875 Channel Body Pc. 3. (Inside Radius Section). This Class A Nozzle to item will not be examined, reference Section 9 for Channel Body Request for Relief.

B03.160.004 1-LDCB-OUT-V2 1-53755 TBD UT SS 3.000 TBD Letdown Cooler 1B Tubeside Outlet Nozzle 51A OM-201-2991 0.875 Pc. 5 to Channel Body Pc. 3. (Inside Radius Class A Nozzle to Section). This item will not be examined, reference Channel Body Section 9 for Request for Relief.

Total B03.160 Items: 2 Total B03 Items: 12

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Restaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report PressurIzer Oconee 1 Page 8 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts and Studs ****

B06.060.001 1-PZR-STUDS OM-201-1262 See Corn UT CS 2.750 40425 Pressurizer Manway Studs Pc. 67. 12 Studs, Stud 0.000 Length = 14.875.

Class A Procedure # PDI-UT-5.

Total B06.060 Items: 1

EOC 25 cI C (7 DUKE ENERGY CORPORATION CATEGORY B-G-1. Pressure Re taiing INSERVICE INSPECTION PLAN MANAGEMENT Bolting, Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 9 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Flange Surface, when connection disassembled ****

B06.070.001 1-PZR-MW-FLANGE OM-201-1026 QAL-13 VT-1 CS 28.000 Pressurizer Manway Flange Surface. Examination 0.000 Includes 1 Annular Surface Surrounding Each Stud.

Class A (Inspect when connection disassembled)

Total 906.070 Items: 1

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY B-G-1, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 10 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOJ'DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Flange Surface, when connection disassembled ****

B06.190.001 1-RCP-1Ai-FLANGE OM-201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump Al Main Flange.

OM-201.D-38 0.000 Examination includes 1 annular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.002 l-RCP-1A2-FLANGE OM.201.D-35 OAL-13 VT-i SS 77.000 Reactor Coolant Pump 1A2 Main Flange.

OM-201.D-38 0.000 Examination includes 1" annular surface of flange Class A OM-201-1 148 surrounding each stud. (Inspect when connection disassembled)

B06.190.003 1.RCP-1B1FLANGE OM.201.D-35 QAL-13 VT-i SS 77.000 Reactor Coolant Pump 1Bl Main Flange.

OM.201.D-38 0.000 Examination includes 1' annular surface of flange Class A OM-201 -1148 surrounding each stud. (Inspect when connection disassembled)

B06.190.004 1-RCP-1B2-FLANGE OM-201.D-35 QAL-13 VT-i SS 77.000 Reactor Coolant Pump 1B2 Main Flange.

OM-201.D-38 0.000 Examination Includes 1 annular surface of flange Class A OM-201-1148 surrounding each stud. (Inspect when connection disassembled)

Total B06.190 Items: 4 Total B06 Items: 6

EOC 25 c C (

DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Restaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diami ?ter Inservice Inspection Database Management System Plan Report Pressurizer Oconee 1 Page 11 Inservice Inspection Plan for Interval 4 Outage 4 10/1412003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.020.002 1-PZR-CHB-STUDS OM-201-9 OAL-13 VT-1 CS 2.000 Pressurizer Center Heater Bundle Studs Pc. 75 and OM-201-1262 0.000 nuts. 16 Studs, Length = 17.875. Examine all studs Class A and nuts.

Total B07.020 Items: 1

EOC 25 c C (

DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaining INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 in. And Less In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 12 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO)'DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.070.007 1-53A-LP1-STUDS OM-245-2054-001 QAL-13 VT-1 CS 1.000 Decay Heat Suction 12' Valve 1LP -1Bolting.

53A O-ISIN4-102A-1.1 0.000 Inspect one of the following valves: 1LP-1 or 1LP-2.

Class A Examine all studs and nuts.

Total B07.070 Items: 1

EOC 25 c C (

DUKE ENERGY CORPORATION CATEGORY B-G-2, Pressure Retaiing INSERVICE INSPECTION PLAN MANAGEMENT Bolting. 2 In. And Less In Diam 3ter Inservice Inspection Database Management System Plan Report CRD Housings Oconee 1 Page 13 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Bolts, Studs, and Nuts ****

B07.080.001 1-RPV-CRD-HOUSING OM.201-2186 OAL-13 VT-1 CS 1.250 CRD Housing includes Bolts (8 bolts on each DPS 706599-1056 0.000 connection) and Housing Rings (1 pair per housing.)

Class A B&W152006E Inspect only if disassembled.

Inspect only bolting that is to be reused.

Total B07.080 Items: 1 Total B07 Items: 3

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 14 Inservice Inspection Plan for Interval 4 Outage 4 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMI 3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Circumferential Welds ****

B09.011.001 1-51A-04.3C 1-51A-04 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A- 1.4 0.531 Class A Pipe to Elbow B09.011.001A 1-51A-04.3C 1-51A-04 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class A Pipe to Elbow B09.011.003 1-53A-01-21L 1-53A-01(2) NDE.600 UT SS 10.000 40399 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Elbow to Pipe B09.011.003A 1-53A-01-21L 1-53A-01 (2) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Elbow to Pipe B09.011.004 1-53A-01-28L 1-53A-01(2) NDE-600 UT SS 10.000 40399 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.004A 1-53A-01-28L 1-53A-01(2) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.005 1-53A-01-6L 1-53A-01(2) NDE-600 UT SS 14.000 40389 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Elbow to Pipe B09.011.005A 1-53A-01-6L 1-53A-01 (2) NDE-35 PT SS 14.000 Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Elbow to Pipe

EOC 25

( C C DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larger Oconee 1 Page 15 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.011.006 1-53A-01-8L 1-53A.01(2) NDE-600 UT SS 14.000 40389 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Elbow to Valve 1CF-13 B09.011.006A 1-53A-01-8L 1-53A-01(2) NDE-35 PT SS 14.000 Circumferential 53A O-ISIN4-102A-1.3 1.250 Class A Elbow to Valve 1CF-13 B09.011.014 1-53A-02-63L 1-53A-02(2) NDE-600 UT SS 10.000 40399 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.014A 1-53A-02-63L 1-53A-02(2) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.3 1.000 Class A Pipe to Elbow B09.011.018 1-PDA2-2 ISI-OCN1-012 See Com UT SS-CS 33.500 40350 Reactor Coolant Pump 1A2 Discharge Piping. Safe Circumferential 50 O-ISIN4-100A-1.1 2.330 40397 End Pc. 213 to 13 Degree Elbow Pc. 212.

Class A OM-201-1844 Safe End to Procedure PDI-UT-10 Dissimilar Elbow B09.011.018A 1-PDA2-2 ISI-OCN1-012 NDE-35 PT SS-CS 33.500 Reactor Coolant Pump 1A2 Discharge Piping. Safe Circumferential 50 O-ISIN4-100A-1.1 2.330 End Pc. 213 to 13 Degree Elbow Pc. 212.

Class A OM-201-1844 Safe End to Dissimilar Elbow B09.011.034 1-PIA2-7 ISI-OCN1-008 See Com UT SS-CS 33.500 40350 Reactor Coolant Pump 1A2 Suction Piping.

Circumferential 50 O-ISIN4-10OA-1.1 2.330 40397 Transition Pc. 210 to Salvaged Pipe Pc. 215.

Class A Stress weld OM-201-1845 Transition Piece to Procedure PDI-UT-10 Dissimilar Pipe B09.011.034A 1-PIA2-7 ISI-OCN1-008 NDE-35 PT SS-CS 33.500 Reactor Coolant Pump 1A2 Suction Piping.

Circumferential 50 O-ISIN4-100A-1.1 2.330 Transition Pc. 210 to Salvaged Pipe Pc. 215.

Class A Stress weld OM-201-1845 Transition Piece to Dissimilar Pipe B09.011.058 1-PIA2-9 ISI-OCN1-008 NDE-600 UT SS 36.500 40397 Procedure PDI-UT-2 may be used.

Circumferential 50 OM-201-1846 2.330 Class A Term end / Stress weld Safe end to RC Pump 1A2

EOC 25 c (

DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report NPS 4 or Larer Oconee 1 Page 16 Inservice Inspection Plan for Interval 4 Outage 4 1011412003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS B09.011.058A 1-PIA2-9 ISI-OCN1-008 NDE-35 PT SS 36.500 Circumferential 50 OM.201-1846 2.330 Class A Term end / Stress weld Safe end to RC Pump 1A2 Total B09.011 Items: 18

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY B-J. Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report Mes hnNPS 4 Oconee 1 Page 17 Ea-re Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIAITHK CAL BLOCKS COMMENTS

        • Circumferential Welds B09.021.007 1-51A-05-59C 1-51A-05 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.4 0.375 Class A Pipe to Elbow 809.021.008 1-51A-05-65C 1-51A-05 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.4 0.375 Class A Pipe to Elbow B09.021.014 1-51A-134A-43 1-51A-134A NDE-35 PT SS 3.000 Letdown Cooler 1A Inlet Channel Nozzle Pc. 5 to Circumferential 51A O-ISIN4-101A-1.1 0.438 Elbow.

Class A Term end OM-201-3107 Nozzle to Elbow B09.021.017 1-51A-136-36 1-51A-136 NDE-35 PT SS 3.000 Letdown Cooler 1A Outlet Channel Nozzle Pc. 5 to Circumferential 51A O-ISIN4-101A-1.1 0.438 Pipe.

Class A Term end OM-201-3107 Nozzle to Pipe B09.021.025 1-PIA2-11 ISI-OCN1-008 NDE-35 PT CS-Inconel 3.500 Reactor Coolant Pump 1A2 Suction Piping. Drain Circumferential 50 O-ISIN4-10OA-1.1 0.816 Nozzle Pc. 64 to Safe End Pc. 65.

Class A OM-201-1870 Nozzle to Dissimilar Safe End B09.021.034 1-PSP-6 ISI-OCN1-016 NDE-35 PT SS 2.875 Circumferential 50 O-ISIN4-100A-1.2 160 0.375 Class A Stress weld Elbow to Tee B09.021.035 1-PSP-8 ISI-OCN1-016 NDE-35 PT SS 2.875 Circumferential 50 O-ISIN4-100A-1.2 160 0.375 Class A Stress weld Pipe to Valve 1RC-3 B09.021.045 ILP-102-10 1LP-102 NDE-35 PT SS 3.000 Circumferential 53A O-ISIN4-102A-1.1 0.438 Class A Valve 1LP-104 to Pipe

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report.

Less Than NPS 4 Oconee 1 Page 18 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 E~hnNS ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS B09.021.051 1RC-201-101 1RC-201 NDE-35 PT SS 2.500 Pump IB1 Discharge Piping. Pipe to Pressure Circumferential 51A O-ISIN4-101A-1.4 0.375 Injection Nozzle Safe End Pc. 47. This weld was Class A Stress weld ISI-OCN1-013 Pipe to listed previously as 1-51A-1 1-89 until iso 151A -11 Safe-End (3)was redrawn. Revision 2 to sometric changed weld number from 1RC-201 -3.

Inspect with G02.001.008C.

B09.021.052 1RC-201-105 1RC-201 NDE-35 PT SS 2.500 Pump 1B2 Discharge Piping. Pipe to Pressure Circumferential 51A O-ISIN4-101A-1.4 0.375 Injection Nozzle Safe End Pc. 47. This weld was Class A Stress weld ISI-OCN1-014 Pipe to listed previously as 1-51A-11-87 until iso 1-51A-11 Safe-End was redrawn. Revision 2 to sometric changed weld number from 1RC-201-2. Weld 1-51 A-i 1-87 was deleted and weld 1RC-201-102 replaced it.

Weld 1RC-201-102 was deleted and weld 1RC-201-105 replaced it.

Inspect G02.001.008D.

B09.021.054 1RC-201-92 1RC-201 NDE-35 PT SS 2.500 This weld was listed previously as 1-51A-1 1-88 until Circumferential 51A O-ISIN4-101A-1.4 0.375 iso 1-51A-1 1 was redrawn. Revision 2 to isometric Class A Stress weld Pipe to changed weld number from 1RC-201-1.Weld Valve 1HP-152 1-51 A-1 1-88 was deleted and weld 1RC-201-92 replaced it.

Inspect withG02.001.01OD.

Total B09.021 Items: 11

EOC 25 C

DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report WBranch Plpe Connection Welds Oconee 1 Page 19 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

        • Less Than NPS 4 ****

B09.032.003 1-PDA2-10 ISI-OCN1-012 NDE-25 MT CS 12.000 28" ID Pipe Pc. 44 to Pressure Injection Nozzle Pc.

Branch 50 O-ISIN4-100A-1.1 2.250 46. The NPS of the branch piping Is 2.5 inches.

Class A Stress weld OM-201-597 Pipe to Nozzle B09.032.004 1-PDBl-10 ISI-OCN1-013 NDE-25 MT CS 12.000 28 IDPipe Pc. 44 to Pressure Injection Nozzle Pc.

Branch 50 O-ISIN4-100A-1.1 2.250 46. The NPS of the branch piping Is 2.5 inches.

Class A Stress weld OM-201-597 Pipe to Nozzle Total B09.032 Items: 2

EOC 25 C C C.

DUKE ENERGY CORPORATION CATEGORY B-J, Pressure Retaining Welds In INSERVICE INSPECTION PLAN MANAGEMENT Piping Inservice Inspection Database Management System Plan Report Socket Welds Oconee 1 Page 20 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B09.040.001 1-50-01-179 1-50-01(1) NDE-35 PT SS 1.500 Socket 50 O-ISIN4-100A-1.1 160 0.281 ClassA Pipe to Elbow B09.040.002 1-50-01-183 1-50-01(1) NDE-35 PT SS 1.500 Socket 50 O-ISIN4-100A-1.1 160 0.281 Class A Pipe to Valve 1RC-29 B09.040.003 1-50-01-206 1-50-01(1) NDE-35 PT SS 1.500 Socket 50 O-ISIN4-100A-1.1 160 0.281 Class A Pipe to Valve 1RC-24 B09.040.004 1-50-01-209 1.50-01(1) NDE-35 PT SS 1.500 Socket 50 O-ISIN4-100A-1.1 160 0.281 Class A Pipe to Elbow B09.040.008 1-51A-135-25 1-51A-135 NDE-35 PT SS 2.000 Socket 51A O-ISIN4-101A-1.1 3.440 Class A Elbow to Pipe Total B09.040 Items: 5 Total B09 Items: 36

EOC 25 C (

DUKE ENERGY CORPORATION CATEGORY B-K, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumns, And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 21 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWC

- GNUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Welded Attachments ****

B10.020.011 1-53-0-479A-H2 1-53-07/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-1301-06,page 91. Inspect Rigid Restraint 53 O-ISIN4-102A-1.1 0.750 with F01.011.005.

Class A B10.020.026 1-59-0-478A-H33 1-59-03/sht.2 NDE-35 PT NA 0.000 Calculation No. OSC-1311-06.

Rigid Support 59 O-ISIN4-100A-1.1 0.375 Class A Total B10.020 Items: 2 Total B10 Items: 2

EOC 25

( C (-

DUKE ENERGY CORPORATION CATEGORY B-L-2. Pump Casings INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 22 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • Pump Casing **

B12.020.001 1RCP-1Al-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump Al Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCN1-007 maintenance, repair, or volumetric examination)

B12.020.002 1RCP-1A2-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump 1A2 Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCN1-008 maintenance, repair, or volumetric examination)

B12.020.003 1RCP-1B1-CASING OM-201.D-35 OAL-14 VT-3 SS 77.000 Reactor Coolant Pump Bi Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump is disassembled for Class A ISI-OCN1-009 maintenance, repair, or volumetric examination)

B12.020.004 1RCP-1B2-CASING OM-201.D-35 QAL-14 VT-3 SS 77.000 Reactor Coolant Pump 1B2 Casing Internal 50 OM-201-1148 0.000 Surfaces. (Inspect only if pump Is disassembled for Class A ISI-OCN1-010 maintenance, repair, or volumetric examination)

Total B12.020 Items: 4

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY B-M-2, Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 23 10/14/2003 EMM Inservice Inspection Plan for Interval 4 Outage 4

_ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • Valve Body, Exceeding NPS 4 ****

B12.050.001 1-53A-CF-1 1 OM-245-0001 OAL-14 VT-3 SS 14.000 A-Side Core Flood Valve Body CF-1 1 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: 1CF-1 1, 1CF-12, 1CF-13, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.002 1-53A-CF-12 OM-245-0001 QAL-14 VT-3 SS 14.000 A- Side Core Flood Valve Body 1CF-12 nternal 53A O-ISIN4-102A-1.3 0.000 Surfaces. W Axis.

Class A Inspect one of the following valves: 1CF-i1, 1CF-12, 1CF-1 3, or 1CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.003 1-53A-CF-13 OM-245-0001 OAL-14 VT-3 SS 14.000 B- Side Core Flood Valve Body 1CF-13 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: 1CF-11, 1CF-1 2, 1CF-1 3, or CF-14 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.004 1-53A-CF-14 OM-245-0001 QAL-14 VT-3 SS 14.000 B- Side Core Flood Valve Body 1CF-14 Internal 53A O-ISIN4-102A-1.3 0.000 Surfaces. Y Axis.

Class A Inspect one of the following valves: 1CF-11, 1CF-12, 1CF-13, or 1CF-14 only if valve Isdisassembled for maintenance, repair, or volumetric examination.

B12.050.005 1-53A-LP-47 OM-245-0001 OAL-14 VT-3 SS 10.000 B-Side LPi Valve Body 1LP-47 nternal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: LP-47 or Class A 1LP-48 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.006 1-53A-LP-48 OM-245-0001 OAL-14 VT-3 SS 10.000 B-Side LP1 Valve Body 1LP-48 Internal Surfaces.

53A O-ISIN4-102A-1.2 0.000 Inspect one of the following valves: 1LP-47 or Class A 1LP-48 only if valve is disassembled for maintenance, repair, or volumetric examination.

B12.050.007 1-53A-LP-1 OM-245-2054 OAL-14 VT-3 SS 12.000 Decay Heat Suction Valve Body ILP-1 Internal 53A O-ISIN4-102A-1.1 0.000 Surfaces. inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve is disassembled for maintenance, repair, or volumetric examination.

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY B-M-2, Valve Body INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Oconee 1 Page 24 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIANTHK CAL BLOCKS COMMENTS B12.050.008 1-53A-LP-2 OM-245-2055 OAL-14 VT-3 SS 12.000 Decay Heat Suction Valve Body LP-2 Internal 53A O-ISIN4-102A-1.1 0.000 Surfaces. Inspect one of the following valves: 1LP-1 Class A or 1LP-2 only if valve Is disassembled for maintenance, repair, or volumetric examination.

Total B12.050 Items: 8 Total B12 Items: 12

EOC 25

( C C DUKE ENERGY CORPORATION CATEGORY B-O, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Control Rod Housings Inservice Inspection Database Management System Plan Report Reactor Vessel Oconee 1 Page 25

  • Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Welds In CRD Housing ****

B14.010.002 1-RPV-CRD-46WH9 OM-201-2186 NDE-35 PT SS-Inconel 4.025 CRDM #46 Housing Body to Adapter.

50 O-ISIN4-100A-1.1 0.650 Class A OM-201-1059 Housing Body to Adapter B14.010.005 1-RPV-CRD-46W60 OM-2201-1085 NDE-35 PT SS-CS 5.000 CRDM #46 Base to Motor Tube.

50 O-ISIN4-100A-1.1 0.500 Class A Base to Motor Tube B14.010.008 1-RPV-CRD-46 OM-2201-1085 NDE-35 PT SS-CS 4.300 CRDM #46 MotorTube to Extension.

50 O-ISIN4-100A-1.1 0.400 Class A Motor Tube to Extension B14.010.011 1-RPV-CRD-46W61 OM-2201-1085 NDE-35 PT SS 4.190 CRDM #46 Extension to 50 O-ISIN4-100A-1.1 0.380 Cap.

Class A Extension to Cap Total B14.010 Items: 4 Total B14 Items: 4

EOC 25

{ C (

DUKE ENERGY CORPORATION CATEGORY C-B, Pressure Retaining Nozzle INSERVICE INSPECTION PLAN MANAGEMENT Welds In Vessels Inservice Inspection Database Management System Plan Report Nozzles Without Reinforcing Plate in Vessels > Oconee 1 Page 26 112 In. Nor. Thickness Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NNUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Nozzle-to-Shell (Nozzle to Head or Nozzle to Nozzle) Weld ****

C02.021.001 1-SGA-WG23-1 ISI-OCN1-003 NDE-640 UT CS 29.000 40338 Steam Generator 1A Outlet Nozzle Pc. 14 to Shell Circumferential 03 OM-201-1873 NDE-820 6.750 Pc. 03. W-X Quadrant.

Class B OM-201-0034 Nozzle to Shell C02.021.001A 1-SGA-WG23-1 ISI OCN1-003 NDE-25 MT CS 29.000 Steam Generator 1A Outlet Nozzle Pc. 14 to Shell Circumferential 03 OM-201-1873 6.750 Pc. 03. W-X Quadrant.

Class B OM-201-0034 Nozzle to Shell Total C02.021 Items: 2

        • Nozzle Inside Radius Section
  • C02.022.001 1-SGA-WG23-1 ISI OCN1-003 TBD VT-1 CS 29.000 40338 Steam Generator 1A Outlet Nozzle Pc. 14 to Shell 03 OM-201-1873 6.750 Pc. 03 (Inside Radius Section). W-X Quadrant.

Class B Nozzle to Enhanced VT-1 inspection will be performed Inlieu Shell of UT inspection.

Total C02.022 Items: 1 Total C02 Items: 3

EOC 25

( ~~~~C(

DUKE ENERGY CORPORATION CATEGORY C-C. Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Pining, Pumps, And Valves Inservice Inspection Database Management System Plan Report PpIng Oconee 1 Page 27

  • - Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Welded Attachments ****

C03.020.011 1-03-0-479A-H1B 1-03-05/sht.2 NDE-25 MT NA 0.000 Calculation No. OSC-1297-06. Inspect with Rigid Support 03 O-ISIN4-121B-1.3 0.280 F01.020.011.

Class B C03.020.041 1-14B-0-479A-H3 1-14-12 NDE-25 MT NA 0.000 Calculation No. OSC-1306-06, page 6(3)-42.

Rigid Restraint 14B O-ISIN4-124B-1.2 0.750 Support has 2 different weld attachments (3/4' plate Class B and 3' pipe stanchion). Inspect with F01.021.044.

C03.020.091 1-53B-5-0-435-R8 1-53-02/sht.2 NDE-35 PT NA 0.000 Calculation No. OSC-408. Inspect with F01.021.095.

Rigid Restraint 53B O-ISIN4-102A-1.2 1.000 Class B O-1AB-15302-02 C03.020.092 1-53B-2-0-435B-H38 1-53-01/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-407, page 104. Inspect with Rigid Restraint 53B O-ISIN4-102A-1.1 0.750 F01.021.093.

Class B 0-1AB-15301-01 C03.020.095 1-53B-5-0-436D-H23 1-53-02/sht.1 NDE-35 PT NA 0.000 Calculation No. OSC-408. Inspect with F01.022.1 05.

Spring Hgr 53B O-ISIN4-102A-1.2 0.237 Class B O-1AB- 15302-01 Total C03.020 Items: 5 Total C03 Items: 5

EOC 25 C (.

DUKE ENERGY CORPORATION CATEGORY C-D, Pressure Retaining Bolting INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Oconee 1 Page 28 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NIUMBERS PROC INSP REQ MATISCH DIATHK CAL BLOCKS COMMENTS

        • Bolts and Studs ****

C04.030.001 1-HPI-PUMP-A OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump A Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A, 1B, C) is required to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

C04.030.002 1-HPI-PUMP-B OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump B Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A, B,1C) is required to be examined. Due to inaccessibility disassembly is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

C04.030.003 1-HPI-PUMP-C OM-201-1704 PDI-UT-5 UT NA 2.500 40422 HPI Pump IC Bolting on Pump Casing. 20 Studs, 51A O-ISIN4-101A-1.3 0.000 Length = 12.000. The bolting on one of the HPI Class B Pumps(1A, 1B, 1C) is required to be examined. Due to Inaccessibility disassembly Is required, so therefore they will be scheduled for each outage.

Examine upon disassembly for maintenance or disassembly will be required to complete the examination.

Total C04.030 Items: 3 Total C04 Items: 3

EOC 25

(, C DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PIina Welds >= 3/8 in. Nominal Wall Thickness Oconee 1 Page 29 for ping > NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER IDNUMBER SYS ISO/DWG NU IMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ***

C05.011.006 1-53A-02-65L 1 53A-02(1) NDE-600 UT SS 10.000 40399 Procedure PDI-UT-2 may be used.

Circumferential 53A O-ISIN4-102A-1.2 1.125 Class B Valve 1LP-47 to Pipe C05.011.006A 1-53A-02-65L 1-53A-02(1) NDE-35 PT SS 10.000 Circumferential 53A O-ISIN4-102A-1.2 1.125 Class B Valve 1LP-47 to Pipe Total C05.011 Items: 2

EOC 25 C C C DUKE ENERGY CORPORATION CATEGORY C-F-i. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PIDlna Welds > 1/5 In. Nom Wall for Pipingi >= Oconeel1 Page 30 WNS2and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld
  • C05.021.004 1-51 A-04-1lC 1-51A-04 NDE-600 UT SS 4.000 TBD Procedure PDl-UT-2 may be used.

Circumferential 51A 0-1SIN4-101A-1.4 0.674 Class B Pipe to Valve 1HP-194 C05.021.004A 1-51A.04-lC 1-51A-04 NDE-35 PT SS 4.000 Circumferential 51A 0-IS1N4-101A-1.4 0.674 Class B Pipe to Valve 1HP-1 94 C05.021.010 1-51A-i123-1 1-51A.123 NDE-600 UT SS 4.000 40406 Procedure PDl-UT-2 may be used.

Circumferential 51 A 0-IS1N4.1 01 A-i.4 0.531 Class B Elbow to Pipe C05.021.010A 1-51A-123-1 1-51A-123 NDE-35 PT S3 4.000 Circumferential 51A 0-1SIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.015 1-51A-124-4 1-51A-124 NDE-600 UT SS 4.000 40406 Procedure PDl.UT-2 may be used.

Circumferential 51A 0-1S1N4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.015A 1-51A-124-4 1-51A-124 NDE-35 PT SS 4.000 Circumferential 51A 0-1SIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.021 1HP-184-5 1HP-184 NDE-600 UT SS 4.000 40406 Procedure PDl-UT-2 may be used.

Circumferential 51A 0-iS1N4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.021A IHP-184-5 IHP-184 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe

EOC 25 c C (

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or Hlah Alloy Piping Inservice Inspection Database Management System Plan Report PiPInn Welds > 1/5 In. Nom Wall for Piping >= Oconee 1 Page 31 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS C05.021.027 1HP-191-4 1HP-191 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.027A 1HP-191-4 1HP-191 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.033 1HP-200-17 1HP-200 NDE-600 UT SS 4.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.674 Class B Pipe to Pipe C05.021.033A 1HP-200-17 1HP-200 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.1 0.674 Class B Pipe to Pipe C05.021.042 1HP-282-87AB I HP-282 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Pipe to Tee C05.021.042A 1HP-282-87AB 1HP-282 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Pipe to Tee C05.021.048 1HP-387-118A 1HP-387 NDE-600 UT SS 4.000 40406 Procedure PD1.UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Valve 1HP-118 to Elbow C05.021.048A 1HP-387-118A 1HP-387 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Valve 1HP-l18 to Elbow C05.021.054 1-51A-02-20B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A 0-ISIN4.101A-1.4 0.531 Class B Valve 1HP-135 to Pipe

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report inPiDinq Welds > 1/5 in. Nom Wall for Pipina >= Oconee 1 Page 32 ENPS2and<=NPS4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAJTHK CAL BLOCKS COMMENTS C05.021.054A 1-51A-02-20B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A OISIN4-101A- 1.4 0.531 Class B Valve 1HP-135 to Pipe C05.021.058 1-51A-03-70B 1.51A.03(1) NDE-600 UT SS 4.000 40406 Procedure PDIlUT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.058A 1-51A-03-70B 1-51 A-03(1) NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Elbow C05.021.064 1HP-193-17 1HP-193 NDE-600 UT SS 2.500 40378 Procedure PDI.UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.375 Class B Tee to Pipe C05.021.064A 1HP-193-17 1HP.193 NDE-35 PT SS 2.500 Circumferential 51A OISIN4-101A-1.4 0.375 Class B Tee to Pipe C05.021.071 1-51A.137-25 1-51A-137 NDE-600 UT SS 2.500 40378 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Elbow to Pipe C05.021.071A 1-51A-137-25 1.51A-137 NDE-35 PT SS 2.500 Circumferential 51A O-ISIN4-101A-1.1 0.375 Class B Elbow to Pipe C05.021.080 1-51A-01-84A 1-51A-01(3) NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Elbow C05.021.080A 1-51A-01-84A 1-51A-01(3) NDE-35 PT SS 4.000 Circumferential 51A 0-1S1N4-101A-1.3 0.531 Class B Elbow to Elbow

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY C-F-1, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PIIng Welds > 1/5 In. Nom Wall for Piping >= Oconee 1 Page 33 NPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.086 1-51A-02-16BH 1-51A-02 NDE.600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Flange C05.021.086A 1-51A-02-16BH 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Pipe to Flange C05.021.092 1-51A-02-56B 1-51A-02 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.092A 1-51A-02.56B 1-51A-02 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.3 0.531 Class B Elbow to Pipe C05.021.098 1HP-192-5A 1HP-192 NDE-600 UT SS 4.000 40406 Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.098A 1HP-192-5A 1HP-192 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4-101A-1.4 0.531 Class B Elbow to Pipe C05.021.108 1-51A-01-101A 1-51A-01(4) NDE-600 UT SS 3.000 TBD Procedure PDI-UT-2 may be used.

Circumferential 51A O-ISIN4-101A-1.3 0.438 Class B Elbow to Valve 1HP-110 C05.021.108A 1-51A-01-101A 1-51A-01(4) NDE-35 PT SS 3.000 Circumferential 51A O-ISIN4-101A-1.3 0.438 Class B Elbow to Valve 1HP-110 C05.021.114 1HP-199-2 1HP.199 NDE-600 UT SS 4.000 40406 Procedure PDIUT-2 may be used.

Circumferential 51A -lS1N4-101A-1.1 0.531 Class B Pipe to Elbow

EOC 25 C C C DUKE ENERGY CORPORATION CATEGORY C-F-1. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report OPilna Welds > 1/5 In. Nom Wall for Piping >= Oconee 1 Page 34 ENPS 2 and <= NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NIUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.021.114A 1HP-199-2 1HP-199 NDE-35 PT SS 4.000 Circumferential 51A O-ISIN4.101A-1.1 0.531 Class B Pipe to Elbow C05.021.115 1HP-367-22 1HP-367 NDE-600 UT SS 4.000 50256 Procedure PDI-UT-2 may be used.

Circumferential 51 B O-ISIN4-101A-1.1 0.237 Class B Pipe to Tee C05.021.115A 1HP-367-22 1HP-367 NDE-35 PT SS 4.000 Circumferential 51 B O-ISIN4-101A-1.1 0.237 Class B Pipe to Tee Total C05.021 Items: 38

EOC 25 C C C DUKE ENERGY CORPORATION CATEGORY C-F-1. Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Austenitic SS Or High Alloy Piping Inservice Inspection Database Management System Plan Report

  • PIpe Branch Connections of Branch Ppilng >= Oconee 1 Page 35 MNPS 2 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUIMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.041.006 1LP-004-12J 1LP-004 NDE-35 PT SS 6.000 This weld was previously listed as 1-53B-04-12J Branch 53B O-ISIN4-101A-1.3 0.134 before the so was redrawn.

Class B Pipe to Pipe C05.041.007 1LP.004-12JA 1LP.004 NDE-35 PT SS 6.000 Reinforcing collar weld at weld 12J.

Branch 53B O-ISIN4-101A-1.3 0.134 This weld was previously listed as 1-53B-04-12JA Class B Reinforcing collar to before the Iso was redrawn.

Pipe C05.041.033 1-51A-01-54A 1-51A-01(2) NDE-35 PT SS 3.000 This Is a saddle weld - 3' pipe to 6' pipe.

Branch 51A O-ISIN4-101A-1.3 0.216 Class B Pipe to Pipe Total C05.041 Items: 3

EOC 25 C C C DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Ploina Welds >= 318 In. Nominal Wall Thickness Oconee 1 Page 36 Wor Ppin > NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.051.008 1MS-001 -29E 1MS-001 NDE-600 UT CS 12.000 This weld was previously listed as 1-01A-01-29E Circumferential 01A O-ISIN4-122A-1.2 0.562 before the Iso was redrawn.

Class B Pipe to Procedure PDI-UT-1 may be used. If procedure Elbow PDI-UT-1 Is used, calibration block PDI-UT-1-O shall be used.

C05.051.008A 1MS-001-29E 1MS-001 NDE-25 MT CS 12.000 This weld was previously listed as 1 01 A-01 -29E Circumferential 01A O-ISIN4-122A-1.2 0.562 before the Iso was redrawn.

Class B Pipe to Elbow C05.051.016 1-MS2A-A 1MS-074 NDE-600 UT CS 24.000 Grinnell subassembly MS-2A.

Circumferential 01A 0.875 Procedure PDI-UT-1 may be used. If procedure Class B Elbow to PDI-UT-1 is used, calibration block PDI-UT-1-O shall Pipe be used.

C05.051.016A 1-MS2A-A 1MS-074 NDE-25 MT CS 24.000 Grinnell subassembly MS-2A.

Circumferential 01 A 0.875 Class B Elbow to Pipe C05.051.021 1-03-3-43B 1-03-3(1) NDE-600 UT CS 24.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 03 O-ISIN4-121B-1.3 1.219 PDI-UT-1 is used, calibration block PDI-UT-1-O shall Class B Elbow to be used.

Pipe C05.051.021A 1-03-3-43B 1-03-3(1) NDE-25 MT CS 24.000 Circumferential 03 O-ISIN4-121B-1.3 1.219 Class B Elbow to Pipe C05.051.027 1-FWD65-A 1.03.3(1) NDE-600 UT CS 20.000 Grinnell subassembly FWD-65.

Circumferential 03 1.031 Procedure PDI-UT-1 may be used. If procedure Class B Pipe to PDI-UT-1 Is used, calibration block PDI-UT-1-O shall Elbow be used.

C05.051.027A 1-FWD65-A 1-03-3(1) NDE-25 MT CS 20.000 Grinnell subassembly FWD-65.

Circumferential 03 1.031 Class B Pipe to Elbow

EOC 25 CI (7-DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Plina Welds >= 3/8 In. Nominal Wall Thickness Oconee 1 Page 37 for Pipin > NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 1011412003 ITEM NUMBER ID NUMBER SYS ISOIDWG NIJMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C05.051.029 1-FWD87-A 1-03-3(1) NDE-600 UT CS 14.000 Grinnell subassembly FWD-87.

Circumferential 03 0.750 Procedure PDl-UT-1 may be used. If procedure Class B Elbow to PDl-UT-1 Is used, calibration block PDI-UT-1-O shall Pipe be used.

C05.051.029A 1i-FWD87-A 1-03-3(1) NDE-25 MT CS 14.000 Grinnell subassembly FWD-87.

Circumferential 03 0.750 Class B Elbow to Pipe C05.051.034 1-20B-21-16-7 1-20B-21-16 NDE-600 UT CS 48.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 20B O-ISIN4-116A-1.1 0.500 PDI-UT-1 Is used, calibration block PDI-UT-1-O shall Class B Pipe to be used.

Valve 1PRV-6 C05.051.034A 1-20B-21-16-7 1-20B-21-16 NDE-25 MT CS 48.000 Circumferential 20B O-ISIN4-116A-1.1 0.500 Class B Pipe to Valve 1PRV-6 C05.051.043 1LPSW-345-35 lLPSW-345 NDE-600 UT CS 8.000 This

--. weld

.. . _was

-_-_listed

. _previouslv

. , _ , as_ 1.-LPSW-345-35 Circumferential 14B -ISIN4-124B-1.2 0.500 until iso -LPSW-345 was redrawn. This weld was Class B Pipe to listed previously as 1-LPS-345-35 until iso Tee I-LPS-345 was deleted.

Procedure P0I-UT-1 may be used. If procedure PDI-UT-1 Is used, calibration block PDI-UT-1-O shall be used.

C05.051.043A lLPSW-345-35 1LPSW-345 NDE-25 MT CS 8.000 This weld was listed previously as 1-LPSW-345-35 Circumferential 14B O-ISIN4-124B-1.2 0.500 until so 1-LPSW-345 was redrawn. This weld was Class B Pipe to listed previously as 1-LPS-345-35 until iso Tee 1-LPS-345 was deleted.

C05.051.048 i-LPSW-346-19 1-LPSW-346 NDE-600 UT CS 8.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 14B -1SIN4-24B-1.2 0.500 PDI-UT-1 Is used, calibration block PDI-UT-1-O shall Class B Elbow to be used.

Pipe C05.051.048A 1-LPSW-346-19 1-LPSW-346 NDE-25 MT CS 8.000 Circumferential 14B O-ISIN4-124B-1.2 0.500 Class B Elbow to Pipe

EOC 25 C

DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • Pipina Welds >= 3/8 In. Nominal Wall Thickness Oconee 1 Page 38 for pDing > NPS 4 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISOIDWG NI JMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS C05.051.053 1-14-19.47M 1-14-19 NDE-600 UT CS 8.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 14B O-ISIN4-124B B-1.2 0.500 PDt-UT-1 Is used, calibration block PDI-UT-1 -0 shall Class B Pipe to be used.

Valve 1LPSW-16 C05.051.053A 1-14-19-47M 1-14-19 NDE-25 MT CS 8.000 Circumferential 14B O-ISIN4-124B-1.2 0.500 Class B Pipe to Valve 1LPSW-16 C05.051.054 1-14-19-47MA 1-14-19 NDE-600 UT CS 8.000 Procedure PDI-UT-1 may be used. If procedure Circumferential 14B O-ISIN4-124B-1.2 0.500 PDI-UT-1 is used, calibration block PDI-UT-1-O shall Class B Pipe to be used.

Elbow C05.051.054A 1-14-19-47MA 1-14-19 NDE-25 MT CS 8.000 Circumferential 14B OISIN4-124B-1.2 0.500 Class B Pipe to Elbow Total C05.051 Items: 20

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY C-F-2, Pressure Retaining Welds INSERVICE INSPECTION PLAN MANAGEMENT In Carbon Or Low Alloy Steel Piping Inservice Inspection Database Management System Plan Report

  • PiPe Branch Connections of Branch Pllng >= Oconee 1 Page 39 TNPS 2 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUIMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS
        • Circumferential Weld ****

C05.081.001 1-03A-4-3D 1-03A-4(2) NDE-35 PT Cs 2.000 Branch 03A O-ISIN4-121D-1.1 0.218 Class B Pipe to Half Coupling Total C05.081 Items: 6 Total C05 Items: 64

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY D-A, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report pressure Vessels Oconee 1 Page 40 10/14/2003 Inservice InspectIon Plan for Interval 4 Outage 4 ITEM NUMBER IDNUMBER SYS ISO/DWCGNUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS t*** Welded Attachments ****

D01.010.001 1-SF-COOLER-A OM-201-84 OAL-13 VT-1 NA 0.000 Spent Fuel Cooler 1A. Welded Attachment at 56 O-ISIN4-104A-1.1 0.000 Support Legs A and B.

Class C Attachment to Shell D01.010.002 1-RBCC-A OM-2201-85 OAL-13 VT-1 NA 0.000 Reactor Building Component Cooler Spare. Welded 14B O-ISIN4-124B-1.1 0.000 Attachment at Support Legs A and B.

Class C Attachment to Shell Total D01.010 Items: 2

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY D-A, Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piping, Pumps, And Valves Inservice Inspection Database Management System Plan Report Oconee 1 Page 41 Inservice Inspection Plan for Interval 4 Outage 4 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DlAtTHK CAL BLOCKS COMMENTS

        • Welded Attachments ****

DO1.020.006 1-02A-1-0-403A-H12 1-01-06/sht.3 OAL-13 VT-I NA 6.000 Calculation No. OSC-325, page 91. Inspect with Spring Hgr 02A O-ISIN4-122A-1.4 0.500 F01.032.011.

Class C D01.020.032 1-03A-1-0-439B-SR47 1-03A-05/sht.2 QAL-13 VT-1 NA 6.000 Calculation No. OSC-339, page 80. Inspect with Rigid Restraint 03A O-ISIN4-121D-1.1 1.000 FO1.030.025.

Class C DO1.020.033 1-03A-1-0-400A-SR66 1-03A-09/sht.5 OAL-13 VT-1 NA 6.000 Calculation No. OSC-342, page 105. Inspect with Rigid Restraint 03A O-ISIN4-121D-1.1 0.500 F01.031.026.

Class C D01.020.081 1-56-438C-SR14 4-56-02/sht.1 OAL-13 VT-i NA 8.000 Calculaton No. OSC-421, page 93. Inspsect with Rigid Support 56 O-ISIN4-104A-1.1 0.750 F01.030.134.

Class C Total DO1.020 Items: 4 Total DOI Items: 6

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Class 1 Piping Supports Oconee 1 Page 42 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 N

ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS

        • Category A, One-Directional ****

F01.010.009 1-59-0-478A-H33 1-59-03/sht.2 OAL-14 VT-3 NA 1.500 Calculation No. OSC-1311-06.

Rigid Support 59 O-ISIN4-100A-1.1 0.375 Class A Total F01.010 Items: 1

        • Category B, Multi-Directional F01.011.005 1-53-0-479A-H2 1-53-07/sht.1 OAL-14 VT-3 NA 12.000 Calculation No. OSC-1301-06, page 91. Inspect Rigid Restraint 53 O-ISIN4-102A-1.1 0.750 with B10.020.011.

Class A F01.011.006 1-53A-0-481A.H36C 1-51-15/sht.3 OAL-14 VT-3 NA 1.500 Calculation No. OSC-1304-06, page 63.

Rigid Restraint 53A O-ISIN4-100A-1.2 0.000 Class A Total F01.011 Items: 2

EOC 25 Q. C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report ECass 2 Piping Supports Oconee 1 Page 43

  • Inservice Inspection Plan for Interval 4 Outage 4 10/1442003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIAITHK CAL BLOCKS COMMENTS
        • Category A, One-Directional F01.020.011 1-03-0-479A-H1 B 1-03-05/sht.2 OAL-14 VT-3 NA 0.000 Calculation No. OSC-1297-06. Inspect with Rigid Support 03 O-ISIN4-121B-1.3 0.280 C03.020.01 1.

Class B F0-.020.041 1-51-0-435C-DE064 1-51-02/sht.2 QAL-14 VT-3 NA 6.000 Calculatign No. OSC-1535, page 136.

Rigid Support 51 O-ISIN4-101A-1.3 0.000 Class B 0-1AB-15102-02 F01.020.050 1-51-0-436D-SR9 1-51-01/sht.1 OAL-14 VT-3 NA 4.000 Calculation No. OSC-400, page 50.

Rigid Support 51 O-ISIN4-101A-1.1 0.750 Class B 0-lAB-15101-01 F01.020.063 1-51A-1-0-444-H2 1-51-07/sht.4 QAL-14 VT-3 NA 4.000 Calculation No. OSC-1 539, page 73. High Pressure Rigid Support 51A O-ISIN4-101A-1.4 0.000 Injection.

Class B 0-lAB-15107-04 F01.020.065 1-51A-6-0-435B-SR58 1-51-02/sht.2 QAL-14 VT-3 NA 6.000 Calculation No. OSC-1535, page 136. High Rigid Support 51A O-ISIN4-101A-1.3 0.000 Pressure Injection.

Class B O-1AB-15102-02 F01.020.093 1-53B-435B-DE065 1-53-01/sht.1 OAL-14 VT-3 NA 10.000 Calculation No. OSC-407.

Rigid Support 53B O-ISIN4-102A-1.1 0.000 Class B O-lAB-15301-01 F01.020.097 1-53B-5-0-439C-H33 1-53-02/sht.2 QAL-14 VT-3 NA 10.000 Calculation No. OSC-408.

Rigid Support 53B O-ISIN4-102A-1.2 0.000 Class B 0-lAB-15302-02 F01.020.100 1-53B-5-0-435B-H67 1-53-02/sht.2 QAL-14 VT-3 NA 6.000 Calculation No. OSC-408.

Rigid Support 53B O-ISIN4-102A-1.2 0.000 Class B 0-lAB-15302-02 Total F01.020 Items: 8

        • Category B, Multi-Directional

EOC 25 C C (C DUKE ENERGY CORPORATION CATEGORY F-A. Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Class 2 Plping SuPorts Oconee 1 Page 44

  • Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.021.034 1-14-0-479A-H19D 1-14-17/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-1306-06, page 6(5)-43.

Rigid Restraint 14 O-ISIN4-124B-1.2 1.000 Class B F01.021.043 1-14B-0-2479A-H2 1-14-16/sht.1 GAL-14 VT-3 NA 6.000 Calculation No. OSC-1 306-06, page 6(2)-43.

Rigid Restraint 14B O-ISIN4-124B-1.2 0.750 Class B F01.021.044 1-14B-0-479A-H3 1-14-12 OAL-14 VT-3 NA 8.000 Calculation No. OSC-1306-06, page 6(3)-42.

Rigid Restraint 14B O-ISIN4-124B-1.2 0.750 Support has 2 different weld attachments (3/4' plate Class B and 3' pipe stanchion). Inspect with C03.020.041.

F01.021.065 1-51A-0-478A-H13C 1-55-03/sht.2 OAL-14 VT-3 NA 2.500 Calculation No. OSC-1660-11, page 66.

Rigid Restraint 51A O-ISIN4-101A-1.1 0.000 Class B F01.021.081 1-53A-0-479A-DBR-HOO01 1-53-07/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-1301-06, page 93.

Rigid Restraint 53A O-ISIN4-102A-1.1 0.000 Class B F01.021.092 1-53B-0-439C-DE053 1-53-04/sht.1 OAL-14 VT-3 NA 12.000 Calculation No. OSC-404, page 39.

Rigid Restraint 53B O-ISIN4-102A-1.1 0.000 Class B F01.021.093 1-53B-2-0-435B-H38 1-53-01/sht.1 OAL-14 VT-3 NA 14.000 Calculation No. OSC-407, page 104. Inspect with Rigid Restraint 53B O-ISIN4-102A-1.1 0.750 C03.020.092.

Class B O-1AB-15301-01 F01.021.095 1-53B-5-0-435-R8 1-53-02/sht.2 QAL-14 VT-3 NA 8.000 Calculation No. OSC-408. Inspect with Rigid Restraint 53B O-ISIN4-102A-1.2 1.000 C03.020.091.

Class B O-1AB-15302-02 Total F01.021 Items: 8

        • Category C, Thermal Movement

EOC 25 C C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report CIass 2 Piping Supports Oconee 1 Page 45

  • Inservice Inspection Plan for Interval 4 Outage 4 1011412003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.022.105 1-53B-5-0-436D-H23 1-53-02/sht.1 QAL-14 VT-3 NA 10.000 Calculation No. OSC-408. Inspect with Spring Hgr 53B O-ISIN4-102A-1.2 0.237 C03.020.095.

Class B 0-1AB-15302-01 F01.022.107 1-53B-3-0-444-R3 1-53-01/sht.2 QAL-14 Vr-3 NA 12.000 Calculation No. OSC-407, page 105.1.

Constant Support 53B O-ISIN4-102A-1.1 0.375 Class B O1AB-15301-02 F01.022.111 1-54A-0-435B-DE015 1-54-01/sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-1628, page 60. Inspect with Mech Snubber 54A O-ISIN4-103A-1.1 0.000 F01.050.056.

Class B Total F01.022 Items: 3

EOC 25 C C (

DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Class 3 Piping Supports Oconee 1 Page 46 Inservice Inspection Plan for Interval 4 Outage 4 10/1412003 ITEM NUMBER IDNUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATtSCH DIA/THK CAL BLOCKS COMMENTS
        • Category A, One-Directional ****

F01.030.034 1-03A-1-0-400B-H131 1-03A-12/sht.1 OAL-14 VT-3 NA 6.000 Calculation No. OSC-1215, page 21.

Rigid Support 03A O-ISIN4-121D-1.1 0.000 Class C F01.030.066 1-07A-6-0-400B-H53 1-07A-01/sht.1 OAL-14 VT-3 NA 20.000 Calculation No. OSC-361, page 85.1 Rigid Support 07A O-ISIN4-121A-1.8 0.000 Class C F01.030.093 1-14B-437A-DE036 1-14-04/sht.2 QAL-14 VT-3 NA 16.000 Calculation No. OSC-396, page 77.

Rigid Support 14B O-ISIN4-124B-1.1 0.187 Class C F01.030.094 1-14B-436D-DE064 4-14-03/sht.4 OAL-14 VT-3 NA 8.000 Calculation No. OSC-394, page 79.

Rigid Support 14B O-ISIN4-121D-1.2 0.000 Class C F01.030.095 1-14B-400B-DE086 1-14A-01/sht.1 OAL-14 VT-3 NA 24.000 Calculation No. OS-395, page 40.

Rigid Support 14B O-ISIN4-124A-1.1 0.000 Class C F01.030.134 1-56-438C-SR14 4-56-02/sht.1 QAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 93. Inspect with Rigid Support 56 O-ISIN4-104A-1.1 0.750 D01.020.081.

Class C Total F01.030 Items: 6

        • Category B, Multi-Directional F01.031.025 1-03A-1-0-439B-SR47 1-03A-05/sht.2 OAL-14 VT-3 NA 6.000 Calculation No. OSC-339, page 80.

Rigid Restraint 03A O-ISIN4-121D-1.1 1.000 Class C F01.031.026 1-03A-1-0-400A-SR66 1-03A-09/sht.5 OAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 105.

Rigid Restraint 03A -1S1N4-121D-1.1 0.500 Class C

EOC 25

( C C DUKE ENERGY CORPORATION CATEGORY F-A, Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System IPlan Report C!ass 3 Pipin Supports Oconee 1 Page 47 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS F01.031.102 1-56-443-H5129 4-56-021sht.9 OAL-14 VT-3 NA 8.000 Calculation No. OSC-421, page 101.

Rigid Restraint 56 O-ISIN4-104A-1.1 0.000 Class C Total F01.031 Items: 3

      • Category C, Thermal Movement F01.032.011 1-02A-1-0-403A-H12 1-01-06/sht.3 OAL-14 VT-3 NA 6.000 Calculation No. OSC-325, page 91. Inspect with Spring Hgr 02A O-ISIN4-122A-1.4 0.500 D01.020.006.

Class C F01.032.023 1-03A-1-0-400B-SR54 1-03A-09/sht.3 QAL-14 VT-3 NA 6.000 Calculation No. OSC-342, page 103. Inspect with Hyd Snubber 03A O-ISIN4-121D-1.1 0.203 F01.050.100.

Class C F01.032.051 1-07A-6-0-402A-H8 1-07A-021sht.1 OAL-14 VT-3 NA 8.000 Calculation No. OSC-362, page 55.

Spring Hgr 07A O-ISIN4-121A-1.8 0.000 Class C Total F01.032 Items: 3

EOC 25

( C (

DUKE ENERGY CORPORATION CATEGORY F-A. Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Supports Other Than Piping Supports Oconee 1 Page 48

. Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMEBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Class 1, 2, and 3 F01.040.014 1-LPSW-PU-B OM 208-0027 OAL-14 VT-3 NA 0.000 Low Pressure Service Water Pump 1B, Support Pad 14B O-ISIN4-124A-1.1 0.000 & Legs.

Class C F01.040.016 1-MCD-C OM-202-5 OAL-14 VT-3 NA 0.000 Main Condenser C Support Legs.

13 O-ISIN4-133A-1.2 0.000 Class C OM-202-25 F01.040.017 1-RBCC-A OM 201-85 QAL-14 VT-3 NA 0.000 Reactor Building Component Cooler 1A Support A &

14B O-ISIN4-124B-1.1 0.000 B.

Class C F01.040.025 1-BWS-TANK OM 201-684 QAL-14 VT-3 NA 0.000 Borated Water Storage Tank.

53B O-ISIN4-102A-1.1 0.000 Class B F01.040.026 1-PEN-ROOM.FTR-A OM 272-10 QAL-14 VT-3 NA 0.000 Penetration Room Filter Train A Support.

20B O-ISIN4-116B-1.1 0.000 Class C OM 201-0571 F01.040.027 1-PEN-ROOM-FAN-A 0-485C OAL-14 VT-3 NA 0.000 Penetration Room Fan 1A Support.

20B O-ISIN4- 116B-1.1 0.000 Class C F01.040.035 1-50-0-66A-RCPM-S9 0-66A OAL-14 VT-3 NA 5.000 Calculation No. OSC-0971-01-0009, Reactor Hyd Snubber 50 O-ISIN4-100A-1.1 0.000 Coolant Pump 1B1 Motor Snubbers. Reference PIP Class A 0-66B 0-096-1575. Inspect with Item No. F01.050.114.

Total F01.040 Items: 7 Total F01 Items: 41

EOC 25 c C (C DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Reactor Coolant Pump Flywheels Oconee 1 Page 49 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWC 'NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS GO1.001.001 1-RCP-1A1 OM-201 D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump 1Al Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the ISI Plan, General Requirements.

G01.001.001A 1-RCP-1A1 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump Al Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.002 1-RCP-1A2 OM-201D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump 1A2 Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.002A 1-RCP-1A2 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump A2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.003 1-RCP-1Bi OM-201 D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump 1Bi Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the ISI Plan, General Requirements.

G01.001.003A 1-RCP-1B1 OM-201D-38 NDE-25 MT CS 72.000 Reactor Coolant Pump 1Bi Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the Interval measured from the previous such Inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

EOC 25 c C (

DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Reactor Coolant PumD Flywheels Oconee 1 Page 50 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS G01.001.004 1-RCP-1B2 OM-201D-38 NDE-900 UT CS 72.000 Reactor Coolant Pump 1B2 Flywheel. The complete Circumferential 50 9.500 volume of the flywheel shall be examined by UT at Class A approximately 3 year intervals. Reference Section 7 of the ISI Plan, General Requirements.

GO1.001.004A 1-RCP-1B2 OM-201D-38 NDE-25 MT CS 72.000 ReactorCoolant Pump 1B2 Flywheel. When Circumferential 50 9.500 maintenance or repair activities require removal of Class A the flywheel, a surface examination of exposed surfaces and a complete volumetric examination shall be performed if the interval measured from the previous such Inspection is greater than 6 2/3 years.

Reference Section 7 of the ISI Plan, General Requirements.

Total GO1.001 Items: 8 Total G01 Items: 8

EOC 25 c C (

DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • HPI Nozzle Safe End Examinations Oconee 1 Page 51 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G02.001.005A 1-PDA1-46 ISI OCN1 -011 NDE-690 UT CS 3.500 40410 lAl Make-Up Nozzle Pc. 46. Perform UT on the 51A OM-201-597 2.500 40350 nozzle inside radius (knuckle area). This schedule Class A cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.005B 1-PDA2-46 [SI OCN1-012 NDE-690 UT CS 3.500 40410 1A2 Make-Up Nozzle Pc. 46. Perform UT on the 51A OM-201-597 2.500 40350 nozzle inside radius (knuckle area). This schedule Class A cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.005C 1-PDB1-46 ISI OCN1-013 NDE-690 UT CS 3.500 40410 1B1 HPI Nozzle Pc. 46. Perform UT on the nozzle 51A OM-201-597 2.500 40350 inside radius (knuckle area). This schedule cannot Class A be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.005D 1-PDB2-46 ISI OCN1-014 NDE-690 UT CS 3.500 40410 1B2 HPI Nozzle Pc. 46. Perform UT on the nozzle 51A OM-201-597 2.500 40350 inside radius (knuckle area). This schedule cannot Class A be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.006A 1-PDA1-11 ISI OCN1-01 1 See Corn UT SS-Inconel 3.500 Component 1Al Make-Up Nozzle Pc. 46 to Safe End Pc. 47.

Circumferential 51A OM-201-597 0.750 40416 Perform UT on the nozzle to safe end weld. This Class A Nozzle to schedule cannot be changed. Reference Section 7 Safe End of the SI Plan, General Requirements.

Procedure PDI-UT-10 G02.001.006B 1-PDA2-11 ISI OCN1-012 See Corn UT SS-Inconel 3.500 Component 1A2 Make-Up Nozzle Pc. 46 to Safe End Pc. 47.

Circumferential 51A OM-201-597 0.750 40416 Perform UT on the nozzle to safe end weld. This Class A Nozzle to schedule cannot be changed. Reference Section 7 Safe End of the ISI Plan, General Requirements.

Procedure PDI-UT-10 G02.001.006C 1-PDB1-11 ISI OCN1-013 SeeCom UT SS-Inconel 3.500 Component IB1 HPI Nozzle Pc. 46 to Safe End Pc. 47. Perfom I1 Circumferential 51A OM-201-597 0.750 40416 UT on the nozzle to safe end weld. This schedule Class A Nozzle to cannot be changed. Reference Section 7 of the ISI Safe End Plan, General Requirements.

Procedure PDI-UT-10

EOC 25 c C (C DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • HPI Nozzle Safe End Examinations Oconee 1 Page 52
  • Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA1HK CAL BLOCKS COMMENTS G02.001.0060 1-PDB2-11 ISI OCN1-014 See Com UT SS-Inconel 3.500 Component 1B2 HPI Nozzle Pc. 46 to Safe End Pc. 47. Perform Circumferential 51A OM-201-597 0.750 40416 UT on the nozzle to safe end weld. This schedule Class A Nozzle to cannot be changed. Reference Section 7 of the ISI Safe End Plan, General Requirements.

Procedure PDI-UT-10 G02.001.007A 1-PDA1-47 ISI OCN1-01 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining Make-Up Nozzle Al.

51A OM-201-597 0.750 Perform UT on the Safe End base metal (between Class A the nozzle to safe end weld and the safe end to pipe weld). This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001 .007B13 -PDA2-47 ISI OCN1-012 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining Make-Up Nozzle 1A2.

51A OM-201-597 0.750 Perform UT on the Safe End base metal (between Class A the nozzle to safe end weld and the safe end to pipe weld). This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.007C 1-PDBI-47 ISI OCNI-013 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining HPI Nozzle IB1. Perform 51A OM-201-597 0.750 UT on the Safe End base metal (between the nozzle Class A to safe end weld and the safe end to pipe weld).

This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.007D 1-PDB2-47 ISI OCN1-014 NDE-960 UT SS 3.500 Component Safe End Pc. 47 adjoining HPI Nozzle 1B2. Perform 51A OM-201-597 0.750 UT on the Safe End base metal (between the nozzle Class A to safe end weld and the safe end to pipe weld).

This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.008A 1RC-1 99-154 1RC-199 NDE-960 UT SS 2.500 Component Safe End Pc. 47 adjoining Make-Up Nozzle Al.

Circumferential 51A O-ISIN4-100A-1.1 0.375 Perform UT on weld 1RC-1 99-154 and adjoining Class A Safe End to base metal out to weld 1RC-1 99-149 (at valve Pipe 1HP-127). This schedule cannot be changed.

Revision 2 changed weld number from 1-RC-199-94.

Inspect with G04.001.029.

The inspection performed for the G02 item number meets the requirements for the G04 Inspection.

Reference Section 7 of the ISI Plan, General Requirements.

EOC 25 C C C DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • HPI Nozzle Safe End Examinations Oconee 1 Page 53 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 M

ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G02.001.008B 1RC-200-161 1RC-200 NDE-960 UT SS 2.500 Component Safe End Pc. 47 adjoining Circumferential 51A O-ISIN 100A-1.1 0.375 Make-Up Nozzle 1A2. Perform UT on weld Class A Safe End to 1RC-200-161 and adjoining base metal out to weld Pipe 1RC-200-160 (at valve 1HP-1 26). This schedule cannot be changed. Revision 2 changed weld number from 1RC-200-7.

Inspect with G04.001.031.

The Inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.008C 1RC-201-101 1RC-201 NDE-960 UT Ss 2.500 Component Safe End Pc. 47 adioinina 51A O-IS1N4-100A-1.1 0.375 HPI Nozzle 1B1. Perform UT on weld 1RC-201-101:

Class A Safe End to and adjoining base metal out to weld 1RC-201-97 Pipe (at valve 1HP-1 53). This schedule cannot be changed. Revision 2 changed weld number from 1-51A-11-89.

Inspect with G04.001.003.

The inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.008D 1RC-201-105 1RC-201 NDE-960 UT SS 2.500 Component Safe End Pc. 47 adjoining HPI Nozzle 1B2.

Circumferential 51A O-ISIN4-100A-1.1 0.375 Perform UT on weld 1RC-201-105 and adjoining Class A Safe End to base metal out to weld 1RC-201-92 (at valve Pipe 1HP-152). This schedule cannot be changed.

Revision 2 changed weld number from 1-51A-1 1-87. Inspect with G04.001.001.

The inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.010A 1RC-199-149 1RC-199 NDE-960 UT SS 2.500 Comoonent Make-UDNozzlelA. PerformUTonweld Circumferential 51A 0-ISIN4-100A-1.1 0.375 1RC-199-149 (at valve 1HP-127). This schedule Class A Pipe to cannot be changed. Inspect with G04.001.028. The Valve inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

C C C EOC 25 DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice inspection Database haanagemen system Plan Report HPI Nozzle Safe End Examinations Oconee 1 Page 54

  • Inservice Inspection Plan for Interval 4 Outage 4 10114/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS G02.001.010B 1RC-200-160 1RC-200 NDE-960 UT SS 2.500 Component Make-Up Nozzle A2. Perform UT on weld Circumferential 51A O-ISIN 100A-1.1 0.375 1RC-200-160 (at valve 1HP-1 26). This schedule Class A Pipe to cannot be changed. Revision 2 changed weld Valve number from 1RC-200-8 to 1RC-200-160. Inspect with G04.001.030. The inspection performed for the G02 item number meets the requirements for the G04 inspection. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.010C 1RC-201-97 1RC-201 NDE-960 UT SS 2.500 Component HPI Nozzle B1. Perform UT on weld 1RC-201-97 Circumferential 51A O-ISIN4-100A-1.1 0.375 (at valve 1HP-153). This schedule cannot be Class A Pipe to changed. Revision 2 changed weld number from Valve 1-51A-11-90. Inspect with G04.001.004.

The inspection performed for the G02 item number-meets the requirements for the G04 Inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.010D 1RC-201-92 1RC-201 NDE-960 UT SS 2.500 Component HPI Nozzle 1B2. Perform UT on weld 1RC-201-92 Circumferential 51A O-ISIN4-10OA-1.1 0.375 (at valve 1HP-152). This schedule cannot be Class A Pipe to changed. Revision 3 changed weld number from Valve 1-51A-11-88. Inspect with G04.001.002.

The inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.011A lAl-THERMSLEEVE ISI OCN1-011 NDE-105 RT SS 3.500 Make-Up Nozzle A. Perform RTbetween the Circumferential 51A O-ISIN4-10OA-1.1 0.750 nozzle to safe end and safe end to pipe weld in the Class A thermal sleeve expansion area as described in procedure NDE-105. This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

G02.001.011lB 1A2-THERMSLEEVE ISI OCN1-012 NDE-105 RT SS 3.500 Make-UD Nozzle 1A2. Perform RT between the Circumferential 51A 0-ISIN4-100A-1.1 0.750 nozzle to safe end and safe end to pipe weld in the Class A thermal sleeve expansion area as described in procedure NDE-105. This schedule cannot be changed. Reference Section 7 of the ISI Plan, General Requirements.

C EOC 25 DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • HPI Nozzle Safe End Examinations Oconee 1 Page 55 Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWCI NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G02.001.011C Bl-THERM SLEEVE ISI OCN1 -013 NDE-105 RT SS 3.500 HPI Nozzle 1B1. Perform RT between the nozzle to Circumferential 51A O-ISIN4-1 OOA-1.1 0.750 safe end and safe end to pipe weld In the thermal Class A sleeve expansion area as described In procedure NDE-105. This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

G02.001.011D 1B2-THERM SLEEVE ISI OCN1-014 NDE-105 RT SS 3.500 HPI Nozzle 1B2. Perform RTbetweenthe nozzleto Circumferential 51A O-ISIN4-100A-1.1 0.750 safe end and safe end to pipe weld In the thermal Class A sleeve expansion area as described In procedure NDE-105. This schedule cannot be changed.

Reference Section 7 of the ISI Plan, General Requirements.

Total G02.001 Items: 24 Total G02 Items: 24

C EOC 25 DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report OPressurizer Surge Line Examinations Oconee 1 Page 56 U Inservice Inspection Plan for Interval 4 Outage 4 10/14/2003 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAJTHK CAL BLOCKS COMMENTS G03.001.001 1 PSL-1 1 ISI OCN1 015 NDE-35 PT SS 1.000 Drain Nozzle to Pipe. Reference Section 7 of the ISI Circumferential 50 160 0.250 Plan, General Requirements.

Class A Stress weld Total G03.001 Items: 1 Total G03 Items: 1

EOC 25 C C, C DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress Piping Examinations Oconee 1 Page 57 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 4 ITEM NUMBER ID NUMBER SYS ISO/DWCINUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS G04.001.001 1RC-201-105 1RC-201 NDE-960 UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-10OA-1.1 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1-51A-11-87. Inspect with G02.001.008D.

Safe-End The Inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.002 1RC-201-92 1RC-201 NDE-960 UT Ss 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Revision 3 changed weld number Class A Pipe to from 1-51A-1 1-88. Inspect with G02.001.010D. The Valve 1HP-1 52 inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.003 1RC-201-101 1RC-201 NDE-960 UT SS 2.500 Inspect 100% of weld & of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1-51A-1 1-89. Inspect with G02.001.008C. The Safe-End inspection performed for the G02 item number meets the requirements for the G04 Inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.004 1RC-201 -97 1RC-201 NDE-960 UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-101A-1.4 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1-51A-1 1-90. Inspect with G02.001.01OC. The Valve 1HP-153 inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.013 1RC-201 -91 1RC-201 See Corn UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A O-ISIN4-101A-1.4 NDE-12 0.375 circumferential scan of the weld and one half Inch of Class A Valve 1HP-489 to base metal on each side of the weld as access Valve 1HP-152 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the SI Plan,

EOC 25 C c (

DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress Piping Examinations Oconee 1 Page 58 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 4 ITEM NUMBER IDNUMBER SYS ISO/DWC !NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS General Requirements.

G04.001.014 1RC-201-96 1RC-201 See Corn UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A O-ISIN4-101A-1.4 NDE-12 0.375 circumferential scan of the weld and one half Inch of Class A Valve 1HP-488 to base metal on each side of the weld as access Valve 1HP-153 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter Inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the ISI Plan, General Requirements.

G04.001.020 1RC-200-166 1RC-200 See Corn UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A NDE-12 0.375 circumferential scan of the weld and one half inch of-Class A Valve 1HP-486 to base metal on each side of the weld as access-Valve 1HP-126 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the ISI Plan, General Requirements.

G04.001.024 1RC-199-150 1RC-199 See Corn UT SS 2.500 Use procedure EPRI-NDEC-UT-X to perform a Circumferential 51A NDE-12 0.375 circumferential scan of the weld and one half inch of Class A Valve 1HP-127 to base metal on each side of the weld as access Valve 1HP-487 permits. Use procedure NDE-12 to perform RT on 100% of the weld and one quarter inch of base metal on each side of the weld. See PIP #

0-99-02-02157 and PIP # 0-01-04673 for examination methods and area of coverage for this item number. Reference Section 7 of the ISI Plan, General Requirements.

G04.001.028 1RC-199-149 IRC-199 NDE-960 UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-1SIN4-100A-1.1 0.375 circumferential). Inspect with G02.001.01 OA. The Class A Pipe to inspection performed for the G02 item number Valve 1HP-127 meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General

C C (

EOC 25 DUKE ENERGY CORPORATION CATEGORY AUG, Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IThermal Stress Piplng Examinations Oconee 1 Page 59 10/14/2003 Inservice Inspection Plan for Interval 4 Outage 4 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Requirements.

G04.001.029 1RC-199-154 1RC-199 NDE-960 UT Ss 2.500 Inspect 100% of weld & 1' of base material (axial &

Circumferential 51A -ISIN4-100A-1.1 0.375 circumferential). Revision 2 changed weld number Class A Safe End Pc. 47 to from 1-RC-199-94. Inspect with G02.001.008A.

Pipe The inspection performed for the G02 item number meets the requirements for the G04 inspection.

Reference Section 7 of the ISI Plan, General Requirements.

G04.001.030 1RC-200-160 1RC-200 See Com UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN4-100A-1.1 0.375 circumferential). Revision 2 changed weld number Class A Pipe to from 1RC-200-8 to 1RC-200-160. Inspect with Valve 1HP-126 G02.001.01OB. The inspection performed for the G02 item number meets the requirements for the G04 Inspection. Reference Section 7 of the ISI Plan, General Requirements.

Procedure EPRI-NDEC-UT-X G04.001.031 1RC-200-161 1RC-200 NDE-960 UT SS 2.500 Inspect 100% of weld & 1 of base material (axial &

Circumferential 51A O-ISIN 100A-1.1 0.375 circumferential). Revision 2 changed weld number Class A Safe End Pc. 47 to from 1RC-200-7. Inspect with G02.001.008B. The Pipe Inspection performed for the G02 meets the requirements for the G04 Inspection. Reference Section 7 of the ISI Plan, General Requirements.

Total G04.001 Items: 12 Total G04 Items: 12

EOC 25 C C C DUKE ENERGY CORPORATION CATEGORY AUG. Augmented Inspections INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Class 1 RTE Mountina Bosses Oconee 1 Page 60 Inservice Inspection Plan for Interval 4 Outage 4 10/1412003 ITEM NUMBER IDNUMBER SYS ISO/DWC'NUMBERS PROC INSP REQ MAT/SCH DIANTHK CAL BLOCKS COMMENTS G10.001.008 1-PIA2-12 ISI-OCN1-008 NDE-35 PT CS-lnconel 8.750 RTE Mounting Pipe. This weld covers the Z-W Branch 50 OM-201-1845 2.250 Quadrant. The diameter of hole that penetrates the Class A Pipe Salvaged to nozzle into the RCP 1A2 Suction Piping = .613'.

Dissimilar Pipe Reference Section 7 of the ISI Plan, General Requirements.

Total G10.001 Items: 1 Total G10 Items: 1