ML033110529

From kanterella
Jump to navigation Jump to search
Transmittal of EP-PS-128, Health Physics Network Communicator: Emergency Plan-Position Specific Procedure
ML033110529
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/31/2003
From:
Susquehanna
To:
Office of Nuclear Security and Incident Response
References
EP-PS-128, Rev 5
Download: ML033110529 (7)


Text

Oct. 31, 2003 Page of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-51488 USHR INFORMATION:

Na CH*R M EMPL#:28401 CA#:0363 Address 2 Phone / i TRANSMITTAL INFORMATION:

TO: r - 10/31/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

128 - 128 - HEALTH PHYSICS NETWORK COMMUNICATOR: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 10/27/2003 ADD MANUAL TABLE OF CONTENTS DATE: 10/30/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-128 .

REPLACE: REV:5 REPLACE: REV:5 REMOVE: PCAF 2003-1459 REV: N/A ADD: PCAF 2003-1459 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

\E qS AC~~~~

Tab 7 EP-PS;-1 28-7 PAR AIRBORNE RELEASES EPENTERED MONITOR CONDmONS:

- PLANT STATUS/PROCEDURES E

- ONSITE RAD CONDmONS ASSESSMENT

- STATUS OF RELEASE

- DOSE PROJECTIONS PA-2\

YES

<SAC F~2MLSSAE EMERGENCY N PLANS.

A VALI XO EOMEDEAUTO IROJECTION INDICATIN E AIMONETND VAIK 2 DOSES OFECTJNSREM TEDE OR I E Do ALRES TO TAKEIN K 2 5 REM THYROID CDE AT AE ACCORDANCE WITH THE D IETANCE OF 2E2 MIS ( STATES EMERGENCY PLANS.T PA-3 \g .~~~~~~A-NO OR UNKNOWN.

RECOMMEND EVACUATING 0-2 MILES AND SHELTERING G ON ITION.

2-0 MILES AND ADVISE CITIZENS ASSEVSMAENT E T TO TAKE K INACCORDANCE WITH THE STATES EMERGENCY PLANS. PA-1 PA-4 NOTE'S:

1 .PA-# CAN BE USED TO REFER TO PROCEDURE STEPS FOR MORE DETAILED INFORMATION ON THE ACTION TO BE TAKEN.

2. DOSE PROJECTIONS DO NOT INCLUDE DOSE ALREADY RECEIVED.
3. TEDE - WHOLE BODY (TEDE) IS THE SUM OF EFFECTIVE DOSE EQUIVALENT RESULTING FROM EXPOSURE TO EXTERNAL SOURCES. THE COMMITTED EFFECTIVE DOSE EQUIVALENT (CEDE) FROM ALL SIGNIFICANT INHALATION PATHWAYS AND THE DOSE DUE TO GROUND DEPOSITION.
4. CDE - COMMITTED DOSE EUIVALENT TO THE CHILD THYROID.

EP-AD-000-1 26, Revision 11, Page 1 of 6

Tab 7 EP-PS-1 28-7 PAR LIQUID RELEASES E NTRY:

INDICATIONS OF A POTENTIAL LIQUID RELEASE

-UNISOLABLE RADWASTE TANK RELEASE

-LEAK TO COOUNG TOWER BASIN

-LEAK TO SPRAY POND PL-1 ENSURE CHEM/ESD TAKES AND ANALYZES SAMPLES PL-2 t NPLANNED RELEAS NOCON C TO \^NRIBUTABLE TORING EC Values RADIONUCUDE (PCI/ml)

Co-60 3E'4 Yes 4

Sr-91 2E Mo-99 2E6 4 RAD PERSONNEL NOTIFY Te-132 9E 4 DEPIBRP THAT A RELEASE 1-131 1E HAS OCCURRED 1-133 7E 1-134 4E' PL4 bo N

1-135 3E6 7

Cs-134 9E LEASE > O Cs-136 6E' TECH REQUIREMENTS (AT Cs-137 1E6 * \~~~LEASE POINTS 4

Ba-139 2E Ba-140 8E6 4

Ba-141 3E Np-239 2E 4  : ~~~~Yes RAD PERSONNEL NOTIFY .

DANVILLE THAT A RELEASE HAS OCCURRED PL-6 CHEMIFTD EVALUATES RELEASE vs PAG PL-7 NOTES:

1. PL- CAN BE USED TO REFER TO
  • ES RELEASE EXCRAD PEI FSONNEL PROCEDURE STEPS FOR MORE ANY OF THE SINGLE-NUCUDE NOTIFY DEPIBRP DETAILED INFORMATION ON THE
  • EC VALUES OR DOES THE No THAT N0 PAR IS ACTION TO BE TAKEN. :SSUM OF EC FRACTIONS REQ
2. CALLS TO DANVILLE ARE COURTE SY EXCEED 0.85 UIRED INFORMATION CALLS ONLY. AUTDAN VILE, PL-1 0 PROTECTIVE ACTION RECOMMENDATION CALLS MUST BE PL-8 MADE BY DEPIBRP.

Yes Or RAD PERSONNEL NOTIFY DEPIBRP FOR DOWNSTREAM USERS TO DIVERT WATER SUPPLY & ESTIMATED TIME OF ARRIVAL OF RELEASE AT DANVILLE PL-9 EP-AD-000-1 26, Revision 11, Page 2 of 6

Tab 7 EP-PS-1 28-7 PUBLIC PROTECTIVE ACTION RECOMMENDATiON GUIDE AIRBORNE RELEASES 0 PA-1 MONITOR CONDITIONS FOR PAR APPLICATION The following conditions should be continuously evaluated to determine if a PAR should be implemented or changed:

  • Plant status and prognosis for changes in conditions
  • Onsite radiological conditions
  • Status of actual or potential radioactive releases
  • Offsite dose projections or actual offsite radiological conditions
  • Escalation in Emergency Classification (i.e., General)

(Go to PA-2) o PA-2 HAS A GENERAL EMERGENCY BEEN DECLARED?

0 YES - Ifa GENERAL EMERGENCY has been declared, a PAR must be made within 15 minutes of the emergency declaration.-The PAR requirement is found in NUREG-0654. (Go to PA-3)

  • NO- If a GENERAL EMERGENCY has not been declared, continue to monitor plant status, parameter trends, and prognosis for termination or escalation of the event. (Go to PA-1) o PA-3 IS THERE A VALID DOSE:PROJECTION INDICATING DOSES OF> 1 REM TEDE OR 2 5 REM CDE CHILD THYROID AT A DISTANCE OF > 2 MILES?

O YES - If the projected doses at 2 miles are 1 REM TEDE orŽ5 REM CDE child thyroid, then full evacuation (0-10 miles) is recommended. (Go to PA-5)

O NO/UNKNOWN- (Go to PA-4)

O PA-4 RECOMMEND EVACUATION 0-2 MILES; SHELTER 2-10 MILES AND ADVISE CITIZENS TO TAKE KI IN ACCORDANCE WITH THE STATE'S EMERGENCY PLANS.

Limited Evacuation (0-2 miles) and sheltering is appropriate for events that are significant enough to cause a General Emergency classification and dose projections are low, unknown, or below full evacuation guidelines. A recommendation is also'given to the state to advise citizens to take KI in accordance with the state's emergency plans.

O PA EVACUATE 0-10 MILES AND ADVISE CITIZENS TO TAKE KI IN ACCORDANCE WITH THE STATE'S EMERGENCY PLANS.

Full evacuation of members of the general public is recommended at this point based on the emergency classification and dose projections. A recommendation is also given to the state to advise citizens to take KI in accordance with the state's emergency plans.

EP-AD-000-1 26, Revision 11, Page 3 of 6

Tab7 EP-PS-1 28-7 LIQUID O PL-1 ENTRY This section is entered when there are indications of a potential unplanned radioactive liquid release.

Indications of potential unplanned releases include:

  • an unisolable radwaste tank release
  • leak to spray pond (Go to PL-2) o PL-2 CHEMISTRY/ENVIRONMENTAL SAMPLING DIRECTOR (ESD)

TAKES AND ANALYZES SAMPLE (Go to PL-3)

PL-3 IS THERE AN UNPLANNED RELEASE TO THE RIVER?

o YES - An unplanned release to the river has occurred when event-related radioactive materials-are released to the river that are not controlled by the release methodologies described in the ODCM and applicable Chemistry procedures; (Go to PL-4) o NO- If there is no unplanned release to the river, then no notifications are required and monitoring should continue.

O PL-4 RAD PERSONNEL NOTIFY.DEP/BRP THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to BRP will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF.

DO NOT MAKE-ANY PROTECTIVE ACTION RECOMMENDATIONS AT THIS TIME.

(Go to PL-5)

EP-AD-000-126, Revision 11, Page 4 of 6

Tab7 EP-PS-1 28-7 LIQUID (CoNT'D).

PL-5 IS RELEASE 2 TECHNICAL REQUIREMENTS: LIMITS (AT THE RELEASE POINT)?

E YES- Releases are at or greater than Technical Requirements limits when Chemistry determines that the limits are exceeded based on methodologies described in the ODCM and applicable Chemistry procedures.

(Go to PL-6) 0 NO- If the release is < Technical Requirements limits, then no further notifications are required and monitoring should continue.

  • 0PL-6 RAD PERSONNEL NOTIFY DANVILLE THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to Danville will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF.

DO NOT MAKE ANY PROTECTIVE ACTION RECOMMENDATIONS AT THIS TIME.

(Go to PL-7) 0 PL-7 CHEM/FTD EVALUATES RELEASE VERSUS PAGS.

The results of the sample analysis are compared to the PAGs for radionueldes in drinking water. The analysis calculates the expected concentration at Danville, taking into account the dilution afforded by the river.

PL-8 . DOES RELEASE EXCEED PAGs (AT DANVILLE)?

0 YES- If a single isotope exceeds its effluent concentration (EC) value or the sum of EC fractions exceeds 0.85, then a protective action recommendation should be made for downstream water users (e.g.,

Danville) to DIVERT DRINKING WATER supply to a backup supply or terminate user intake until the release has passed.

(Go to PL-9) 0 NO- If the PAGs are not exceeded, monitoring should continue and the State should be notified that no PAR for the liquid release is required.

(Go to PL-10)

EP-AD-000-1 26, Revision 11, Page 5 of 6

Tab7 EP-P8-1 28-7 LIQUID (CoNT'D) 0 PL-9 RAD PERSONNEL NOTIFY DEP/BRP OF PAR Depending on which facility is activated, the PAR notification to DEP/BRP will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF. The PAR FORM shall be used to document the PAR.

DO NOT COMMUNICATE THE PROTECTIVE ACTION RECOMMENDATION TO DANVILLE. THE DEPIBRP IS RESPONSIBLE FOR THIS COMMUNICATION AND ANY COMMUNICATION TO OTHER DRINKING WATER SUPPLIERS OR WATER USERS.

0 PL-10 RAD PERSONNEL NOTIFY DEP/BRP No PAR is required. Depending on which facility is activated, the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF shall notify DEP/BRP that no PAR is required.

EP-AD-000-126, Revision 11, Page 6 of 6