MONTHYEARML0330402182003-10-27027 October 2003 Supplemental Information for Technical Specification Change Regarding TS 3/4.7.1.7, Motor Driven Feedwater Pump System to Correct the Safety Grade Designation of the Motor Driven Feedwater Pump Flow Indication in Surveillance Requirement 4. Project stage: Supplement ML0335606102003-12-18018 December 2003 Tech Spec Page for Amendment 261 Motor Driven Feedwater Pump Flow Indication Project stage: Other ML0331102072003-12-18018 December 2003 License Amendment, Motor Driven Feedwater Pump Flow Indication Project stage: Other 2003-10-27
[Table View] |
|
---|
Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24057A0772024-03-0101 March 2024 Conforming License Amendments - Enclosure 1 ML24057A0782024-03-0101 March 2024 Amendments to Indemnity Agreements - Enclosure 2 ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML22269A3582022-11-15015 November 2022 Issuance of Amendment No. 305 Revising the Emergency Plan ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML20280A8272020-11-0303 November 2020 Issuance of Amendment No. 301 to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program ML20213C7262020-08-24024 August 2020 Issuance of Amendment No. 300 to Revise the Containment Leakage Rate Testing Program ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19100A3062019-06-21021 June 2019 Issuance of Amendment No. 298 to Adopt National Fire Protection Association Standard 805 ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML17270A1122017-10-19019 October 2017 Issuance of Amendment Revising Technical Specification Requirements for Ultrasonic Flow Meter Outage Time (CAC No. MF9080; EPID L-2017-LLA-0167) ML17219A0182017-08-0808 August 2017 License Renewal Commitment No. 42 ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML16342C9462017-01-12012 January 2017 Issuance of Amendment Revising Emergency Action Level Scheme ML16298A3492017-01-11011 January 2017 Issuance of Amendment Revising Technical Specification Requirements for the Radioactive Effluent Controls Program ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML16083A4812016-04-27027 April 2016 Issuance of Amendment Revising Emergency Diesel Generator Minimum Voltage and Frequency Acceptance Criteria ML15302A0752016-03-0808 March 2016 Issuance of Amendment Revising the Completion Date for Milestone 8 of the Cyber Security Plan ML15316A0562015-12-0808 December 2015 Renewal License ML15295A3192015-12-0707 December 2015 License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1 - Record of Decision ML15251A0462015-10-20020 October 2015 Issuance of Amendment Revising Containment Spray Nozzle Surveillance Requirement ML15239B2932015-10-0909 October 2015 Issuance of Amendment Related to Containment Leakage Rate Testing Program L-15-186, Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 572015-06-0505 June 2015 Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 57 ML14205A6192014-08-29029 August 2014 Amendments to Indemnity Agreements (TAC MF0701, MF0702, MF0703, and MF0704) ML14023A7662014-03-31031 March 2014 Issuance of Amendment Related to Steam Generator Inventory Change (TAC No. MF0536)(L-13-040) ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC ML1208604472012-04-18018 April 2012 Issuance of Amendment Modification of the Special Visual Inspection Requirement of TS 5.5.8 Steam Generator Program ML1202502702011-12-27027 December 2011 2011 Davis - Besse Nuclear Power Station Initial Examination Administrative Files ML1125904312011-12-0909 December 2011 Issuance of Amendment Adoption of Technical Specifications Task Force Change Traveler 513, Revision to Technical Specification 3.4.14 L-11-289, License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report2011-09-19019 September 2011 License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report ML1118902982011-08-31031 August 2011 Issuance of Amendment Cyber Security Plan ML1036101482011-01-28028 January 2011 Issuance of Amendment Request to Incorporate the Use of Alternative Methodologies for the Development of the Reactor Coolant System Pressure-Temperature Curves ML1009705492010-04-0909 April 2010 Corrections of Typographical Errors Amendment No. 281 and Safety Evaluation ML1006405062010-03-24024 March 2010 Issuance of Amendment Application to Update the Leak-Before-Break Evaluation for the Reactor Coolant Pump Suction and Discharge Nozzle Dissimilar Metal Welds ML1003506402010-02-0404 February 2010 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License ML0918103972009-07-16016 July 2009 Issuance of Amendments Application for TS Change for Adoption of TSTF-511 ML0829006002008-11-20020 November 2008 Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues ML0824902622008-10-0202 October 2008 Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD ML0814106522008-06-30030 June 2008 Issuance of Amendment 278 Regarding Measurement Uncertainty Recapture Power Uprate ML0723902602007-10-17017 October 2007 License Amendment, Issuance of Amendment Administrative Control of Penetrations During Refueling ML0720404172007-07-31031 July 2007 License Amendment, Issuance of Amendment Steam Generator Tube Integrity TS Amendment Using the Consolidated Line Item Improvement Process ML0719200042007-07-11011 July 2007 Revised Pages of Facility Operating License No. NPF-3 ML0604004722006-08-0909 August 2006 License Amendment, Issuance of Amendment Safety Features Actuation System Instrumentation Setpoints and Surveillance Testing Requirements, MC3084 ML0604005522006-03-0202 March 2006 License Amendment 274 Framatome Mark B-HTP Fuel Design for Cycle 15 ML0604102252006-03-0202 March 2006 Amendment License Application to Revise TS 3/4.8.1.1 A.C.Sources-Operating ML0526403932006-02-0707 February 2006 Licensing Amendment - Issuance of Amendment Administrative Controls 2024-03-01
[Table view] Category:Safety Evaluation
MONTHYEARML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22269A3582022-11-15015 November 2022 Issuance of Amendment No. 305 Revising the Emergency Plan ML22277A6012022-10-14014 October 2022 Issuance of Amendment No. 304 Revising the Design Basis for the Shield Building Containment Structure ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22147A1492022-06-0202 June 2022 Relief Request RP-3 Regarding Fuel Oil Transfer Pump Testing ML22136A1092022-05-24024 May 2022 Proposed Alternative Request RP-2 Regarding the Inservice Testing of Certain Pumps ML22118B0382022-05-0505 May 2022 Proposed Alternative Request RP-4 Regarding the Inservice Testing of High-Pressure Injection Pumps ML22096A3162022-04-12012 April 2022 Proposed Alternative Request RP-1 Regarding Digital Instrumentation for Inservice Testing ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML20280A8272020-11-0303 November 2020 Issuance of Amendment No. 301 to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7262020-08-24024 August 2020 Issuance of Amendment No. 300 to Revise the Containment Leakage Rate Testing Program ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19100A3062019-06-21021 June 2019 Issuance of Amendment No. 298 to Adopt National Fire Protection Association Standard 805 ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17270A1122017-10-19019 October 2017 Issuance of Amendment Revising Technical Specification Requirements for Ultrasonic Flow Meter Outage Time (CAC No. MF9080; EPID L-2017-LLA-0167) ML17256B1902017-10-12012 October 2017 Time-Limited Aging Analysis for the Reactor Vessel Internals Loss of Ductility at 60 Years ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17017A3402017-01-31031 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-051 and EA-12-049 ML16328A1252017-01-23023 January 2017 Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) ML16342C9462017-01-12012 January 2017 Issuance of Amendment Revising Emergency Action Level Scheme ML16298A3492017-01-11011 January 2017 Issuance of Amendment Revising Technical Specification Requirements for the Radioactive Effluent Controls Program ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML16083A4812016-04-27027 April 2016 Issuance of Amendment Revising Emergency Diesel Generator Minimum Voltage and Frequency Acceptance Criteria ML15302A0752016-03-0808 March 2016 Issuance of Amendment Revising the Completion Date for Milestone 8 of the Cyber Security Plan ML15251A0462015-10-20020 October 2015 Issuance of Amendment Revising Containment Spray Nozzle Surveillance Requirement ML15211A1612015-10-16016 October 2015 FENOC-Beaver Valley Power Station, Unit No. 1; Beaver Valley Power Station ISFSI, Davis-Besse Nuclear Power Station ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI Annual Financial Test for a Parent Company Guarantee ML15239B2932015-10-0909 October 2015 Issuance of Amendment Related to Containment Leakage Rate Testing Program ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML14142A2922014-09-12012 September 2014 BVPS, Unit No. 1, BVPS (ISFSI) Davis-Besse Nuclear Power Station ISFSI, Perry Nuclear Power Plant, Unit 1, and Perry Nuclear Power Plant ISFSI - Annual Financial Test for Firstenergy Nuclear Operating Company Parent Company Guarantee (MF374 ML14030A5742014-03-31031 March 2014 Safety Evaluation Concerning Comprehensive Pump Testing Relief Request (TAC No. MF0756) (L-13-067) ML14023A7662014-03-31031 March 2014 Issuance of Amendment Related to Steam Generator Inventory Change (TAC No. MF0536)(L-13-040) ML14030A5922014-02-10010 February 2014 Safety Evaluation for Relief Requests RR-A1 and RR-B1 ML14002A4442014-02-0505 February 2014 Safety Evaluation for Relief Request RP-3 (TAC No. MF0757)(L-13-076) ML14003A2662014-01-27027 January 2014 Davis-besse Nuclear Power Station, Unit 1, Safety Evaluation for Relief Requests RP-1 and RP-1A ML13210A4672013-08-0101 August 2013 Safety Evaluation for Relief Requests RP-6 and RV-1 ML13121A4042013-05-0808 May 2013 Safety Evaluation in Support of Proposed Alternative Regarding Post-Repair Pressure Testing Requirements ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC ML12242A4992012-09-11011 September 2012 Safety Evaluation in Support of 10 CFR 50.55a Requests RP-2 and RP-4 Regarding Inservice Pump Testing ML1210706862012-05-11011 May 2012 Safety Evaluation Regarding the Reactor Coolant System Pressure and Temperature Limits Report, Revision 1 ML1208604472012-04-18018 April 2012 Issuance of Amendment Modification of the Special Visual Inspection Requirement of TS 5.5.8 Steam Generator Program ML1207504812012-04-0909 April 2012 Safety Evaluation in Support of 10 CFR 50.55a Request RR-A35, Proposed Alternative to System Leakage Test Requirements ML1124305562011-09-22022 September 2011 Request for Threshold Determination Under 10 CFR 50.80 - Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1 ML1118903222011-07-11011 July 2011 Review of the Steam Generator Tube Inspections Performed During Refueling Outage No. 16 in 2010 2024-01-17
[Table view] |
Text
December 18, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE: MOTOR DRIVEN FEEDWATER PUMP FLOW INDICATION (TAC NO. MB9017)
Dear Mr. Myers:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 261 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit 1. The amendment revises the Technical Specifications (TSs) in response to your application dated May 19, 2003, as supplemented October 27, 2003.
This amendment revises the TSs to require flow indication, rather than safety-grade flow indication, to satisfy Surveillance Requirement 4.7.1.7.e.2 for the motor driven feedwater pump.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Carl F. Lyon, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. Amendment No. 261 to License No. NPF-3
- 2. Safety Evaluation cc w/encls: See next page
ML033110207 (Amdt)
ADAMS Accession No.: ML033560610 (TS)
ADAMS Accession No.: ML033560609 (Package)
OFFICE PDIII-2/PM PDIII-2/LA SPLB/SC EEIB/SC IROB/SC OG(NLO) PDIII-2/SC NAME FLyon THarris DSolorio EMarinos TBoyce RHoefling AMendiola DATE 11/18/03 11/17/03 11/21/03 11/26/03 12/1/03 12/9/03 11/16/03 Davis-Besse Nuclear Power Station, Unit 1 cc:
Mary E. O'Reilly Carol OClaire, Chief, Radiological Branch FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St. 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-2206 Manager - Regulatory Affairs Zack A. Clayton First Energy Nuclear Operating Company DERR Davis-Besse Nuclear Power Station Ohio Environmental Protection Agency Oak Harbor, OH 43449-9760 P.O. Box 1049 Columbus, OH 43266-0149 Director Ohio Department of Commerce State of Ohio Division of Industrial Compliance Public Utilities Commission Bureau of Operations & Maintenance 180 East Broad Street 6606 Tussing Road Columbus, OH 43266-0573 P.O.Box 4009 Reynoldsburg, OH 43068-9009 Attorney General Department of Attorney Regional Administrator 30 East Broad Street U.S. Nuclear Regulatory Commission Columbus, OH 43216 801 Warrenville Road Lisle, IL 60523-4351 President, Board of County Commissioners of Ottawa County Michael A. Schoppman Port Clinton, OH 43252 Framatome ANP 1911 N. Ft. Myer Drive President, Board of County Rosslyn, VA 22209 Commissioners of Lucas County One Government Center, Suite 800 Resident Inspector Toledo, Ohio 43604-6506 U.S. Nuclear Regulatory Commission 5503 North State Route 2 David Lochbaum, Nuclear Safety Engineer Oak Harbor, OH 43449-9760 Union of Concerned Scientists 1707 H Street NW, Suite 600 Plant Manager, Randel J. Fast Washington, DC 20006 FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station The Honorable Dennis J. Kucinich 5501 North State - Route 2 United States House of Representatives Oak Harbor, OH 43449-9760 Washington, D.C. 20515 Dennis Clum The Honorable Dennis J. Kucinich, Member Radiological Assistance Section Supervisor United States House of Representatives Bureau of Radiation Protection 14400 Detroit Avenue Ohio Department of Health Lakewood, OH 44107 P.O. Box 118 Columbus, OH 43266-0118
FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-346 DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 261 License No. NPF-3
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the FirstEnergy Nuclear Operating Company (the licensee) dated May 19, 2003, as supplemented October 27, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-3 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 261 , are hereby incorporated in the license. FirstEnergy Nuclear Operating Company shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of issuance and shall be implemented within 120 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 18, 2003
ATTACHMENT TO LICENSE AMENDMENT NO. 261 FACILITY OPERATING LICENSE NO. NPF-3 DOCKET NO. 50-346 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert 3/4 7-12c 3/4 7-12c
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 261 TO FACILITY OPERATING LICENSE NO. NPF-3 FIRSTENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 DOCKET NO. 50-346
1.0 INTRODUCTION
By application dated May 19, 2003, as supplemented by letter dated October 27, 2003, FirstEnergy Nuclear Operating Company (the licensee) requested changes to the Technical Specifications (TSs) for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The supplement dated October 27, 2003, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published in the Federal Register on June 10, 2003 (68 FR 34669).
The proposed changes would revise TS Surveillance Requirement (SR) 4.7.1.7, Motor Driven Feedwater Pump System, to remove the requirement that safety grade flow indication be used to satisfy SR 4.7.1.7.e.2. Specifically, the proposed changes would revise:
1.1 SR 4.7.1.7.e.2 SR 4.7.1.7.e states, in part, After any modification or repair to the Motor Driven Feedwater Pump System that could affect the systems capability to deliver water from the Condensate Storage Tanks to the Auxiliary Feedwater System, the affected flow path shall be demonstrated available as follows:
- 1. ...
- 2. If the modification or repair is upsteam of the Motor Driven Feedwater Pump test flow line tie-in, the Motor Driven Feedwater Pump shall pump water from the Condensate Storage Tanks to the test flow line and the flow path availability will be verified by Motor Driven Feedwater Pump Safety Grade Flow Indication.
The licensee proposes to revise the wording of SR 4.7.1.7.e.2 to read,
- 2. If the modification or repair is upsteam of the Motor Driven Feedwater Pump test flow line tie-in, the Motor Driven Feedwater Pump shall pump water from the Condensate Storage Tanks to the test flow line and the flow path availability will be verified by Motor Driven Feedwater Pump flow indication.
2.0 REGULATORY EVALUATION
The staff finds that the licensee in Sections 3.0 and 5.2 of its submittal identified the applicable regulatory requirements. The motor driven feedwater pump (MDFWP) is described in DBNPS Updated Safety Analysis Report (USAR) Section 9.2.8. The regulatory requirements for which the staff based its acceptance are TS 3/4.7.1.7 and USAR Section 9.2.8.
3.0 TECHNICAL EVALUATION
3.1 Background
The MDFWP was installed by the licensee as part of the corrective actions following the loss of feedwater and subsequent steam generator dryout event at DBNPS in 1985. The MDFWP system provides feedwater to the steam generators during normal plant startup and shutdown.
It also provides a backup supply of feedwater to the steam generators in the event of a total loss of both auxiliary feedwater (AFW) and the main feedwater. The MDFWP system is non-safety-related, as described in Section 9.2.8 of the USAR and Sections 3.3.1.2 and 3.3.1.3 of NUREG-1177, Safety Evaluation Report Related to the Restart of [DBNPS] Following the Event of June 9, 1985. However, the MDFWP provides a diverse method of supplying AFW to the steam generators and so functions as a backup to the safety-related AFW system.
Performance of SR 4.7.1.7.e.2 demonstrates the availability of the flowpath from the condensate storage tanks to the test flow line tie-in following any modification or repair activity upsteam of the test flow line tie-in that could affect the MDFWP systems capability to supply water from the tanks to the AFW system. SR 4.7.1.7.e.2 currently requires the flow indication used to verify flow path availability be safety-grade. The original wording of the SR required only the use of the [MDFWP] flow indication to verify flow path availability. The wording was changed to [MDFWP] safety grade flow indication by Amendment No. 193, dated October 18, 1994, which was issued in response to the licensees application for amendment dated April 5, 1994.
3.2 Evaluation The staff has reviewed the licensees technical analyses in support of its proposed license amendment, which is described in Sections 3.0 and 4.0 of the licensees May 19, 2003, application, as supplemented by letter dated October 27, 2003.
The licensee states that the change in wording in SR 4.7.1.7.e.2 from [MDFWP] flow indication to [MDFWP] safety grade flow indication was made due to an error in its application for Amendment No. 193. The licensee confirmed that the flow indication for the MDFWP was not originally installed as safety-grade equipment and has not been upgraded to safety-related standards. The licensee states that the flow indication for the MDFWP is not required during design-basis accidents. There are no accidents analyzed in the USAR that credit the MDFWP system. If both AFW pumps were not available and the MDFWP system was being used to supply water to the steam generators, the MDFWP system flow indication would not be the relied-upon indication. Instead, flow would be verified by other safety-grade flow indications in the AFW system that are periodically tested by other SRs. The licensee states that the proposed correction to the wording in SR 4.7.1.7.e.2 does not involve any physical alteration of
the plant or a change in the methods of normal plant operation. No modification or repair activity has been identified as having been performed upsteam of the MDFWP test tie-in since Amendment No. 193 was implemented; therefore, SR 4.7.1.7.e.2 has not been required.
Since (1) the MDFWP is a non-safety-related system that is not assumed in any accident analysis and (2) safety-grade flow indication in the AFW system would be relied upon if the AFW pumps were not available and the MDFWP was supplying flow to the steam generators, there is no need to require that the MDFWP flow indication be safety-grade. Therefore, the licensees proposed change to the wording of SR 4.7.1.7.e.2 is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes an inspection or a surveillance requirement. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (68 FR 34669). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: F. Lyon Date: December 18, 2003