ML032900072
From kanterella
Jump to navigation
Jump to search
ML032900072 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 09/25/2003 |
From: | Entergy Nuclear Operations, VE&C Nuclear |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML032890483 | List:
|
References | |
LRA-M-2241, Rev 0 | |
Download: ML032900072 (1) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:Drawing
MONTHYEAR2CAN011502, Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections2015-01-12012 January 2015
[Table view]Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections 2CAN121206, Clarification on Initial Flaw Size and Qualified Examination Area, Revised Request for Alternative ANO2-ISI-007 Code Case N-770-1 Baseline Examination2012-12-17017 December 2012 Clarification on Initial Flaw Size and Qualified Examination Area, Revised Request for Alternative ANO2-ISI-007 Code Case N-770-1 Baseline Examination 1CAN041105, Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05 Relief Request ANO1-R&R-0162011-04-20020 April 2011 Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05 Relief Request ANO1-R&R-016 2CAN070807, Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests2008-07-31031 July 2008 Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests ML0407702742004-01-0808 January 2004 Draft Information Input E-Mail Dated 01/08/04 Poison Insert Sketches - Attachment 1 ML0332203102003-10-15015 October 2003 Figure 2-3, ANO Exclusion Zone and Features ML0332202982003-10-15015 October 2003 Figure 3-2, ANO 2 Transmission Line ML0329000452003-09-26026 September 2003 Drawing LRA-M-2231, Rev 0, Piping & Instrument Diagram Chemical & Volume Control System. Sheet 2 ML0329000472003-09-26026 September 2003 Drawing LRA-M-2232, Rev 0, Piping & Instrument Diagram Safety Injection System. Sheet 1 ML0329000602003-09-26026 September 2003 Drawing LRA-M-2238, Rev 0, Piping & Instrument Diagram Reactor Coolant Pump Connections. Sheet 1 ML0329000712003-09-25025 September 2003 Drawing LRA-M-2241, Rev 0, Piping & Instrument Diagram Aac Generator System Starting Air & Service Air Subsystems. Sheet 4 ML0329000692003-09-25025 September 2003 Drawing LRA-M-2241, Rev 0, Piping & Instrument Diagram Aac Generator System Fuel Oil Subsystem. Sheet 3 ML0329000722003-09-25025 September 2003 Drawing LRA-M-2241, Rev 0, Piping & Instrument Diagram Aac Generator System Lube Oil System. Sheet 5 ML0329000672003-09-25025 September 2003 Drawing LRA-M-2241, Rev 0, Piping & Instrument Diagram Aac Generator System Air Intake & Exhaust Subsystem. Sheet 2 ML0329000642003-09-25025 September 2003 Drawing LRA-M-2241, Rev 0, Piping & Instrument Diagram Aac Generator System Engine Cooling Water Subsystem. Sheet 1 ML0329000412003-09-25025 September 2003 Drawing LRA-M-2230, Rev 0, Piping & Instrument Diagram Reactor Coolant System. Sheet 2 ML0329000382003-09-25025 September 2003 Drawing LRA-M-2230, Rev 0, Piping & Instrument Diagram Reactor Coolant System. Sheet 1 ML0329000962003-09-25025 September 2003 Drawing LRA-M-2260, Rev 0, Piping & Instrument Diagram Aac Generator Building Heating, Ventilation & Air Condition Subsystem. Sheet 4 ML0329001102003-09-25025 September 2003 Drawing LRA-M-2263, Rev 0, Piping & Instrument Diagram Units 1 & 2 Control & Computer Rooms Hvac. Sheet 1 ML0329000732003-09-23023 September 2003 Drawing LRA-M-2260, Rev 0, Piping & Instrument Diagram Air Flow Diagram Heating, Ventilating & Air Conditioning Turbine Bldg. & Misc. Area. Sheet 1 ML0329000332003-09-23023 September 2003 Drawing LRA-M-2220, Rev 0, Piping & Instrument Diagram Plant Heating System. Sheet 1 ML0329000362003-09-23023 September 2003 Drawing LRA-M-2221, Rev 0, Piping & Instrument Diagram Control & Computer Room Emerg. HVAC Freon System. Sheet 2 ML0329000372003-09-23023 September 2003 Drawing LRA-M-2222, Rev 0, Piping & Instrument Diagram Chilled Water System Containment, Turbine & Aux. Bldgs. Sheet 1 ML0329001152003-09-23023 September 2003 Drawing LRA-M-2263, Rev 0, Piping & Instrument Diagram Air Flow Diagram HVAC Aux. Bldg. - Misc Rooms. Sheet 6 ML0329000442003-09-23023 September 2003 Drawing LRA-M-2231, Rev 0, Piping & Instrument Diagram Chemical & Volume Control System. Sheet 1 ML0329001142003-09-23023 September 2003 Drawing LRA-M-2263, Rev 0, Piping & Instrument Diagram Air Flow & Control Diagram Heating, Ventilating, Air Cond. Aux, Bldg. Office/CA-2 Area. Sheet 5 ML0329001082003-09-23023 September 2003 Drawing LRA-M-2262, Rev 0, Piping & Instrument Diagram Air Flow Diagram Heating Ventilating Air Conditioning Aux, Bldg. Radwaste Area. Sheet 2 ML0329000482003-09-23023 September 2003 Drawing LRA-M-2233, Rev 0, Piping & Instrument Diagram Reactor Coolant Pump Oil Collection System. Sheet 1 ML0329000512003-09-23023 September 2003 Drawing LRA-M-2234, Rev 0, Piping & Instrument Diagram Component Cooling Water System. Sheet 1 ML0329000532003-09-23023 September 2003 Drawing LRA-M-2235, Rev 0, Piping & Instrument Diagram Fuel Pool System. Sheet 1 ML0329000552003-09-23023 September 2003 Drawing LRA-M-2236, Rev 0, Piping & Instrument Diagram Containment Spray System. Sheet 1 ML0329000562003-09-23023 September 2003 Drawing LRA-M-2237, Rev 0, Piping & Instrument Diagram Sampling System. Sheet 1 ML0329001052003-09-23023 September 2003 Drawing LRA-M-2262, Rev 0, Piping & Instrument Diagram Heating, Ventilating & Air Conditioning Aux, Bldg. - Radwaste Area. Sheet 1 of 3 ML0329000612003-09-23023 September 2003 Drawing LRA-M-2239, Rev 0, Piping & Instrument Diagram Nitrogen Addition System. Sheet 1 ML0329000632003-09-23023 September 2003 Drawing M-2239, Rev 0, Piping & Instrument Diagram Electrical Penetration Nitrogen Pressurization System. Sheet 2 ML0329001022003-09-23023 September 2003 Drawing LRA-M-2261, Rev 0, Piping & Instrument Diagram Air Flow & Control Diagram Heating, Ventilating & Air Cond. Containment Building. Sheet 4 ML0329001012003-09-23023 September 2003 Drawing LRA-M-2261, Rev 0, Air Flow & Control Diagram HVAC Post Accident Hydrogen Analysis System. Sheet 3 ML0329001002003-09-23023 September 2003 Drawing LRA-M-2261, Rev 0, Flow & Control Diagram Heating, Ventilation & Air Conditioning Containment Building. Sheet 2 ML0329000982003-09-23023 September 2003 Drawing LRA-M-2261, Rev 0, Piping & Instrument Diagram Air Flow & Control Diagram Heating, Ventilating & Air Cond. Containment Building. Sheet 1 ML0211401212002-03-26026 March 2002 Attachment 8, Faxed on March 26, 2002 (Docket No. 50-368) 2015-01-12 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML032900072&oldid=2641192"