ZN c
MC Committed to Nuclear Excellence I
DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO CTAM-88)
To:
NRC-NRR Document Control Desk US NRC Washington DC 20555 Re:
Entire EPIP Document (Copy 28)
PSM
Title:
n/a Distribution Date:
Effective Date of Change:
Return by:
10/08 /2003 10/13/2003 10/22 /2003 Please perform the following to your assigned manual. If you have any questions regarding this TAM please contact Don A. Johnson at 319-851-7872.
REMOVE Rev. 142 EPIP Table of Contents Revision EPIP CR-01 (PWR: 22803)
Rev. 3 INSERT Rev. 143 Rev. 4 Rev.
Rev. 2 Rev. 5 EPIP CR-02 (PWR: 22804)
Remove this form.
EPIP EOF-04 (PWR: 22805)
Rev.
Rev.
Rev. 4 EPIP EOF-07 (PWR: 22785)
PERFORMED BY:
Print Name Sign Name Date Please return to:
K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.
Palo, IA 52324 AG145 To be completed by DAEC EP personnel only:
Date TAM returned:
EPTools updated:
Committed to Nuclear Excelle DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO (TAM-88)
EPIP EOF-08 (PWR: 22753)
Rev. 6 Rev. 7 EPIP EOF-09 (PWR: 22784)
Rev. 0 Rev. I EPIP EOF-12 (PWR: 22887)
Rev. 0 Rev. I EPIP EOF-13 (PWR: 22895)
Rev. 0 Rev. 0 Remove this form.
EPIP EOF-16 (PWR: 22752)
Rev. I Rev. 2 EPIP EOF-17 (PWR: 22886)
Rev. 2 Rev. 3 EPIP EOF-18 (PWR: 22896)
Rev. 3 Rev. 4 EPIP EOF-32 (PWR: 22897)
Rev. 3 Rev. 4 EPIP ERO-01 (PWR: 22871)
Rev. 0 Rev. 1 EPIP NOTE-07 (PWR: 22799)
Rev. 1 Rev. 2 EPIP OSC-02 (PWR: 22812)
Rev.
Rev.
Remove this form.
EPIP OSC-03 (PWR: 22813)
Rev. 1 Rev. 2 EPIP OSC-10 (PWR: 22814)
Rev. 0 Rev. 1 PERFORMED BY:
Print Name Sign Name Date Please return to:
K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.
Palo, IA 52324 To be completed by DAEC EP personnel only:
Date TAM returned:
EPTools updated:
Committed to Nuclear Excellence DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO (TAM-88)
EPIP TSC-01 (PWR: 22800)
Rev. 3 Rev. 4 EPIP TSC-03 (PWR: 22808)
Rev. 1 Rev. 2 EPIP TSC-04 (PWR: 22792)
Rev. 3 Rev. 4 EPIP TSC-06 (PWR: 22703)
Rev. I Rev. 2 EPIP TSC-07 (PWR: 22801)
Rev. I Rev. 2 EPIP TSC-08 (PWR: 22810)
Rev. I Rev. 2 EPIP TSC-10 (PWR: 22806)
Rev. 3 Rev. 4 EPIP TSC-1 1 (PWR: 22802)
Rev. I Rev. 1 Remove this form.
EPIP TSC-15 (PWR: 22807)
Rev. I Rev. 2 EPIP TSC-16 (PWR: 22807)
Rev. 0 Rev. 0 Remove this form.
EPIP TSC-17 (PWR: 22881)
Rev. 0 Rev. 0 Remove this form.
EPIP TSC-19 (PWR: 22797)
Rev. 1 Rev. 2 EPIP TSC-20 (PWR: 22798)
Rev. 2 Rev. 3 PERFORMED BY:
Print Name Sign Name Date Please return to:
K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.
Palo, IA 52324 To be completed by DAEC EPpersonnel only:
Date TAM returned:
EPTools updated:
tNMC Committed to Nucolear Excellence DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO (TAM-88)
EPIP TSC-21 (PWR: 22793)
Rev. 0 Rev. 1 EPIP TSC-22 (PWR: 22794)
Remove this form.
EPIP TSC-25 (PWR: 22811)
Remove this form.
EPIP TSC-29 (PWR: 22795)
EPIP TSC-31 (PWR: 22910)
EPIP TSC-32 (PWR: 22809)
Remove this form.
EPIP TSC-34 (PWR: 22796)
Rev. 0 Rev. I Rev. 2 Rev. 1 Rev. 2 Rev. 3 Rev. 1 Rev. 1 Rev. 4 Rev. 0 Rev. 1 Rev. 3 PERFORMED BY:
Print Name Sign Name Date Please return to:
K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.
Palo, IA 52324 To be completed by DAEC EP personnel only:
Date TAM returned:
EPTools updated:
l XER99;l3E8X~~TNG PRl Rev. 143l INDEX lPAGE 1 of 7l Procedure Title Revision Date Number 1.1 Determination of Emergency Action Levels 21 10/13/03 1.2 Notification 29 10/13/03 1.3 Plant Assembly and Site Evacuation 9
09/12/01 1.4 Release of Emergency-Related Information 5
10/13/03 1.5 Activation and Operation of the EOF 5
10/13/03 2.1 Activation and Operation of the OSC 14 10/13/03 2.2 Activation and Operation of the TSC 24 10/13/03 2.3 Operation of the FTS-2001 Phone Network 7
10/13/03 2.4 Activation and Operation of the ORAA 8
09/12/01 2.5 Control Room Emergency Response Operation 15 10/13/03 2.6 Activation and Operation of the ORAL 9
12/30/02 2.7 Activation and Operation of the ODEF 6
10/15/01 2.8 Securiy Threat 2
7/30/03 3.1 In-Plant Radiological Monitoring 13 10/13/03 3.2 Field Radiological Monitoring 14 10/13/03 3.3 Dose Assessment and Protective Action 20 10/13/03 4.2 First Aid, Decontamination and Medical Support 7
8123/02 4.3 Rescue and Emergency Repair Work 11 8123/02 4.5 Administration of Potassium Iodide (KI) 7 2/10/03 5.2 Recovery and Re-entry 10 10/13/03 I
I
-EMERGENC PLNIMPLEMENTING POCEDUE Rev. 143 INDEX PAGE 2 of 7 Form Title Revision Referencing Number Number Procedure CR-01 OSM/OSS Checklist Rev. 4 EPIP 2.5 CR-03 Dose Projection & ARM Data Sheet Rev. 0 EPIP 2.5 CR-04 Control Room to TSC Transfer Checklist Rev. 2 EPIP 2.5 EAL-01 Abnormal Rad Levels/Radioactive Effluent Table Rev. 4 EPIP 1.1 EAL-02 Fission Barrier Table Rev. 4 EPIP 1.1 EAL-03 Hazards & Other Conditions Affecting Plant Safety Rev. 4 EPIP 1.1 EAL-04 System Malfunction Table Rev.3 EPIP 1.1 EAL-05 ISFSI Table Rev. 0 EPIP 1.1 EOF -02 NRC - HPN Communicator Checklist Rev. 3 EPIP 1.5 EOF -03 Technical Recorder Checklist Rev. 2 EPIP 1.5 EOF -04 Summary of Computer Data Backup Collection Rev. 2 EPIP 1.5 Activities EOF -05 EOF Information Services Representative Checklist Rev. 3 EPIP 1.5 EOF -06 DAEC Key Parameter Log Rev. 0 EPIP 1.5 EOF -07 Emergency Response and Recovery Director Rev. 5 EPIP 1.5 Checklist EOF -08 Rad & EOF Manager Checklist Rev. 7 EPIP 1.5, 3.3 EOF - 09 EOF OPS Liaison Checklist Rev. I EPIP 1.5 EOF -10 EOF-Communicator Checklist Rev. 3 EPIP 1.5 EOF - 11 Support Services Coordinator Checklist Rev. 3 EPIP 1.5 EOF - 12 Field Team Director Checklist Rev. 1 EPIP 1.5,3.3 I
I
EMERGEN P
N iP ENT PROCEDURES Rev. 143 I
~~~~~~INDEX lPAGE 3 of 7 EOF - 14 EOF MIDAS Operator Checklist Rev. 1 EPIP 1.5, 3.3 EOF - 15 Radiological Data Plotter Checklist Rev. 0 EPIP 1.5,3.3 EOF - 16 Radiological Assessment Coordinator Checklist Rev. 2 EPIP 1.5, 3.3 EOF - 17 EOF Security Access Clerk Checklist Rev. 3 EPIP 1.5 EOF -18 EOF Staffing Accountability Roster Rev. 4 EPIP 1.5 EOF - 19 Drill Announcement Message Rev. 0 EPIP 1.4, 1.5 EOF 20 Emergency Announcement Message Rev. 1 EPIP 1.4, 1.5 EOF -21 Personnel Access Log Rev. 1 EPIP 1.4,1.5 EOF - 22 Registration Form Rev. 0 EPIP 14, 1.5 EOF - 23 Security Post Log Rev. 2 EPIP 1.4,1.5 EOF - 24 First Floor Security Post Description Rev. 2 EPIP 1.4, 1.5 EOF -25 Fourteenth Floor Security Post Description Rev. 11 EPIP 1.5 EOF - 27 Status Update Message - EOF Communicator Rev. 0 EPIP 1.5 EOF - 28 Verbal Closeout Summary Rev. 0 EPIP 1.5 EOP -29 Written Closeout Summary Rev. 0 EPIP 1.5 EOF-30 Status Board Rev. 1 EPIP 1.5 EOF -31 Access B adge Example Rev. 0 EPIP 1.5 EOF -32 EOF Staff Response Rev. 4 EPIP.15 EOF-33 Recovery Issues Rev. 0 EPIP 5.2 EOF - 34 EOF Activities Rev. 0 EPIP 5.2 EOF -35 Recovery Phase Plan Outline Guidance Rev. 0 EPIP.52 EOF - 36 RE-Entry Briefing Guide Rev. 0 EPIP 5.2 EOF - 37 RE-Entry Debriefing Guide Rev. 0 EPIP 5.2 EOF - 38 EOF Messenger Checklist Rev. 1 EPIP 1.5 ERO - 01 ERO Position Equivalency Table Rev. 1 EPIP 1.5 JPIC - 01 JPIC Manager Checklist Rev. 4 EPIP 1.4 JPIC -03 Alliant Spokesperson Checklist Rev. 3 EPIP 1.4
,ii iEN t
iiL ; E;EtT:
- E PLA
- N;;
E ME
%.7, 1 A evi;;n
!ti
- N ;ii
~;!
EMERGENC P
MPEMETING PROCEDU Rev. 143 INDEX PAGE 4 of 7 JPIC - 04 Technical Liaison Checklist Rev. 4 EPIP 1.4 JPIC - 05 Sequence of Events Rev. 0 EPIP 1.4 JPIC - 06 Public Information Officer Support Checklist Rev. 5 EPIP 1.4 RPIC -07 Logistics Coordinator Checklist Rev. 4 EPLP 1.4 JPIC - 08 Logistics Support Checklist Rev. 4 EPIP 1.4 JPIC - 09 Audiovisual Support Checklist Rev. 4 EPIP 1.4 JPIC - 11 Rumor Control Coordinator I Checklist Rev. 3 EPIP 1.4 JPIC - 12 Rumor Control Event Summary Log Rev. I EPIP 1.4 JPIC - 13 Rumor Control Coordinator II Checklist Rev. 2 EPIP 1.4 JPIC -14 Public Rumor Control Checklist Rev. 2 EPIP 1.4 JPIC - 15 News Media Rumor Control Checklist Rev. 4 EPIP 1.4 JPIC -16 Assistant JPIC Manager Checklist Rev. 3 EPIP 1.4 JPIC - 17 JPIC Security Access Control Checklist Rev. 3 EPIP 1.4 JPIC - 18 Sixth Floor Security Post Description Rev. 2 EPIP 1.4 JPIC - 19 JPIC Distribution List Rev. 2 EPIP 1.4 NOTE-01 ERO Notification -Phone System Callout Rev. 5 EPIP 1.2 NOTE-02 ERO Notification - Alphanumeric Paging System Rev. 3 EPIP 1.2 Callout NOTE-03 Event Notification Worksheet Rev. 1 EPIP 1.2 NOTE-04 Plant Assembly Notification Rev. 2 EPIP 1.2 NOTE-05 Emergency Action Level Notification Rev. 7 EPIP 1.2 NOTE-06 Plant Page for Emergency Classification Changes Rev. 1 EPIP 1.2 NOTE-07 Basic Notification Flowpath Rev. 2 EPIP 1.2 ODEF-01 ODEF Decontamination Waiting Area Rev. 0 EPIP 2.7 ODEF-02 Floor Plan for ORAIIODEF Rev. 0 EPIP 2.7 ODEF-03 Travel Route to ORALIODEF Rev. 0 EPIP 2.7 ODEF-04 12 d' Avenue Entrance to ORAIJODEF Rev. 0 EPIP 2.7 ORAA-O1 Offsite Relocation and Assembly Area Supervisor's Rev. 1 EPIP 2.4 1I i
I
- -- E E ENW08;I P
E NGPR XEUREj Rev. 143 INDEX PAGE 5 of 7 Checklist ORAA-02 Health Physics Support for the Offsite Relocation Rev. 0 EPIP 2.4 and Assembly Area ORAA-03 Security Support for the Offsite Relocation and Rev. 0 EPIP 2.4 Assembly Area ORAA-04 Offsite Relocation and Assembly Area Rev. 0 EPIP 2.4 ORAA-05 Offsite Relocation and Assembly Area Parking and Rev. 0 EPIP 2.4 Vehicle Monitoring OSC-01 OSC Layout Rev. 0 EPIP 2.1 OSC-03 Minimum Staffing Level Rev. 2 EPIP 2.1 OSC-04 Recommended Log Entry Topics Rev. 0 EPIP 2.1 OSC-05 Emergency Event Log Sheet Rev. 0 EPIP 2.1 OSC-06 Personal Statement Concerning Incident Rev. 0 EPIP 2.1 OSC-07 Emergency Exposure Tracking Log Rev. 0 EPIP 2.1 OSC-08 OSC Supervisor Checklist Rev. 0 EPIP 2.1 OSC-09 Health Physics Supervisor Checklist Rev. 0 EPIP 2.1 OSC-10 IC/EM & Mechanical Supervisor Checklist Rev. 1 EPIP 2.1 OSC-11 Emergency Assignment Staffing Board Duties Rev. 0 EPIP 2.1 OSC-12 External Exposure Limits Rev. 0 EPIP 4.3 OSC-13 Guidance on Dose Limits for Workers Performing Rev. 0 EPIP 4.3 Emergency Services OSC-14 Guidelines Regarding Selection of Volunteers Rev. 0 EPIP 4.3 OSC-15 OSC Repair Team Work Order Rev. 0 EPIP 4.3 OSC-16 Repair Team Datasheet Flowpath Rev. 0 EPIP 4.3 PAR -01 PAR Decision Making - Recommendations Rev. 0 EPIP 3.3 PAR -02 PAR Decision Making - Flowchart Rev. 0 EPIP 3.3 PASE-02 Onsite Assembly Locations Rev. 2 EPIP 1.3 PASE-05 Site Evacuation Routes Rev. I EPIP 1.3 SAM-01 EOP-SAG Transition Checklist Rev. 0 EPIP 2.2
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I EMERGENCY PLAN IMP LEM TING PROCEURESE` Rev. 143 INDEX PAGE 6 of 7 TSC-01 Emergency Coordinator Checklist Rev. 4 EPIP 2.2 TSC-02 TSC-EOF Transfer Checklist Rev. 3 EPIP 2.2 TSC-03 Site Radiation Protection Coordinator Checklist Rev. 2 EPIP 2.2 TSC-04 Technical & Engineering Supervisor Checklist Rev. 4 EPIP 2.2 TSC-05 Quality Assurance Checklist Rev. 1 EPIP 2.2 TSC-06 Security & Support Supervisor Checklist Rev. 2 EPIP 2.2 TSC-07 Administrative Supervisor Checklist Rev. 2 EPIP 2.2 TSC-08 Material Management Supervisor Checklist Rev. 2 EPIP 2.2 TSC-09 TSC Communicator Checklist Rev. 2 EPIP 2.2 TSC-10 CR-Communicator Checklist Rev. 4 EPIP 2.2 TSC-12 ENS Communicator Checklist Rev. 2 EPIP 2.2 TSC-13 HPN Communicator Checklist Rev.
EPIP 2.2 TSC-14 TSC/OSC Operations Liaison Checklist Rev. 2 EPIP 2.2 TSC-15 Radiological Support Staff Checklist Rev. 2 EPIP 2.2 TSC-18 TSC MIDAS Operator Checklist Rev. 0 EPIP 2.2 TSC-19 Technical & Analysis Engineer Checklist Rev. 2 EPIP 2.2 TSC-20 TSC Operations Supervisor Rev. 3 EPIP 2.2 TSC-21 Electrical Engineer Checklist Rev. 1 EPIP 2.2 TSC-23 Mechanical Engineer Checklist Rev. 0 EPIP 2.2 TSC-24 Reactor Engineer Checklist Rev. 2 EPIP 2.2 TSC-26 Information Services Representative Checklist Rev. 2 EPIP 2.2 TSC-27 Fire Marshall Checklist Rev. 1 EPIP 2.2 TSC-28 NRC Roles During A Nuclear Power Plant Rev. 0 EPIP 2.2 Emergency Checklist TSC-29 TSC Minimum Staffing Level Rev. 3 EPIP 2.2 TSC-30 Emergency Action Request Log Rev. 0 EPIP 2.2 TSC-31 Radio Operator Log Rev. 1 EPIP 2.2 TSC-33 Typical Organization of the NRC Site Team Rev. 0 EPIP 2.2 I
I I0 I,
-:."EMERGENCY'.PAN'IMP E r=NIN!POE i
t0 INDE)C PAGE 7 of 7 TSC-34 TSC Organization Chart Rev. 4 EPIP 2.2 TSC-35 Assignment Form Rev. 0 EPIP 5.2 TSC-36 Deactivation Report Rev. 0 EPIP 5.2 TSC-37 Plant Operations Status Rev. 0 EPIP 5.2 TSC-38 TSC/Control Room/OSC Activities Rev. 0 EPIP 5.2 TSC-39 TSC Clerical Checklist Rev. 0 EPIP 2.2 TSC40 ARM Locations Rev. 0 EPIP 3.1/4.3 TSC41 PASS Capabilities Rev. 0 EPIP 3.1 TSC-42 On-Site Map Rev. 0 EPIP 3.2 TSC-43 ESB Logon Instructions (TSC/CR/EOF)
Rev. 0 EPIP 2.2 I
OSMICRSI CHECKLIST Page 1 of 2 OPERATION Evaluate plant conditions and review EPIP 1.1 to verify if appropriate emergency classification has been declared.
Verify notifications are implemented lAW EPIP 1.2. Mark table below as applicable.
I ACTIONIL1EI 1SEI.G A. Contact the Duty Emergency Coordinator" if the event is' suspected to require EAL Classification.
B. CLASSIFY event per EPIP 1.1, Determination of x
x x
x Emergency Action Levels,".
C. Complete NOTE-5: State and County Notification Form x
x x
x (DETERMINE appropriate PARs per EPIP 3.3)
D. INFORM Security Supervisor of emergency conditions.
x x
x x
l Request 2 Security individuals @ an ALERT or higher if event is NOT Security oriented.
Verify Emergency Accountability card readers are activated @ an ALERT or higher.
E. Have Security make notifications using NOTE-05 x
x x
x E. Complete NOTE-02 ZERO Notification". If event is x
x x
off-hours, in addition to NOTE-02, complete NOTE-01 for ZERO Off-hours Notification". (Refer to EPIP 1.3)
G. DIRECT Security to activate the Emergency Response x
x x
Organization ERO to staff TSC and OSC using NOTE-02.
H. Complete Plant Assembly Notification Form NOTE-04 x
x x
and perform the Page Announcement.
I. ASSEMBLE And ACCOUNT for site personnel within x
x x
30minutes of EAL declaration.'
J. Complete NOTE-03 NRC Event Notification Worksheet x
x x
x as soon as possible after State & County notifications, but within 60 minutes of declaration.
K. DIRECT Radiation Protection to determine habitability of station by performing surveys and taking samples L. Evacuate NON-ESSENTIAL site personnel.
x x
M. TRANSFER Command and Control to TSC or EOF as x
x applicable.
N. DIRECT Radiation Protection to DISPATCH Field x
x Team(s) for environs monitoring.
- 0. Have In-plant operators go through OSC for task x
x x
assignments when a release is occurring.
.I.
CR-0l Rev.4 I
OSMICRSI CHECKLIST Page 2 of 2
>X; kiACTION
- [URl¢fSEJG Htt^X < 2 P. Notify onsite personnel via page of any abnormal X
X x
X radiological areas or safety hazards (steam leaks).
Q. Complete notifications to State, Counties and NRC X
X X
X X
upon TERMINATION OF EVENT._
Report accountability of NSPEO's to Security & Support Supervisor in the TSC (x7715).
If OSM desires hands-free communications:
Acquire phone headset; plug headset into phone.
Place OSM Desk (X7610) Portable Phone Switch' to ON.
Verify the following positions are staffed:
CR Communicator Verify turnover of plant status to the Emergency Coordinator.
Verify turnover of command and control of the ERO to the Emergency Coordinator.
Verify NRC ENS Communicator receives a turnover and notifies the NRC Emergency Operations Center as soon as possible but no later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after event declaration. (The Security Lt. and STA are backups to the NRC ENS Communicator)
Verify Protective Action Recommendations IAW EPIP 3.3.
Callout additional operators as necessary.
Limit access to the Control Room to only those personnel necessary for operations support.
RECOVERY Refer to EPIP 5.2 "Recovery and Re-entry-CR-O0 Rev.4
ATTACHMENT 3
SUMMARY
OF COMPUTER DATA BACKUP COLLECTION ACTIVTES Information Services Representative in each facility:
(TSC = 851-7463; EOF - 398-4245)
- 1.
To be contacted upon suspicion of data loss from any computer generated information.
- 2.
Shall initiate call to Information Services Representative in the TSC as needed to verify data or computer reliability.
- 3.
Shall inform the Emergency Coordinator or the ER&RD of computer related problems.
Information Services Representative in the TSC:
- 1.
Will be the person to contact with computer info problems. Will delete as needed, after confirmation with Control Room personnel, selected bad computer points.
- 2.
Will be the focal point to start announcement back to the TSC and EOF Computer Operators that data is good/bad and to have them ignore or turn off displayed data or return to service as necessary.
DATA COLLECION UPON COMPUTER LOSS CR Communicator: Responsible to collect data on Form EOF-06, DAEC Key Parameter Log" and communicate to TSC Communicator who will fill out identical form for transmission to EOF Communicator.
RAC: Transcribes data from CR-03 "Dose Projection & Arm Data Sheets" of EPIP 2.5 as normal and also shares data with MIDAS Operator or others as necessary.
MIDAS Operators: Will communicate with each other as necessary any information that is needed to take Dose Projections.
DISPLAYS in EOF: Like TSC, will have CAD generated drawings behind glass to allow for markup and trending without taking down.
RAD Status Plotter: Will make copies of Rad Data from MIDAS Operator as necessary to share with Plant Status Plotter who will update EOF displays before and during any computer problems.
Plant Status Plotter: Will continually update EOF displays with computer generated data or data taken from DAEC Key Parameter Log as necessary.
EOF-04 Rev.2
DAEC EAMI; ERGE1NCY VIRESPONSE1 OR I0IN PSTIO N SPCFC CHECKLIST11 sal i FACILITY:
EOF ERO POSITION: Emergency Response & Recovery Director EPIP FORM EOF-07 REVISION #: 5 NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' 1.1, 'Determination of EAL's' Section D, 'Emergency Classification System' 1.2, 'Notification' Section E, 'Notification Methods & Procedures' 1.3, 'Plant Assembly and Seco 'Accountability' Section H, 'Emergency Facilities Staffing, Activation 1.5, 'Activation & Operation and Equipment' of the EOF' Section, 'Accident Assessment 3.3, 'Dose Assessment &
Protective Action' Section J, 'Protective Response' 4.6, 'Administration of Kl' Section M, 'Recovery and Reentry Planning and Post-Accident Operation'
_5.2, Recovery & Reentry' BASIC PURPOSE OF THIS ERO POSITION:
This position assumes command & control responsibility for the ERO from the Emergency Coordinator. Responsible for coordinating the total response effort of the ERO.
Time constraints to keep in mind during the event:
15 minutes to declare an event once conditions are recognized State & County notifications (EAL and PAR) - 15 minutes from event declaration or change. (by Rad & EOF Manager)
ENS Notified-As soon as possible but within 60 minutes of event declaration. (by EOF HPN Communicator)
EOF must be OPERATIONAL within 1-hour of declaration of a Site Area or General Emergency
ONSE O NZ O
., l I
POSMTON SPCFIC IA CLS ACTIVATION Report to the EOF, sign in, acquire handbook. Utilize checklist, as a guide.
Receive a plant status update from the Emergency Coordinator.
If the event is an Alert or Unusual Event, assemble and staff the EOF at your discretion based upon the potential needs of the site and the ERO. Discuss activating the JPIC with the JPIC Manager.
Brief the EOF Staff of the event.
If the event is a Site Area or General Emergency, EOF is to be OPERATIONAL within 1-hr of event declaration.
EOF minimum staff for declaring facility OPERATIONAL:
Rad & EOF Manager Rad Assessment Coordinator (RAC)
EOF Ops Liaison Support Services Coordinator Receive a turnover and assume responsibility for specific functions from the EC in accordance with TSC-02.
Brief the EOF Staff on the status of the event and inform them of what the EOF is assuming responsibility for.
Ensure that this information gets on the Electronic Status Board and the JPIC Manager is informed.
OPERATION ON-GOING TASKS TO BE PERFORMED THROUGHOUT THE EVENT Periodically (at least every 30-minutes, or as conditions change) brief the EOF staff on the current status of the plant and response actions being taken to mitigate the event.
Ensure to give the facility a 'heads-up', i.e., Standby for a brief in 1-minute" so conversations can cease.
Try not to talk' over the Rad & EOF Manager if the Rad & EOF Manager is notifying the State & Counties of a change in EALs or PARs.
Ask the Rad & EOF Manager and the EOF Ops Liaison to prepare status updates for their respective areas and allow them an opportunity to brief the EOF as necessary.
The following information should be given as applicable, Plant status Significant changes or problems
DAEC EIMERGENCYRESPO NSE ORGANIUZATION]
OSITION'SPECFCCH KLS Response actions in progress Planned response actions Potential offsite consequences Reminder to keep extraneous conversations to a minimum Reminder to use phonetic alphabet and 3-Part Communications Ensure that this information gets on the Electronic Status Board Direct the EOF Staff on applicable tasks to be carried out.
Direct the Rad & EOF Manager on applicable tasks to be carried out by the radiation protection staff.
Coordinate accident assessment and analysis efforts to determine the full scope and impact of the emergency.
Coordinate efforts, with the EC, to return the plant to, and maintain it in a safe, stable condition.
Keep corporate directors (Asset Owner and NMC) apprised of events at DAEC as necessary.
Verify that the Insurance & Risk Manager (or Individual responsible for this role if a title change has occurred) for the Asset Owner has contacted American Nuclear Insurers (ANI). ANI should be contacted at an Alert or greater.
Classify/Reclassify the event as necessary. This responsibility may not be delegated.
Approve Protective Action Recommendations. This responsibility may not be delegated. (Ensure to include the Rad & EOF Manager when deciding on PARs)
Approve extensions on exposure limits for emergency workers. This responsibility may not be delegated.
o 2 Rem can be extended to 5 Rem TEDE o 10 Rem TEDE protecting property o 25 Rem TEDE life saving o >25 Rem TEDE life saving on a volunteer basis o Lens of the eye 15 Rem o Dose to any organ 50 Rem o KI is administered if 25 Rem CDE is likely (EPIP 4.5)
Verify that the Support Services Coordinator has arranged for continuous coverage by ERO personnel, for events of a protracted nature.
AEC EMER GCYR RSPONS ORA7NiZAIO NRC TEAM Brief the NRC Team upon arrival on the following topics:
o Event sequence.
o Plant status, major problems and corrective actions being taken or planned.
o Dose projection results and PAR's.
- Onsite radiological concerns
- Offsite radiological concerns Meteorological conditions EPZ implemented actions o Prognosis of the event.
o Potential need for Tech. Spec./license deviations.
RECOVERY Coordinate with the EC to initiate recovery planning in accordance with EPIP 5.2.
Deactivate emergency response centers.
Direct the Technical Recorder to prepare a written summary upon downgrading from an ALERT or greater. Topics to be covered should be summary of the event, response actions taken or in progress, significant problems which require further evaluation before resolution. (in accordance with EPIP 1.5)
- a.
, i
- DAMERG CY R'SPONSE 6RGA ATIN PITIONS SPEIFI I; ECKLS FACILITY
EOF ERO POSITION: Rad & EOF Manager EPIP FORM EOF-08 REVISION#: 7 NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' 1.1, 'Determination of EAL's' Section D, 'Emergency Classification System' 1.2, 'Notification' Section E, 'Notification Methods & Procedures' 1.5, 'Activation & Operation of the EOF' Section H, 'Emergency Facilities Staffing, 2
Activation and Equipment'Section I, 'Accident Assessment' 3.2, 'Field Radiological Monitoring' Section J, 'Prodeioctica Eposure Control' 3.3, 'Dose Assessment & Protective Action' Section M, 'Recovery and Reentry' 5.2, 'Recovery & Reentry' BASIC PURPOSE OF THIS ERO POSITION:
Responsible for coordinating site radiological response efforts in coordination with the State and County's. Responsible for notifying the State and Counties of changes
Time constraints to keep in mind during the event:
15 minutes to declare a PAR change, or update, once conditions are recognized
- ENS (NRC) notified of changes to EALs - As soon as possible but within 60 minutes of event declaration)
I
it
!KS I
t !'
- ' ! Xi a
iiiilt i;,
zj;
-j
- d.
e~
X
~
"E-l;
-;;it; Xf ACTIVATION Verify the following positions are filled:
Field Team Director (May be at TSC.
Contact SRPC to have 1 FT Director relocate to the EOF when the EOF is to be activated) l MIDAS Operator Radiological Assessment Coordinator (RAC)
(this position is necessary to declare the EOF operational.)
Rad Data Plotter HPN Communicator (May be at TSC.
Contact SRPC to have HPN Communicator relocate to the EOF when the EOF is to be activated)
- 2.
From the RAC:
Verify dose projection capability Verify radio operability Verify EOF ready to assume Command &
Control of the Offsite Field Teams (pending possible relocation of FT Director)
Verify Rad Data Line operability
- 3.
Communications:.
Verify State & County communication paths open as necessary:
Establish communications with the State & Counties via the ADMIN HOT LINE (786-8172) or call the state.
[NOTE: No need to maintain this line open, i.e., putting the headset in the drawer. Call when desired to brief the state & counties.]
I
DAEC MERGN~Y ESPO SE.ORGANIZATOW POSTIN SPECIFIC CHECKLST
- 4.
Status (From SRPC):
EAL Declared:
-(time) update PAR board)
PAR Declared:
(time) (update PAR board 50m Wind Direction given on last NOTE-05:
50m Wind Speed given on last NOTE-05:
Standby Gas Treatment Status:
Rx shutdown? (From Rx Eng via SRPC)
Status of release:
Start time:
Release point:
Filtered and/or unfiltered release?
(from last NOTE-05):
Field Teams:
Location of FT 'A':
Location of FT'B':
Field survey results consistent with dose projections?
Plume:
Characteristics:
Plume exposure rates:
Plume edges:
I
!DAE EMERGENYRSOS GAIA O4 OPERATION
- 1.
Brief the RAC of the status of Rad Pro issues.
- 2.
Verify ERDS and SPDS are operational in the EOF.
- 3.
When the EOF is declared Operational:
Notify the State & Counties via the Admin Hotline Notify the State via the 'Red Phone" (Line #2, 6666)
ONGOING
- 4.
Periodically brief the State & Counties, via the Admin Hotline, of the status of the emergency.
- 5.
Work with the RAC to ensure that Field Teams are periodically briefed of the status of the emergency.
- 6.
Work with the RAC to ensure that the PAR Board is kept up to date.
- 7.
Work with the RAC to ensure that the State PAR Display is kept up to date.
- 8.
Work with the RAC to continually monitor potential PAR changes based upon:
Change in wind direction requiring subarea changes.
Change in dose projections requiring a PAR change.
Field Team results inconsistent with dose projections.
- 9.
Ensure to inform the EOF Communicator of pertinent information for display on the ESB. (PARs recommended by the site, State Protective Actions, status of evacuation, etc.)
- 10.
Assist the EOF Ops Liaison in looking ahead for changes in EALs.
- 11.
Keep the ER&RD apprised of ongoing status.
- 12.
Iflwhen subarea 23 is evacuated, notify JPIC to relocate to alternate location.
I
.bAE EMREC REPOS ORGANIZATIONGo 5-POSIION I'ECFI HECLIST STATE & COUNTY NOTIFICATIONS s>
[Time requirements:
15-min from CLASSIFICATION to MESSAGE INITIATED for State/County notification.
ASAP) but within 60-min from CLASSIFICATION, to notify the NRC via the ENS line, by the HPN Communicator.]
I.
Assist the ER&RD and EOF Ops Liaison in developing the NOTE-05.
- 2.
If time permits, i.e. can be performed and still meet the 1 5-min requirement for State/County notification, discuss potential PAR changes with the State via the 'RED' phone (line #2, 6666) and annotate on NOTE-05 the State Protective Actions (block 14).
- 3.
Using the approved NOTE-05 (peer check prior to contact),
contact the State & Counties, via the ADMIN HOT LINE, and notify the State & Counties as follows:
- a. INTERRUPT ALL CONVERSATIONS on the ADMIN HOTLINE informing them that DAEC has an announcement.
- b. Perform an initial roll call, noting the time the first State or County responder states that they are there. Note this time, and date, on NOTE-05.
- c. Read NOTE-05 as follows, for example, "This is a DAEC emergency action level notification. Block 1, bravo, drill. Block 2, charlie, EOF. Block 3, delta, etc."
- d. Inform the State & Counties of who you are, which facility you are calling from, & the time you completed the message.
- e. Perform a FINAL ROLL CALL and obtain the initials of the State & County recipients of the notification.
- 4.
Have the Messenger fax NOTE-05 to the State/Counties.
- 5.
Ensure that the HPN Communicator informs the NRC of the EAL change, via the ENS line.
I
DAEC MENGY !F PONS ORGANZTO 17 5
D~l:0;..
)
1C E KL RECOVERYiREENTRY
- 1.
Coordinate with the ER&RD, RAC, & SRPC to develop implement a RecoverylReentry Plan in accordance with EPIP 5.2 and EPIP Forms EOF-28 & EOF-29.
I
USA:~~~~~~~~~~~~~~~~~~~~~~~
~
~~~~~
w FACILITY:
EOF ERO POSITION: EOF OPERATIONS LIAISON EPIP FORM EOF-09 REVISION #: I NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' Section D, 'Emergency Classification System' Section E, 'Notification Methods and Procedures' 1.1, 'Determination of Emergency Action Levels' 1.2, 'Notification' 1.5, 'Activation and Operation of the EOF' 5.2, 'Recovery and Reentry' BASIC PURPOSE OF THIS ERO POSITION:
This position is responsible for looking ahead to the next EAL or PAR declaration, to assist the ER&RD and Rad & EOF Managerin making EALIPAR declarations, to generate the paperwork necessary to make EAUIPAR declarations, and to ensure that the State, Counties, and the NRC get notified.
, ;, =~~~~~~~~~~~~~~~~~~..
.........e...
dj; P DAEC EMERGENCY RESPONS OGANIZATION.,
ACTIVATION P
S Report to the EOF, sign in, acquire position badge & handbook. Utilize checklist, as a guide.
Receive a briefing from the TSC Ops Liaison to ensure you are aware of the current plant status.
OPERATION Track control room implementation of EOPs and inform the ER&RD when EOPs are entered or exited.
Track TSC implementation of SAGs and inform the ER&RD when SAG paths are entered or exited.
Monitor plant status and inform the ER&RD and Rad & EOF Manager when EALs are entered or when a change in the EAL classification is warranted.
When an EAL/PAR is declared or downgraded, perform the following:
Complete NOTE-05, ensure to obtain input from the Rad & EOF Manager on the PAR. Ensure that the ER&RD approves the NOTE-05.
Give the approved NOTE-05 to the Rad & EOF Manager to make the notifications to the State and Counties.
Complete NOTE-02, and NOTE-03 and ensure the ER&RD approves them.
Give the NOTE-02 to the Support Services Coordinator to implement Give the NOTE-03 to the HPN Communicator to implement.
Make sure the DAEC Plant Page announcement is made in accordance with NOTE-06 (performed by TSC).
Collect all paperwork from notification once they are all complete Inform the ER&RD that all notifications/announcements are completed Inform the EOF Communicator of the time when the event was declared and when State, County, and Federal notifications were completed for entry on the Electronic Status Board.
Advise the ER&RD and Rad & EOF Manager on any matter that pertains to the operation of the DAEC.
RECOVERY Assist the ER&RD during the recovery/reentry phase.
OAEC EMERGENCYi REPNEOG
- ZATION, POSITIONT CPEIFIC CHECKLISt FACILITY:
TSC/EOF EPIP FORM EOF-12 ERO POSITION: Field Team Director REVISION #: I NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's 1.5, 'Activation & Operation of the EOF' Section B, 'Emergency Response Organization' 2.1, 'Activation & Operation of the OSC' 2.2, 'Activation & Operation of the TSC' Section, 'Accident Assessment' 2.8, 'Security Threat' Section J, 'Protective Response' 3.2, 'Field Radiological Monitoring' Section K, 'Radiological Exposure Control' 3.3, 'Dose Assessment & Protective Action' Section M, 'Recovery and Reentry' 5.2, 'Recovery & Reentry' BASIC PURPOSE OF THIS ERO POSITION:
Directs the Field Teams. Coordinates offsite radiological monitoring performed by DAEC with the State and Federal organizations. Ensures State Field Team Captain is kept apprised of site dose projections.
2 Field Team Directors report to the TSC initially, to direct the Offsite and Onsite Field Teams. When the EOF is to be activated, I Field Team Director will relocate to the EOF to assume control of the Offsite Field Teams while the remaining Field Team Director maintains control of the Onsite Field Team. During the transition, the remaining Field Team Director will control all Field Teams with assistance from the Rad Support Staff as requested.
EOF-12 Rev.
Page I of 5
EEMERGEN RE S P E S P ONSE O G I
gANI ZAT II POSITION SPECIFIC!'CHECKLIST ACTIVATION
- 1.
Report to the TSC, swipe in the Accountability Card Reader
, sign in on the Staffing Board, acquire and wear your position badge and SRD (when in the TSC).
- 2.
Verify/setup the following:
- i. Headset amplifier on-off switch to ON ii. Headset amplifier volume turned up iii. Volume control on radio turned down iv. Repeater switch on radio to position #1
- i. Vertical section (top portion)
- 1. Ch 1 push-button, OUT
- 2. Ch 2 push button, IN
- 3. Ch 3 push-button, IN
- 4. Ch 5 push-button, IN
- 5. Unselected Volume, full counterclockwise ii. Horizontal section (bottom portion)
- 1. On/Off switch, ON
- 2. Ch I push-button, DOWN
- 3. Ch 2 push-button, UP
- 4. Ch 3 push-button, UP
- 5. Ch 5 push-button, UP
- 6. Speaker Volume, adjust as necessary
- 7. All mute push-button, UP
- 8. "Pi: Monitor push-button, UP
- 9. Speaker mute, DOWN EOF-12 Rev. I Page 2 of 5
DAEC EMERGENCY i'--ES
.E OGNAO POSIION PIC CHECKLIST
- 10. Tone Alert, UP 11.Intercom, UP
- 3.
Perform a Radio Check with all Field Teams (once dispatched)
- a. Offsite Team 'A'
- b. Offsite Team 'B'
- c. Onsite Team
- 4.
Obtain plotting supplies and equipment.
OPERATION
- 1.
Inform the SRPCIRAC that contact has been established and that your are ready to control the Field Teams
- 2.
Assume control of the Field Teams as directed.
- 3.
Obtain team information:
- a. Offsite Team #1
- i. Location:_
ii. Vehicle type, color, make, model, year, license #:
iii. Current exposure rates:
iv. Personnel names/badge #s:
- v. Personnel dose:
vi. Last instructions given:
- b. Offsite Team #2
- i. Location:_
ii. Vehicle type, color, make, model, year, license #:
EOF-12 Rev. I Page 3 of
-i;-iDAEEMERGE YR ffO; d-G A
-~~~~~~~~~~~~~~~~~~~~~
'i.-,j J ' I '1 1 1`1 Go t ie iii. Current exposure rates:
iv. Personnel names/badge #s:
- v. Personnel dose:
l vi. Last instructions given:
l
- c. Onsite Team
- i. Location:_
ii. Vehicle type, color, make, model, year, license #:
iii. Current exposure rates:
iv. Personnel names/badge #s:
- v. Personnel dose: __
vi. Last instructions given:
ONGOING
- 4.
Brief the Field Teams periodically, or as conditions warrant, on the following:
- a. Event classification
- b. PAR determination
- c. State/County protective actions
- d. Plant status
- e. Met conditions and forecast
- f. Projected exposure rates
- g. Anticipated plume location EOF-12 Rev. I Page 4 of S
DAEC EMERGENCY~~ RESPOS ORAIZATIONIFi
,POSITION4 SPECFIC CHECKLIST
- 5.
Consider replacing TLD and particulate/iodine filters at environmental sample stations (coordinate with SRPC/RAC).
- 6.
Keep the State Field Team Captain apprised of team locations and results, and likewise keep informed of State Field Team locations and results.
Coordinate with the RAC.
- 7.
Ensure that all rad data boards are kept up to date.
- 8.
Keep accurate logs in accordance with EPIP 3.2 & 3.3 DIRECTING FIELD TEAMS
- 9.
Onsite Field Team
- a. As directed by the SRPC.
- i. May be asked to perform habitability checks of the Badging Center, PSC, Training Center, etc.
ii. May be asked to monitor the area around the site to assist in determining release paths.
- 10.
Offsite Field Teams
- a. Use the grid coordinate system
- b. Anticipate plume location based on wind direction & speed
- c. Determine a traverse for the team to locate and define the plume
- d. Make plume traverses wide enough to find a meandering plume (approximately 1 mile beyond the suspected plume edge)
- e. Initially define the plume with a few fixed point survey readings, then request more surveys to refine the plume shape
- f. After finding the leading edge of the plume, have one team continue to track the leading edge while another team traverses the plume to find the maximum radiation fields, plume edges and the trailing edge.
- g. Request plume centerline air samples after the plume has been defined
- h. Monitor team personnel doses and request dose extensions from the SRPC/RAC as required
- i. Request soil, water, & vegetation samples when requested by the SRPC/RAC
- j. Arrange sample transport to a laboratory for analysis when necessary, coordinate with the SRPC/RAC and ORAL Supervisor.
EOF-12 Rev. I Page 5 of 5
DbAEC MERGENCY ESPONSE ORGNZTO JOI JO SPECIFI CD-ECK-.ST FACILITY:
EOF ERO POSITION: Rad Assessment Coordinator EPIP FORM EOF-16 REVISION #: 2 NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' 1.5, 'Activation & Operation of the EOF' Section 1, 'Accident Assessment' 2.8, 'Security Threat' Section J, 'Protective Response' 3.2, 'Field Radiological Monitoring' Section K, 'Radiological Exposure Control' 3.3, 'Dose Assessment & Protective Action' Section M, 'Recovery and Reentry' 5.2, 'Recovery & Reentry I
BASIC PURPOSE OF THIS ERO POSITION:
Directs the Field Teams & coordinates with the Rad & EOF Manager and SRPC performance of dose projection activities. Coordinates offsite radiological monitoring and dose assessment performed by DAEC with the State and Federal organizations.
Works with the Rad & EOF Manager to ensure PARs are properly developed based upon dose projections and/or Field Team results. Ensures State Filed Team Captain is kept apprised of site dose projections.
Time constraints to keep in mind during the event:
15 minutes to declare a PAR change, or update, once conditions are recognized State & County notifications (EAL and PAR) - 15 minutes from event declaration or change I
Po pAEC H
CECL ACTIVATION
- 1.
Verify the following positions are filled:
Field Team Director (May be at TSC.
Contact SRPC to have 1 FT Director relocate to the EOF when the EOF is to be activated)
MIDAS Operator Rad Data Plotter l
- 2.
Verify/setup the following:
Verify dose projection capability (MIDAS Operator)
Verify radio operability Verify EOF ready to assume Command &
Control of the Offsite Field Teams (pending possible relocation of FT Director)
Verify "Rad Data Line" operability
DAE CEME RGEC EPOS RANZTO
- 3.
Status (From Rad & EOF Manager):
EAL Declared:
(time) (update PAR board)
PAR Declared:
(time) (update PAR board) 50m Wind Direction given on last NOTE-05:
50m Wind Speed given on last NOTE-05:
Standby Gas Treatment Status:
Rx shutdown? (From Rx Eng via SRPC)
Status of release:
Start time:
Release point:
Filtered and/or unfiltered release?
(from last NOTE-05):
Field Teams:
Location of FT 'A':
Location of FT 'B':
Field survey results consistent with dose projections?
Plume:
Characteristics:_
Plume exposure rates:
Plume edges:
I
>~~~~~~~~~~k 0-
'- f -- 4a SA t l Si DAE C E RGNVRESPONSE~ OR ANIZATIN~i
,.,,~ ~
~~~~PA f.Q1.As OPERATION
- 1.
Brief the 'Glasshouse' of the status of Rad Pro issues.
- 2.
When ready to assume responsibility for Dose Projections and Field Teams, notify the Rad & EOF Manager.
- 3.
When directed to assume responsibility for Dose Projections, have the EOF MIDAS Operator coordinate with the TSC MIDAS Operator to ensure that transfer is accomplished. Use Information Services to assist in ensuring a smooth transfer as necessary.
- 4.
When directed to assume responsibility for Field Teams, ensure that the FT Director has relocated to the EOF and coordinate with the SRPC to complete the transfer.
ONGOING
- 5.
Periodically brief the ORAIODEF and Field Teams of the status of the emergency.
- 6.
Work with the Rad & EOF Manager to ensure that the PAR Board is kept up to date.
- 7.
Work with the Rad & EOF Manager to ensure that the State PAR Display is kept up to date.
- 8.
Work with the Rad & EOF Manager & MIDAS Operator to continually monitor potential PAR changes based upon:
Change in wind direction requiring subarea changes.
Change in dose projections requiring a PAR change.
Field Team results inconsistent with dose projections.
- 9.
Ensure to inform the EOF Communicator of pertinent information for display on the ESB.
- 10.
Keep the Rad & EOF Manager apprised of ongoing status.
I
DAEC EERGENCY~ RSPONSE ORANIZTIO 0
9..
I. 1Z 1
i.
POSITION SPECIFIC CHE CKLIST.
- 11.
Ensure Dose Projections and Field Team reports are reviewed ASAP so as to quickly identify potential changes to PARs. If it is determined that a change in PARs may be warranted, IMMEDIATELY have the RAD & EOF Manager review the information and take the appropriate action(s).
- 12.
Verify plume characterization:
Plume exposure rates:
Air samples:
Plume edges:
Environmental samples:
Air sample station samples:
Identify additional dose projections based on changes in:
Weather forecast Release rates Release points Release duration Drywell/Torus radiation monitor readings
I-DAECEMEGENMAR~ PON,,SE!ORGNZTO 4 f 'I i
i; At P 'at A;
.P obj
, j,
-I, !
>~~~~~~~~
~ ',ntiipaed RECOVERYIREENTRY
- 1.
Coordinate with the ER&RD, Rad & EOF Manager, & SRPC to develop implement a Recovery/Reentry Plan in accordance with EPIP 5.2 and EPIP Forms EOF-28 & EOF-29._
EOF SECURITY ACCESS CLERK CHECKLIST Page 1 of 2 The following checklist is available for use by the Security Access Clerk in the EOF on the 15th Floor as a guide to ensuring that emergency response actions are completed. The column to the right can be used to put either a check when an item has been completed or any notation which will be of assistance to the user.
- 1.
Upon notification that the EOF is being activated, report to the 15th floor of the Alliant Tower.
- 2.
Ensure that the entry doors remain closed and/or monitored.
- 3.
Set up access table.
- 4.
Obtain supplies:
- a.
Personnel Access Logs and Pen
- b.
Digital clock
- c.
Badges, alligator clips and plastic badge holders
- 5.
Complete set up of access area near the 15th floor lobby.
- 6.
Process EOF staff as they arrive.
- 7.
Ensure that all EOF staff have name and position badges and have K>
signed in on the Personnel Access Log.
- a.
Use Form EOF-18 from Appendix 1 of the EPIP manual to ensure that those present are accounted for and to identify those positions not yet filled and inform the ER&RD.
NOTE If an actual event occurs, only post the "Access Limited to Authorized Personnel Only" sign.
- 8.
Post appropriate signs on the doors:
- a.
"DRILL NOTICE"
- b.
"ACCESS LIMITED TO AUTHORIZED PERSONNEL ONLY" EOF-17 REV. 3
EOF SECURITY ACCESS CLERK CHECKLIST Page 2 of 2
- 9.
Post emergency classification signs (ALERT, SITE AREA EMERGENCY or GENERAL EMERGENCY) as appropriate when the emergency classification changes.
- 10.
Notify the ER&RD when your area is completely set up.
l
- 11.
Process any incoming telephone calls as described in EPIP 1.5 i
- 12.
Ensure that Support Services personnel who are delivering equipment and/or supplies for emergency use sign-in and out on the Personnel Access Log.
- 13.
Sign in and out key EOF staff.
- 14.
Address access questions to the ER&RD
._l EOF-17 REV 3
EOF STAFFING ACCOUNTABILITY ROSTER Page 1 of 1 4;IAE e~odr
- El izabeth U.,
"j;
'St 0 C d
eshbn-der's"I Eftre-s-n,
'r, w
i,
^ ER&RD NRC Representative
- Radiological and EOF Manager NRC Representative
- Radiological Assessment Coordinator NRC Representative
- Support Services Coordinator FEMA Representative Field Team Director (may be in TSC until needed In EOF. Contact Rad & EOF FEMA Representative Manager for status)
Radiological Data Plotter FEMA Representative EOF Communicator FEMA Representative Technical Recorder State EMD Representative Security Access Clerk Benton County Representative MIDAS Operator Unn County Representative nnation Services Representative State Health Dept. Representative Information Services Representative Messenger NRC-HPN Communicator 4
4 4
- = Required responders for EOF activation (all are 1-hr responders)
Notify the ER&RD of any DAEC positions that are vacant.
EOF-18 Rev. 4
EOF STAFF RESPONSE ositi
- Requlred Response Time Emergency Response and Recovery Director I hour'*
Radiological and EOF Manager I hourP Radiological Assessment Coordinator 1 hour*
Support Services Coordinator I hour' EOF Ops Liaison I hour**
Field Team Director (may be in TSC initially) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> NRC-HPN Communicator 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Radiological Data Plotter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Security Access Clerk 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EOF Communicator 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> l
Technical Recorder 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Messenger 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EOF MIDAS Operator 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EOF Information Services Representative 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EOF Information Services Representative 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />
- At a Site Area or General Emergency
EOF-32 Rev. 4
EMERGECY PLAN IMPLEMEN GPOEDURE ERO-01 Rev.
I ERO POSITION EQUIVALENCY TABLE Page I of 6 ERO POSITION EQUIVALENCY TABLE (1)
ERO Position Equivalency Table: A table used to provide guidance for determining which ERO positions can be called upon to support other ERO positions where skill sets and training are similar.
(a)
In the event that timely augmentation with qualified ERO responders becomes suspect, the ER&RD and EC have the authority to appoint plant personnel to staff these positions until a qualified responder can respond (reference E-Plan TB" & EPIP 1.5, 2.2)
(b)
This ERO Equivalency Table provides a subset of positions with similar skill sets to allow the ER&RD or EC to determine who should staff what.
NOTE Staffing via the Equivalency Table shall only be until a qualified responder is available.
Positions staffed by the Equivalency Table shall receive increased direction & oversight, and shall be appropriately documented.
(2)
When staffing ERO positions with additional staff, use this table as follows:
(a)
Determine the ERO position you wish to staff (b)
Determine if additional ERO personnel equivalent to the open position are available (i) If an alternate is not available for the open position, staffing the open position with anyone else is satisfactory.
However, as much as possible, adherence to this equivalency table should be maintained.
(c)
Staff the open ERO position with the additional ERO staff member (d)
Provide additonal direction and oversight to this staff member (e)
Continue to locate qualified ERO staff members for the given position.
(3)
This staffing decision shall be documented in the logs of the ERO Staff member making the decision.
I1
- - R-TO ETB FOR QUALIFIED STAFF J
y
)
ERO-C
)
I EMERGENC'~~~~ PLAN IMPLEMENTI% #1ROCEDURES
~~RGEERO-01 Re.
ERO POSITION EQUIVALENCY TABLE Rae.
f ERO OITION QiVLNTPSTO ADMIN SUPV TSC CLERICAL ISECURITY SUPV ASST JPIC MANAGER WEBMASTER AV SPECIALIST LOGISTICS SUPPORT/I LOGISTIC COORDINATOR BENTON COUNTY LIAISON ANY STATE COUNTY LIAISON CHEM TECHS CHEM STAFF CR COMM TSC COMM DAEC SPOKESPERSON JPIC MANAGER EMERGENCY COORDINATOR TECH & ENG SUPV I TSC OPS SUPV IC/EM ENGINEER ANY ERO ENG ICIEM SUPV ANY OSC SUPV ELECTRICIANS IC/EM ENG OR SUPV
- - REFER TO ETI3 FOR QUALIFIED STAFF ERO-01
ME-O-EME Y PLA I PR UES
< ERO01 ERO POSITION EQUIVALENCY TABLE Re.
Page 3 of 6 E...
RO PROSITION~l
,EQUIVALENT: POSTION.
0 0. t '. 0.";.',:.'r'".
. .E 1.
>;i' "-1i'l.'
' D' l'.i"E at. ' ', "
' " '" ' ' '"." '"' ' '~ ~ ~ ~ ~ ~ ~~~~~~~!!""Phamacutial" EOF HPN COMM TSC HPN / TSC ENS COMM EOF MIDAS OPERATOR RAD PRO STAFF EOF OPS LIAISON TSC OPS SUPV I TSC OPS LIAISON I OSM-CRS-STA ER&RD NONE FIELD TEAM DIR RAD SUPPORT STAFF / RAC FIELD TEAM DRIVER
- ANYONE WITH A DRIVER'S LICENSE FIELD TEAM MONITOR
HP STAFF I&C TECHS IC ENG I IC SUPV INFO SERVICES REP EDS FROM TSC OR EOF JPIC MGR ASST JPIC MGR / TECH LIAISON
- - RF' 7 TO ETB FOR QUALIFIED STAFF ERO-C
)
1, I I
4 URI5,':5 IMPLE Ef,
-01 F71 ERO POSITION EQUIVALENCY TABLE IRev.I Page 4 of 6
~~E~~~Q~1TION.
EQUIV~~~ALEN OTN JPIC SECURITY ACCESS CLERK LOGISTICS SUPPORT/ I PO SUPPORT LINN COUNTY LIAISON ANY STATE COUNTY LIAISON LOGISTICS COORD JPIC MGR ASSISTANT JPIC MGR LOGISTICS SUPPORT SPECIALIST P1O SUPPORT MECHANICAL ENGINEER ANY ERO ENG MECHANICAL SUPV ANY 080 SUPV MECHANICS MM ENG I MM SUPV MESSENGERS POOL EOF NEWS MEDIA RUMOR CONTROL ASST JPIC MGR ORAA SUPV ANY RAD PRO STAFF ORAL/ODEF SUPV ANY RAD PRO STAFF OSC STAFF (RADWASTE)
POOL TSC,
- - REFER TO ETB FOR QUALIFIED STAFF EOO ERO-01
EME^;
RGENCY PLAN M ERO-01 ERO POSITION EQUIVALENCY TABLE Rev.
Page 5 of 6 0 S ; ! ERO POSITION i,,EQUVALENT POSTION;;
OSC SUPV ANY OSC SUPV PIO SUPPORT LOGISTICS SUPPORT / LOGISTISC COORDINATOR RAC RAD & EOF MGR RAD & EOF MGR SRPC RAD DATA PLOTTER INFO SERVICES RAD SUPPORT STAFF SRPC TSC OR EOF HPN COMM RUMOR CONTROL COORD ALLIANT CUSTOMER SERVICE SUPV RX ENGINEER STA SECURITY & SUPPORT SUPV SECURITY LT.
SECURITY ACCESS CLERK POOL EOF SRPC HPSUPV STATE LIAISON ANY COUNTY LIAISON
- - REr TO ETB FOR QUALIFIED STAFF
.0 ERO-)
EMRGrrC LAN IMPL rENTN:.AOC DURE
'9, 1Rev.
1 ERO POSITION EQUIVALENCY TABLE Page 6of6 E 1;
.T t
.i D
>t;;
.i o
E Q U I V A L E N T P O S T I O W.
SUPPORT SERVICES COORD POOL FROM EOF TECH & ANALYSIS ENG ANY PRA QUALIFIED ENG OR STA TECH & ENG SUPV ANY ERO ENG TECHNICAL LIAISON ASST JPIC MGR / ANY ENG OR OPS LIAISON / SPOKESPERSON TECHNICAL RECORDER TSC DED COMMUNICATOR / ANY STATE & COUNTY LIAISON TSC CLERICAL PLANT POOL EOF COMM TSC-CR / CR-TSC COMM TSC COMM CR-TSC COMM TSC-OPS LIAISON EOF OPS LIAISON / TSC OPS SUPVI OSM-CRS-STA
- - REFER TO ETB FOR QUALIFIED STAFF ER01
0 EMERGENCY PLAN IMPLEMENTING PROEDURES NOTE-07 Rev. 2 BASIC NOTIFICATION FLOWPATH Page 1 of 2 STAcopletes }
_l_l_
OSM approves NOTE-05
_1
_Initial State and County Notifications STA completes from the Control NOTE-02, NOTE-Security Lt, or Room 03, NOTE-04, and STA. performs NOTE-01 (ifnoicaon applicable).
1Ops crewmember performs NOTE-Communctor performs NOTE-
- 02. and if o
NOTE-ll 04 ll llnecessary NOTE-03 efnn OE I
NOTE-07
EMERGENCY PLAN IMPLEMENTING PROCEDUPES NOTE-07 Rev. 2 BASIC NOTIFICATION FLOWPATH Page 2 of 2 State and EOF Ops Uason ER&RD approves County NOTE-05 Notifications from the EOF EOF Ops Liason I
II~~~~~~~~~~~~~~~~
coFpes LNaoTEr Rad & EOF Mgr Messenger/Supp
_ompletes NOTEI performs Serv Coord Faxes 02dOesired) notifications NOTE-05 EOFHPN Messenger/Supp Communicator Serv Coord informs NRC of performs NOTE-event (use NOTE-02 03 as a guide if desired)
EOF OPS Uaison collects NOTE-02, 03,05 NOTE-07
OSC MINIMUM STAFFING LEVEL POSITION 30 MIN 60 MEN REFERENCE Operational Support 1
DAEC Plan Center Supervisor HP Supervisor 1
DAEC Plan Maintenance Supervisor 1
DAEC Plan Electrical and I&C 1
DAEC Plan Supervisor Health Physics 5
4 NUREG 0654 and DAEC Plan Technicians
- 1. Offsite Survey
- 2. Onsite Survey,
- 3. Inplant Surveys
- 4. Access Control/Dosimetry
- 5. Coverage for: Repair, Search&Rescue, First aid, Fire fighting.
- 6. Habitability Mechanics 1
NUREG 0654 and DAEC Plan Electricians 1
NUREG 0654 and DAEC Plan I & C Technicians 1
NUREG 0654 and DAEC Plan Chenistry Technicians 1
NUREG 0654 and DAEC Plan OSC Staff Personnel 1
2 NUREG 0654 and defined in the DAEC Plait l
OSC-03 Rev. 2 I
IC/EM and MECHANICAL MAINTENANCE SUPERVISOR The following checklist is available for use by the IC/EM and Mechanical Maintenance Supervisor or another individual, so designated, as an aid in ensuring that emergency response actions are completed.
ITEM
- 1.
Relocate magnetic nameplate to appropriate location on Emergency Assignment Staffing Board.
- 2.
Report to the OSC Supervisor.
- 3.
Plan work packages with assistance of engineering personnel in the TSC.
- 4.
Select personnel for repair teams appropriate to the work being conducted.
Additional personnel can be obtained from the assembly areas.
- 5.
Conduct briefing (Electricians, I&C Technicians, and Mechanics) on work activities and ensure they have received a briefing from the HP Supervisor if appropriate, prior to their dispatch for repair activities.
- 6.
Ensure team status board is updated.
OSC-10 RevI I
YAC EMEGEC RE--ONS O-ANZATION 7=
FACILITY:
TSC ERO POSITION: EMERGENCY COORDINATOR EPIP FORM TSC-01 REVISION #: 4 NAME:
I DATE-_
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' Section D, 'Emergency Classification System' Section E, 'Notification Methods & Procedures' Section H, 'Emergency Facilities Staffing, Activation and Equipment'Section I, 'Accident Assessment' Section J, 'Protective Response' Section M, 'Recovery and Reentry Planning and Post-Accident Operation' 1.1, 'Determination of EAL's' 1.2, 'Notification' 1.3, 'Plant Assembly and Accountability' 2.1, 'Activation & Operation of the OSC' 2.2, 'Activation & Operation of the TSC' 3.3, 'Dose Assessment & Protective Action' 4.5, 'Administration of Kl' 5.2, 'Recovery & Reentry' BASIC PURPOSE OF THIS ERO POSITION:
This position assumes command & control responsibility for the ERO from the OSM/OSS.
Responsible for coordinating the total response effort of the ERO. Reports to the ER&RD who may assume some aspects of the emergency response effort ifAvhen the EOF becomes operational Time constraints to keep in mind during the event:
15 minutes to declare an event once conditions are recognized State & County notifications (EAL and PAR) - 15 minutes from event declaration or change ENS Notified - As soon as possible but within 60 minutes of event declaration ERDS activated - Within 60 minutes of initial event declaration Accountability - Completed within 30 minutes of event declaration Facility Activation within 30 minutes (30 minute positions filled or assigned)
TSC-01 Page 1 of 6
DAECiEMERAGENCYRESPONS ORGAZ IO ACTIVATION Report to the TSC, sign in, acquire position badge and position specific manual.
Utilize EC checklist, as a guide.
Report to the Control Room to receive a detailed turnover from the OSM.
Reference form CR-04. Before returning to the TSC, complete all elements of the checklist including leaving an emergency message volicemail as described in CR-04.
Verify notifications and protective action recommendations are completed in accordance with EPIP 1.2, Notifications" If the Control Room is unable to perform or complete required notifications, verify that the required notifications are completed from the TSC.
Notifications and PAR's must be completed within 15 minutes of event -
declaration. This includes initial declarations, upgrades, downgrades and cancellations.
Confer with the Tech & Eng Supervisor to determine if the TSC/OSC is activated.
(NOTE: The facility is considered activated when all 30-minute ERO positions are filled or assigned.)
Document activation date:
time:
Relocate to the TSC and provide the TSC/OSC an initial briefing summarizing the event and setting priorities.
Confer with the Security and Support Supervisor on the status of plant accountability.
Inform the ER & RD of the operational status of the ERO and status of accountability.
TSC 01 Page 2 of 6
DAECEMERENC RESONS ORGi~ZATIO OPERATION At the discretion of the EC, the authority to dispatch rescue/repair teams may be delegated to the Tech & Engineerng Supervisor and/or OSC Supervisor.
ON-GOING TASKS TO BE PERFORMED THROUGHOUT THE EVENT Periodically (at least every 30-minutes, or as conditions change) brief the TSC/OSC staff on the current status of the plant and response actions being taken to mitigate the event. The following information should be given as applicable, ensure to give the facility a 'heads-up' so conversations can cease:
Plant status Significant changes or problems Response actions in progress Planned response actions Habitability concerns Check of Self-Reading Pocket Dosimetry (SRPD)
Reminder to keep extraneous conversations to a minimum Reminder to use phonetic alphabet and 3-Part Communications Direct the TSC Staff on applicable tasks to be carried out.
Direct the Site Radiation Protection Coordinator on applicable tasks to be carried out by the radiation protection staff.
Coordinate accident assessment and analysis efforts to determine the full scope and impact of the emergency.
Coordinate efforts to return the plant to, and maintain it in a safe, stable condition.
TSC 01 Page 3 of 6
Apprise Company, local, State, and Federal officials and agencies of updated information pertaining to the emergency condition.
Provide periodic updates to local, State and Federal officials and agencies.
Provide accurate plant status information to the JPIC.
Classify/Reclassify the event as necessary. This responsibility may not be delegated.
Approve Protective Action Recommendations. This responsibility may not be delegated. (Ensure to include the SRPC when deciding on PARs)
Approve extensions on exposure limits for emergency workers. This responsibility may not be delegated.
Select and prioritize response actions to be pursued and ensure this information is transmitted to the OSC Supervisor.
Verify that the Security and Support Supervisor has arranged for continuous coverage by ERO personnel, for events of a protracted nature.
Update the ER & RD on plant status, response options in progress, protective action recommendations, etc.
If it is anticipated that escalation beyond the ALERT level will occur; Authorize the OSC Supervisor to activate the ORAA (confer with the SRPC to ensure the radiological conditions will not have any impact) or the alternate ORAA.
Authorize the evacuation of all non-essential personnel, as necessary.
Authorize the OSC Supervisor to activate the Offsite Radiological and Analytical Laboratory (ORAL) and Offsite Decontamination Facility (ODEF).
TSC 01 Page 4 of 6
MAC'EMERGIONCY kSP EOG IZATION""
If the TSC becomes uninhabitable, relocate the following TSC positions to the Control Room, (the EC may add to this list, or remove some from this list as conditions dictate). All other TSC staffing may be relocated to other locations deemed appropriate by the EC (if conditions permit, the remaining TSC personnel would relocate to the EOF, and OSC personnel would relocate to the ORAA).
Emergency Coordinator TSC-Ops Supervisor SRPC ENS Communicator Security & Support Supv Rx Eng MIDAS Operator Admin Supervisor EOF ACTIVATION Upon activation of the EOF, facilitate the transfer of the following responsibilities to the ER & RD. Use TSC-02 as a guide to facilitate transfer (fax completed form to the EOF).
Offsite communications.
Notifications to local, State and Federal agencies (note: TSC ENS Communication will remain in the TSC).
Dose projection and dose assessment activities.
Development and transmittal of PAR's.
EAL upgrading, downgrading or cancellation.
Recovery activities.
TSC-01 Page 5 of 6
A E
EMERGEN R
O ORXANIATI7 NRC SITE TEAM Brief the NRC Site Team upon arrival on the following topics:
Event sequence.
Plant status, major problems and corrective actions being taken or planned.
Dose projection results and PAR's.
Onsite radiological concerns Offsite radiological concerns Meteorological conditions EPZ implemented actions Prognosis of the event.
Potential need for Tech. Spec./license deviations.
RECOVERY Coordinate with the ER & RD to initiate recovery planning.
Deactivate emergency response centers.
Direct the Tech & Engineering Supervisor to prepare a written summary upon downgrading from an ALERT or greater. Topics to be covered should be summary of the event, response actions taken or in progress, significant problems which require further evaluation before resolution.
TSC-01 Page 6 of 6
t/
.DA NCYRES NIATIOa FACILITY:
TSC ERO POSITION: SITE RAD PRO COORDINATOR EPIP FORM TSC-03 REVISION : 2 NAME:
DATE:__
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' Section J, 'Protective Response' Section K, 'Radiological Exposure Control' Section L, 'Medical and Public Health Support' Section M, 'Recovery and Reentry Planning and Post-Accident Operation' r
1.3, 'Plant Assembly and Accountability' 2.1, 'Activation & Operation of the OSC' 2.2, 'Activation & Operation of the TSC' 3.3, 'Dose Assessment & Protective Action' 4.5, 'Administration of KI' 5.2, 'Recovery & Reentry' BASIC PURPOSE OF THIS ERO POSITION:
This position is responsible for all on-site radiological activities and protection. Also responsible for the On-Site Field Team and the Off-Site Field Teams until the EOF relieves the SRPC of Off-Site Field Team responsibility. Also, assist the EC in making PARs.
TSC 03 Page 1 of 5
E1VIERG
~
~
~
RG'NIZ
`77 ACTIVATION Report to the TSC.
Swipe in the emergency accountability card reader, sign in on the Emergency Assignment Staffing Board, acquire the Site Radiation Protection Coordinator badge.
Locate and utilize the Site Radiation Protection Coordinator Position Specific Manual and checklist.
Verify the following positions have been staffed.
MIDAS Terminal Operator (Chem Tech) (shared resource with the EOF)
Radiological Support Staff Member Field Team Director - Onsite Field Team Director - Offsite
-NRC HPN Communicator Report staffing results to the Tech & Eng Supervisor OPERATION Verify MIDAS is operable.
Verify TSC & OSC is habitable.
Verify EC or Tech & Eng Supervisor initiates a PA announcement with regard to facility habitability.
Verify operational status of SBGT Trains, inform MIDAS Operator of status.
Verify reactor trip. Time (All rods full in)
Verify Radiological Support Staff person is acquiring ARM data.
Advise EC of dose extensions. (Only EC may authorize dose extensions)
Review MIDAS projections every 15-30 minutes and issue Protective Action Recommendations (PAR's) to the EC, as necessary.
TSC 03 Page 2 of 5
Verify Linn Co., Benton Co., and the State of Iowa EMA's are notified of any PAR changes within 15 minutes of EC approval. The usual path for those notifications once the TSC is activated, is through the Admin Supervisor.
Verify MIDAS information is consistent with data obtained from the Offsite Field Monitoring Teams.
Authorize the administration of KI as neccesary. inform the EC.
MEDICAL Name of Injured:
Badge:
Location and Contamination Levels:
Verify hospital notified to receive contaminated/injured person Hospital name:
Time:
Verify Medical Consultant notified of contaminated/injured person (telephone numbers in the ETB).
Personal information and condition of contaminated/injured person provided to the EC.
Verify follow-up of patient's condition.
Verify follow-up information provided to the EC.
TSC 03 Page 3 of 5
11 RADIOLOGICAL MONITORING TEAMS Provide information regarding the projected or ongoing release to the HP Supervisor for dissemination to the Onsite and /or Offsite Radiological Monitoring Teams prior to dispatch.
Verify dispatch of the onsite field team. Time of dispatch:_
Assume control of the onsite team upon being advised of their readiness for dispatch by the HP Supervisor.
Verify dispatch of the Offsite Field Team A. Time of dispatch:_
Verify dispatch of the Offsite Field Team B. Time of dispatch:_
EC informed of dispatch of Onsite and Offsite Field Teams.
Assume control of the offsite teams upon being advised of their readiness for dispatch by the HP Supervisor.
Transfer control of the offsite teams to the Radiological Assessment Coordinator (RAC)in the EOF.
Time:
ORAA ACTIVATION Review current MIDAS projection for direction of plume travel prior to activation of ORAA.
Determine travel route for staff and evacuees.
Verify EC informed of impending ORAA activation and travel route.
Authorize OSC Supervisor to activate the ORAA. Time:_
Verify HP Supervisor informed of impending ORAA activation.
Verify ORAA operational. Time:_
Verify plume direction periodically, relocate ORAA personnel to the ORAUODEF as necessary.
TSC 03 Page 4 of 5
17:; 9 DAEC EMERG~~~~~~~~~~~~~~~~~~~~~~~Nc~~~~ft~~~~~ONS~~~~~~ oRGAWTZA~~~~~~~~~~~~AEIbNIF NS'OG ORAL/ODEF ACTIVATION Authorize OSC Supervisor to activate the ORAUODEF. Time:
Verify HP Supervisor informed of impending ORAL/ODEF activation.
Verify ORAL/ODEF operational. Time:_
Verify EC informed the ORALIODEF is operational.
PASS SAMPLE (as necessary or requested)
Verify PASS sample initiated Large Volume Small Volume Offgas Stack Containment Atmosphere Reactor Building Vents Turbine Building Vents RECOVERYIREENTRY Assist the EC is recovery/reentry activities as requested.
TSC-03 Page 5 of 5
'V f
ThAED~C,,EMERGENCY REXSPONSE 'ORG'ANIZATION PST1Q P~FC IEKIT FACILITY:
TSC ERO POSITION: TECH & ENG SUPERVISOR EPIP FORM TSC-04 REVISION#: 4 I
NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO. Reference the applicable Emergency Procedures
- often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' Section H, 'Emergency Facilities Staffing, Activation and Equipment Section J, 'Protective Response' Section M, 'Recovery and Reentry Planning and Post-Accident Operation' 1.3, 'Plant Assembly and Accountability' 2.1, 'Activation & Operation of the OSC' 2.2, 'Activation & Operation of the TSC' 4.3, 'Rescue and Emergency Repair Work' 5.2, 'Recovery & Reentry' BASIC PURPOSE OF THIS ERO POSITION:
This position is responsible for staffing the TSC. Once the TSC has become operational, then the Tech & Eng Supv becomes responsible for the Engineering Staff assembled in the ERO Time constraints to keep In mind during the event:
Facility Activation within 30 minutes (30-minute positions filled or assigned)
Accountability - Completed within 30 minutes of event declaration ERDS activated - Within 60 minutes of initial event declaration TSC-04 Page 1 of 4 Tech & Engineering Supervisor
ACTIVATION Activate the TSC (Within 30 minutes of ALERT Declaration)
- Alert declared @
l Verify all 30 minute responders are filled using form TSC-29.
X TSC Declared Activated @
Assist EC in making the TSC Operational Inform the EC that 30-minute responders are staffed and the TSC is Activated. (The TSC is operational when the EC arrives and assumes control of the facility.)
Verify Accountability is complete. Completed @
Brief the TSC/OSC via the PA system.
Status of the Plant Accountability
- Immediate Response Actions In Progress Reminder to periodically check SRD's.
- Verify ERDS is activated within 60 minutes of ALERT declaration.
Normally performed by Information Services, the Rx Engineer is the backup for this function.
Activated @
Verify Information Services synchronizes clocks in the TSC and the Electronic Status Board with PPC time.
- Verify the 60-minute response TSC positions are staffed within 60 minutes of ALERT Declaration.
Verify the other TSC positions are staffed. The expectation is for them to be staffed within 60-minutes of ALERT Declaration.
- Verify communications are established with the CR, the OSC, the ENS and the HPN. (NOTE: Allow an appropriate time to allow for the CR to setup their communications, i.e., let the CR initiate the communication link to the TSC. The TSC may initiate the communication link with the CR if the CR has not initiated the communication link within minutes of facility activation.)
TSC 04 Page 2 of 4 Tech & Engineering Supervisor
-DfDC:-F ERGENCYR SPkiNSERGXNIZ'hON
- zX~~~~X Ensure all of the TSC Supervisors are setting up their area(s) and will inform you of any problems.
Inform the TSC Communicator of the TSC/OSC activation time, and accountability completion time for entry onto the ESB
- Verify staffing for ERO Engineering Positions Electrical and l&C Engineer Mechanical Engineer Turnover operation of the TSC to the EC (@
OPERATION Coordinate with the OSC Supv and TSC Ops Supv in establishing priorities and Repair Teams as necessary.
Assign a staff Engineer to maintain the priority list current on the priority board and to maintain the signs relating to EAL severity levels (i.e., Alert, General Emergency, etc.).
Assign a staff Engineer to maintain a running list of degraded equipment on the 'printing' dry-erase board for use when in the recovery/reentry phase.
Obtain feedback from the OSC Supervisor on the completion of priority task items.
Verify Emergency Team Data Sheets are filled out for each priority task item.
Ensure that the engineering staff work as a team with the OSC Supervision to resolve/complete the priority task items.
Assign specific engineers to resolve/complete priority task items.
Verify all completed Emergency Team Data Sheets are returned to the TSC and collected.
Generate an AR as necessary to document situations such as:
QL1 equipment repaired with non-QL1 parts, Plant equipment in an unforeseen condition, Lifted leads and/or electrical jumpers installed and/or removed, TSC-04 Page 3 of 4 Tech & Engineering Supervisor
i i I.
]~fCEM GENC RESPONS,(E M!A OW
- Any other issue that must be documented to ensure it is returned to
'normal' when in the recovery phase.
RECOVERY Assist the EC in developing a recovery/reentry plan as necessary TSC-04 Page 4 of 4 Tech & Engineering Supervisor I.:
I:W'e AEC EMERGEY RPNSORGANIZATIO POSTIO
$J~CFCCHCKLIT FACILITY:
TSC ERO POSITION: SECURITY AND SUPPORT SUPERVISOR EPIP FORM TSC-06 REVISION #: 2 I
NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' Section F, 'Emergency Communications' Section J, 'Protective Response' 1.2, 'Notification' 1.3, 'Plant Assembly and Site Evacuation' 2.1, 'Activation and Operation of the OSC' 2.2, 'Activation and Operation of the TSC' 2.4, 'Activation and Operation of the ORAA' 2.8, 'Security Threat 4.2, 'First Aid, Decontamination and Medical Support J.
BASIC PURPOSE OF THIS ERO POSITION:
This position is responsible for security related activities at DAEC, and for the TSC Support Staff (Admin Supv, Clerical support, Information Services Reps, Offsite Communicator, Warehouse Supv).
TSC 06 Page 1 of 4
I I I IA~
EMRGEN CY jkFS9PGNZ TOSITo NsPEm T CICKL ST ACTIVATION Report to the TSC, swipe into accountability reader, sign in, acquire position badge and handbook. Utilize checklist, as a guide.
Call out additional Security Force personnel, as required.
Verify the Emergency Accountability Card Readers have been toggled "ON" by the SAS or CAS Operator.
Verify accountability is in progress or completed within 30 minutes of event declaration. (Ask the TSC Ops Liaison when the event was declared via NOTE-05)
Event Declaration:
Time Accountability Complete:
Time Prior to dispatching the Security Force Member, obtain concurrence from the HP Supervisor. Verify the dispatch of Security Force Members to tour the buildings outside the Protected Area, excluding the Badging Center, Training Center, and PSC; and direct or escort individuals found, to the Security Control Point (SCP).
Limit access into the facility to only those individuals required for emergency response.
Assign personnel to maintain access control at the following locations:
Warehouse Security Ingress Dispatch a Security Force member to retrieve the accountability list at the Plant Support Center.
Dispatch a Security Force Member to retrieve the accountability list at the Training Center.
Dispatch a Security Force Member to retrieve the accountability list at the Badging Center.
TSC 06 Page 2 of 4
POSITIN SCFI NHC~TT Verify the dispatch of a Security Force Member to perform the following:
Unlock the Emergency Lockers located in OSC Staging Area.
Locker keys are located in the key locker in the Security Control Point. Duplicate keys are located in the Secondary Alarm Station (SAS).
NOTE Simulate the lineup of the TSC Emergency Ventilation System during drills and exercises in order to minimize ventilation run-time unless specifically told to perform the lineup by the TSC Lead Controller.
Lineup TSC Emergency Ventilation System per 01 729.2.
Log startup time in TSC HVAC Filter Unit Operating Log located in TSC Ventilation Room.
Relocate emergency equipment lockers in the TSC HVAC Equipment Room to the OSC Staging Area.
Check with HP Supervisor as to plant radiological status before dispatching a Security Force Member with two access authorization lists to the site boundary to control access to the DAEC.
Coordinate with local law enforcement agency personnel who establish a roadblock at the intersection of Palo Marsh Road and DAEC Road to authorize access to the site. A list of employees should be provided to local law enforcement personnel.
OPERATION Verify the Security Officers posted in the powerblock have their names posted on the Repair Team Status Board to remind the OSC to keep them informed of rad conditions.
Ensure the Admin Supervisor generates a TSC shift rotation schedule, and provide to the EC.
Provide assistance, as required, in completing the required Emergency Response Notifications.
TSC-06 Page 3 of 4
a-
.,2i-20 WEMRGE Y' EspS ORI ATN 7.
Authorize deviations from standard security practices, as appropriate, to promote rapid response by Emergency Response Organization personnel.
Coordinate with the HP Supervisor and assign qualified first aid personnel as required.
Advise the Site Radiation Protection Coordinator and/or the HP Supervisor when personnel injuries occur.
ORAA ACTIVATION Upon being advised that activation of the ORAA is planned; refer to EPIP 2.4, "Activation and Operation of the ORAA", and:
Assign a Security Force Member to the ORAA Supervisor.
Advise the local law enforcement agency representative at the intersection of Palo Marsh Road and DAEC Road of the planned evacuation.
SITE EVACUATION If evacuation of the site is required, including the SCP and CAS, refer to EPIP 2.4 and relocate badge boards, dosimetry, all 800 mHz and VHF radios, access authorization lists and keys to the ORAA or other site as determined by management.
RECOVERY Provide assistance, as required, in deactivating the Emergency Response Organization including:
Secure the TSC HVAC System per 01 729.2. Log the shutdown time in the TSC HVAC Filter Operating Logbook.
Relock the TSC Emergency Locker when equipment and supplies have been returned.
Relocate the Emergency Lockers in the OSC Staging Area when equipment and supplies have been returned to the TSC HVAC Emergency Room.
Collect all documentation and provide to the Clerical Staff in the TSC.
TSC-OB Page 4 of 4
[
DAEC[bGyNC~S~ ONSE dR4IZ~i~iO7 FACILITY:
TSC ERO POSITION: ADMINISTRATIVE SUPERVISOR EPIP FORM TSC-07 REVISION #: 2 NAME:
I DATE:_
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' Section E, 'Notification Methods and Procedures' Section F, 'Emergency Communications' 1.2, 'Notification' 2.2, 'Activation and Operation of the TSC 1.4, 'Release of Emergency Related Information' BASIC PURPOSE OF THIS ERO POSITION:
This position is responsible for the clerical staff assigned to the TSC. Primary duties include assisting in facility activation, assisting the ERO with administrative functions, creating a 24-hour schedule for the TSC/OSC, and for collectingAiling all required documentation. This position is also responsible for communicating EALAPAR declarations or changes to the State of Iowa EMD and the Unn and Benton County Emergency Responders and with ensuring they remain cognizant of on-going efforts by means of periodic updates on status.
K>
TSC 07 Page 1 of 4
ACTIVATION Report to the TSC, swipe into accountability reader, sign in, acquire position badge and handbook. Utilize checklist, as a guide.
Call out additional clerical support personnel, as required.
Verify TSC clerical support personnel are locating and utilizing their checklists to set up the TSC.
Verify TSC clerical support personnel are wearing dosimetry.
Verify the TSC/OSC PA system is operational.
Transmitter plugged in to the power strip.
Place the "operate switch" on the transmitter to the OPERATE position.
Microphone (preferably the Lapel mic) given to the EC.
PA System turned on (located in Radio Room in TSC)
Acquire phone headset from Emergency Equipment Locker #9.
Plug headset into Meridian phone.
OPERATION Verify clerical support staff are providing necessary support to the TSC staff, assist as necessary.
Utilizing the ETB, identify for the Security and Support Supervisor, personnel names and positions for second and third shifts. These lists should include both the TSC and OSC positions and a MIDAS operator (Chem Tech) for the EOF.
Verify adequate administrative supplies are provided to all TSC staff.
TSC 07 Page 2 of 4
POITION- $PCII CEKLS NOTE If you are communicating with anyone over the phone during drills and exercises, it is VERY IMPORTANT that you begin and end ALL communications with "THIS IS A DRILL" Log all pertinent information acquired from the EOF and JPIC on log sheets.
Prior to the EOF assuming command and control: Periodically (approximately every hour or as conditions change) brief the State and County's of current plant status, using the microwave Red" phone system*
NOTE To use the Microwave "Red" Phone system (Ref. EPIP 1.2)
Press 9999
- When everyone is on the line, press ### to stop the ringing Read NOTE-05 or other information as applicable Inform the Iowa EMD and Linn/Benton County of EAUPAR declarations or changes by reading the information provided on NOTE-05 as filled in by the TSC Ops Liaison and approved by the Emergency Coordinator. NOTE: DO NOT read this information unless it has been approved by the Emergency Coordinator.
Perform a "peer check" and verify the form is filled out correctly before proceeding with the Notification phone calls.
Read NOTE-05 as follows:
- 1. Perform an initial roll-call, even if you heard everyone state their name when they answered the phone. The "message initiated" line on NOTE-5 should note the time the first State or County representative came onto the line. NOTE: The 15 minute clock starts with the EAUPAR declaration and stops when you get the first State/County responder on the line. It is very important that the time for "message initiated" is correct.
- 2. State your name and that you are going to give them an update or EAUPAR declaration, whatever is applicable.
- 3. Starting with number 1, read in the following manner (for example): "1 alpha actual, 2 bravo TSC, 3 charlie Site Area Emergency,... etc."
TSC 07 Page 3 of 4
1 I
- 4. State your name and Facility again
- 5. Ask if there are any questions
- 6. Perform a final roll call and get everyone's initials. Enter the time the you have completed reading the message on the appropriate line in the Message Transmitted By:"
box.
- 7. Fax page 1 of NOTE-05 to the parties concerned as a backup to your phone call
- 8. Give NOTE-05 back to the TSC-Ops Liaison.
RECOVERY Collect all documentation generated during the event for filing.
Establish long term personnel support for the TSC.
Assist the Security and Support Supervisor with Recovery/Reentry efforts as requested
-rsc 07r Page 4 of 4
I:CEC i=
PQSITION piI CfHECKLIS FACILITY:
TSC ERO POSITION: MATERIAL MANAGEMENT SUPERVISOR EPIP FORM TSC-08 REVISION #: 2
. I NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' 2.2, 'Activation and Operation of the TSC' BASIC PURPOSE OF THIS ERO POSITION:
This position is responsible for assisting the ERO in the procurement of materials and supplies necessary to support the ERO in returning the plant to a stable condition. The Materials Management Supervisor (or Warehouse Supervisor) is not needed during the early stages of an event, or at al if procurement needs do not arise. Site staff have the capability of procuring their own parts from the Warehouse in an emergency. Procurement needs tend to arise when activities are being taken to recover the plant, and as such, the Warehouse Supervisor shall be called in the support the need as desired.
TSC 08 Page 1 of 2
I
.i
~DAECEMECEC
~oNW ACTIVATION Report to the TSC, swipe into accountability reader, sign in, acquire position badge and handbook. Utilize checklist, as a guide.
If at an Alert or NOUE:
Notify the Security and Support Supervisor of the current phone number to be reached at.
Relocate to normal work area in the warehouse.
OPERATION Procure materials and supplies necessary for the continued operation of the Emergency Response Organization.
Expedite the procurement of materials and supplies necessary for returning the plant to a safe and stable condition.
RECOVERY Support any material requests necessary for recovery activities.
TSC 08 Page 2 of 2
RXs -aSr-SpEpfg.
- =.,FRgp2gryr rs3.FM Ad w;mix g~~~~~~~~~~EOI fPq=
DAIC MEGENC1( RESPONSE ORGANIZATION FACILITY:
CR ERO POSITION: CONTROL ROOM COMMUNICATOR
'I EPIP FORM TSC-10 REVISION#: 4 NAME:
DATE:
NOTE This checklist is intended to be an aid in your response to the ERO.
Reference the applicable Emergency Procedures often, as time permits, to ensure compliance.
REFERENCES DAEC EMERGENCY PLAN DAEC EPIP's Section B, 'Emergency Response Organization' 2.2, 'Activation and Operation of the TSC' 2.5, 'Control Room Emergency Response Operation' BASIC PURPOSE OF THIS ERO POSITION:
This position is the main communication link to the TSC. This position also enters information onto the Electronic Status Board regarding Control Room activities and selected Rad Monitor readings.
TSC-10 Page of 2 I
j4-DAEC EMJMENCY RE NEv ORGNI~
PQSIO
,PCIFCCqHE KUST ACTIVATION Report to the TSC, swipe into accountability reader, sign in, acquire position specific manual and position badge. Utilize checklist, as a guide.
Report to the Control Room.
Locate and utilize the Control Room Communicator position specific manual and checklist.
Acquire phone headset, plug headset into phone.
Place "STA Desk (X7145) Portable Phone Switch" to ON.
Verify communications equipment operational with the TSC.
Log onto ESB, using EPIP form, TSC-43; ensure PC clock is in-synch with the PPC time.
Inform the OSM of your ready status.
OPERATION Log all pertinent information acquired from the TSC onto the log sheet.
Log pertinent Control Room information onto the ESB, do not place information onto the ESB detailing what other facilities are doing, those facilities will provide that information.
Pertinent information is, at a minimum, the following:
Summary of crew briefings Status of EOP and/or AOP activities Status of Control Room personnel in the plant prior to them being under OSC control Selected Rad Monitor data (RR-4448 A and RR-4448 B) every 30-minutes or as conditions change.
Other information as necessary to ensure the ERO stays current with Control Room activities.
Relay any instructed information back to the TSC, ensure to use 3-part communication.
TSC-10 Page 2 of 2
RADIOLOGICAL SUPPORT STAFF CHECKLIST Page 1 of I TSC ACTIVATION Report to the TSC.
Swipe in the emergency accountability card reader, sign in on the Emergency Assignment Staffing Board TSC STAFFING Locate the Radiological Support Staff Position Specific Manual and utilize the checklist. Locate the Rad Data Communicator badge contained within the Position Specific Manual.
OPERATION Obtain Area Radiation Monitor data via SPDS from the Tech & Analysis Engineer.
Post ARM data on the floor plan map located in the TSC.
Continuously update floor plan map with the most current ARM data obtained, at least every 15 minutes.
Continuously monitor data for trends or changes.
Alarming ARM data may be provided to the TSC Communicator for display on the Electronic Status Board.
Notify the SRPC immediately of any changes in ARM data.
Notify the HP Supervisor immediately of any changes in ARM data.
Assist the MIDAS Operator with any dose projection operations.
After the EOF takes control of dose projections, print out a copy of each dose projection run calculated by the EOF from the TSC Seiko color printer as directed by the SRPC.
Provide any assistance requested by the SRPC.
RECOVERY Provide any assistance requested by the SRPC.
Ts-15 REV.2 I
. TECHNICAL & ANALYSIS ENGINEER CHECKLIST TSC ACTIVATION Report to the TSC.
Swipe in the emergency accountability card reader, sign in on the Emergency Assignment Staffing Board, acquire the Technical & Analysis Engineer badge.
TSC STAFFING Locate and utilize the Technical & Analysis Engineer handbook and applicable checklist.
Locate and utilize the Safety Analysis Engineer Technical Support Guideline (TSG) handbook.
Locate and utilize the SPDS Operator Technical Support Guideline (TSG) handbook.
OPERATION Participate as member of the TSC Accident Management Team to assess plant status, the effectiveness of control room actions, prioritization of actions and development of accident mitigation strategies.
Perform trending/forecasting of key plant parameters.
Reference probabilistic safety assessment studies for insights into expected plant response.
Determine availability of key plant systems and equipment used in EOPs/SAGs.
Evaluate the operability and reliability of instrumentation used to determine key plant parameters in EOPs/SAGs.
Solicit input from the Accident Management Team and the TSC ERO staff as to which SPDS screens would be most useful to display.
Recall historical plot trends in order to establish a basis for comparison.
Track assigned Point Value Displays.
RECOVERY Complete recovery assignments.
TSC-1 9 REV.2
TSC OPERATIONS SUPERVISOR CHECKLIST TSC ACTIVATION Report to the TSC.
Swipe in the emergency accountability card reader, sign in on the Emergency Assignment Staffing Board, acquire an SRD.
TSC STAFFING Locate and utilize the TSC Operations Supervisor Position Specific Manual and applicable checklist. Position badge should be in book.
OPERATION Direct the TSC Accident Management Team, (Rx Eng, TSC Communicator, Technical & Analysis Eng, TSC-Ops Liaison), in assessing plant status, the effectiveness of Control Room actions, prioritization of actions, and development of accident mitigation strategies.
Ensure the Operation Shift Manager (OSM)/Control Room Supervisor (CRS) is kept informed of TSC and OSC activities and is aware of the TSC/OSC priorities, and status of Repair Team activities.
Provide input and assistance to the Emergency Coordinator and to the OSM/CRS on the following:
Plant conditions that caused any EAL classification RPV & Containment status, current trends, prognosis Status of significant plant systems Operations that could affect the plant Accident mitigation objectives, strategies, and priorities Ensure the trending and status boards are kept current by the TSC Accident Management Team.
Advise the TSC and OSC on any matter that pertains to the operation of the plant.
Direct the TSC Ops Liaison to draft forms NOTE-01, 02, 03, 04, 05, and 06 when necessary.
RECOVERY Assist the TSC with operations concerns during recovery discussions.
TSC-20 REV.3 October 2003
IC/EM ENGINEER Checklist TSC ACTIVATION Report to the TSC.
Swipe in the emergency accountability card reader, sign in on the Emergency Assignment Staffing Board, acquire the IC/EM Engineer badge.
TSC STAFFING Locate and utilize the IC/EM Engineering Position Specific Manual and applicable checklist.
OPERATION Standby for any assignments from the Technical & Engineering Supervisor pertaining to plant engineering concerns.
Establish any necessary external vendor contacts for area of expertise.
Assist applicable Supervisors in the OSC with the development of plans to resolvelcomplete priority task items.
Participate with other discipline engineers in order to develop plans to resolvelcomplete priority task.
If necessary complete Emergency Team Data Sheets for assigned priority task items.
Develop modification packages, including prints, installation instructions and operating limitations.
Determine availability of existing hardware at the DAEC, or at other NMC or Alliant Energy facilities.
Modify DCP's as necessary, to enable use of existing hardware.
Propose modifications and develop engineering justifications.
Assist the Technical & Engineering Supervisor in the prioritization of response actions which, if implemented, would mitigate the event, restore the plant to a safe condition, and minimize or stop any radiological release in progress.
Evaluate trends and provide recommendations to the Technical & Engineering Supervisor.
Log major activities.
RECOVERY Complete recovery assignments.
TSC-21 REVI
TSC MINIMUM STAFFING LEVEL POSITION 30 MIN 60 MIN REFERENCE Emergency Coordinator X
NUREG 0654 and DAEC Plan Site Rad Protection Coordinator X
NUREG 0654 and DAEC Plan Reactor Engineer X
NUREG 0654 and DAEC Plan TSC Communicator X
NUREG 0654 and DAEC Plan CR Communicator X
NUREG 0654 and DAEC Plan Security & Support Supervisor X
DAEC Plan Tech & Eng Supervisor X
DAEC Plan Mechanical Engineer X
NUREG 0654 and DAEC Plan Electrical and I&C Engineer X
NUREG 0654 and DAEC Plan I
NRC-ENS Communicator X
NUREG 0654 and DAEC Plan NRC-HPN Communicator X
NUREG 0654 and DAEC Plan TSC Operations Supervisor X
DAEC Plan Admin Supervisor X
DAEC Plan
TSC-29 Rev. 3 October 2003 I
v FIELD TEAM LOG I
DATE:
K>I Time Team Message Location Open Closed Air Sample Window Window pCi/cc
~~~~~~~~~~~~~mR/hr mR/hr I
I~~~~~~
I I~~~~~~~
I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
t =
- ~~~~~~~~~
TSC-31 Revi I
(
~~~~~~~~~~~~TSC f
i1ZTION(
-mergencyh Coordinator l__
lIC/EM Supervisor Oprtin Shf lall Security Forcel 1
Superviso
- Fieldage Suppor CR EnEngDA Tech's~~~~~~~~~~~~~~~~~~~~
NRC HPN
_ESCNSrce 1H'Suervi or l
F=Com un ator Fil Ta q HP Tech's l lTech & Analysls l
~~~~
~
iretorAdmn S
1
- ~En Joint Position wth EOF