ML032801511

From kanterella
Jump to navigation Jump to search
NRC Ltr Dated 10/7/03 - Requalification Program Inspection - Nine Mile Point Nuclear Station, Units 1 and 2
ML032801511
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/07/2003
From: Conte R
Division of Reactor Safety I
To: Katz P
Nine Mile Point
Shared Package
ML032680852 List:
References
Download: ML032801511 (3)


Text

October 7, 2003 Mr. Peter E. Katz Site Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC.

P.O. Box 63 Lycoming, NY 13093

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2

Dear Mr. Katz:

In a telephone conversation on September 30, 2003, Mr. Julian H. Williams, Examiner/Inspector, and Mr. Glen Bridges, Acting Operations Training General Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Nine Mile Point facility. The inspection is planned for the week of December 1, 2003, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations, and operating tests scheduled for the week of the inspection to the NRC by by November 17, 2003.

Mr. Bridges has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

Mr. Peter E. Katz The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Williams at (610) 337-6967 or me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos.

50-220/410 License Nos. DPR-63, NPF-69 cc:

M. J. Wallace, President, Nine Mile Point Nuclear Station, LLC A. Shiever, Manager - Nuclear Training J. M. Petro, Jr., Esquire, Counsel, Constellation Energy Group, Inc.

M. Wetterhahn, Esquire, Winston and Strawn P. Smith, President, New York State Energy, Research, and Development Authoritiiy C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board P. D. Eddy, Electric Division, NYS Department of Public Service Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. R. Evans, LIPA P. Smith, Acting President, New York State Energy Research and Development Authority T. Judson, Central NY Citizens Awareness Network

Mr. Peter E. Katz Distribution:

Region I Docket Room (with concurrences)

G. Hunegs, SRI - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA J. Trapp, DRP N. Perry, DRP J. Jolicoeur, RI EDO Coordinator R. Laufer, NRR P. Tam, PM, NRR G. Vissing, NRR (Backup)

B. Fuller, RI - Nine Mile Point E. Knutson, RI - Nine Mile Point J. Williams, DRS Examiner, DRS C. Buracker, DRS (OL Facility File)

L. Vick, HOHB, NRR W. Lanning, DRS R. Crlenjak, DRS DRS Files DOCUMENT NAME: G:\\OSB\\Williams/NineMileRequalNov03/60DAYRPI.WPD ADAMS PKG:ML032680852 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker JWilliams RConte DATE 10/06/03 10/06/03 10/07/03 10/ /03 10/ /03 OFFICIAL RECORD COPY