ML032680752

From kanterella
Jump to navigation Jump to search

Letter, Proprietary Review of Draft Safety Evaluation
ML032680752
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/25/2003
From: Alexion T
NRC/NRR/DLPM/LPD4
To: Krupa M
Entergy Operations
Alexion T W, NRR/DLPM, 415-1326
Shared Package
ml032680770 List:
References
EA-03-009, TAC MB9542
Download: ML032680752 (5)


Text

September 25, 2003 Mr. Michael A. Krupa, Director Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2) - RELAXATION REQUEST FROM U.S. NUCLEAR REGULATORY COMMISSION (NRC)

ORDER EA-03-009 FOR THE VESSEL HEAD PENETRATION CONTROL ELEMENT DRIVE MECHANISM (CEDM) NOZZLES (TAC NO. MB9542)

Dear Mr. Krupa:

By letter dated June 11, 2003, as supplemented by letters dated August 27 and September 12, 2003, you submitted a relaxation request from NRC Order EA-03-009. Specifically, you requested authorization to inspect the vessel head penetration CEDM nozzles using a three-step alternative, which involves the use of ultrasonic testing examination, analysis, and surface examination techniques.

Enclosed is a partial draft safety evaluation (SE) that the NRC staff has prepared to support the relaxation request. The enclosed partial draft SE is being withheld from public disclosure at this time because it may contain proprietary information.

We are providing this partial draft SE to you for the purpose of identifying if it contains any proprietary information pursuant to 10 CFR 2.790. (The staff has attempted to ensure that it does not contain proprietary information.) Please provide any comments that you may have on the enclosure with regard to inclusion of proprietary information within 3 working days. This target date for response has been discussed with Guy Davant of your staff. Should a situation occur which prevents you from meeting this date, please contact me.

Sincerely,

/RA/

Thomas W. Alexion, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

Partial Draft SE cc w/o Encl: See next page

Mr. Michael A. Krupa, Director September 25, 2003 Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2) - RELAXATION REQUEST FROM U.S. NUCLEAR REGULATORY COMMISSION (NRC)

ORDER EA-03-009 FOR THE VESSEL HEAD PENETRATION CONTROL ELEMENT DRIVE MECHANISM (CEDM) NOZZLES (TAC NO. MB9542)

Dear Mr. Krupa:

By letter dated June 11, 2003, as supplemented by letters dated August 27 and September 12, 2003, you submitted a relaxation request from NRC Order EA-03-009. Specifically, you requested authorization to inspect the vessel head penetration CEDM nozzles using a three-step alternative, which involves the use of ultrasonic testing examination, analysis, and surface examination techniques.

Enclosed is a partial draft safety evaluation (SE) that the NRC staff has prepared to support the relaxation request. The enclosed partial draft SE is being withheld from public disclosure at this time because it may contain proprietary information.

We are providing this partial draft SE to you for the purpose of identifying if it contains any proprietary information pursuant to 10 CFR 2.790. (The staff has attempted to ensure that it does not contain proprietary information.) Please provide any comments that you may have on the enclosure with regard to inclusion of proprietary information within 3 working days. This target date for response has been discussed with Guy Davant of your staff. Should a situation occur which prevents you from meeting this date, please contact me.

Sincerely,

/RA/

Docket No. 50-368 Thomas W. Alexion, Project Manager, Section 1

Enclosure:

Partial Draft SE Project Directorate IV cc w/o Encl: See next page Division of Licensing Project Management Office of Nuclear Reactor Regulation DISTRIBUTION:

PUBLIC (w/o Encl) RidsNrrLADJohnson CSheng PDIV-1 r/f RidsRgn4MailCenter (AHowell) JClark (RIV Plants)

RidsOgcRp RidsNrrPMNKalyanam RidsNrrPMTAlexion RidsAcrsAcnwMailCenter RidsNrrDlpmLpdiv1 (RGramm) RDavis Accession No.: ML032680752 Package: ML032680770 Encl: ML032680763 OFFICE PDIV-1/PM PDIV-1/LA EMCB/SC PDIV-1/SC NAME TAlexion DJohnson TChan RGramm DATE 9/24/03 9/24/03 9/24/03 9/25/03 OFFICIAL RECORD COPY

Arkansas Nuclear One cc:

Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Mr. Mike Schoppman Framatome ANP, Richland, Inc.

Suite 705 1911 North Fort Myer Drive Rosslyn, VA 22209 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 March 2001