August 27, 2003 Southern Nuclear Operating Company, Inc.

ATTN: Mr. J. B. Beasley, Jr.

Vice President P. O. Box 1295 Birmingham, AL 35201-1295

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - JOSEPH M.

FARLEY NUCLEAR PLANT

Dear Mr. Beasley:

On August 12, 2003, the NRC staff completed its mid-cycle plant performance assessment of the Joseph M. Farley Nuclear Plant. The mid-cycle review for Farley involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the first half of the current assessment cycle, January 1 -

December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2004.

The enclosed inspection plan details the inspections scheduled through September 30, 2004.

Included in the inspection schedule are license renewal inspections. Also, we will be conducting inspections during the construction of your independent spent fuel storage facility (ISFSF). Since your construction schedule was not finalized at the time our inspection plan was developed, we will inform you in advance of these ISFSF inspections. Additionally, upon finalization of the future force-on-force program, we will be conducting an inspection at the next available opportunity to verify the effectiveness of your efforts to address the White finding identified during the previous Operational Security Response Evaluation.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last six months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

SNC 2

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4540 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Brian R. Bonser, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8

Enclosure:

Farley Inspection/Activity Plan cc w/encl: (See page 3)

SNC 3

cc w/encl:

M. J. Ajluni, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. E. Grissette General Manager, Farley Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution J. D. Woodard Executive Vice President Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 1552 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution Institute of Nuclear Power Operations (INPO)

Distribution w/encl: (See page 4)

SNC 4

Distribution w/encl:

F. Rinaldi, NRR RIDSNRRDIPMLIPB PUBLIC OFFICE DRP/RII DRS/RII SIGNATURE cr ab NAME CRapp:vyg ABoland DATE 8/25/2003 8/25/2003 E-MAIL COPY?

YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML032390317.wpd