ML032370361
| ML032370361 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/26/2003 |
| From: | Ellen Brown NRC/NRR/DLPM/LPD2 |
| To: | Stall J Florida Power & Light Co |
| Brown Eva, NRR/DLPM, 415-2315 | |
| References | |
| TAC MB7148, TAC MB7149 | |
| Download: ML032370361 (6) | |
Text
August 25, 2003 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
TURKEY POINT PLANT UNITS 3 AND 4 - ENVIRONMENTAL ASSESSMENT REGARDING PROPOSED TECHNICAL SPECIFICATION ADMINISTRATIVE CHANGES (TAC NOS. MB7148 AND MB7149)
Dear Mr. Stall:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for amendments to the Turkey Point Nuclear Plant, Units 3 and 4, Facility Operating License and Technical Specifications (TSs) dated December 20, 2002, as supplemented in a letter dated August 15, 2003. The proposed license amendments would allow for administrative changes to the Turkey Point Units 3 and 4 TSs.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Eva A. Brown, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
Environmental Assessment cc w/encl: See next page
- See previous concurrence OFFICE PDII-2/Intern PDII-2/PM PDII-2/LA RLEP/SC OGC PDII-2/SC NAME EBrown for MDudek EBrown BClayton REmch for JTappert*
RWeisman*
AHowe DATE 8/25/03 8/25/03 8/25/03 07/18/03 08/05/03 8/25/03
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FLORIDA POWER AND LIGHT DOCKET NOS. 50-250 AND 50-251 TURKEY POINT UNITS 3 AND 4 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Facility Operating License (FOL) Nos. DPR-31 and DPR-41, issued to Florida Power and Light Company (the licensee), for operation of the Turkey Point Nuclear Plant Units 3 and 4, located in Miami-Dade County, Florida. Therefore, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.
ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action:
The proposed action would revise the Turkey Point, Units 3 and 4, FOLs and Technical Specifications (TSs) to correct, update, and reorder the TS Index, reformat TS equations with more appropriate mathematical symbols, delete irrelevant information, correct an error in the titling of a figure, correct ACTION and APPLICABILITY statements to improve consistency and readability, and would enhance, through administrative means, the overall clarity of the TSs.
The proposed action is in accordance with the licensees application dated December 20, 2002, as supplemented in a letter dated August 15, 2003.
The Need for the Proposed Action:
The proposed action is needed in order to achieve consistency with previously approved TS amendments, and other parts of the existing TSs through administrative changes.
Environmental Impacts of the Proposed Action:
The NRC has completed its evaluation of the proposed action and concludes that the proposed license amendment and associated changes to the TSs are administrative in nature and have no effect on the physical aspect or operation of components or structures within the restricted area as defined in 10 CFR Part 20.
The proposed action will not significantly increase the probability or consequences of accidents, no changes are being made in the types or amounts of any effluents that may be released offsite, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.
With regard to potential nonradiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect nonradiological plant effluents and has no other environmental impacts. Therefore, there are no significant nonradiological environmental impacts associated with the proposed action.
Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action:
As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the no-action alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.
Alternative Use of Resources:
The action does not involve the use of any different resource than those previously considered in the Final Environmental Statement for the Turkey Point Nuclear Plant, Units 3 and 4, dated July 1972.
Agencies and Persons Consulted:
Based upon a letter dated March 8, 1991, from Ms. Mary E. Clark of the State of Florida, Department of Health and Rehabilitative Services, to Ms. Deborah A. Miller, Licensing Assistant, NRC, the State of Florida does not desire notification of issuance of license amendments.
FINDING OF NO SIGNIFICANT IMPACT On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.
For further details with respect to the proposed action, see the licensees letter dated December 20, 2002. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 25th day of August 2003.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Eva A. Brown, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Nuclear Regulation Reactor
Mr. J. A. Stall TURKEY POINT PLANT Florida Power and Light Company cc:
M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 T. O. Jones, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 NW 1 Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344th Street Florida City, Florida 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Walter Parker Licensing Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 Vice President, Nuclear Operations Support P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Heinz Mueller [5 copies]
Environmental Review Coordinator US EPA Region 4 61 Forsyth Street, SW.
Atlanta, Georgia 30303-3104