ML031560014
| ML031560014 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/05/2003 |
| From: | Ellen Brown NRC/NRR/DLPM/LPD2 |
| To: | Stall J Florida Power & Light Co |
| Brown Eva, NRR/DLPM, 415-2315 | |
| References | |
| TAC MB7148, TAC MB7149 | |
| Download: ML031560014 (4) | |
Text
June 5, 2003 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
TURKEY POINT PLANT UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED TECHNICAL SPECIFICATION ADMINISTRATIVE CHANGES (TAC NOS. MB7148 AND MB7149)
Dear Mr. Stall:
By a letter dated December 20, 2002, Florida Power and Light Company submitted a request for proposed license amendments that would modify the Turkey Point Units 3 and 4 Technical Specifications. The U.S. Nuclear Regulatory Commission staff has reviewed the submittal and finds that a response to the enclosed request for additional information (RAI) is needed before we can complete the review.
This request was discussed with your staff on May 27, 2003, and Mr. Dave LaFleur agreed that a response would be provided within 60 days of the receipt of this letter. If you have any questions, please feel free to contact Mr. Michael Dudek at (301) 415-4016 or me at (301) 415-2315.
Sincerely,
/RA/
Eva A. Brown, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
RAI cc w/encl: See next page
ML031560014 OFFICE PDII-2/Intern PDII-2/PM PDII-2/LA PDII-2/SC NAME MDudek EBrown BClayton AHowe DATE 6/4/2003 6/4/2003 6/4/2003 6/4/2003
Enclosure REQUEST FOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION ADMINISTRATIVE CHANGES FLORIDA POWER AND LIGHT TURKEY POINT PLANT UNITS 3 AND 4 DOCKET NOS. 50-250 AND 50-251 1.
Change #7: Concerning the deletion of "below an average coolant temperature of 275F," it appears that the Bases and Technical Specifications (TSs) disagree in wording.
- TSs use average coolant temperature of 275F.
- Bases use less than or equal to coolant temperature of 275F.
Provide an explanation for the discrepancy. (Title 10 of the Code of Federal Regulation (10 CFR) Section 50, Appendix G, and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Appendix G, contain guidance for the origin and use of a coolant temperature of 275F.)
2.
Section 50.90 of 10 CFR requires that amendments to the license be fully described.
Section 3.2 of the submittal discusses the types of editorial changes made and indicates that no specific justifications for the changes are provided. However, no marked-up TS pages were provided to show what editorial changes were made.
Provide the mark-ups of the editorial changes not submitted with the original application.
Mr. J. A. Stall TURKEY POINT PLANT Florida Power and Light Company cc:
M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 T. O. Jones, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 NW 1 Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344th Street Florida City, Florida 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Walter Parker Licensing Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 Mr. William Jefferson Vice President, Nuclear Operations Support P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420