ML032250343
| ML032250343 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 08/01/2003 |
| From: | Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML032250343 (8) | |
Text
.01, NM Cormibed to NucfearExe-n DUANE ARNOLD ENERGY CENTER TRANSMITTAIJACKNOWLEDGMENT MEMORANDUM Manual # 28 NRC-NRR Document Control Desk August 1, 2003 This Index for the EPIP Manuals were not included in your last set of updates MANUAL CONTENTS l
REMOVE l REPLACE EPIP Index 138 139 Please acknowledge that the above action has been taken by signing below and returning this memorandum to K. Dunlap, 3313 DAEC Rd, Emergency Planning, PSC, Palo, IA 52324 PLEASE RETURN WITHN 20 DAYS.
I have made the above revisions as indicated.
Print Name Signature/Date
AP EMRE=YPAMLM
- e. 139 INDE)C~~~~PAGE I o~f 7
Procedure Title Revision Date Number 1.1 Determination of Emergency Action Levels 20 815103 1.2 Notification 28 4/4/03 1.3 Plant Assembly and Site Evacuation 9
09112/01 1.4 Release of Emergency-Related Information 4
09104/02 1.5 Acfivation and Operation of the EOF 4
6/11/03 2.1 Activation and Operation of the OSC 13 09/12/01 2.2 Activation and Operation of the TSC 23 10/23/02 2.3 Operation of the FTS-2001 Phone Network 6
09/04/02 2.4 Activation and Operation of the ORAA 8
09/12/01 2.5 Control Room Emergency Response Operation 14 10/15/01 2.6 Activation and Operation of the ORAL 9
12/30/02 2.7 Activation and Operation of the ODEF 6
10/15/01 2.8 Security Threat 2
7/30/03 3.1 In-Plant Radiological Monitoring 12 9/2/02 3.2 Field Radiological Monitoring 13 92/02 3.3 Dose Assessment and Protective Action 19 6W25/03 4.2 First Aid, Decontamination and Medical Support 7
8/23/02 4.3 Rescue and Emergency Repair Work 11 8/23/02 4.5 Administration of Potassium Iodide (KI) 7 2/10/03 5.2 Recovery and Re-entry 9
10/15/01 I
- EMERGENCYPLNIMP EME'TING PICEDURES-Rev. 139 INDEXC PAGE 2 of 7 Form Title Revision Referencing Number Number Pro'cedure CR-01 OSMIOSS Checklist Rev. 2 EPIP 2.5 CR-02 Back Panel Communicator Checklist Rev. I EPIP 2.5 CR-03 Dose Projection &ARM Data-Sheet Rev. 0 EPIP 2.5 CR-04 Control Rooln to TSC Command and Control Rev. 1 EPIP 2.5 Transfer Checklist EAL-01 Abnormal Rad Levels/Radioactive Effluent Table Rev. 3 EPIP 1.1 EAL-02 Fission Barrier Table Rev. 3 EPIP 1.1 EAL-03 Hazards & Other Conditions Affecting Plant Safety Rev. 3 EPIP 1.1 EAL-04 System Malfunction Table Rev. 3 EPIP 1.1 EAL-OS ISFSI Table, Rev. 0 EPIP 1.1I EOF - 02 NRC - HPN Communicator Checklist Rev. 3 EPIP 1.5 EOF - 03 Technical Recorder Checklist Rev. 2 EPIP 1.5 EOF - 04 Summry of Computer Data Backup Collection Rev. 1 EPIP 1.5 Activities EOF -05 EOF Information Services Representative Checklist Rev. 3 EPIP 1.5 EOF - 06 DAEC Key Parameter Log Rev. 0 EPIP 1.5 EOF -07 Emergency Response and Recovery Director Rev. 4 EPIP 1.5 Checklist EOF -08 Rad & EOF Manager Checklist Rev. 6 EPIP 1.5,3.3 EOF- 09 EOF STA/OPS Liaison Checklist Rev. 0 EPIP 1.5 EOF-10 EOF-TSC Communicator Checklist Rev. 3 EPIP 1.5 EOF-11 Support Services Coordinator Checklist Rev. 3 EPIP 1.5 EOF -12 Field Team Director Checklist Rev. 0 EPIP 1.5, 3.3 EOF-13 Radiological Data Communicator Checklist Rev. 0 EPIP 1.5,3.3 I
a
.-EMERGENCYPLAN I lM0PEMENTING1PR.13-K>-
INDEX PAGE 3 of 7 EOF -14; EOF MIDAS Operator Checklist Rev. 1 EPIP 1.5,3.3 EOF Radiological Data Plotter Checklist Rev. 0 IEPIP 1.5,3.3 EOF - 16 Radiological Assessment Coordinator Checkist --
Rev. 1 EPIP 1.5,3;3, EOF - 17 EOF Security Access Clerk Checklist-Rew-EPIP1.5 i EOF EOF Staffing Accountability Roster Rev. 3 EPIP 1.5 EOF -19 Drill Announcement Message Rev.0 EPIP 1.4, 1.5 EOF-20 EmergencyAnnouncementMessage g Rev. I EPIP 1.4,1.5 EOF-21 PersonnelAccessLog ev.l EPIP14A, 1.5 EOF -22 Registration Form Rev.0 EPIP 14,1.5 EOF-23 SecurityPostLog 'ev.2 EPIP 1.A, 1.5 EOF -24 First Floor Security Post Description Rev. 2 EPIP.1A, 1.5 EOF.- 25 Fourteenth Floor Security Post Description I
lev.. 1 EPIP 1.5.
EOF -27 Status Update Message - EOF Communicatix Rev. p, EPIP 1.5 EOF -28 Verbal Clo§seout Summary q
Rev. 0 EPIP 1.5$
EOP Written Closeout Snnmary Rev. 0 EPIP 1.5 EOF -30 Status BoardT-i' Rey.1I EPIP 1.5 EOF-31 Access B adge Exaqple
'Rev..0 EPIP1.5.-
EOF-32 EOF StaffResponse ev.3 EPIP.15 EOF -33 Recovery Issues Rev. 0 EPIP 5.2 EOF-34 EOF Activities Rev. 0 EPIP 5.2 EOF - 35 Recovery Phase Plan Outline Guidance Rev. 0 EPIP.52 EOF-36 RE-Entry Briefing Guide Rev.'0 EPIP 5.2 EOF - 37 RE-Entry Debriefing Guide Rev. 0 EPIP 5.2 EOF - 38 EOF Messenger Checklist Rev. 1 EPIP 1.5 ERO -01 ERO Position Equivalency Table Rev. 0 EPIP 1.5 JPIC - 01 JPIC Manager Checklist Rev. 4 EPIP 1.4 JPIC - 03 Alliant Spokesperson Checklist Rev. 3 EPIP 1.4
I EMERGENCYPLAN :IM.PLEMENtING PROCEDURES Rev. 139 INDEX PAGE 4 of 7 4
JPIC - 04 Technical Liaison Checklist Rev. 4 EPIP 1.4 JPIC - 05 Sequence of Events Rev. 0 EPIP 1.4 JPIC - 06 Public InformationOfficer Support Checklist Rev. 5 EPIP 1.4 JPIC - 07 Logistics Coordinator Checklist Rev. 4 EPIP 1.4 JPIC -08 Logistics Support Checklist Rev. 4 EPIP 1.4 JPIC - 09 Audiovisual Support Checklist Rev. 4 EPIP 1.4 JPIC - 11 Rumor Control Coordinator I Checklist Rev. 3 EPIP 1.4 JPIC - 12 Rumor Control Event Summary Log Rev. 1 EPIP 1.4 JPIC -13 Rumor Control Coordinator II Checklist Rev. 2 EPIP 1.4 JPIC - 14 Public Rumor Control Checklist Rev. 2 EPIP 1.4 JPIC - 15 News Media Rumor Control Checklist Rev. 4 EPIP 1.4 JPIC - 16 Assistant JPiC MaanagerChecklist Rev. 3 EPIP 1.4 JPIC - 17 JPIC Security Access Control Checklist Rev. 3 EPIP 1.4 JPIC - 18 Sixth Floor Security Post Description Rev. 2 EPIP 1.4 JPIC - 19 JPIC Distribution List Rev. 2 EPIP 1.4 NOTE-01 ERO Notification -Phone System Callout
_-Rev. 4 EPIP 1.2 NOTE-02 ERO Notification - Alphanumeric Paging System Rev. 3 EPIP 1.2 Callout NOTE-03 Event Notification Worksheet Rev. 1 EPIP 1.2 NOTE-04 Plant Assembly Notification Rev. 2 EPIP 1.2 NOTE-05 Emergency Action Level Notification Rev. 7 EPIP 1.2 NOTE-06 Plant Page for Emergency Classification Changes Rev. 1 EPIP 12 NOTE-07 Basic Notification Flowpath Rev. 1 EPIP 1.2 ODEF-01 ODEF Decontamination Waiting Area Rev. 0 EPIP 2.7 ODEF-02 Floor Plan for ORAIJODEF Rev. 0 EPIP 2.7 ODEF-03 Travel Route to ORALIODEF Rev. 0 EPIP 2.7 ODEF-04 12"' Avenue Entrance to ORAIJODEF Rev. 0 EPIP 2.7 ORAA-01 Offsite Relocation and Assembly Area Supervisor's Rev. 1 EPIP 2.4 I
4 EM-
.M
~RE NGev 139IM EM 0 INDEX
~~~~~~~PAGE 5 of 7-Checklist ORAA-02 Health Physics Support for the Offsite Relocation Rev. 0 EPIP 2.4 and Assembly Area --
ORAA-03 Security Support for the Offsite Relocation and Rev. 0 EPIP 2.4 AssemblyArea!
ORAA-04 Offsite Relocation and Assembly Area 9Rev.0 EPIP 2.4 ORAA-05 Offsite Relocation and Assembly Area Parlg aiNid Rev. 0 EPIP 2.4 Vehicle Monitoring OSC-01 OSC Layout Rev.0 EP1P 2.1 OSC-02 OSC Organization Chart Rev.O0 EPIP 2.1 OSC-03 Minimum Staffing Level Rev.
EPIP 2.1 OSC-04 Recommended Log Entry Topics Rev. 0 EPIP 2.1 OSC-05 Emergency Event ILog Sheet Rev. 0O EPIP 2.1 OSC-06 Personal Statement Concering Rev. 0 EPIP 2.1 OSC-07 Emergency sure Tracking Log Rev. 0 EPIP 2.1 0SC ~
OSC Supervisor Checklist R
ev. 0 EPIP 2.1 OSC-09 Health Physics Supervisor Checklist;
Supervisor Checklist OSC-11 Emergency Assignment Staffing Board Dutiesi.
- Rev. 0 EPIP 2.1 OSC-12 External Exposure Limits Rev. 0 EPIP 4.3 OSC-13 Guidance on Dose Limits for Workers Performing Rev. 0 EPIP 4.3 Emergency Services -_-_-__
OSC-14 Guidelines Regarding Selection of Volunteers Rev. 0 EPIP 4.3 OSC-15 OSC Repair Team Work Order Rev. 0-EPIP 4.3 OSC-16 Repair Team Datasheet Flowpath Rev. 0 EPIP 4.3 PAR-01 PAR Decision Making - Recommendations Rev. 0 EPIP 3.3 PAR - 02 PAR Decision Making - Flowchart Rev. 0 EPIP 3.3 PASE-02 Onsite Assembly Locations Rev. 2 EPIP 1.3
,I EMERGENCY PLAN IMPLEMENTING PR'CEDpURES j.1-.
Rev. 139' PAGE6 of 7 INDEX PASE-05 Site Evacuation Routes Rev. 1 EPIP 1.3 SAM-01 EOP-SAG Transition Checklist Rev. 0 EPIP 2.2 TSC-01 Emergency Coordinator Checklist Rev. 3 EPIP 2.2 TSC-02 TSC Supervisor Checklist Rev. 2 EPIP 2.2 TSC-03 Site Radiation Protection Coordinator Checklist Rev. 1 EPIP 2.2 TSC-04 Technical & Engineering Supervisor Checklist Rev. 3 EPIP 2.2 TSC-05 Quality Assurance Checklist Rev. 1 EPIP 2.2 TSC-06 Security & Support Supervisor Checklist Rev. I EPIP 2.2 TSC-07 Administrative Supervisor Checklist Rev. 1 EPIP 2.2 TSC-08 Material Management Supervisor Checklist Rev. 1 EPIP 2.2 TSC-09 TSC-CR-OSC Communicator Checklist Rev. 2 EPIP 2.2 TSC-10 CR-TSC-OSC Communicator Checklist Rev. 2 EPIP 2.2 TSC-1 1 TSC-EOF-JPIC Communicator Checklist Rev. 1 EPIP 2.2 TSC-12 ENS Communicator Checklist Rev. 2 EPIP 2.2 TSC-13 HPN Communicator Checklist Rev. 1 EPIP 2.2 TSC-14 TSC/OSC Operations Liaison Checklist
-Rev. 2 EPIP 2.2 TSC-15 Radiological Support Staff Checklist Rev. 1 EPIP 2.2 TSC-16 Radio Operator - Offsite Checklist Rev. 0 EPIP 2.2 TSC-17 Radio Operator-Onsite Checklist Rev. 0 EPIP 2.2 TSC-18 TSC MIDAS Operator Checklist Rev. 0 EPIP 2.2 TSC-19 Technical & Analysis Engineer Checklist Rev. 1 EPIP 2.2 TSC-20 TSC Operations Supervisor Rev. 2 EPIP 2.2 TSC-21 Electrical Engineer Checklist Rev. 0 EPIP 2.2 TSC-22 I & C Engineer Checklist Rev. 0 EPIP 2.2 TSC-23 Mechanical Engineer Checklist Rev. 0 EPIP 2.2 TSC-24 Reactor Engineer Checklist Rev. 2 EPIP 2.2 TSC-25 SPDS Operator Checklist Rev. I EPIP 2.2 aJ
i
-- E--tEMEA M;S EN G
I 1R39-:-
INDEX PAGE,7 of 7 TSC-26 Information Services Representative Checklist Rev. 2 EPIP 2.2 TSC-27 Fire Marshall Checklist Rev. 1 EPIP 2.2 TSC-28 NRC Roles During A Nuclear Power Plant
'Rev.- 0 EPIP 2.2 Emergency Checldist TSC-29 TSC Minimum Staffing Level ' ' '
Rev. 2 EPIP 2.2 TSC-30 Emergency Action Request Log Rev. 0 EPjP 2.2 TSC-31 Radio Operator Log Rev. 0 EPIP 2.2 TSC-32 Status Board Recorder Rev. 1 EPIP 2.2 TSC-33 Typical Organization of the NRC Site reai Rev,. 0 EPP 2.2 TSC-34 TSC Organization Chart Rev. 3 EPIP 2.2 TSC-35 Assignment Form Rev.o 0 EPIP 5.2 TSC-36 Deactivation Report
,kev.Q EPIP-5.2 TSC-37 Plant Operations Status
'Rev.. 0EPIP 5.2 TSC-38 TSC/Control RobmIOSC Activities
-ey.
0 EPIP 5.2 TSC-39 TSC ClericalTecklist Rev. 0o EPIP 2.2 TSC-40 ARM Locations' Rev.0 EPIP 3.1/4.3 TSC-41 PASS Capabilies Rev. 0 EPIP 3.1 TSC-42 On-Site Map-,
Rev. 0.
EPIP 3.2 TSC-43 ESB Logon Instructions (MSC/CRlEOF)':'
Rev. 0 EPIP 2.2