MONTHYEARML0321906792003-08-0707 August 2003 Facsimile Transmission, Draft Request for Additional Information (RAI) to Be Discussed in an Upcoming Conference Call Project stage: Draft RAI ML0403404682004-01-23023 January 2004 Response to RAI Regarding a Change to the Fire Protection Program Project stage: Response to RAI ML0411703982004-04-15015 April 2004 Connecticut, Inc. Millstone Power Station Unit 3 License Amendment Request Regarding a Change to the Fire Protection Program Project stage: Request ML0414003582004-05-27027 May 2004 Review of Proposed Revision to the Previously - Approved Deviation from Branch Technical Position Cmeb 9.5-1 Project stage: Approval 2004-01-23
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22028A3502022-01-21021 January 2022 Green Mountain Power, 2021 Annual Summary of Special Nuclear Committee ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML19165A1192019-06-14014 June 2019 Memoranda to File Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S Decommissioning Funding Plans Submitted ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15075A1922015-03-26026 March 2015 Reactor Coolant System Alloy 600 Inspection Program for License Renewal Commitment No. 14. (Tac No. MF3433) ML13031A1832013-02-0505 February 2013 Closed Meeting Announcement Millstone Drop-In ML13032A0572013-01-30030 January 2013 2012 Annual Summary of the Green Mountain Power Special Nuclear Committee ML12178A6132012-06-27027 June 2012 Notice of Forthcoming Pre-Application Meeting with Dominion Nuclear Connecticut, Inc. to Discuss a Proposed Millstone Power Station, Unit 2, License Amendment Request Concerning Spent Fuel Pool Criticality Re-Analysis ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML11271A1782011-10-0303 October 2011 Review of Topical Report, Revision 11 for Kewaunee Power Station and ISFSI, Millstone Power Station, Units 1, 2, & 3 and ISFSI, North Anna Power Station, Units 1 & 2 and ISFSI, Surry Power Station, Units 1 & 2 and ISFSI (Tac ME6649, ME6650, ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1116804602011-06-30030 June 2011 Review of Commitment Change Report for 2009 ML1103106822011-02-0101 February 2011 Revised Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station Licensing Activities ML1100701752011-01-11011 January 2011 Request for Technical Assistance on Request for Exemption Form Certain Requirements of 10 CFR 73.55 for Millstone Power Station, Unit 1 ML1035103202010-12-20020 December 2010 30-Day Report of Emergency Core Cooling System Model Change ML1033305502010-12-15015 December 2010 Potential Notice of Enforcement Discretion for the Turbine Driven Auxiliary Feedwater Pump ML1031202422010-11-0808 November 2010 Notice of Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response ML1030100732010-10-28028 October 2010 Meeting Notice Milestone Power Station Revised 10 CFR 73.55 ML1019502842010-07-14014 July 2010 Notice of Forthcoming Public Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response ML1008204222010-03-26026 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos 2 and 3 Generic Letter 2004-02 Supplemental Responses ML1003314992010-03-0101 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses ML0931406252009-11-17017 November 2009 Summary of Teleconference Verbal Authorization for Relief Request RR-89-67 ML0913401332009-05-15015 May 2009 Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps from the Technical Specifications for Millstone Power Station, Unit No. 2 ML0906205722009-03-0303 March 2009 Meeting Minutes of the Power Uprates Subcommittee, July 8, 2008 ML0811500912008-04-23023 April 2008 Proposed Stretch Power Uprate to Millstone Power Station, Unit 3 ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0734708412007-12-11011 December 2007 Drop-In Visit from Dominion (Millstone) ML0730304052007-10-31031 October 2007 E. Marinos Memo Technical Assistance Request-Dominion Resources, Inc.'S December 6, 2006, Request for Exemption from 10 CFR 74.13(a) Requirements Regarding Material Status Report Submittal Time Frame ML0715100542007-05-31031 May 2007 Closeout of TAC Numbers for Licensing Activities That Do Not Require Staff Review ML0710201942007-04-24024 April 2007 Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004-02 ML0707902492007-03-20020 March 2007 Facsimile Transmission, Draft Request for Additional Information Regarding Steam Generator Tube Integrity ML0634902692007-01-11011 January 2007 Memo: K. Mcconnell to M. Lesar - Notice of Environmental Assessment and Finding of No Significant Impact Related to Partial Exemption from 10 CFR Part 50, Recordkeeping Requirements - Millstone Power Station, Unit 1 ML0633901162006-12-19019 December 2006 Fax - Draft Request for Additional Information Regarding Post-Maintenance/Modification Surveillance Requirements ML0630701472006-12-12012 December 2006 Facsimile Transmission, Draft Request for Additional Information ML0631101502006-11-13013 November 2006 Request for Additional Information Regarding Human Factors - Millstone, Unit 2, Alternate Source Term License Amendment Request ML0626800242006-10-0202 October 2006 Transfer of Project Management Responsibilities ML0625100662006-09-29029 September 2006 Facsimile Transmission, Draft Request for Additional Information Regarding Extension of Integrated Leakage Rate Test Interval ML0619500042006-07-14014 July 2006 Facsimile Transmission, Draft Request for Additional Information Regarding Post Maintenance/Modification Surveillance Requirements ML0619500092006-07-14014 July 2006 Facsimile Transmission, Draft Request for Additional Information Regarding Relaxation Request IR-2-46, Reactor Pressure Vessel Head Inspections ML0617805592006-07-10010 July 2006 Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0617701952006-06-26026 June 2006 Closeout of Tac Number for Licensing Activities Incorrectly Identified for Staff Review ML0606702532006-03-24024 March 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call ML0608601632006-03-21021 March 2006 Handouts to Applicants (Folder 3) ML0604005082006-03-0202 March 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call ML0602700882006-01-31031 January 2006 Facsimile Transmission Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call (Tac No. MC8327) ML0602502612006-01-26026 January 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call ML0528500672005-10-25025 October 2005 Facsimile Transmission RAI to Be Discussed in an Upcoming Conference Call 2022-05-20
[Table view] |
Text
August 7, 2003 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Victor Nerses, Sr. Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 3, FACSIMILE TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (RAI) TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB8731)
The attached draft RAI was transmitted by facsimile on August 7, 2003, to Mr. D. Dodson, Dominion Nuclear Connecticut, Inc. (licensee). This draft RAI was transmitted to facilitate the technical review being conducted by NRR and to support a conference call with the licensee to discuss the RAI. The RAI was related to the licensees submittal dated April 17, 2003, concerning the cable spreading area fire suppression fire suppression system.
Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
Docket No. 50-423
Attachment:
Draft RAI
August 7, 2003 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Victor Nerses, Sr. Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 3, FACSIMILE TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (RAI) TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB8731)
The attached draft RAI was transmitted by facsimile on August 7, 2003, to Mr. D. Dodson, Dominion Nuclear Connecticut, Inc. (licensee). This draft RAI was transmitted to facilitate the technical review being conducted by NRR and to support a conference call with the licensee to discuss the RAI. The RAI was related to the licensees submittal dated April 17, 2003, concerning the cable spreading area fire suppression fire suppression system.
Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
Docket No. 50-423
Attachment:
Draft RAI DISTRIBUTION PUBLIC J. Clifford V. Nerses PQualls PDI-2 Reading Accession Number: ML032190679 OFFICE PDI-2/PM SPLB/SC NAME VNerses SWeerakkody DATE 08/07/03 08/07/2003 OFFICIAL RECORD COPY
DRAFT REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FACILITY OPERATING LICENSE NO. NPF-49 DOMINION NUCLEAR CONNECTICUT, INC MILLSTONE POWER STATION, UNIT NO. 3 DOCKET NO. 50-423 (TAC NO. MB8731)
- 1. 10 CFR Part 50.48(a) requires each operating nuclear power plant to have a fire protection plan which meets Criterion (GDC) 3 of Appendix A to Part 50. In particular, GDC 3 states, Fire-fighting systems shall be designed to assure that their rupture or inadvertent operation does not significantly impair the safety capability of these structures, systems, and components. The NRC has provided specific criteria, information, recommendations, and guidance acceptable to the staff that may be used to meet the requirements of 10 CFR 50.48 and GDC 3. This information is provided in NUREG 0800, Standard Review Plan, Section 9.5.1, Fire Protection Program and in Regulatory Guide (RG) 1.78 as it relates to habitable areas such as the control room and to the use of specific fire extinguishing agents.
Please describe how the planned configuration meets the regulatory requirements . The licensee may address this by describing how the proposed change conforms to RG 1.78 as it relates to habitable areas such as the control room and at the local control stations in the east and west switchgear rooms or describe specifically how any alternatives will meet the requirements.
- 2. Millstone Power Station, Unit No. 3 committed to install an incipient fire detection system.
How would the incipient fire detection system, which is desgined to detect very minute quantities of combustion products, will assure adequate plant response (defense-in-depth) for fires which are more rapidly developing than a cable that slowly overheats due to ampacity problems? This should include a discussion of how the licensee assures other plant activities, such as welding or diesel generator operations, that may result in spurious alarms will not affect response to valid alarms.
- 3. The most recent test, which was to demonstrate in part that the licensing basis is still being met, of the CO2 fire suppression system resulted in failure of a closed door to the Cable Spreading Area (CSA) and the test had to be aborted before all the objectives were achieved. Lacking this demonstration via the test, the licensee provides an explanation of why it is not necessary to retest. However, the explanation does not make clear how the licensee will assure when the CO2 system is called upon to perform as designed it will function within the CSA to extinguish a fire.
- 4. Your approved fire protection program includes a smoke purge system to remove smoke from the cable spreading room. This system was provided to meet the guidelines of the Standard Review Plan, Section 9.5.1.
Explain why prior approval is not required prior to disabling this system.
- 5. You state that the smoke will be removed hydraulically or with electrical fans.
Please provide details of the planned smoke removal method. What is the power supply to the electrical fans, and how will you assure the reliability and availability of the power supply after the fire has started? Where will water drain if the smoke is removed hydraulically, and how you will assure safe shutdown capability especially in light of the concerns in Question 7 ?
- 6. You state that the fire brigade will be directed to minimize the use of water and to use fire extinguishers to suppress a fire in the cable spreading room. The primary in situ combustible material in this area is electrical cable insulation which burns with a deep seated fire. Several recent industry events have highlighted the fact that gaseous fire extinguishers will not suppress a deep seated cable fire.
Please provide details of the types of extinguishers available for use by the fire brigade in this area, and how you will assure fires with these attributes will be effectively extinguished?
- 7. In your submittal you note that water on the cable spreading room floor could leak through the floor onto the alternative shutdown areas below. Since plant operation in these areas may be required for a cable spreading room fire, this scenario appears to lead to lack of capability to safely shutdown the plant.
Has the risk associated with this event been analyzed? If so, what are the results? How will you assure safe plant shutdown? Include in your discussion the scenario of a fire in the CSA that leads to evacuation of the Main Control Room and fire fighting in the CSA leads to the loss of alternate shutdown.
- 8. You propose to remove water from the cable spreading room floor with a vacuum.
Given the concern of water leaking though the cable spreading room floor, justify how this method will meet the objectives of your Fire Protection Plan.