Reply to Michael S. Tuckmans Response to Issuance of Orders to Modify Licenses for Revised Design Basis Threat and for Training and Physical Fitness Enhancements Applicable to Security Force Personnel (TAC Nos. MB9273, MB9274, MB9307, MB930
ML032170222
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 09/25/2003
From: Marsh L
NRC/NRR/DLPM
To: Tuckman M
Duke Power Co
Fretz R, NRR/DLPM, 415-1324
References
TAC MB9273, TAC MB9274, TAC MB9307, TAC MB9308, TAC MB9316, TAC MB9317, TAC MB9318, TAC MB9377, TAC MB9378, TAC MB9411, TAC MB9412, TAC MB9420, TAC MB9421, TAC MB9422
Download: ML032170222 (11)


Text

SAFEGUARDS INFORMATION September 25, 2003 Mr. Michael S. Tuckman Executive Vice President, Nuclear Generation Duke Power 526 South Church Street Charlotte, NC 28202

SUBJECT:

ORDERS MODIFYING LICENSES FOR REVISED DESIGN BASIS THREAT AND FOR TRAINING AND PHYSICAL FITNESS ENHANCEMENTS APPLICABLE TO SECURITY FORCE PERSONNEL (TAC NOS. MB9273, MB9274, MB9307, MB9308, MB9316, MB9317, MB9318, MB9377, MB9378, MB9411, MB9412, MB9420, MB9421 AND MB9422)

Dear Mr. Tuckman:

On April 29, 2003, the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Orders modifying the operating licenses for Catawba Nuclear Station, Unit Nos. 1 and 2, William B. McGuire, Unit Nos. 1 and 2, and Oconee Nuclear Station, Unit Nos. 1, 2 and 3 to:

(1) require compliance with a revised Design Basis Threat (DBT); (2) implement new security force personnel training and physical fitness requirements; and (3) prescribe compensatory measures related to fitness-for-duty enhancements applicable to security force personnel.

The Orders required that licensees respond to the Commission within thirty-five (35) days. By letters dated June 2, 2003, you submitted a response to the Orders for Catawba Nuclear Station, Unit Nos. 1 and 2, William B. McGuire, Unit Nos. 1 and 2, and Oconee Nuclear Station, Unit Nos. 1, 2 and 3. In your response to the Orders, you requested that the NRC provide clarification of five DBT-related issues described in the safeguards attachment to a letter from Mr. Colvin, President and CEO of the Nuclear Energy Institute, to Chairman Diaz dated May 16, 2003. You specifically requested that the NRC provide further clarification associated with the NRCs use of force-on-force testing upon implementation of the revised safeguards contingency plans, security plans and security officer training and qualification plans. You requested a timely response from the Commission on this matter, since the Commissions clarifications may affect the manner of your compliance with the Orders.

SAFEGUARDS INFORMATION NOTICE: Enclosure 1 to this letter contains Safeguards Information. Upon separation from Enclosure 1, this letter and Enclosure 2 are DECONTROLLED.

M. Tuckman By letter dated July 18, 2003, Chairman Diaz replied to Mr. Colvins letter, providing the Commissions response and clarification on the five DBT-related issues. In response to your request, a copy of Chairman Diazs July 18, 2003, letter, including the safeguards attachment, is provided as Enclosure 1. Furthermore, I am including a list of guiding principles (Enclosure 2) that the NRC staff intends to follow when it reviews the revised security plans that will be submitted in response to the April 29, 2003, Orders. This information was previously shared with members of the Nuclear Energy Institute, and other industry representatives, during a meeting held on August 28, 2003.

Finally, in your letters dated June 2, 2003, you stated your understanding that the Commission intends to exercise enforcement discretion to accommodate issues which may arise as licensees, in good faith, take reasonable actions to implement the specific requirements of this Order. You further stated that you understood that the Commission would exercise enforcement discretion for the period necessary to resolve such issues, and to integrate the requirements of these Orders with the Order issued February 25, 2002, as well as with other pertinent regulatory requirements, and safeguards contingency plans, security plans and security officer training and qualification plans. The NRC staff is currently evaluating the enforcement-related aspects of implementing the Orders to determine the extent to which enforcement discretion is appropriate, and the NRC intends to clarify its policy on this matter in separate correspondence.

The NRC staff is reviewing your response to the Orders, and will reply to you with its determination of whether or not your response met the requirements of the Orders in separate correspondence.

Please contact Robert J. Fretz at 301-415-1324, if you have any other questions on these issues.

Sincerely,

/RA by ELeeds for/

Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369, 50-370, 50-269, 50-270 and 50-287

Enclosures:

As stated cc w/o encls: See next page

M. Tuckman By letter dated July 18, 2003, Chairman Diaz replied to Mr. Colvins letter, providing the Commissions response and clarification on the five DBT-related issues. In response to your request, a copy of Chairman Diazs July 18, 2003, letter, including the safeguards attachment, is provided as Enclosure 1. Furthermore, I am including a list of guiding principles (Enclosure 2) that the NRC staff intends to follow when it reviews the revised security plans that will be submitted in response to the April 29, 2003, Orders. This information was previously shared with members of the Nuclear Energy Institute, and other industry representatives, during a meeting held on August 28, 2003.

Finally, in your letters dated June 2, 2003, you stated your understanding that the Commission intends to exercise enforcement discretion to accommodate issues which may arise as licensees, in good faith, take reasonable actions to implement the specific requirements of this Order. You further stated that you understood that the Commission would exercise enforcement discretion for the period necessary to resolve such issues, and to integrate the requirements of these Orders with the Order issued February 25, 2002, as well as with other pertinent regulatory requirements, and safeguards contingency plans, security plans and security officer training and qualification plans. The NRC staff is currently evaluating the enforcement-related aspects of implementing the Orders to determine the extent to which enforcement discretion is appropriate, and the NRC intends to clarify its policy on this matter in separate correspondence.

The NRC staff is reviewing your response to the Orders, and will reply to you with its determination of whether or not your response met the requirements of the Orders in separate correspondence.

Please contact Robert J. Fretz at 301-415-1324, if you have any other questions on these issues.

Sincerely,

/RA by ELeeds for/

Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369, 50-370, 50-269, 50-270 and 50-287

Enclosures:

As stated cc w/o encls: See next page DISTRIBUTION:

PUBLIC RFretz DLPM Project Managers PD Reading Files VNerses DLPM Licensing Assistants TMarsh CRaynor Loren R. Plisco, Region II CHolden DLPM Project Directors OGC JClifford DLPM Section Chiefs ACRS

  • See previous concurrence OFFICE PDI-2/LPM PDI-2/LPM*

PDI-2/LA PDI-2/SC*

NAME RFretz VNerses CRaynor JClifford DATE 09/25/03 09/16/03 09/25/03 09/16/03 OFFICE OGC**

NSIR/DNS*

PDI/D*

DLPM/D NAME JGoldberg GTracy CHolden ELeeds for TMarsh DATE 08/26/03 09/17/03 09/16/03 09/25/03 OFFICIAL RECORD COPY

LETTER FROM NILS DIAZ, NRC CHAIRMAN, TO MR. JOE COLVIN, PRESIDENT AND CEO, NUCLEAR ENERGY INSTITUTE, DATED JULY 18, 2003

U.S. NUCLEAR REGULATORY COMMISSION STAFF GUIDING PRINCIPLES AND CRITERIA FOR CONDUCTING THE REVIEW OF REVISED PHYSICAL SECURITY PLANS, SAFEGUARDS CONTINGENCY PLANS, AND TRAINING AND QUALIFICATION PLANS PURPOSE:

To inform affected licensees of the criteria the U.S. Nuclear Regulatory Commission (NRC or the Commission) staff intends to adhere to in reviewing revisions made to site-specific Physical Security Plans, Safeguards Contingency Plans, and Training and Qualification Plans as a result of the nuclear security and safeguards-related Commission Orders dated February 25, 2002, January 7, 2003, and April 29, 2003.

DISCUSSION:

The information presented herein is intended to provide general information to licensees regarding the NRC staffs review criteria, but is not intended to be all-inclusive. The NRC staff is currently developing detailed criteria against which the revised site-specific plans will be reviewed for acceptance and approval. The NRC staff is also coordinating this effort with the Nuclear Energy Institute and industry working groups. Final review guidance will be developed no later than December 31, 2003.

GUIDING PRINCIPLES:

1.

Revised plans must comprehensively comply with all requirements of Orders (February 25, 2002; January 7, 2003; and April 29, 2003) except to the extent that a more stringent requirement is set forth in the licensees current plans.

2.

Revised plans must comprehensively comply with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, in particular, the plans must comply with Section 73.55, paragraphs (b) through (h) unless other alternative measures are explicitly approved by the NRC staff.

3.

Measures other than those in 10 CFR 73.55, paragraphs (b) through (h), may be approved by the staff if, and only if, they meet the objective of "high assurance" and provide a level of protection equivalent to that provided by paragraphs (b) through (h).

4.

Upon NRC approval of the revised plans and their full implementation, licensees may seek relaxation or rescission, in whole or in part, of the Interim Compensatory Measures (ICMs) provided in the Orders dated February 25, 2002.

5.

Subsequent to NRC approval of the revised plans, licensees may make changes to their revised plans, without prior NRC approval, in accordance with 10 CFR 50.54(p), i.e., if the changes would not decrease the effectiveness of the plans (plan changes may also be made in accordance with the provisions of 10 CFR 50.90, and 73.5).

6.

All licensee actions and activities which the staff deems essential, necessary, or important in complying with the Orders or 10 CFR 73.55 must be included in the plans and, therefore, will be enforceable.

ADDITIONAL GUIDANCE:

Consistent with guiding principles 1 and 2:



Pursuant to 10 CFR 73.55 and the DBT Orders, licensees must develop and implement an effective site-specific security system and organization that will protect against the threat capabilities of the revised DBT, satisfy the requirements of all the Orders, and comply with 10 CFR 73.55, paragraphs (b) through (h).



Each plan should clearly and specifically identify each Commission requirement that is to be complied with, or is intended to be satisfied, by each site-specific measure, procedure, policy, or action addressed in the plan.

Consistent with guiding principles 3 and 6:



While a licensee may identify a more efficient or effective method for satisfying a specific requirement of the Orders or 10 CFR 73.55, paragraphs (b) through (h), such site-specific measures, procedures, policies, or actions that are intended to be an alternative to a specific requirement of the Orders or 10 CFR 73.55, paragraphs (b) through (h), should be clearly and explicitly identified in each plan.



The NRC may authorize a licensee to provide alternative measures for protection against radiological sabotage other than those required by the Orders or 10 CFR 73.55, paragraphs (b) through (h), if:

a.

the licensee demonstrates that the proposed alternative measure has the same high-assurance objective specified by 10 CFR 73.55(a),

b.

the overall level of system performance provides protection against radiological sabotage equivalent to that which would be provided by compliance with the specific requirement of the Orders or 10 CFR 73.55, paragraphs (b) through (h),

for which the measure is an alternative, and c.

the plan contains sufficient detailed information to support an NRC staff conclusion that the proposed alternative measure is consistent with a. and b.

above through satisfying the intent of the specific requirement for which it is an alternative.



Where a licensee does not clearly and explicitly identify a site-specific measure, procedure, policy, or action as a proposed alternative to a specific Commission requirement, the NRC staff will conduct its review on the basis that the intent of the licensee is to comply with the specific requirement as written in the Orders or 10 CFR 73.55, paragraphs (b) through (h).

Consistent with guiding principle 4 and 5:



Upon NRC approval of the revised plans, or no later than October 29, 2004, licensees must, in accordance with the DBT Order, implement all site-specific measures, procedures, policies, actions, and alternatives, as written in each plan.



The NRC staff intends to provide timely information to all licensees regarding the possible use of enforcement discretion at a later date.

SUMMARY

The NRC intends to review and approve all revised site-specific plans between April 29 and October 29, 2004. If, for whatever reason, the NRC has not yet approved a revised site-specific plan by the full-implementation date, each licensee is, nonetheless, required to implement the revised plans in accordance with the DBT Order, no later than October 29, 2004.

Catawba Nuclear Station cc:

Mr. Gary Gilbert Regulatory Compliance Manager Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 Ms. Lisa F. Vaughn Duke Energy Corporation Mail Code - PB05E 422 South Church Street P.O. Box 1244 Charlotte, North Carolina 28201-1244 Anne Cottingham, Esquire Winston and Strawn 1400 L Street, NW Washington, DC 20005 North Carolina Municipal Power Agency Number 1 1427 Meadowwood Boulevard P. O. Box 29513 Raleigh, North Carolina 27626 County Manager of York County York County Courthouse York, South Carolina 29745 Piedmont Municipal Power Agency 121 Village Drive Greer, South Carolina 29651 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P. O. Box 629 Raleigh, North Carolina 27602 NCEM REP Program Manager 4713 Mail Service Center Raleigh, NC 27699-4713 North Carolina Electric Membership Corporation P. O. Box 27306 Raleigh, North Carolina 27611 Senior Resident Inspector U.S. Nuclear Regulatory Commission 4830 Concord Road York, South Carolina 29745 Henry Porter, Assistant Director Division of Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201-1708 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Licensing Duke Energy Corporation 526 South Church Street Charlotte, North Carolina 28201-1006 Saluda River Electric P. O. Box 929 Laurens, South Carolina 29360 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210

Catawba Nuclear Station cc:

Mr. T. Richard Puryear Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 D. M. Jamil Vice President Catawba Nuclear Station Duke Energy Corporation 4800 Concord Road York, South Carolina 29745-9635

McGuire Nuclear Station cc:

Ms. Lisa F. Vaughn Duke Energy Corporation Mail Code - PB06E 422 South Church Street P.O. Box 1244 Charlotte, North Carolina 28201-1244 County Manager of Mecklenburg County 720 East Fourth Street Charlotte, North Carolina 28202 Michael T. Cash Regulatory Compliance Manager Duke Energy Corporation McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Anne Cottingham, Esquire Winston and Strawn 1400 L Street, NW.

Washington, DC 20005 Senior Resident Inspector c/o U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Dr. John M. Barry Mecklenburg County Department of Environmental Protection 700 N. Tryon Street Charlotte, North Carolina 28202 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P. O. Box 629 Raleigh, North Carolina 27602 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Licensing Duke Energy Corporation 526 South Church Street Charlotte, North Carolina 28201-1006 NCEM REP Program Manager 4713 Mail Service Center Raleigh, NC 27699-4713 Mr. Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. T. Richard Puryear Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 G. R. Peterson, Vice President McGuire Nuclear Station Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078

Oconee Nuclear Station cc:

Ms. Lisa F. Vaughn Duke Energy Corporation Mail Code - PB05E 422 South Church Street P.O. Box 1244 Charlotte, North Carolina 28201-1244 Anne W. Cottingham, Esquire Winston and Strawn 1400 L Street, NW Washington, DC 20005 Manager, LIS NUS Corporation 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Senior Resident Inspector U. S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, South Carolina 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Drive Suite 705 Rosslyn, VA 22209 Mr. L. E. Nicholson Compliance Manager Duke Energy Corporation Oconee Nuclear Site 7800 Rochester Highway Seneca, South Carolina 29672 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P. O. Box 629 Raleigh, North Carolina 27602 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Licensing Duke Energy Corporation 526 South Church Street Charlotte, North Carolina 28201-1006 Mr. Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672