Committed to Nuclear Excellence Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-071 10 CFR 50, App. E June 30, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 RADIOLOGICAL EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50 Appendix E, attached is the latest revisions to the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures (EPIPs). These revised procedures supersede the previously submitted procedures.
Pursuant to 10 CFR 50.4, two additional copies of this letter and attachment are hereby submitted to the Regional Administrator, U. S. Nuclear Regulatory Commission, Region IlIl, Lisle, Illinois. As required, one copy of this letter and attachment is also submitted to the Kewaunee Nuclear Power Plant NRC Senior Resident Inspector.
Thomas Coutu Site Vice-President, Kewaunee Plant SLC Attachment cc US NRC Senior Resident Inspector, w/attach.
US NRC, Region III (2 copies), w/attach.
Electric Division, PSCW, wlo attach.
QA Vault, wlo attach.
N490 Highway 42
- Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560 IVNS
DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT FROM:
DIANE FENCL - KNPP TRANSMITTAL DATE 06-19-2003 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)
\\SCampion - NRC Document Control Desk (1)*
Krista Kappelman - PBNP - EP (10)*
S. Campion-- NRC Region III (2, 3)*
Kevin Joachim - Alliant Energy (11)*
S. Campion - NRC Resident Inspector (4) (receives Appx. A phone numbers)*
S. Campion - State of Wisconsin (5)*
Jill Stern - Nuclear Management Company (12)*
S. Campion - KNPP QA Vault (NRC Letter & Memo Only) (15)*
Chuck Zoia - NRC Region III (13)*
PERSONAL COPIES (21-40) These copies are for the personal use of the listed Individuals for reference or emergency response.
J. Bennett (33)
W. Bartelme (24)
J.- Ferris (13)
T. Coutu (28)
REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named Individual is the responsible custodian for the procedures and shall insure they are properly maintained.
NO Library - KNPP (59)
C. Sternitzky - ATF-2 (44)
M. Daron - Security Building (46)
C. Grant - EOF (81)
C. Grant - OSF (52)
LOREB - STF (62,66,67,68,70,72,73,74)
STF Library (43)
Resource Center - Training (82)
D. Krall - CR/SS Office (51, 56)
C. Grant - TSC (50)
W. Galarneau - RAF (53)
W. Galarneau - SBF/EMT (54)
W. Galarneau - RPO (55)
STF (86, 87, 88)
WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use In response to an emergency.
W. Galarneau - RAFIRPO (106, 107)(Partiai Distribution)
W. Galarneau. SBF/ENV (108, 109)(Paruai Distribution)
W. Galarneau - SBF/EM Team (110, 111, 111A)(Parial Distribulion)
W. Flint - Cold Chem/HR Sample Room (113)
S. Zutz - SBFISEC (114)
M. Fencl - Security (121)
S. Zutz - Security Building (120)
Ops Admin. (126)
C Gran TC P Reponse.Bhn-Pornaa-strbIon)-
C. Grant - EOF Response Binder (Partial Distribution)
-D-Krall--C-R-Response Bnder-orew
-IStangel-SCR-Response Binderyahais n)
D. Krall - CR Tag Desk Martial Distribution)
K. Stangel - SCR Tag Desk partial Distribution)
Originals to KNPP QA Vault
-Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.
- THIS IS NOT A CONTROLLED COPY. IT IS A COPY FOR INFORMATION ONLY.
1
KEWAUNEE NUCLEAR POWER PLANT.
REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES June 19; 2003 Please follow the directions listed below.
EPIP Index, dated 06-19-2003.
REMOVE INSERT PROCEDURE -
REV.
PROCEDURE.
REV.
E PI P-E OF-12, Q
EPIP-EOF-12
- ~
EPIP-RET-04
? T EPIP-RET-04 U
Figlire FPIPFS-l4;8lS
- '; ]3 Figure FGIEE)FXF Lt-n.
Retur 0
lete igucwIOF1-
, aged and datedcopy of thl tranmi, l l 10days oftransinittal date to. the' "I
?
- 1.
i~~~~~~~~t Zib fwt lef
- - Mth ivl¢
- i f'??.'.s ';:~~tasi$-fit
-(
"l dt-;t?6't:
-sv:.1 I
I I CERTIFY Copy No.
(WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.
SIGNATURE DATE Please return this sheet to DIANE FENCL.
Diane Fencl Enclosure 2
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 PROC. NO.
TITLE REV.
DATE EP-AD EPIP-AD-01 Personnel Response to the Plant Emergency Siren K
11-26-2002 EPIP-AD-02 Emergency Class Determination AG 05-05-2003 EPIP-AD-03 KNPP Response to an Unusual Event AH 03-18-2003 EPIP-AD-04 KNPP Response to Alert or Higher AM 03-18-2003 EP-AD-5 Site Emergency Deleted 04-27-87 EPIP-AD-05 Emergency Response Organization Shift Relief E
02-18-2003 Guideline EP-AD-6 General Emergency Deleted 04-24-87 EPIP-AD-07 Initial Emergency Notifications AT 03-18-2003 EP-AD-8 Notification of Alert or Higher Deleted 02-26-96 EP-AD-9 Notification of Site Emergency Deleted 04-27-87 EP-AD-10 Notification of General Emergency Deleted 04-27-87 EPIP-AD-1 1 Emergency Radiation Controls 5
12-19-2002 EP-AD-12 Personnel Assembly and Accountability Deleted 03-26-94 EP-AD-13 Personnel Evacuation Deleted 04-25-94 EP-AD-13A Limited Area Evacuation Deleted 03-01-83 EP-AD-13B Emergency Assembly/Evacuation Deleted 03-01-83 EP-AJ-13C Site Evacuation Deleted 03-01-83 EP-AD-14 Search and Rescue Deleted 05-25-94 EPIP-AD-15 Recovery Planning and Termination P
09-12-2002 EP-AD-16 Occupational Injuries or Vehicle Accidents Deleted 03-14-97 During Emergencies EP-AD-17 Communications Deleted 03-05-84 EPIP-AD-18 Potassium Iodide Distribution P
02-27-2002 EPIP-AD-19 Protective Action Guidelines S
01-20-2003 PAGE 1 OF 11
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 PROC. NO.
TITLE REV.
DATE EPIP-AD-20 KNPP Response to a Security Threat D
01-20-2003 EP-ENV EPIP-ENV-01 Environmental Monitoring Group Organization W
08-20-2002 and Responsibilities EPIP-ENV-02 Environmental Monitoring Team Activation X
10-02-2001 EP-ENV-3A Environmental Protection Director Actions and Deleted 09-26-84 Directives EP-ENV-3B EM Team Actions Deleted 09-26-84 EPIP-ENV-03C Dose Projection Using RASCAL Version 2.2 W
08-20-2002 Software EP-ENV-3D Revision and Control of ISODOSE II Deleted 02-14-95 EP-ENV-3E Manual Determination of X/Q Deleted 04-24-87 EP-ENV-3F Manual Determination of X/Q (Green Bay Deleted 05-30-86 Meteorological Data)
EP-ENV-3G Manual Dose Projection Calculation Deleted 06-02-89 EP-ENV-3H Protective Action Recommendations Deleted 04-13-90 EPIP-ENV-04A Portable Survey Instrument Use T
08-20-2002 EPIP-ENV-04B Air Sampling and Analysis X
08-20-2002 EP-ENV-4C Environmental Monitoring Teams Deleted 04-13-90 EPIP-ENV-04C Ground Deposition Sampling and Analysis X
08-20-2002 EPIP-ENV-04D Plume Tracking for Environmental Monitoring 0
08-20-2002 Teams EP-ENV-5A LCS-1 Operation Deleted 04-14-86 EP-ENV-5B MS-3 Operation Deleted 04-14-86 EP-ENV-5C SAM II Operation Deleted 04-14-86 EP-ENV-SD PAC-4G (Alpha Counter) Operation Deleted 04-14-86 EP-ENV-5E Reuter-Stokes Operation Deleted 08-27-85 PAGE 2 OF 11
EMERGENCY PLAN IMPLENENTING PROCEDURES INDEX DATE: 06-19-2003 PROC. NO.'
TITLE REV.
DATE EP-ENV-6 Data Analysis, Dose Projections and Protective Deleted 12-21-81 Action Recommendations EP-ENV-6 Alternate Sample Analysis and Relocation of EM Deleted 04-14-86 Team EP-ENV-6A Relocation of Site Access Facility (Habitability)
Deleted 03-23-84 EP-ENV-6B SAF Environmental Sample Analysis Relocation Deleted 03-23-84 EP-ENV-7 Site Access Facility Communications Deleted 09-26-84 EP-ENV-8 Total Population Dose Estimate Calculations Deleted 04-14-86 EP-EOF EP-EOF-1 Corporate Emergency Response Organization Deleted 03-11-94 EPIP-EOF-02 Emergency Operations Facility (EOF) Activation AA 08-06-2002 EPIP-EOF-03 EOF Staff Action for Unusual Event AD 01-20-2003 EPIP-EOF-04 EOF Staff Action for Alert or Higher AK 01-20-2003 EP-EOF-5 Corporate Staff Action for Site Emergency Deleted 04-24-87 EP-EOF-6 Corporate Staff Action for General Emergency Deleted 04-24-87 EP-EOF-7 Notification of Unusual Event Deleted 04-06-94 EP-EOF-8 Relocation of EOF Deleted 03-01-83 EPIP-EOF-08 Continuing Emergency Notifications Z
01-28-2003 EP-EOF-9 Interface with Support Organizations Deleted 03-05-84 EP-EOF-9 Notification of Site Emergency Deleted 04-24-87 EP-EOF-10 Notification of General Emergency Deleted 04-24-87 EPIP-EOF-l 1 Internal Communication and Documentation V
11-07-2002 Flow EPIP-EOF-12 Media Center/Emergency Operation Facility/Joint R
06-19-2003 Public Information Center/Security PAGE 3 OF 11
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 PROC. NO.
TITLE REV.
DATE EP-OP EP-OP-1 Control Room Emergency Organization Deleted 04-24-87 EP-OP-2 Emergency Control Room Activation for Deleted 04-24-87 Emergency Response EP-OP-3 Control Room Communications Deleted 04-24-87 EP-OSF EP-OSF-1 Operation Support Facility Emergency Deleted 04-24-87 Organization EPIP-OSF-02 Operational Support Facility Operations V
11-26-2002 EPIP-OSF-03 Work Orders During an Emergency P
05-09-2002 EP-OSF-4 Operational Support Facility Communications Deleted 04-24-87 EPIP-OSF-04 Search and Rescue E
05-23-2002 EP-RET EP-RET-1 Radiation Emergency Team Organization Deleted 04-16-96 EPIP-RET-02 In-Plant Radiation Emergency Team W
04-29-2003 EPIP-RET-02A Radiation Protection Office/Radiological Analysis U
11-07-2002 Facility (RPO/RAF) Activation EPIP-RET-02B Gaseous Effluent Release Path, Radioactivity, and S
08-06-2002 Release Rate Determination EP-RET-2C Containment Air Sampling and Analysis Deleted 03-01-83 EPIP-RET-02D Emergency Radiation Entry Controls and M
06-12-2001 Implementation EP-RET-2E Handling of Injured Personnel Deleted 04-16-96 EP-RET-2F Personnel Decontamination Deleted 04-13-90 EPIP-RET-03 Chemistry Emergency Team P
02-18-2003 EPIP-RET-03A Liquid Effluent Release Paths L
11-29-2001 EP-RET-3B Post-Accident Reactor Coolant Alternate Deleted 01-25-88 Sampling Procedure PAGE 4 OF 11
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 PROC. NO.
TITLE REV.
DATE EPIP-RET-03C Post Accident Operation of the High Radiation P
01-15-2002 Sample Room EPIP-RET-03D Containment Air Sampling Analysis Using CASP N
01-15-2002 EP-RET-3E Post Accident Operation of High Rad Sample Deleted 08-27-85 Room Inline Multiported Count Cave EPIP-RET-04 SBF Activation U
06-19-2003 EP-RET4A EOF Radiological Monitoring Deleted 03-10-83 EPIP-RET-04A SBF Operation/Relocation Deleted 10-02-2001 EP-RET4B Radiological Controls at Site Access Facility Deleted 07-12-94 EP-RET-4C Site Radiological Monitoring Deleted 07-12-94 EP-RET-4D SAM-il Operation Deleted 07-12-94 EP-RET-5 Plume Projection Deleted 09-26-84 EPIP-RET-05 Site Boundary Dose Rates During Controlled H
10-09-2001 Plant Cooldown EP-RET-A Plume Projection Deleted 04-27-87 EP-RET-6 Dose Projection Deleted 04-24-87 EP-RET-7 Radiological Analysis Facility/Radiation Deleted 04-24-87 Protection Office Communications EPIP-RET-08 Contamination Control of the Aurora Medical Deleted 05-23-2002 Center EPIP-RET-09 Post-Accident Population Dose M
04-29-2003 EP-SEC EP-SEC-1 Security Organization Deleted 04-24-87 EPIP-SEC-02 Security Force Response to Emergencies Y
11-14-2002 EP-SEC-2A Manual Activation of Emergency Sirens Deleted 04-16-82 EPIP-SEC-03 Personnel Assembly and Accountability AG 05-20-2003 EPIP-SEC-04 Security Force Actions for Dosimetry Issue P
10-02-2001 PAGE 5 OF 11
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 PROC. NO.
TITLE REV.
DATE EP-SEC-5 Security Force Response to the EOF Deleted 07-28-88 EPIP-SEC-05 Personnel Evacuation G
06-20-2002 EP-TSC EPIP-TSC-01 Technical Support Center Organization and S
01-28-2003 Responsibilities EPIP-TSC-02 Technical Support Center Activation U
01-20-2003 EPIP-TSC-03 Plant Status Procedure W
05-05-2003 EPIP-TSC-04 Emergency Modifications 0
04-29-2003 EP-TSC-5 Technical Support Center Communications Deleted 04-24-87 Equipment EP-TSC-6 Assessment of Reactor Core Damage Deleted 09-30-86 EPIP-TSC-07 RV Head Venting Time Calculation J
06-20-2002 EPIP-TSC-08A Calculations for Steam Release from Steam 0
11-26-2002 Generators EPIP-TSC-08B*
STMRLS Computer Program G
06-20-2002 EP-TSC-8C*
See EP-TSC-8B Deleted 04-16-92
- EP-TSC-8B was totally deleted; therefore, EP-TSC-8C was changed to EP-TSC-8B EP-TSC-9 Core Damage Assessment Using Released Deleted 09-30-86 Radionuclides EPIP-TSC-09A*
Core Damage Assessment K
05-05-2003 EPIP-TSC-09B*
CORE Computer Program Deleted 05-16-2002 EP-TSC-9C*
See EP-TSC-9B Deleted 04-16-92
- EP-TSC-9A, Rev. D was totally deleted; therefore, EP-TSC-9B became EP-TSC-9A. EP-TSC-9B was previously EP-TSC-9C.
EPIP-TSC-10 I Technical Support for IPEOPs K
l05-09-2002 PAGE 6 OF 11
ENERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 FIGUR
,E EPIP FIG#
Figure EPIPFG DESCRIPTION REV.
DATE EP-SEC-5 Technical Support EPIP-APPX-A-06 EP-RG403 APPX-A-06-03 Center - KNP Floor Plan B
06-12-2001 Site Boundary Facility -
EPIP-APPX-A-06 EP-RG405 APPX-A-06-02 KNP Floor Plan A
10-31-2000 Radiological Analysis EPIP-APPX-A-06 EP.noIoos APPX-A-06-01 Facility - KNP Floor Plan A
10-31-2000 EPIP-EOF-12 Division Office Building Form EPIPF-EOF-02-01 EP-FIG-09 EOF-12-01 (2nd Floor) Floor Plan C
06-19-2003 State/County Work Area -
EPIP-APPX-A-06 EP-G.012 APPX-A-06-08 WPSC D2-1 Floor Plan C
10-31-2000 NRC Work Area -
EPIP-APPX-A-06 EP-RG4013 APPX-A-06-09 WPSC D2-4 Floor Plan A
10-31-2000 Population Distribution by Geographical Sub-EPIP-AD-19 EP-HI014 AD-19-01 Areas (with sectors)
A 10-31-2000 EOF - WPSC D2-3 EPIP-APPX-A-06 EP-RG-022 APPX-A-06-04 Floor Plan D
04-29-2003 Location of JPIC and Media Briefing Center EPIP-EOF-12 EP-IG-02 EOF-12-02 Map D
06-19-2003 KNP Site Map &
EP-SEC-5 EP-RG-42 SEC-05-01 Evacuation Routes C
06-20-2002 Floor Plan - Media APPX-A-6 EP-FIG434 Briefing Center Deleted 08-04-98 EPIP-EOF-12 EPIP-APPX-A-06 EP-FIG35 APPX-A-06-06 Media Briefing Center D
04-29-2003 Floor Plan - Corporate APPX-A-6 EP-FIG-037 Response Center Deleted 08-04-98 APPX-A-6 EP-IG4038 Floor Plan - JPIC Deleted 08-04-98 EPIP-OSF-02 EP-F4!39 OSF-02-01 High Priority Work A
10-02-2001 EPIP-OSF-02 EP-FIG-039A OSF-02-02 Lower Priority Work A
10-02-2001 JPIC - Federal Work EPIP-APPX-A-06 EP-FIG043 APPX-A-06-10 Area - WPSC D2-9 C
04-29-2003 JPIC - State and County Work Area -
EPIP-APPX-A-06 EPFG44 APPX-A-06-07 WPSC D2-8 D
04-29-2003 JPIC - Utility Work EPIP-APPX-A-06 EP.FIG-045 APPX-A-06-05 Area - WPSC D2-7 D
04-29-2003 Aurora Medical Center RET-08 EP-qG-46 RET-08-01 Location Deleted 05-23-2002 EPIP-APPX-A-02 APPX-A-02-01 ERO Call Tree Deleted 12-04-2001 PAGE 7 OF 11
ENERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 NUMBER TITLE REVISION DATE APPENDIX A APPX-A-1 Communication System Description AF 08-04-98 EPIP-APPX-A-02 Response Personnel Call List Deleted 02-06-2002 EPIP-APPX-A-03 Off-Site Telephone Numbers Deleted 02-06-2002 EPIP-APPX-A-06 KNPP Emergency Response Facility Figures AB 04-29-2003 PAGE 8 OF 11
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 FORM EPIPF TITLE REV.
go DATE APPENDIX B EP-AD AD-07-01 Event Notice - Nuclear Accident Reporting System Form V
05-05-2003 (NARS)
AD-07-02 State Call-Back - Question Guideline C
11-15-2001 AD-07-03 Fax Event Notice B
03-06-2003 AD-07-04 ERO Event Notification C
05-29-2003 AD-11-01 Emergency Radiation Work Permit H
12-19-2002 AD-184-1 Airborne Radioiodine Dose Accountability and Potassium B
08-06-2002 Iodide Distribution AD-18-02 Record of Known Allergy To or Voluntary Refusal to Take A
02-27-2002 Potassium Iodide EP-ENV ENV-01-01 Environmental Dispatch Area Activation Checklist D
10-31-2000 ENV-01-02 EMT Status B
10-31-2000 ENV-01-03 Meteorological and Plant Status Data C
12-14-2001 ENV-01-04 EMT Orders/Field Data B
10-31-2000 ENV-02-01 EMT Activation Checklist N
08-20-2002 EP-EOF EOF-02-01 EOF Activation Checklist T
08-06-2002 EOF-02-02 EOF Deactivation Checklist N
01-28-2003 EOF-04-01 SRCL Initial Action Checklist D
01-20-2003 EOF-04-02 Telephone Communications Log Sheet A
12-14-2001 EOF-08-03 Fax for Emergency Declaration or Status Updates H
01-20-2003 EOF-08-05 Plant Emergency Status Report A
11-27-2001 EOF-08-06 Radiological Status Report E
01-20-2003 EOF-11-02 Operating Status G
11-07-2002 PAGE 9 OF 11
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 FORM EPIPF TITLE REV.
DATE EOF-1 1-03 Environmental Status Board G
11-07-2002 EOF-12-01 I.D. Badge Registration Form G
10-24-2000 EP-OSF OSF 2.2 Maintenance Work in Progress Deleted 07-08-98 OSF-03-01 Operational Support Facility Team Briefing C
12-04-2001 EP-RET RET-02A-02 Emergency Sample Worksheet E
06-05-2001 RET-02B-01 Containment Stack Release (Grab Sample)
D 08-06-2002 RET-02B-02 Auxiliary Building Stack (Grab Sample)
D 08-06-2002 RET-02B-03 Auxiliary Building Stack (Sping Reading)
D 08-06-2002 RET-02B-04 Containment Stack (Sping Reading)
C 08-06-2002 RET-02B-05 Steam Release D
08-06-2002 RET-02B-06 Field Reading (Grab Sample)
B 08-06-2002 RET-04-01 SAM-2 Counting Equipment Worksheet E
06-12-2001 RET 8.3 Hospital Survey I Deleted 06-05-2001 RET 8.4 Hospital Survey 2 Deleted 07-25-97 RET 8.5 Hospital Survey 3 Deleted 07-25-97 RET-08-06 Hospital Survey 4 Deleted 05-23-2002 RET-09-01 Post-Accident TLD Record Sheet D
04-16-2002 EP-SEC SEC-03.01 Emergency Accountability Log A
03-28-2000 SEC-04-01 Emergency Dosimeter Log G
06-20-2002 EP-TSC TSC-01.01 Plant Status Summary for SAM Implementation C
01-28-2003 TSC-01.02 Severe Accident Management Summary and Strategy B
02-06-2002 Recommendation PAGE 10 OF 11
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 06-19-2003 FORM EPIPF TITLE REV.
DATE TSC-01.03 Severe Accident Management - Status B
02-06-2002 TSC-02-01 TSC and OSF Activation Checklist P
01-20-2003 TSC-02-02 TSC Ventilation Checklist I
01-20-2003 TSC-02-03 Emergency Response Data System (ERDS) Link Initiation H
01-2Q-2003 Checklist TSC-02-04 TSC Chart Recorder Operation Checklist E
01-20-2003 TSC-02-05 TSC and OSF De-Activation Checklist C
01-28-2003 TSC-03-01 Plant System Status L
06-12-2001 TSC-03-02 Plant Equipment Status L
06-12-2001 TSC-03-03 Environmental Status Board J
06-12-2001 TSC-03-04 Radiation Monitors I
01-08-2002 TSC-04-01 Emergency Modification Request H
04-29-2003 TSC-04-02 Emergency Physical Change Safety Review Deleted 05-09-2002 TSC-04-03 Emergency Modification Index G
04-29-2003 TSC-07-01 Head Venting Calculation G
06-20-2002 TSC-08A-01 Steam Release Data Sheet (Energy Balance)
H 12-14-2001 TSC-08A-02 Steam Release Calculation Sheet (Energy Balance)
G 12-14-2001 TSC-08A-03 Steam Release Data/Calculation Sheet (Open Valve)
E 12-14-2001 TSC-08A-04 Steam Release Data/Calculation Sheet (STMRLS Program)
D 12-14-2001 TSC-09A-01 Core Exit Thermocouple Data D
05-16-2002 TSC-09A-02 Fuel Rod Clad Damage Estimate D
05-16-2002 TSC-09A-03 Fuel Rod Overtemperature Damage Estimate E
05-16-2002 TSC 9A.4 Core Damage Based on Activity Ratios Deleted 05-16-2002 TSC-09A-05 Core Damage Assessment (Monitoring Data)
E 05-16-2002 TSC 9A.6 Core Damage Summary Deleted 05-16-2002 TSC-09A-07 Core Damage Assessment Results A
05-05-2003 PAGE 11 OF 11
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 Page 1 of 13 Reviewed By Bruce Heitzkey Approved By Jerrie Morlino Nuclear P
Yes ReviCw a Yes SRO Approval Of 3 Yes Safety El No Revie Temporary Related 0 NO Required 0 No Changes Required El No 1.0 Purpose 1.1 This procedure provides instruction for implementing security arrangements for Emergency Plan.
2.0 General Notes 2.1 None 3.0 Precautions and Limitations 3.1 All security stations will be staffed on a 24-hour per day basis unless mutually agreed upon by the Administrative Logistics Director (ALD) and the Security Leader.
3.2 Conflicts or misunderstandings concerning implementation of this procedure by the security company should be resolved promptly between the Security Leader, the ALD, or the Emergency Response Manager (ERM).
3.3 If unauthorized personnel interfere with the operation of the Emergency Operations Facility (EOF), doors marked by a circled "L" on Figure EPIPFG-EOF-12-01 can be locked.
Keys for these doors can be found hung on the backside of the door in the EOF storage closet to be issued to EOF personnel as needed.
4.0 Initial Conditions 4.1 This procedure shall be implemented when the Kewaunee Nuclear Power Plant declares an Alert, Site Emergency, or General Emergency, or at the request of an Emergency Response Manager, OR upon notification from the Point Beach Nuclear Plant that the Joint Public Information Center (JPIC) and Media Briefing Center are needed in support of a declared emergency at their plant.
J:\\appdataproopws\\draft\\epipeeofl2.doc-Christine Simmons/Christine SimmonsJeanne Ferris REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 I Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 192003 i
Page 20f 13 5.0 Procedure 5.1 Administrative Logistics Director (ALD) or designee shall:
Note IF after normal work hours, THEN page one of the following Pieschek representatives: Mike Horst (920) 556-9102, Jill Hagerstrom (920) 556-9382, or Ed Byrne (920) 556-4558.
5.1.1 Contact Pieschek Protective Services, (920) 468-0100, and inform them of the following:
Six (6) Security Officers and one (1) Security Leader are needed at the Wisconsin Public Service Corporation building complex The Security Team should bring eight (8) mobile radios for team communication They are to report to the Northeast entrance door under the skywalk of the Division Office Building (DOB-3)
The team should park in the lots to the East of the building complex Note The Green Bay Parking Authority phone number is (920) 448-3431.
5.1.2 During normal work hours, contact Building Services at ext. 1629 and instruct them to call the Green Bay Parking Authority to have Wisconsin Public Service Corporation (WPSC) parking lot monitoring suspended until further notice.
5.1.3 Obtain the security instruction manual for all security stations from the EOF (Conference Room D2-3) sealed bookcase.
5.1.4 Obtain badges for Station 1 (Red Media) and Station 5 (Yellow EOF/JPIC) from the EOF file cabinet, second drawer.
5.1.5 Provide the instruction manual for Security Station 5 and the Yellow badges (EOF/JPIC) to an EOF Support Person and direct them to implement Section 5.2 of this procedure.
5.1.6 Provide the instruction manual for Security Station 6 and the Yellow badges (EOF/JPIC) to a second EOF Support Person and direct them to implement Section 5.3 of this procedure.
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 I Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 l
Page 3 of 13 5.1.7 Upon arrival of the Security Team:
- a. Transfer the remaining instruction and material packages and Station 1 (Red Media) badges to the Security Leader.
- b. Provide the Security Leader with three (3) Green WPSC Contractor badges, one (1) for himself and one (1) each for the Security Officers staffing Station 1 and Station 5.
- c. Answer any questions the Security Leader may have and inform him how you can be reached.
- d. Obtain a security force radio from the Security Leader.
- e. Accompany the Security Team Leader while he staffs the security stations.
- f. When the security stations are staffed, introduce the Security Leader to the JPIC Manager and Emergency Response Manager.
5.1.8 When Final Conditions (See Section 6.0) are met:
- a. Inform the Security Leader of the event close-out so he can release his personnel.
- b. Ensure that the Security Leader returns all security instructions and material packages to the EOF.
- c. Ensure any doors that were locked in Steps 5.8 and 5.10 are unlocked.
- d. Ensure the completed Form EPIPF-EOF-12-01 is placed in EOF master file.
- e. Ensure all security contractor invoices are properly processed.
5.2 The EOF Support Person (1) assigned by the ALD or his representative shall:
5.2.1 Obtain the table and chair labeled for EP use from Conference Room D1-7 and put in place for Station 5 (See Figures EPIPFG-APPX-A-06-06, EPIPFG-EOF-12-02, EPIPFG-EOF-12-01, and the applicable instruction packages).
5.2.2 Until relieved by a contract Security Officer, follow the instructions for Station 5 as described in Section 5.9 of this procedure.
5.2.3 When the Security Team arrives, hold the Security Team in the hallway at the entrance for a briefing by the Administrative Logistics Director (ALD) or his designated representative.
5.3 The EOF Support Person (2) assigned by the ALD or his representative shall:
5.3.1 Hang signs as indicated on the floor plan for the Division Office Building (2nd Floor)
(Figure EPIPFG-EOF-12-01) by a circled "P."
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 I Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 Page 4 of 13 5.3.2 During the activation stage of the Emergency Operations Facility (EOF)/Joint Public Information Center (JPIC), go through the EOF/JPIC and issue badges to personnel at their duty stations.
- a. Confirm they are a representative of one of the following organizations.
Nuclear Management Company (NMC) employees Wisconsin Public Service Corporation (WPSC) employees We Energies employees State of Wisconsin emergency response personnel Kewaunee County emergency response personnel Manitowoc County emergency response personnel US - Nuclear Regulatory Agency representatives Federal Emergency Management Agency representatives
- b. Log them into the EOF or JPIC by instructing the individual to enter the following information on Form EPIPF-EOF-12-01:
Printed last and first name
- Signature Organization Represented Work Phone Number
- c. Complete Form EPIPF-EOF-12-01 by entering the "date" and "time in."
- d. Issue them a Yellow (EOF/JPIC) badge.
5.3.3 When individuals present in the EOF and JPIC have been badged, turn any remaining badges and the completed Registration Form, Form EPIPF-EOF-12-01, over to Station 5.
5.3.4 Until relieved by a contract Security Officer, follow the instructions for Station 6 as described in Section 5.10 of this procedure.
5.4 Security Leader shall:
5.4.1 Review identification badge types with all Security Officers (See Attachment A).
5.4.2 Issue a Green WPSC Contractor badge to the Security Officers that will staff Station 1 and Station 5.
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 I Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 T
Page 5 of 13 5.4.3 Assign a Security Officer with a radio to each Security Station 1 through 6, as described in Steps 5.5 through 5.10 of this procedure.
5.4.4 Ensure each Officer understands his responsibilities as described in Steps 5.5 through 5.10 of this procedure.
5.4.5 Ensure that each Security Station has the appropriate information and material package.
5.4.6 Ensure all Security Station radios are functional.
5.4.7 Wear the green "Contractor" Wisconsin Public Service Corporation (WPSC) security badge (See Attachment A for description) while in the building complex. This will allow you access through the electronically controlled external doors of the complex to facilitate Security Team movement outside the buildings.
5.4.8 Periodically tour all Security Stations.
5.4.9 Periodically check in with the Administrative Logistics Director (ALD) at the EOF on status of security activities.
5.5 Security Station 1, Security Officer at (700 N. Adams St.) Receptionist Area, (See Figure EPIPFG-APPX-A-06-06) shall:
5.5.1 Control access to the building:
- a. Allow entry to individuals with a Wisconsin Public Service Corporation (WPSC) badge, WPSC Contractor badge, KNP Plant badge, or WPS NMC access badge, to badge (See Attachment A for description) themselves in (See Attachment A for description).
- b. Provide access for individuals with only a Red Media badge or Yellow EOF/JPIC badge (See Attachment A for description) using the electronic release button at the reception counter or your Green WPSC Contractor badge.
5.5.2 IF personnel require access to the Media Briefing area and do not have a Red Media badge or Yellow EOF/JPIC badge (See Attachment A for description), THEN:
- a. Require they show proper identification.
- b. Direct representative of the following organizations to Station 5 for issuance of a Yellow EOF/JPIC badge (See Attachment A for description)
OR issue a badge:
- Nuclear Management Company (NMC) employees
- Wisconsin Public Service Corporation (WPSC) employees REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 l
Page 6 of 13 We Energies employees State of Wisconsin emergency response personnel Kewaunee County emergency response personnel Manitowoc County emergency response personnel US - Nuclear Regulatory Agency representatives Federal Emergency Management Agency representatives Note Media representatives desiring access to the Media Briefing Center (MBC) must have an appropriate identification issued by an organization listed below.
Print (newspaper, magazine, etc.)
Electronic (News services, Internet, etc.)
Broadcast (television, radio, etc.)
5.5.3 Log media representatives into the Media Briefing Center.
- a. Instruct the individual to enter the following information on Form EPIPF-EOF-12-01:
- Printed last and first name Signature Organization Represented Work Phone Number
- b. Complete Form EPIPF-EOF-12-01 by entering the "date" and "time in."
- c. Issue a Red Media identification badge (See Attachment A for description).
- d. Allow the individual access to the Media Briefing Center using the electronic release button at the reception counter or your WPSC Contractor badge.
5.5.4 IF an individual has no identification or identification seems out of order, THEN contact an Administrative Logistics Director (ALD) using the security radio.
5.5.5 When an individual leaves the complex for any reason other than emergency response duties, remind individual to:
- a. Leave the facility through the same security station where they logged in.
- b. Return the identification badge.
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 I Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 l
Page 7 of 13 5.5.6 Maintain the check in logs until collected at the end of the event.
5.5.7 IF individuals check out through a security station other than the one at which they signed in, THEN radios can be used to notify the station with the log they are signed in on to log them out.
5.6 Security Station 2, Security Officer at (700 N. Adams St.) East of Receptionist Area, (See Figure EPIPFG-APPX-A-06-06) shall:
5.6.1 Allow entry to individuals with a Yellow (EOF/JPIC) badge (See Attachment A for description) complete access to the facility including the Media Briefing Center (MBC).
5.6.2 If needed, provide directions for utility, Federal, State, and County response persons with Yellow (EOF/JPIC) badges (See Attachment A for description) who are unsure of the route to the Emergency Operations Facility(EOF)/Joint Public Information Center (JPIC).
5.6.3 Allow entry to individuals with a Wisconsin Public Service Corporation (WPSC) badge, WPSC Contractor badge access to WPS facilities.
5.6.4 DO NOT ALLOW Red MEDIA badged persons (See Attachment A for description) down the East or South walkway or up the Lobby elevators.
5.6.5 Inform all media of the availability of Conference Room G1-1 as a work area.
5.6.6 Provide directions for individuals with a Red Media badge (See Attachment A for description) to the MBC or media work area (Conference Room GI-1) via the West walkway.
5.6.7 When an individual leaves the complex for any reason other than emergency response duties, remind individual to:
- a. Leave the facility through the same security station where they logged in.
- b. Return the identification badge.
5.6.8 Allow individuals with Wisconsin Public Service Corporation (WPSC) or Yellow EOF/JPIC identification badge (See Attachment A for description) access to the MBC via the media access route.
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 I Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 i
Page 8 of 13 5.7 Security Station 3, Security Officer at (700 N. Adams St.) Media Briefing Center (MBC) stage entrance to Conference Room G1-5 and G1-6 (See Figure EPIPFG-APPX-A-06-06) shall:
5.7.1 Ensure that only personnel with Yellow EOF/JPIC identification badges (See Attachment A for description) access into the MBC through the stage entrance.
5.7.2 DO NOT ALLOW Red MEDIA badged persons (See Attachment A for description) down the East or South walkway or up the Lobby elevators.
5.8 Security Station 4, Security Officer at (700 N. Adams St.) North end of Media Briefing Center (MBC) Conference Room G1-5 and G1-6 (See Figure EPIPFG-APPX-A-06-06) shall:
5.8.1 Ensure that the doors leading to the inside stairwell are in the locked position. The allen wrench enclosed in the information package for Security Station 4 will release the door from open to the locked position.
5.8.2 Ensure that individuals in your field of view have a Red (Media) or Yellow (EOF/JPIC) identification badge (See Attachment A for description).
5.8.3 Direct those who do not have proper identification to Station 1.
5.8.4 Control the crowd and ensure that no unauthorized individuals enter the Media Center through the North external doors.
Note The Administrative Logistics Director (ALD) or alternate may be contacted using the security radio.
5.8.5 Requests to run cabling through the North external door must be approved by the ALD.
5.9 Security Station 5, Security Officer at (600 N. Adams St.) two-story Division Office Building (DOB) doorway below skywalk (See Figure EPIPFG-EOF-12-01) shall:
5.9.1 Control access to the building, allow entry to individuals with a Wisconsin Public Service Corporation (WPSC) badge, WPSC Contractor badge, KNP Plant badge, WPS NMC access badge, or a Yellow EOF/JPIC badge (See Attachment A for description).
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 T Page 9 of 13 5.9.2 IF personnel require access to the Emergency Operations Facility(EOF)/Joint Public Information Center (JPIC) and do not have a Yellow EOF/JPIC badge (See Attachment A for description), THEN:
- a. Require they show proper identification.
Note Individuals desiring access to the EOF/JPIC without an appropriate identification issued by their organization shall be identified by the Administrative Logistics Director (ALD) or his alternate. The ALD or alternate may be contacted using the security radio.
- b. Confirm they are a representative of one of the following organizations:
- Nuclear Management Company (NMC) employees
- Wisconsin Public Service Corporation (WPSC) employees We Energies employees State of Wisconsin emergency response personnel Kewaunee County emergency response personnel Manitowoc County emergency response personnel
- c. Log them into the EOF or JPIC by instructing. the individual to enter the following information on Form EPIPF-EOF-1201:
Printed last and first name Signature Organization Represented Work Phone Number
- d. Complete Form EPIPF-EOF-12-01 by entering the "date" and "time in."
- e. Issue a Yellow EOF/JPIC identification badge.
5.9.3 IF the individual is a local or national news media representative, THEN direct them to Station 1.
5.9.4 IF an individual has no identification or identification badge seems out of order, THEN contact an ALD using the security radio.
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 I Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 TPage 10 of 13 5.9.5 WHEN an individual leaves the complex for any reason other than emergency response duties, remind individual to:
- a. Leave the facility through the same security station where they logged in.
- b. Return their Red/Yellow identification badge.
5.9.6 Maintain the check-in logs until collected at the end of the event.
5.9.7 IF individuals check out through a security station other than the one at which they signed in, THEN radios can be used to notify the station with the log they are signed in on to log them out.
5.10 Security Station 6, Security Officer at central hallway to Emergency Operations Facility (See Figure EPIPFG-EOF-12-01) shall:
5.10.1 Patrol the Emergency Operations Facility (EOF), Joint Public Information Center (JPIC), the hallways surrounding them, and inspect individuals to ensure they have a Yellow EOF/JPIC identification badge (See Attachment A for description).
5.10.2 IF personnel require access to the EOF/JPIC and do not have a Yellow EOF/JPIC badge (See Attachment A for description), THEN direct them to Station 5 OR issue a badge.
5.10.3 IF the individual is a local or national news media representative, THEN direct them to Station 1.
5.10.4 IF an individual has no identification or identification badge seems out of order, THEN contact an Administrative Logistics Director (ALD) using the security radio.
5.10.5 IF access control becomes a problem, THEN contact ALD to lock doors.
5.10.6 WHEN an individual leaves the complex for any reason other than emergency response duties, remind individual to:
- a. Leave the facility through the same security station where they logged in.
- b. Return their identification badge.
6.0 Final Conditions 6.1 Plant emergency has been Terminated or Recovery actions have begun and the responsible director has suspended the use of EPIPs.
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-EOF-12 Rev.
R Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center/Security Emergency Plan Implementing Procedure Date JUN 19 2003 l
Page 11 of 13 7.0 References 7.1 Figure EPIPFG-EOF-12-01, Division Office Building (2nd Floor) Floor Plan 7.2 Figure EPIPFG-EOF-12-02, Location of JPIC and Media Briefing Center Map 7.3 Figure EPIPFG-APPX-A-06-06, Media Briefing Center 7.4 Form EPIPF-EOF-12-01, I.D. Badge Registration Form 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.
8.1.1 OA Records None 8.1.2 Non-OA Records I.D. Badge Registration Form, Form EPIPF-EOF-12-01 REFERENCE USE
'N
-h^
(E
- i -2
<vFs o'
c r + 0 0... 4 -
. u.. a.
t.\\
-) ;-',
t ''V-s,,
- ' C ' 0 f fffii
(.^S,4-'s.'. i
.1'X.
- )d b..; - s s
". t
- -: i- -: MEDIA-5:-w: 0-: -::
i;
^^ff ---
,i
- C,.
=
L f... -..-.
j..
R.:
'.,;..,5 t ^ Xt-ta-t.-.-.
t -.. -; t;
,.>,r.
' J f
s t 1.
I ).'. ' *
- r I,. ', ', !: ' - '
a, i
S j
S.
v.
S
\\ >
,:. X ",:
\\',,
J.;
f. S ',_,.-
(Red XlXad ^ l.
X >-.0x
..9 z s.
, i
<. e 1 < >
' ' - 0.
'0 ' ' b o -
X '
2, A, /,. L S S -,
oE,S' 8,
\\,
,. j ', ' '., ;"'
S: ' " -' 5' :'; " I'O' i:.',
' L '::,
i:;
4 y
- < -i ' *;
' *j n T
j
',. S s
s 2, j I -,.. A-t
.e jc i;
S i
EMERGENCY STAFF EOF/JPIC (Yellow Badge)
~~-3C
'.'I
-C-(Green B Tadge) i~>t t-G'> e-fi:Ba'
- it 8-4 PHOTO NAME (Gray Border)
Attachment A EPIP-EOF-12 Rev. R Date: JUN 19 2003 REFERENCE USE Page 12 of 13
EMPLOEES 00000 PICrURE JOHN SMITH Comphay NMC KNPP KNP Plant Badge WPS NMC Access Badge Attachment A EPIP-EOF-12 Rev. R Date: JUN 19 2003 REFERENCE USE Page 30 OT 13
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-RET-04 Rev.
U Title SBF Activation Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure Date JUN 19 2003 Page 1 of 4 Reviewed By Rick Adams Approved By Jerrie Morlino Nuclear a Yes PORC 0 Yes SRO Approval Of 3 Yes Safety Review Temporary Related 0 No Required 0 No Changes Required E No 1.0 Purpose 1.1 This procedure provides instruction for the steps to be taken to fully activate the Site Boundary Facility (SBF).
2.0 General Notes 2.1 None 3.0 Precautions and Limitations 3.1 None 4.0 Initial Conditions 4.1 The Environmental Monitoring Team (EMT) has been activated.
5.0 Procedure 5.1 Site Boundary Facility (SBF) Coordinator 5.1.1 At the declaration of an Alert or higher, the first available Radiation Protection Technologist in the Radiation Protection Office/Radiological Assessment Facility (RPOIRAF) will perform the following activities to activate the SBF:
- 1. Obtain the keys to the facility doors and cabinets from the RPO.
- 2. Take copies of the current crew dose and deliver to the EMTs.
- 3. Report to the SBF and open the facility.
- 4. Assume the duties of the Site Boundary Facility Coordinator.
- 5. Activate the SBF as described below.
5.2 Facility Activation 5.2.1 Source check the portable survey instruments.
5.2.2 Perform background and efficiency checks on the counting equipment and record on appropriate counting worksheets.
j:\\appdata\\procpwsdraftepip\\eretO4.doc-Dor Ziegler/Dori Ziegler-Wayne Galameau REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-RET-04 I Rev.
U Title SBF Activation Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure I Date JUN 19 2003 l
Page 2 of 4 5.2.3 Set up the PPM-1 Portal Monitor in accordance with IP-06.085, "Instrument Operating Procedure - PPM-I Portable Personnel Monitor."
5.2.4 Perform radiation and contamination surveys at the SBF to establish base line radiological conditions.
5.2.5 Assist the Emergency Monitoring Teams with set-up or replacement of instrumentation as requested.
5.2.6 Notify the Radiation Protection Director (RPD) that the SBF is activated.
5.2.7 IF conditions change, THEN update the RPD with the status of radiological conditions at the SBF.
Note The SAM-2 is used as a back-up counting system (single channel analyzer) in case the MCA in the plant is NOT operable or silver zeolite cartridges can NOT be counted by MCA at the Point Beach Nuclear Plant to determine Iodine-131 concentrations.
5.2.8 The SAM-2 is maintained in a "powered-up" and "ready-to-go" condition at all times with only the display turned off. (IF this is NOT the case, THEN set up the SAM-2 in accordance with HP-06.007, "Instrument Operating Procedure - SAM-2.")
5.2.9 If needed, use the SAM-2 to determine Iodine-131 concentrations.
5.3 Dosimetry 5.3.1 IF arriving ERO personnel do NOT have plant issued dosimetry, THEN issue emergency dosimetry stored in the SBF.
5.3.2 For EMT members that will monitor the plume, direct them to read their dosimeters as follows:
5.3.2.1 IF a release occurs OR is in progress, THEN read dosimeters at a minimum of every 15 minutes, more often as radiation levels dictate.
5.3.2.2 Advise the RPO/RAF (or Emergency Operations Facility (EOF) when activated) of dosimeter readings every hour OR when 100 mrem is accumulated.
5.3.3 Instruct personnel remaining in the SBF to perform the following:
- 1. Periodically monitor their Self Reading Dosimeters (SRDs).
- 2.
Report dose readings of 100 mrem to the SFB Coordinator.
- 3. IF the dosimeter reads 3/4 scale or greater, THEN have the dosimeter re-zeroed by the SBF Coordinator.
REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPIP-RET-04 Rev.
U Title SBF Activation Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure Date
-JUN 19 2003 l
Page 3 of 4
- 4. Log the dose on Form EPIPF-SEC-04-01 "Emergency Dosimetry Log Security."
- 5. Report dose increments of 100 mrem to the RPD.
5.4 SBF Radiation Surveys 5.4.1 If the SBF should become contaminated, then follow normal RP procedures to prevent the spread of contamination.
5.4.2 IF advised that a release is in progress OR has occurred, THEN perform radiation surveys of the SBF.
5.4.3 Advise the RPD immediately of elevated radiation or contamination readings in the SBF.
5.5 SBF Relocation 5.5.1 IF the SBF becomes uninhabitable OR ineffective due to radiation levels or contamination, THEN contact the RPD and consider relocation of the SBF.
5.5.2 If relocation is deemed necessary, then determine the new location of the SBF.
5.5.3 Collect the following and move it to the new SBF location:
All Portable Instruments TLDs and TLD issue sheets Status Board Sheets Radios and associated equipment Potassium Iodide Tablets
- Emergency Plan and Emergency Plan Implementing Procedures
- Dosimeters and Chargers Swipe packets Phone lists Calculator Step-off Pads Rad Bags Lab coats Gloves Shoe covers REFERENCE USE
WISCONSIN PUBLIC SERVICE CORP.
No.
EPEP-RET-04 I Rev.
U Title SBF Activation Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure Date JUN 19 2003 T
Page 4 of 4 5.5.4 Report to the new location.
5.5.5 Set up instruments and radiological controls.
5.5.6 Inform the RPD when the SBF has been relocated and reestablished.
6.0 Final Conditions 6.1 Plant Emergency has been Terminated or Recovery actions have begun and the Emergency Response Manager has suspended the use of EPIPs.
7.0 References 7.1 EPIP-AD-04, KNPP Response to Alert or Higher 7.2 HP-06.007, Instrument Operating Procedure - SAM-2 7.3 HP-06.085, Instrument Operating Procedure - PPM-1 Portable Personnel Monitor 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.
8.1.1 OA Records Counting System Worksheet, Form HPF-100 (i.e., MS-3)
SAM-2 Counting Equipment Worksheet, Form EPIPF-RET-04-01 Emergency Dosimetry Log Security, Form EPIPF-SEC-04-01 8.1.2 Non-OA Records None REFERENCE USE