ES-301 Control Room Svstems and Facilitv Walk-Throuah Test Outline Form ES-301-2 Facility: Seabrook Station Exam Level (circle one): RO / SRO(I) / SRO(U)
Date of Examination: 6/02/03-6/06/03 Operating Test No.:
B.l Control Room Systems System / JPM Title Type Code*
Safety Function 1
- a. 001 Control Rod Drive / 1/M Plot performance. Identify that the reactor goes critical below -500 pcm value.
- c. 01 0 Primary Pressure Control System / Depressurize the RCS during a natural circulation cooldown with letdown unavailable IAW ES-0.2.
(SRO-U) 6
- d. 062 AC Electrical distribution / Loss of All AC Power; failure of EDG output breaker and charging pump auto start.
(SRO-U)
- f. 012 RPS Power Range NI Failure
- g. 076 Service Water System / Transfer Service Water to the Cooling Tower D, S 5
7 4(sec) 11 B.2 Facility Walk-Through
(SRO-U)
D 6
- c. 061 EFW / Reset the TDEFW pump turbine trip throttle valve.
ll D
4(sec)
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA
ES-30 1 Administrative Topics Outline Form ES-301-1 escription Loss of RHR Cooling SDM Calculation Review Facility: Seabrook Station Examination Level: SRO Administrative TopidSubject A. I A.2 A.3 A.4 Tagouts Radiation control Emergency Classification, Notifications, and PAR.
JPM Date of Examination:
Operating Test Number:
Describe method of evaluation:
I.
- 2. TWO Administrative Questions
~~
~
2.1.25 Ability to obtain and interpret station reference materials such as as graphs, monographs, and tables which contain performance data. SRO: 3. I.
JPM: Evaluate loss of cooling conditions and determine time to boiling from chart.
- 2. I
.25 Ability to obtain and interpret station reference materials such as as graphs, monographs, and tables which contain performance data. SRO: 3.1.
JPM: Review a SDM calculation for Natural Circulation Cooldown.
2.2.1 3 Knowledge of tagging and clearance procedures. SRO:
3.8.
JPM: Review a tagout request.
2.3.4 Knowledge of radiation exposure limits and contamination control, including permissible levels in excess of those authorized. SRO: 3.1 JPM: Contaminated injured man actions.
2.4.38 Ability to take actions called for in the facility emergency plan, including (if required) supporting or acting as emergency coordinator. SRO: 4.0 JPM: Given a set of conditions, the applicant will make an EAL determination, PAR, and make required notifications.
ES-301 Administrative Topics Outline Form ES-301-1 escription QPTR Calculation JPM SDM Calculation JPM Tagout JPM Facility: Seabrook Station Examination Level (circle Administrative Topidsubject A..l A.2 A.3 A.4 High Radiation Area Question Contamination Control Question ROs Responsibilities During Emergency Plan Implementation one): RO Date of Examination:
Operating Test Number:
Describe method of evaluation:
- 2. TWO Administrative Questions 2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation. RO: 3.9.
JPM: Perform rewired QPTR due to PRNl failure.
2.1.25 Ability to obtain and interpret station reference materials such as graphs, monographs, and tables which contain performance data. RO:
2.8.
JPM: Perform a SDM calculation for Natural Circulation Cooldown.
2.2.13 Knowledge of tagging and clearance procedures. RO: 3.6.
JPM: Generate a danger tagout.
Facility: Seabrook Station Examination Level (circle one):
Administrative Topidsubject A..l A.2 A.3 A.4 2.3.4 Knowledge of radiation exposure limits and contamination control, including permissible levels in excess of those authorized. RO: 2.5.
Question: Given the plant is in a Site Area Emergency, what is the highest dose a worker is allowed to receive in a non-emergency oDeration.
2.3.1 Knowledge of 1 OCFR20 and related facility radiation control requirements. RO: 2.6.
Question: Reauirements for a Locked Hioh Rad Area.
2.4.39 Knowledge of the ROs responsibilities in emergency plan implementation. RO: 3.3.
Question: E Plan reporting requirements during training (off watch).
2.4.39 Knowledge of the ROs responsibilities in emergency plan implementation. RO: 3.3.
Question: Operator responsibilities during SGTR event.
JOB PERFORMANCE MEASURE WORKSHEET JPM #I: 1/M PLOT DURING APPROACH TO CRITICALITY ALTERNATE PATH Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
WA reference: 001 K5.75 Definition, uses, and calculation of 1/M plot-USNRC initial Licensing Examination Seabrook Station June 2003 Section 6.1 JPM #I Page 1 of 8
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.1 JPM #I Page 2 of 8
JOB PERFORMANCE MEASURE WORKSHEET I
.O Task Number and
Description:
Task number is N/A.
Applicant is to perform a I/M plot during a normal approach to criticality. Shut down banks have been withdrawn. Staff will act as the primary RO and bring the reactor critical. Reactor will achieve criticality before reaching the -500 pcm rod height. The applicant should determine from the I/M plot that the ECP is incorrect and recommend to the USISM to stop the startup.
2.0 Conditions
0 Plant is in mode 3.
0 All shutdown banks are withdrawn.
0 All steps of OS1000.07 are complete up to and including 4.3.
0 Procedure is currently in step 4.4 (WITHDRAW control banks to criticality)
3.0 Standards
Perform 1/M plot in accordance with Form A: Manual Inverse Count Rate Ratio Plot (l/M) of OS1000.07, Approach to Criticality. Notify US/SM that reactor will achieve criticality before -500 pcm. Applicant must locate actions for criticality for outside of 500 pcm band but above Rod Insertion Limit.
4.0 Student Materials:
0 Copy of the Tear-Off Sheet.
0 ECP paperwork.
0 Procedure OS1 000.07, Approach to Criticality 0
Form A of OS1 000.07, Approach to Criticality.
0 1/M plotting paper.
0 Calculator 5.0 Limitations on performance:
None.
6.0
References:
OS1 000.07, Approach to Criticality.
0 Form A of OS1000.07, Approach to Criticality.
7.0 Setting Simulator 8.0 Safety Considerations:
None USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #I Page 3 of 8
JOB PERFORMANCE MEASURE WORKSHEET 9.0 Approximate Completion Time:
30 Minutes.
10.0 Initial Cue A. You are tasked by the SM to perform Form A of OSlOOO.07, the 1/M plot.
B. You will have the following references: ECP, OSlOOO.07, "Approach to Criticality", Form A of OS1000.07, and a 1/M plotting sheet.
C. Plant conditions:
. The plant is in mode 3.
=
All shutdown banks are withdrawn.
. Reactor startup is in progress per OS1 000.07.
All pre-job briefs are complete.
1 1.O Attachments 0
1/M validation plot.
e Form A of RS1735, "Estimated Critical Position Data & Analysis Form" Form A of OS1000.07, "Manual Inverse Count Rate Ration Plot (VM)"
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.1 JPM #I Page 4 of 8
PERFORMANCE CHECKLIST D=Discuss ELEMENTISTEP STANDARD EVALUATION I NITIALWDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT
- 1.
P Start time:
Initiating cue read.
CUE:
status to the SM. The SM should direct the continuation of rod withdrawal until the I/M plot shows that the real critical position is outside of the 500 pcm band. For the sake of time, the RO will not wait until source range counts are completely atable.
The candidate should review the ECP and precautions in OS1000.07. The applicant may report 1/M
- 2.
- 3.
Note:
- 4.
- 5.
P Fill in pertinent data from step D.1 of Form A Fills in required data from step D.l of Form A.
P Mark the +/- 500 pcm rod position limits on the full size ICRR form.
Mark the +/- 500 pcm rod position limits on the full size ICRR form.
At this point the RO will start control rod withdrawal. The RO will shim out 50 steps or until source range counts double, whichever occurs first. The RO will simulate counts stabilizing. The RO will report the average count rate to the applicant.
P Record on the table provided Record on the table provided on the cover form, the rod height, average count rate, and calculate the inverse ratio.
on the cover form, the rod height, average count rate, and calculate the inverse ratio.
P Draw a best straight line through the last three data points and extend the line to the horizontal axis of the plot.
The point at which this line crosses the axis is the critical rod height predicted by the plot.
Plots the best fit line using last three points.
NOTE: The applicant will repeat step 3 until criticality or until a problem exists.
- 6.
P Determine that projected ECP Inform US/SM that ECP is outside 500 pcm band.
is outside 500 pcm band.
- 7.
P Explain to examiner actions for Explains actions of ECP outside 500 pcm band.
OS1000.07 step 4.5.2.
(Should show examiner procedure step)
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #I Page 5 of 8
PERFORMANCE CHECKLIST D=Discuss ELEMENTISTEP STANDARD EVALUATION I NITIALSDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT CUE: When applicant informs shift supervision that criticality was achieved outside + M O O pcm, and explains actions above inform them: The JPM is complete USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #1 Page 6 of 8
Tear-Off Sheet for Applicant A. Initial conditions:
The plant is in mode 3.
=
All shutdown banks are withdrawn.
Reactor startup is in progress per OS1000.07.
=
All pre-job briefs are complete.
B. You will have the following references: ECP, OS1 000.07, Approach to Criticality, Form A of OS1000.07, and a 1/M plotting sheet.
C. You are tasked by the SM to perform Form A of OS1000.07, the 1/M plot.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #I Page 7 of 8
Simulator Operator Instructions Reset simulator to IC 186.
Set RCS boron concentration to 1650 ppm.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #1 Page 8 of 8
JOB PERFORMANCE MEASURE WORKSHEET JPM #Z: TRANSFER SI TO COLD LEG RECIRCULATION (CBS-VI4 FAILS)
ALTERNATE PATH Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
WA reference: 006A4.05 Abilitv to manuallv operate and monitor in the control room:
Transfer of ECCS flowpaths prior to recirculation.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #2 Page 1 of 9
_&I JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #2 Page 2 of 9
1.o 2.0 3.0 A.
B.
4.0 5.0 6.0 SYS KA Description 01 3 A I.06 Predicffmonitor changes in RWST levels.
013 A I.08 Predicffmonitor changes in Ctmt sump level.
013 A3.02 Monitor operation of actuated equipment.
013 A4.03 Manuallv oPerate ESFAS initiation.
JOB PERFORMANCE MEASURE WORKSHEET Value RO1SRO 3.613.9 3.713.8 4.114.2 4.514.7 Task Number and
Description:
Position:
RO 0050500601 Align RH For SI Recirculation, Cold Leg 0060500301 Transfer SI To Cold Leg Recirculation Conditions:
A. A reactor trip with SI occurred from 100% power.
B. The US has transitioned through E-0 to E-1, and is ready to transition to ES-1.3.
C. RWST level is decreasing toward the RWST LEVEL LO-LO setpoint.
Standards:
Align ECCS equipment to the Cold Leg Recirculation Mode within the time limits specified in the body of this JPM. The tine limits were determined in DCR 00-0013, "Manual Transfer to Cold Leg Recirculation Timing".
Student Materials:
Copy of the Tear-Off Sheet.
Copy of ES-1.3, "Transfer To Cold Leg Recirculation", Rev. 19 Limitations On Performance:
SimulateIPerform all steps. Verbalize all actions to the evaluator
References:
CR 01-07468-01 [DCR 00-0013, Manual Transfer to Cold Leg Recirculation Timing (Entire JPM)]
Procedures:
0 ES-1.3, Transfer To Cold Leg Recirculation e OGP-1, Control Switch Operation USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #I2 Page 3 of 9
JOB PERFORMANCE MEASURE WORKSHEET
7.0 Setting
Simulator:
A. The simulator can be initialized to any mode I IC, or to a snapshot IC for the JPM.
B. Insert the following overrides to simulate inability to open CBS-V14.
- 1. ON (CBS-VI4 S signal reset lamp for RWST lo-lo, pg. PBFI 1)
- 2. RESET (CBS-VI4 S signal reset switch, pg. PBFI I)
- 3. CLOSE (CBS-V-I4 control switch, pg. PBF12)
C. Insert the double-ended RCS Cold Leg malfunction.
D. Run the simulator while performing the following per E-0 and E-I :
I. Trip RCPs.
- 2. Reset SI.
- 3. Throttle ERN.
- 4. Shutdown both EDGs by stopping both, shutting SW-V16, and 18, resetting both diesels.
- 5. Place the simulator in freeze when the RWST is approximately 130,000 gallons to ensure the automatic swap-over signal has not actuated.
8.0 Safety Considerations:
None 9.0 Approximate Completion Time:
20 minutes 10.0 Initiating Cue A. Initial Conditions:
0 A reactor trip with SI occurred from 100% power.
0 The US has transitioned through E-0 to E-I, and is ready to transition to ES-1.3.
0 RWST level has decreased to approximately 130,000 gallons.
- 8. You are the Primary Operator. You are going to transfer ECCS to the cold leg recirculation mode when we receive the RWST LEVEL LO-LO alarm.
C. Perform the task using ES-1.3, Transfer to Cold Leg Recirculation.
US to Primary Operator, Primary Operator (or students name), let me know when we receive the RWST LEVEL LO-LO alarm, then you will transfer the Emergency Core Cooling System to Cold Leg Recirculation per ES-1.3.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 6.1 JPM #2 Page 4 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTISTEP STANDARD EVALUATION JNITIALSDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT This JPM is faulted - CBS-VI4 fails to open. The student must use the RNO Column in Step 2 of ES-1.3. Under this condition, certain ES-1.3 actions have time limits that must be met to pass the JPM. The actions and time limits are:
- 1. RH-P-8B & CBS-P-9B in PTL: I 3 min. from RWST LEVEL LO-LO alarm actuation;
- 2. CBS-V2 & CBS-V5 CLOSED: I 5 min. 48 sec. from RWST LEVEL LOCO alarm actuation;
NOTE: VERIFY THAT THE CONTROL SWITCH FOR CBS-VI4 IS IN THE AUTO POSITION!
NOTE: Ensure that the person reading the procedure reads the caution prior to step 1 of ES 1.3 to the student.
I.
P Start time:
Initiating cue read.
CUE:
check your actions. Please continue with the task.
If the student requests a Peer Check at any time during the JPM, respond: NO one is available to peer RWST LEVEL LO-LO alarm Record time:
actuation:
- 2.
P Reset SI.
- Verifies SI reset.
- 3.
P Verify Containment sump recirc.
valves - FULL OPEN:
0 TRAIN A - CBS-V8 TRAIN B - CBS-VI4
- a. Perform RNO - manually open valves.
P-8B & P-9B in PTL
- 4.
P Simultaneously close RWST
- O Verifies CBS-V-8 is open.
- O Verifies CBS-V-14 is NOT open.
- a. Attempts to open CBS-V14.
- b. Places CBS-P-9B and RH-P-8B in PTL.
Time ATime I
3 min.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #2 Page 5 of 9
PERFORMANCE CHECKLIST STANDARD EVALUATION I NITIALS/DATE
- denotes critical standard SAT UNSAT D=Discuss ELEMENTISTEP P=Perform
- denotes a S=Simulate critical step suction valves.
TRAIN A - CBS-V2 Closes CBS-V-2.
TRAIN B - CBS-VS Closes CBS-V-5.
CBS-V2 & V5 Fully Closed Time ATime 5 5 min. 48 sec.
NOTE: If the RWST EMPTY alarm occurs prior to opening RH-V35 & 36, the student is expected to stop all pumps taking suction from the RWST (CCPs & SIPS). The student must leave the Train A RHR and CBS pumps running.
If the RWST EMPTY alarm does nct actuate, the following two times are not applicable.
RWST EMPTY alarm actuation All CCPs & SIPS stopped
- 5.
P Align ECCS for Cold Leg recirculation:
- a. Verify RHR Pumps - at least one running.
- b. Place running RHR pump switches in NA-START.
Time Time ATime Aligns ECCS for Cold Leg recirculation:
- a. Verifies RH-P-8A running.
- b. Places RH-P-8A switch in NA-START.
- c. Close SI pump mini-flow
- c. Closes:
valves:
SI-V89 SI-V89
. SI-V90
. SI-V90 SI-V93
. SI-V93
- d. Energize MCC-E522 and
- d. Energizes MCC-522 622.
and 622.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #2 I I 1 min. after RWST EMPTY Page 6 of 9
D=Discuss ELEMENT/STEP P=Perform
- denotes a S=Simulate critical step PERFORMANCE CHECKLIST STANDARD EVALUATION INITIALSDATE
- denotes critical standard SAT UNSAT
- e. Close RH-V14, RHR
- e. Closes RH-V-14.
discharge to cold legs 1 and 2.
- f.
- f. Opens/ checks open:
cross-connects:
CS-V460 CS-V460 CS-V461 CS-V461 cs-v475
. cs-v475 g, Open RHR supplies to SI
- g. Opens:
and CCP suctions:
RH-V35 RH-V35 RH-V36 RH-V36 interlock with CBS-VI4 keeps it shut.
- h. Start any pump that was
- h. No action required stopped due to RWST empty alarm.
since the empty alarm should not come in.
- 6.
P Isolate RWST feed to CCPs and Isolates RWST feed to SI pumps.
- a. Close SI pump suction
- a. Closes:
valves:
CBS-V47 CBS-V47 CBS-V51 CBS-V51
- b. Close CCP suction valves:
- b. Closes:
CS-LCV-112D CS-LCV-112D CS-LCV-I 12E CS-LCV-112E CUE:
The JPM is complete.
- 7.
Stop time Time to complete the task I 20 minutes.
Evaluator calculates time to complete task.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 6.1 JPM #2 Page 7 of 9
Tear-Off Sheet for Applicant A. Initial Conditions:
0 A reactor trip with SI occurred from 100% power.
The US has transitioned through E-0 to E-I, and is ready to transition to ES-1.3.
0 RWST level has decreased to approximately 130,000 gallons.
B. You are the Primary Operator. You are going to transfer ECCS to the cold leg recirculation mode when we receive the RWST LEVEL LO-LO alarm.
C. Perform the task using ES-1.3, Transfer to Cold Leg Recirculation.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.1 JPM #2 Page 8 of 9
Simulator Operator Instructions A. The simulator can be initialized to any mode 1 IC, or to a snapshot IC for the JPM.
B. Insert the following overrides to simulate inability to open CBS-V14.
0 ON (CBS-VI4 S signal reset lamp for RWST lo-lo, pg. PBFI 1)
RESET (CBS-VI4 S signal reset switch, pg. PBFI I)
CLOSE (CBS-V-14 control switch, pg. PBF12)
C. Insert the double-ended RCS Cold Leg malfunction.
D. Run the simulator while performing the following per E-0 and E-I :
Trip RCPs.
0 Reset SI.
Throttle EFW.
Shutdown both EDGs by stopping both, shutting SW-VI 6, and 18, resetting both diesels.
0 Place the simulator in freeze when the RWST is approximately 130,000 gallons to ensure the automatic swap-over signal has not actuated.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #2 Page 9 of 9
JOB PERFORMANCE MEASURE WORKSHEET JPM #3: DEPRESSURIZE THE RCS DURING A NATURAL CIRCULATION COOLDOWN ALTERNATE PATH Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
WA reference: 004A4.09 Ability to manually operate and monitor in the control room:
PZR spray and heater controls.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Page 1 of 8
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Page 2 of 8
JOB PERFORMANCE MEASURE WORKSHEET 1.0 Task Number and
Description:
Task number is N/A.
Applicant is to depressurize the RCS during a natural circulation cooldown in accordance with ES-0.2, "Natural Circulation Cooldown". The letdown system will fail/isolate forcing an alternate method of depressurization in the procedure. The JPM is complete when the applicant depressurizes the RCS to 1900 psig in accordance with step 8 of ES-0.2.
2.0 Conditions
A. The crew is performing ES-0.2, "Natural Circulation Cooldown".
B. Steps 1-7 are complete or are in progress.
C. The reactor is tripped. RCPs are secured.
D. RCS pressure is 2300 psig.
3.0 Standards
The applicant is to reduce RCS pressure to 1900 psig using both the auxiliary spray followed by using the PZR PORVs when the letdown system fails.
4.0 Student Materials:
0 ES-0.2, "Natural Circulation Cooldown" 0
OS1202.01, "Loss of Letdown" 5.0 Limitations on performance:
Peer checks will be performed by the examiner. A Peer check will only consist of an acknowledgement or concurrence of the action peer checked.
6.0
References:
Procedures 0
ES-0.2, "Natural Circulation Cooldown" 0
OS1 202.01, "Loss of Letdown" Detailed Systems
. cs
. PPLC 7.0 Setting Simulator USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Page 3 of 8
JOB PERFORMANCE MEASURE WORKSHEET 8.0 Safety Considerations:
None 9.0 Approximate Completion Time:
15 minutes 10.0 Initial Cue Initial Conditions:
0 The crew is performing ES-0.2, "Natural Circulation Cooldown".
0 Steps 1-7 are complete or are in progress.
0 The reactor is tripped. RCPs are secured.
0 RCS pressure is 2300 psig.
You are the primary reactor operator. The crew is cooling down and depressurizing the plant in accordance with ES-0.2, "Natural Circulation Cooldown". Steps 1-7 are complete. Your task is to complete step 8 of ES0.2, "Depressurize RCS to 1900 PSIG".
USNRC Initial.Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Page 4 of 8
D=Discuss P=Perform S=Simulate
- 1.
P
- 2.
P
- 3.
P PERFORMANCE CHECKLIST ELEM ENT/STEP STANDARD EVALUATION INITIALS/DATE
- denotes a
- denotes critical critical step standard SAT UNSAT Start time Initiating cue read.
Step 8.b. Turn PZR heaters OFF.
OFF.
Turns all PZR heaters Step 8.c. Use auxiliary spray per AlTACHMENT A.
Lines up auxiliary spray IAW attachment A.
Uses auxiliary spray to reduce RCS pressure.
USNRC initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Place normal PZR spray valves controller(s) in manual and open normal PZR spray valves OPEN CS-V142, CHG TO REGEN IS0 OPEN CS-V143, CHG TO REGEN IS0 OPEN CS-V185, PZR AUX SPRAY Close normal charging loop isolation valves:
CLOSE CS-VI 77 CLOSE CS-V180 Place CS-FK-121 in manual and charge at desired rate Control RCS pressure as follows:
Throttle normal PZR spray valves, as necessary.
Adjust charging flow, as necessary.
Adjust seal injection Page 5 of 8
D=Discuss ELEMENTKTEP P=Perform
- denotes a S=Sirnulate critical step PERFORMANCE CHECKLIST STANDARD EVALUATION INITIALSIDATE
- denotes critical standard SAT UNSAT flow as necessary using CS-HCV-I 82.
Note: When applicant completes spray lineup and initiates spray, letdown will be isolated and remains unavailable.
CUE: After applicant informs US of letdown isolation, inform applicant that letdown will remain unavailable for the remainder of the procedure.
- 5.
P Blocks SI actuation before If pressure drops below 1950 psig then rises above 1950 psig, the SI PZR pressure block will have to be reset.
1950 psig.
Note: the above step may be not applicable if PZR pressure does not rise above 1950 psig during the performance of this procedure.
- 6.
P WHEN auxiliary spray is no OPEN desired normal longer required, then perform charging loop isolation the following:
valve:
OPEN CS-VI77 OPEN CS-~180 OR CLOSE CS-Vl85, PZR AUX SPRAY Place CS-FK-121 in AUTO Close normal PZR spray valves as necessary.
CUE: the operator may not execute the RNO without instruction from the US. If required, allow the RO to inform you that letdown is isolated. If necessary, order the RO to reduce pressure to 1900 psig using the PZR PORV in accordance with the step 8 RNO column.
- 7.
P Step RNO 8.a. IF letdown can Use one PZR PORV to NOT be established, THEN use one PZR PORV.
psig.
reduce pressure to 1900 CUE: When pressure is reduced to 1900 psig using PZR PORVs, inform the applicant: The JPM is complete.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Page 6 of 8
Tear-Off Sheet for Applicant Initial Conditions:
0 The crew is performing ES-0.2, "Natural Circulation Cooldown".
0 Steps 1-7 are complete or are in progress.
0 The reactor is tripped. RCPs are secured.
RCS pressure is 2300 psig.
You are the primary reactor operator. The crew is cooling down and depressurizing the plant in accordance with ES-0.2, "Natural Circulation Cooldown". Steps 1-7 are complete. Your task is to complete step 8 of ESQ.2, "Depressurize RCS to 1900 PSIG".
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Page 7 of 8
Simulator Operator Instructions Establish plant conditions for the cooldown (post4rip). Snap the IC the first day of exam week for exam security reasons. Save the IC and password protect it.
IC:
When the applicant complete the auxiliary spray line-up and initiates spray, fail letdown isolation valve CS-VI 50.
Sim Diagram CS1 cpCSV150 AOV Fails Closed USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #3 Page 8 of 8
~~
JOB PERFORMANCE MEASURE WORKSHEET JPM ##4: MANUAL START AND LOAD OF EDG AFTER LOSS OF ALL AC POWER ALTERNATE PATH Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
K/A reference: 064A4.01 Ability to manually operate and monitor in the control room:
local and remote operation of the EDG.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #4 Page 1 of 9
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiners signature and date:
USNRC initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #4 Page 2 of 9
JOB PERFORMANCE MEASURE WORKSHEET 1.0 Task Number and
Description:
Task number is N/A.
Applicant is to restore power to at least one AC bus by restoring the A EDG in accordance with ECA-0.0 step 5. Both EDGs will fail to start automatically. EDG I B will not start under any circumstance. EDG IAs output breaker will fail to close automatically upon manual start. EDG 1A will not be able to start via the emergency start pushbutton but will start with the normal start pushbutton. Charging pump CS-P-24 will fail to start automatically on restoration of bus E5.
2.0 Conditions
0 A loss of all AC power has occurred from 100% power.
0 The reactor is tripped.
0 Both EDGs have failed to automatically start.
0 Steps 1-5.b of ECA-0.0 are complete.
3.0 Standards
The applicant must get EDG A started, shut its output breaker, and restore all loads prescribed by ECA-0.0 step 5.
4.0 Student Materials:
0 ECA-0.0, Loss of All AC Power 5.0 Limitations on performance:
Peer checks will be performed by the examiner. The only response given by the examiner in a peer check will be a simple acknowledgement or concurrence.
6.0
References:
0 ECA-0.0, Loss of All AC Power 7.0 Setting Simulator 8.0 Safety Considerations:
None USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #4 Page 3 of 9
JOB PERFORMANCE MEASURE WORKSHEET 9.0 Approximate Completion Time:
20 minutes.
10.0 Initial Cue Initial conditions:
0 The plant was operating at 100% power.
A loss of offsite power resulted in a plant trip.
0 Both EDGs failed to start automatically.
0 The crew is in ECA-0.0, "Loss of All AC Power".
0 Steps 1 through 5.b have been completed.
Your task is to restore power to at least one emergency AC bus and restore vital loads in accordance with ECA-0.0 step 5.c-f.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #4 Page 4 of 9
PERFORMANCE CHECKLIST D=Discuss.
ELEMENWSTEP STANDARD EVALUATION I NITIALSIDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT I.
P Start time:
Initiating cue read.
Note: The applicant will begin by verifying at least one EDG is running. Neither EDG is running. The operator should enter the RNO column for step 5.c. EDG,B will not start under any circumstance.
- 2.
P Start EDG 1B using the Presses the emergency start pushbutton for EDG 1 B. EDG 1 B does NOT start.
emergency start pushbutton.
- 3.
P Start EDG 1 B using the normal start pushbutton.
Presses the normal start pushbutton for EDG 1 B.
EDG 1B does NOT start.
- 4.
S Calls NSO to attempt EDG 1B Simulator operator start using slave relay K603 using test switch S909 at SSPS.
using relays.
simulates a FAILED attempt to start EDG 1B NOTE: the applicant may attempt to start EDG 1A before attempting the manual starts below, if so, skip to step
- 11.
CUE: Simulator operator to control room: EDG I B did not start using test switch S909 at SSPS
- 5.
S Calls diesel operator to start Simulator operator simulates a FAILED attempt to start EDG 1 B using local control.
EDG I B locally.
- 6.
P RO orders EDG operator to place EDG 1 B generator breaker control selector switch in LOCAL.
- 7.
P RO orders EDG operator to depress EDG 1B ENGINE RESET PUSHBUTTON.
- a.
P RO orders EDG operator to USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #4 CUE: simulator operator: Report when EDG 1 B generator breaker control selector switch is in LOCAL.
CUE: simulator operator: Report when EDG 1B ENGINE RESET PUSHBUTTON has been depressed.
CUE: simulator Page 5 of 9
D=Discuss ELEMENTETEP P=Perform
- denotes a S=Simulate critical step depress EDG IB EMERGENCY START PUSHBUTTON
- 9.
P RO orders EDG operator to depress the TEST START pushbutton.
PERFORMANCE CHECKLIST STANDARD EVALUATION I NITIALWDATE
- denotes critical standard SAT UNSAT operator: Report when EDG 1B EMERGENCY START PUSHBUTTON has been depressed and that the diesel has NOT started.
CUE: simulator operator: Report when the TEST START pushbutton has been depressed and inform control room that the diesel has not started.
- 10.
P RO orders EDG operator to CUE: simulator manually override main air start valve@).
operator: Report that the diesel did not start when the main air start valve@) were opened.
NOTE: At this point, all attempts to start EDG 1B have failed, applicant will try to start EDG IA.
- 11.
P Start EDG I A using the Presses the emergency start pushbutton for EDG 1A. EDG 1Adoes NOT start.
emergency start pushbutton.
- 12.
P Start the A EDG using Applicant starts A EDG NORMAL start.
using normal start pushbutton.
Note: EDG A starts but the output breaker does not shut.
- 13.
P Step 5.e.2 Diesel generator Manually closes the A breaker - CLOSED - NO EDG output breaker.
Note: the operator should verify that the EPS is sequencing properly by observing the EPS status lights Simulator Operator: delete override for CS-P-2A when the applicant attempts to start pump manually.
progress sequentially.
- 14.
P Step 5.e.3 Verify the following Start CS-P-2A equipment loaded. The A manually.
CCP failed to start automatically.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #4 Page 6 of 9
D=Discuss ELEMENTETEP P=Perform
- denotes a S=Simulate critical step PERFORMANCE CHECKLIST STANDARD EVALUATION I NITIALSIDATE
- denotes critical standard SAT UNSAT CUE: When emergency bus E5 is energized and step 5.f has been completed, inform the applicant The JPM is complete USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.1 JPM ##4 Page 7 of 9
Tear-Off Sheet for Applicant Initial conditions:
0 The plant was operating at 100% power.
0 A loss of offsite power resulted in a plant trip.
0 Both EDGs failed to start automatically.
0 The crew is in ECA-0.0, Loss of All AC Power.
0 Steps 1 through 5.b have been completed.
Your task is to restore power to at least one emergency AC bus and restore vital loads in accordance with ECA-0.0 step 5.c-f.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #4 Page 8 of 9
Simulator Operator Instructions L
OVERRIDE DGI B EMERGENCY START PB TO RELEASE OVERRIDE DGI B NORMAL START SWITCH TO NORMAL Reset simulator to IC 100.
Failure of A EDG to start automatically.
I MFED031 DGlA AUTO START FAILURE I OVERRIDE DGIA EMERGENCY START PB TO RELEASE Failure of B EDG to start manually or automatically I MFED033 DGI B AUTO START FAILURE Failure of CS-P-2A to start automatically I MFCSOOI CS-P-2A FAILS TO AUTO START MFEPSOOI EPS TRAIN A PRI DOES NOT ENERGIZE NFEPS002 EPS TRAIN A PRIX DOES NOT ENERGIZE Simulator operator is to act as NSO when locally starting the EDGs as written in the Performance Checklist.
Delete OVERRIDE on CS-P-2A when operator attempts to start pump manually.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 6.1 JPM #4 Page 9 of 9
JOB PERFORMANCE MEASURE WORKSHEET JPM #5: START HYDROGEN RECOMBINERS Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
K/A reference: 028A4.01 Abilitv to oDerate and monitor in the control room: HRPS controls.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 1 of 9
~~
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiners signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 2 of 9
JOB PERFORMANCE MEASURE WORKSHEET 1.0 Task Number and
Description:
Position:
RO 0280500201 Start 'A' H2 Recombiner From The Main Control Room.
2.0 Conditions
This JPM can be implemented with any plant conditions such that the electric plant can support operation of the recombiners.
3.0 Standards
Place a hydrogen recombiner in service.
4.0 Student Materials:
Copy of the Tear-Off Sheet.
Copy of OS1023.40, Hydrogen Recombiner Operation, Rev. 7, Chg. 1.
Calculator.
5.0 Limitations On Performance:
Simulate/Perform all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM.
6.0
References:
Procedures:
e FR-C. 1, Response To Inadequate Core Cooling.
e OS1 023.40, Hydrogen Recombiner Operation.
OGP-1, Control Switch Operation.
Technical Specifications:
3.6.4.2, Com bustible Gas Control - Electric Hydrogen Recombiners USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 3 of 9
JOB PERFORMANCE MEASURE WORKSHEET SYS KA Description 2.1 2.1.23 Ability to perform specific system and integrated 2.1 2.1.21 Ability to obtain and verify controlled procedure copy.
2.1 2.1.20 Ability to execute procedure steps.
2.1 2.1.31 Ability to locate control room switches, controls, and plant procedures during all modes of operation.
indications, and determine that they are correctly reflecting the desired plant lineup.
Value RO/SRO 3.914.0 3.113.2 4.314.2 4.213.9
7.0 Setting
Simulator: Any IC may be used. Perform this JPM on the back of the MCB at the recombiner control panel. The simulator must be in RUN to allow the PWR OUT meter to respond to the potentiometer.
Verify the PWR OUT potentiometer is at MINIMUM prior to beginning the JPM.
8.0 Safety Considerations:
None 9.0 Approximate Completion Time:
20 minutes 10.0 Initial Cue:
US to Secondary Operator, Secondary Operator (or students name), we are in FR-C.l, and containment hydrogen concentration is presently 3.4%. Place Hydrogen Recombiner A in sewice per OS1 023.40, Hydrogen Recombiner Operation. Report to me when the recombiner is in service.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 4 of 9
D=Discuss ELEMENTSTEP P=Perform
- denotes a S=Simulate critical step
- 1.
P Start time:
PERFORMANCE CHECKLIST STANDARD EVALUATION I NITIALWDATE
- denotes critical standard SAT UNSAT Initiating cue read.
CUE:
If the student request a Peer Check at any time during the JPM, respond: NO one is available to peer check your actions. Please continue with the task.
NOTE: Place the Simulator in RUN.
NOTE: If asked by the student, The electrical lineup has been completed.
CUE:
When student checks light, evaluator to student, The light is energized. --
- 2.
S Verify the white PWR. IN Verifies the PWR. IN AVAIL.
AVAIL. light is energized.
light is energized.
- 3.
P Set the PWR. ADJ.
Turns PWR ADJ pot to 000.
potentiometer to zero.
- 4.
Moves switch to ON switch to the ON position and VERIFY that the red light on the switch plate comes on.
position.
Verifies the red light is on.
CUE:
AT EACH POWER LEVEL, INFORM THE OPERATOR THE STATED TIME HAS ELAPSER
- 5.
Energize the Hydrogen Energizes the recombiner:
Recom biner heater by PERFORMING the following:
P
- a.
P
- b.
TURN the PWR. ADJ.
Potentiometer clockwise until 5 kW is indicated on the PWR. OUT meter.
MAINTAIN the 5 kW value for at least 10 minutes.
TURN the PWR. ADJ.
Potentiometer clockwise until 10 kW is indicated on the PWR. OUT meter.
MAINTAIN the 10 kW value for at least 10 minutes.
- a. Turns the PWR ADJ pot clockwise until 5 kW is indicated. Maintain 5 kW for 10 minutes.
- b. Turns the PWR ADJ pot clockwise until 10 kW is indicated. Maintain 10 kW for 10 minutes.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 5 of 9
D=Discuss ELEMENTISTEP P=Perform
- denotes a S=Simulate critical step PERFORMANCE CHECKLIST STANDARD EVALUATION INITIALWDATE
- denotes critical standard SAT UNSAT P
- c. TURN the PWR. ADJ.
- c. Turns the PWR ADJ pot clockwise until 20 kW is kW for 5 minutes.
Potentiometer clockwise until 20 kW is indicated on indicated. Maintain 20 the PWR. OUT meter.
MAINTAIN the 20 kW value for at least 5 minutes.
P
- d. DETERMINE the
- d. Refers to Form A.
recombiner power setting per Form A, Power Out Setpoint Calculation.
P
- e. Calculate the I+ recombiner e. Determines power power setpoint by setting:
performing the following:
CUE:
When the student locates any of the required pressure instruments, cue the student: Containment pressure is 4 psig.
0 DETERMINE the current Determines the current containment pressure from SI-PI-934 or SI-PI-935, MCB containment pressure indicators.
cntmnt pressure from SI-PI-934 or 935.
Current Containment Convertscntmnt Pressure + 14.7 psi = psia pressure to psia and records on data sheet
(= 18.7 psia).
0 Pre-accident Containment No action required.
Average Temperature is 120°F.
0 Using containment absolute
- e Determines C, and --
pressure, pre-accident temperature and Figure 2, Recombiner Power determine the Pressure Factor (C,).
Records on data sheet -
containment average (Cp=1.17-1.20).
Enter student C, value:
Correction Factor Curve c, =
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 6 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP STANDARD EVALUATION INITIALWDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT 0
MULTIPLY the Pressure Multiplies C, by the Factor (C,) by Reference Power (45.24 kw).
(C,) x 45.24 = Power Setting kW reference power.
Records on data sheet -
(52.9 - 54.3 kw).
Enter student kW value:
Kw=
CUE:
If the student requests a second person verification, respond: For the purpose of this evaluation, a second verification will not be performed. Please continue with the procedure.
0 Have a second person Requests second VERIFY the power setting calculation.
person verification.
P
- f. Turn the PWR. ADJ.
- f. Turns the PWR ADJ pot potentiometer clockwise clockwise until the until the power setpoint, as calculated in Step 4.2.4.4, is indicated on the PWR OUT meter.
power setpoint is indicated on the PWR OUT meter.
CUE:
When student mentions that conference with the TSC is necessary to determine recombiner effectiveness, inform the student, The STED is aware of this and in contact with the TSC on this matter.
P
- g. CONFER with the TSC to
- g. Attempts to confer with determine recombiner the TSC.
effectiveness and the need to make adjustments to recom biner power.
CUE:
The JPM is complete.
- 6.
Stop time Time to complete the task I 20 minutes.
Evaluator calculates time to complete task.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 7 of 9
Tear-Off Sheet for Applicant US to Secondary Operator, Secondary Operator (or students name), we are in FR-C.1, and containment hydrogen concentration is presently 3.4%. Place Hydrogen Recombiner A in service per OS1 023.40, Hydrogen Recombiner Operation.
Report to me when the recombiner is in service.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page a of 9
Simulator Operator Instructions Reset the simulator to any convenient IC.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #5 Page 9 of 9
JOB PERFORMANCE MEASURE WORKSHEET JPM #6: POWER RANGE NI FAILURE Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
K/A reference: 015A2.01 Ability to predict the impacts of the following malfunctions on the NIS and use procedures to mitigate, control, or correct the consequences of those malfunctions: power supply loss or erratic operation.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #E Page 1 of 8
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #6 Page 2 of 8
JOB PERFORMANCE MEASURE WORKSHEET 1.0 Task Number and
Description:
Position:
RO 01 50402101 Electronically Remove A Failed NI Detector
2.0 Conditions
A. Plant is in mode I at 100% power.
B. The US entered OS1 21 1.04, Power Range NI Instrument Failure, in response to channel N42 failing high.
3.0 Standards
Remove NI channel N42 from service per OS121 1.04.
4.0 Student Materials:
A. Copy of the Tear-Off sheet.
B. Copy of OS121 1.04, Power Range NI Instrument Failure, Rev. 9, Chg. 1.
5.0 Limitations on performance:
Simulate/Perform all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM.
6.0
References:
Procedures:
OS121 I
.04, Power Range NI Instrument Failure OGP-1, Control Switch Operation Technical Specifications:
3.3.1 RX Trip System Instrumentation 3.2.4 QPTR Drawings:
1 -NHY-509043,509044 NI Functional Diagrams USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #6 Page 3 of 8
JOB PERFORMANCE MEASURE WORKSHEET
~~
SYS 01 5 01 5 01 5 01 5 KA Description Value ROISRO A I.04 Quadrant power tilt ratio.
3.513.7 A2.01 Power supply loss or erratic operation.
3.513.9 A2.02 Faulty operation.
3.1 13.5 A4.01 Selection of controlling NIS channel.
3.613.6 7.0 8.0 9.0 10.0 e
e e
Setting:
Simulator A. Initialize the simulator to a 100% power IC. Place the simulator in RUN.
Safety Considerations:
None Approximate Completion Time:
15 minutes Initiating Cue:
Initial conditions:
The plant is at 100% power.
Power range channel, NI-42, has failed.
The US entered OS121 1.04, "Power Range NI Instrument Failure", in response to channel N42 failing high.
US to applicant: "Reactor operator, remove power range channel N42 from service in accordance with OS121 I
.04,"Power Range NI Instrument Failure".
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #6 Page 4 of 8
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP P=Perform
- denotes a S=Simulate critical step STANDARD EVALUATION IN ITIALS/DATE
- denotes critical standard SAT UNSAT
- 1.
P Start time Initiating cue read.
CUE:
If the student requests a Peer Check at any time during the JPM, respond: NO one is available to peer check your actions. Please continue with the task.
CUE:
If the student asks if electrical load is decreasing, the US should respond that it is not.
- 2.
P Check Power Range Channel - Reports NI-42 failed high.
FAILED HIGH.
- a. Place rod control in Manual.
- a.
- b. Select Rod Stop Bypass switch - TO FAILED CHANNEL
- b.
C. Check Taw - within 1°F Of C.
Tref.
If Taw > Tw by more than 1 OF, manually control rod motion or turbine load to restore temperature.
Verifies rods in Manual. --
Selects N42 on the rod stop bypass switch.
CheckdControls Tayo within 1°F of TM.
- 3.
P Bypass The Failed Power Bypasses the failed channel:
Range Channel:
- a. Select the following NI
- a.
Positions switches as cabinet switches to the failed channel (N42):
follows:
e Upper Section Detector
- a Selects N42 on the Current Comparator upper section switch.
detector current comparator switch. --
a Lower Section Detector
- a Selects N42 on the Current Comparator lower section switch.
detector current comparator switch. --
a Power Mismatch Bypass
- a Selects N42 on the switch.
power mismatch bypass switch.
IF NOT selected a
VerifiesN42 USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #6 Page 5 of 8
PERFORMANCE CHECKLIST D=Discuss ELEMENTBTEP STANDARD EVALUATION IN ITIALSIDATE P=Perform
- denotes a
- denotes &tical S=Simulate critical step standard SAT UNSAT previously, Rod Stop selected on the rod Bypass switch.
stop bypass switch. --
0 Selects N42 on the comparator channel defeat switch.
Comparator Channel Defeat switch to N42.
- b. Trip affected channel bistables
- 1) Verify redundant channel bistables - NOT TRIPPED.
UL RCS LOOP OTAT PR High TRIP PR HIGH RATE TRIP POWER RANGE LOW If power is less than P-IO:
TRIP
- 2) Remove control power fuses for affected power range channel.
CUE:
The JPM is complete.
- 4.
- I)
Verifies and reports redundant channel bistables - NOT TRIPPED for N41, N43, N44 0
RCS Loop OTAT 0
PRHighTrip 0
PR High Rate Trip
- 2) Removes N42 control power fuses.
Stop time Evaluator calculates the time to complete the task.
Time to complete the task I 15 minutes.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 6.1 JPM #6 Page 6 of 8
Tear-Off Sheet for Applicant Initial conditions:
0 The plant is at 100% power.
0 Power range channel, NI-42, has failed.
0 The US entered OS121 1.04, "Power Range NI Instrument Failure', in response to channel N42 failing high.
US to applicant: "Reactor operator, remove power range channel N42 from service in accordance with OS121 1.04,"Power Range NI Instrument Failure".
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.1 JPM #6 Page 7 of 8
Simulator Operator Instructions Reset the simulator to a 100% power IC.
Fail the power range channel NI-42 to 120%
MFNlOO2 value: 120 USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #6 Page 8 of 8
Page 1 of1 http://ads.specificpop.com/code?pid=89&gid=17&rid=705401424&dom=29&dow=4&ho
... 05/29/2003
~. _ _
Page 1 of1 http://ads.specificpop.codcode?pid=89&gid=l7&rid=70540 1424&dom=29&dow=4&ho... 05/29/2003
JOB PERFORMANCE MEASURE WORKSHEET JPM #7: TRANSFER SERVICE WATER TO THE COOLING TOWER Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
WA reference: 076A4.01 Ability to manually operate and monitor in the control room:
SWS pumps (076A4.02) SWS Valves.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.1 JPM #7 Page I of 9
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #7 Page 2 of 9
JOB PERFORMANCE MEASURE WORKSHEET Description Ability to predict the impact of and use procedures to control a loss of SW.
Knowledge of the effect that a loss of malfunction of SW on closed cooling water system.
1.o 2.0 3.0 4.0 5.0 6.0 Value RO/SRO 333.7 3.4/3.6 Task Number and
Description:
Position:
RO 0760103401 Switch From SW To Cooling Tower Operation Conditions:
A. The plant is operating at 100%.
B. On line maintenance needs to be done on the Service Water System Train A.
C. The SM requested that Service Water Train A be transferred to the Cooling Tower, until the job is complete in approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
D. Pre-starts are complete on the "A" Cooling Tower Pump.
Standards:
Place the Cooling Tower in operation per OS1 01 6.05, Service Water Cooling Tower Operation.
Student Materials:
Copy of the Tear-Off Sheet.
Copy of OS1016.05, Service Water Cooling Tower Operation, Rev. 7, Chg. 26 Limitations On Performance:
Simulate/Perform all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM.
References:
Procedures:
0 0
OGP-1, Control Switch Operation OS1016.05, Service Water Cooling Tower Operation p
K3.01 USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.1 JPM #7 Page 3 of 9
JOB PERFORMANCE MEASURE WORKSHEET
7.0 Setting
Simulator Reset the simulator to any 100% IC.
8.0 Safety Considerations:
None 9.0 Approximate Completion Time:
20 minutes 10.0 Initial Cue:
Initial Conditions:
- 1. The plant is operating at 100%.
- 2. On line maintenance needs to be done on the Service Water System Train A.
- 3. The SM requested that Service Water Train A be transferred to the Cooling Tower, until the job is complete in approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- 4. Local pre-starts are complete on the A Cooling Tower Pump.
Perform the task using OS1016.05, Service Water Cooling Tower Operation.
US to Secondary Operator, Secondary Operator (or students name), using OS1016.05 section 4.3, transfer Service Water train A from the ocean to the Cooling Tower. All prerequisites, precautions/limitations are complete.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #7 Page 4 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTKTEP STANDARD EVALUATION INITIALWDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT
- 1.
P Starttime Initiating cue read.
CUE:
If the student requests a Peer Check at any time during the JPM, respond *NO one is available to peer check your actions. Please continue with the task.
NOTE:
NOTE:
- 2.
CUE:
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
Student may verify prerequisites, precautions & limitations.
Student may put the color graphic on the MPCS for Service Water.
P RECORD cooling tower level Records cooling tower in the Unit Journal, as read on level.
either SW-LI-6139, Cooling Tower Basin Level, or A1537.
If the student attempts to perform pump pre-start checks, provide the cue: Local pump pre-starts checks are complete.
PERFORM pump pre-starts for SW-P-11 OA, cooling tower pump A, as determined by the us.
Performs control room pre-start checks.
Verify SW-V-5, SW isolation to Verifies SW-V-5 open.
secondary loads is OPEN.
VERIFY SW-V-139, SW cooling tower train A spray Verifies SW-V-139 open.
bypass recirculation, is OPEN.
CLOSE SW-V-4, SW isolation to secondary loads.
Closes SW-V4.
CHECK CLOSED/CLOSE Checks SW-V74 closed.
SW-V-74, turbine building SW cross-connect to PAB.
START SW-P-1 I OA, cooling tower pump A.
Starts SW-P-I I OA.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 6.1 JPM #7 Page 5 of 9
D=Discuss P=Perform S=Simulate
- 9.
P
- IO.
P NOTE: Using a stopwatch, start timing the flush when student starts opening SW-V54,
- 11.
- I2
- I
- 3.
14 PERFORMANCE CHECKLIST ELEMENTKTEP STANDARD EVALUATION IN ITIALS/DATE
- denotes a
- denotes critical critical step standard SAT UNSAT PLACE the train A standby SW pump control switch in Places SW-P41C (A) in PTL.
PULL-TO-LOCK.
SHUTDOWN the running train Stops P-41A (C) and places --
A SW pump, and PLACE its control switch in PULL-TO-LOCK.
in PTL.
OR Record current time OPEN SW-V54, Cooling Opens SW-V54.
Tower Pump A discharge isolation.
When SW-V-54 indicates full OPEN, PLACE SW-V-54 control switch in AUTO.
When SW-V54 is full open, place switch in AUTO.
VERIFY SW-V-56, cooling tower train A spray header test, auto closed.
Verify SW-V56 auto-closed.
If required, manually control PCCW heat exchanger outlet required.
temperature using CC-TK-2171 (Train A).
No action should be USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #7 Page 6 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTISTEP P=Perform
- denotes a S=Simulate critical step STANDARD EVALUATION INITIALSIDATE
- denotes critical standard SAT UNSAT Flushes to o(
at least 103 3 prior to proa next step.
- I
- 5.
P FLUSH the train A SW system to discharge transition structure for at least 103 seconds, then CONTINUE
- ean for
- econds teding to --
with step 4.3.15.
NOTE: Record current time or observe stop watch reading
- Elapsed time for flush (2 103 seconds).
- I
- 6.
P OPEN SW-V34, SW Train A Opens SW-V34.
return to cooling tower.
- I
- 7.
P CLOSE SW-V20, SW Train A Closes SW-V20.
to discharge structure.
- I
- 8.
P ADJUST SW-V-15, PCCW If necessary, adjusts SW-VI5 to establish 46,000 heat exchanger A SW isolation, as required to limit cooling tower pump A flow to less than 16,000 gpm.
gpm.
CUE:
The JPM is complete.
- 19.
Stop time Time to complete the task 5 20 minutes.
Evaluator calculates time to complete task.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #7 Page 7 of 9
Tear-Off Sheet for Applicant Initial Conditions:
0 The plant is operating at 100%.
0 On line maintenance needs to be done on the Service Water System Train A.
0 The SM requested that Service Water Train A be transferred to the Cooling Tower, until the job is complete in approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
0 Local pre-starts are complete on the "A" Cooling Tower Pump.
Perform the task using OS1016.05, "Service Water Cooling Tower Operation".
US to Secondary Operator, "Secondary Operator (or student's name), using OS1 01 6.05 section 4.3, transfer Service Water train A from the ocean to the Cooling Tower. All prerequisites, precautionsllimitations are complete."
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #7 Page 8 of 9
Simulator Operator Instructions Reset the simulator to a 100% power IC.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.l JPM #7 Page 9 of 9
JOB PERFORMANCE MEASURE WORKSHEET JPM #8: MANUAL OPERATION OF RHR TCV FOR MID-LOOP OPERATIONS Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
WA reference: 005K4.02, K4.03 Knowledne of RHRS desian features and/or interlocks which provide for modes of operation, RHR heat exchanger bypass flow control.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM #8 Page 1 of 7
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.2 JPM #8 Page 2 of 7
d JOB PERFORMANCE MEASURE WORKSHEET KA Description SYS
- 2. I
- 2. I
.20 Ability to execute procedure steps.
078 K3.02 Loss of IAS on systems having pneumatic valves 2.1 2.1.30 Ability to locate and operate components, including 005 K3.01 RCS.
and controls.
local controls.
1.o 2.0 3.0 4.0 5.0 6.0
' Value RO1SRO 4314.2 3.413.6 3.913.4 3.914.0 Task Number and
Description:
Position:
NSO 1 1501 01 004 Position Any Valve Conditions:
A. The Plant is in mode 6 with fuel in the vessel.
B. In preparation for installing SG nozzle dams, Complex Procedure OS1000.12, "Operation With The RCS At Reduced Inventory1Midloop Conditions", is being used to drain the RCS to mid-loop.
C. All Prerequisites of OS1000.12 are complete, and RHR train A is in service.
D. OS1 000.1.2 is completed through step 6.1.I
1.2. Standards
Simulate manually blocking RH-HCV-606 per OS1 000.1 2.
Student Materials:
Copy of the Tear-Off sheet Copy of OS1000.12, "Operation with The RCS At Reduced Inventory1Midloop Conditions", Revision 3, Change I I, pages 18 through 21.
Wrench to operate the I
%-inch jam nut. (Simulate obtaining from the Tool Crib.)
Flashlight Limitations on performance:
Simulate all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be prowded during the JPM.
References:
OS1000.12, "Operation With The RCS At Reduced InventoryMdloop Conditions", Rev.3, Chg.9.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM #B Page 3 of 7
JOB PERFORMANCE MEASURE WORKSHEET
7.0 Setting
In plant: -25 ft elevation, A RHRvault stairwell (B RHR vault stairwell).
8.0 Safety Considerations:
Review HP radiological maps/postings prior to entry. NRC examiners should enter RCA under RWP 4 task 1.
There is a posted area in the RHR Vault stainnray with radiation levels near 25mremlhr.
9.0 Approximate Completion Time:
15 minutes 10.0 Directions to the Student:
Initial Conditions:
0 The Plant is in mode 6 with fuel in the vessel.
In preparation for installing SG nonfe dams, Complex Procedure OS1 000.12, Operation With The RCS At Reduced InventoryMidloop Conditions, is being used to drain the RCS to mid-loop.
All Prerequisites of OS1000.12 are complete, and RHR train A is in service.
0 OS1000.12 is completed through step 6.1.I I
.2.
You are the Primary NSO. You are going to manually gag RH-HCV-606, Train A temperature control to limit fail open flow rate to 3500 gpm.
US to Primary Operator, Primary Operator (or students name), train A RHR flow has been stabilized at 3500 gpm in accordance with OS1000.12, step 6.1.I 1.2. Complete section 6.1.I I and report when the required actions are complete.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.2 JPM #8 Page 4 of 7
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP P=Perform
- denotes a S=Simulate critical step
- 1.
P Start time STANDARD EVALUATION INITIALS/DATE
- denotes critical standard SAT UNSAT Initiating cue read.
CUE:
If the student request valve location from the control room, RH-HCV-606 is located on the (-)25 ft elevation, A vault, northwest corner by stairs.
CUE:
peer check your actions. Please continue with the task.
If the student requests a Peer Check at any time during the JPM, respond: NO one is available to
- 2.
S Prepare RH-HCV-606 handjack Simulates preparing for operation.
handjack for operation.
CUE:
If the student contacts the control room for permission to unlock the handjack, You have permission to unlock RH-HCV-606.
CUE:
When student simulates unlocking the lock, The lock unlocks.
- a. Unlock handjack
- a. Using Best key from NSO key ring, simulates unlocking the handjack for RH-HCV-606.
CUE:
When student simulates turning the jam nut in the counter clockwise direction, The nut backs off.
NOTE: The jam nut may be finger tight which would eliminate the requirement for using a wrench in the next step.
- b. Back off jam nlrt
- b. Simulates turning the jam nut counter-clockwise.
CUE: When the student request the control room to perform step 6.1.I 1.4 (6.1.12.4), RH-FCV-618 (619) is full closed and flow indicates 3500 gpm.
CUE: After the student has simulated rotating the handwheel a few turns in the closed direction, You start to feel resistance.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM ##8 Page 5 of 7
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP P=Perform
- denotes a S=Simulate critical step
- 3.
S Engage handjack.
STANDARD EVALUATION IN ITIALS/DATE
- denotes critical standard SAT UNSAT Simulates rotating RH-HCV-606 (607) in the closed direction until resistance is felt.
CUE: When the student simulates turning the jam nut in the clockwise direction,The nut rotates several turns and then tightens.
- 4.
S Tighten jam nut.
Simulates rotating the jam nut in the clockwise direction until snug tight.
- 5.
S Inform the control room that the Informs the control room that the handjack for RH-HCV-606 (607) is set.
handjack is set per procedure.
CUE: The JPM is complete.
- 6.
Stop Time Evaluator calculates the time to complete the task.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM #8 Time to complete the task I; 15 minutes.
Page 6 of 7
Initial Conditions:
0 The Plant is in mode 6 with fuel in the vessel.
In preparation for installing SG nozzle dams, Complex Procedure OS1 000.1 2, Operation With The RCS At Reduced InventorylMidloop Conditions, is being used to drain the RCS to mid-loop.
0 All Prerequisites of OS1 000.1 2 are complete, and RHR train A is in service.
0 OS1000.12 is completed through step 6.1.1 1.2.
You are the Primary NSO. You are going to manually gag RH-HCV-606, Train A temperature control valve to limit fail open flow rate to 3500 gpm.
US to Primary Operator, Primary Operator (or students name), train A RHR flow has been stabilized at 3500 gpm in accordance with OS1000.12, step 6.1.I 1.2. Complete section 6.1.l I and report when the required actions are com plete.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM #8 Page 7 of 7
JOB PERFORMANCE MEASURE WORKSHEET JPM #9: LOCAL EDG NORMAL START AND LOAD Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
K/A reference: 2.4.35 Knowledge of local auxiliary operator tasks during emeraency operations including system geography and system implications.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM #9 Page 1 of 9
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.2 JPM #9 Page 2 of 9
JOB PERFORMANCE MEASURE WORKSHEET 1.0 Task Number and
Description:
Position:
NSO 0640400204 Locally Start And Load An EDG.
2.0 Conditions
A.
B.
C.
D.
E.
The plant is in mode 5.
DG 1 B is being locally started and loaded for postmaintenance testing.
Precautions 3.1 - 3.3, 3.7, 3.8, 3.12, 3.20 and 3.21 of OS1026.09are All prerequisites of OS1026.09 are satisfied.
The pre-start logs were completed 15 minutes ago by another NSO.
satisfied.
3.0 Standards
Simulate a local start of DG 1 B and parallel it to bus E-6.
4.0 Student Materials:
Copy of the Tear-Off Sheet.
Copy of OS1026.09, Operation Of DG IB, Rev. 8, Chg. 22.
5.0 Limitations On Performance:
Simulate all steps, and verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM.
6.0
References:
Procedures / Good practices:
0 OS1 026.09, Operation Of DG 1 B.
OGP-I, Control Switch Operation Detailed Systems:
EDM EDE Technical Specifications:
3.8.1.1, AC Sources Operating 3.8.1.2, AC Sources Shutdown USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.2 JPM #I9 Page 3 of 9
JOB PERFORMANCE MEASURE WORKSHEET
2.4 Drawings
RO/SRO 2.4.35 Knowledge of local auxiliary operator tasks during 3.3/3.5 emergency operations including.
0 EDE: 1-NHY-310102 0
DG:
1-NHY-310857 I
~
~~
I SYS 1--
I Description I Value
7.0 Setting
B EDG Room.
8.0 Safety Considerations:
High noise area.
DO NOT OPERATE any controls since the potential for an inadvertent ESF actuation exists.
9.0 Approximate Completion Time:
20 minutes 10.0 Directions To The Student@):
Initial Conditions:
- 1. The plant is in mode 5.
- 2. DG 1 B is being locally started and loaded for post-maintenance testing.
- 3. All applicable Precautions of OS1026.09 are satisfied.
- 4. All prerequisites of OS1026.09 are satisfied.
- 5. The pre-start logs were completed 15 minutes ago by another NSO.
You are a spare NSO. You are going to simulate the local NSO actions required to start and parallel DG 1B to bus E-6.
US to Spare NSO, Spare NSO (or students name), simulate local starting and paralleling of DG 1B IAW OS1026.09 starting at step 4.2.2. Operate the EDG in AUTO voltage control. Desired load is 5500 kW f 500 kW. The ROVER has completed step 4.2.1. The DG 1 B pre-start logs are complete and satisfactory.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM #9 Page 4 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTBTEP P=Perform
- denotes a S=Simulate critical step
- 1.
CUE:
CUE:
NOTE:
- 2.
CUE:
CUE:
- 3.
CUE:
- 4.
- 5.
- 6.
STANDARD EVALUATION I NITIALWDATE
- denotes critical standard SAT UNSAT P
Start time Initiating cue read.
If the student requests a Peer Check at any time during the JPM, respond: NO one is available to peer check your actions. Please continue with the task Evaluator to NSO, The DG breaker control switch is in REMOTE.
NSOs carry keys. Student may simulate having and placing a key in the switch.
S Place DG breaker control Simulates placing the selector switch to LOCAL.
breaker control SS to local:
- a. Place key in breaker
- b. Rotate SS to local.
switch.
Control Room to NSO, We show that DG 1B is in LOCAL.
Evaluator to NSO, The voltage regulator mode selector switch is in AUTO.
S Place the voltage regulator Verifies the voltage mode selector switch in AUTO. regulator mode SS in AUTO.
Evaluator to NSO, The manual voltage regulator switch is pulled out in the TRACK position.
Check the manual voltage regulator switch pulled out in the TRACK position.
Press both EMERGENCY STOP push-buttons at the same time to prevent an uncontrolled diesel start after reset.
Notify local personnel of loud noise due to venting high pressure air.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.2 JPM #9 Verifies the manual voltage regulator switch pulled out in TRACK.
Simulates pushing both EMERGENCY STOP push-buttons.
Notifies local personnel of venting high-pressure air.
Page 5 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTSTEP STANDARD EVALUATION INITIALS/DATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT CUE:
- 7.
- 8.
NOTE:
- 9.
CUE:
IO.
CUE:
CUE:
- 11.
- 12.
CUE:
When the engine reset button is pressed, the air shutdown relay resets and produces a whoosh.
S Press the ENGINE RESET Simulates resetting the push-button.
diesel engine.
S Check DG-P-227B off prior to starting the DG.
Checks the rocker arm pre-lube pump off.
If ENGINE RESET is not pushed, the DG will not start.
S Press the TEST START push-Simulates starting the button.
diesel engine.
Evaluator to NSO, The engine starts. Output is 59.5 Hz and 4,190 AC volts.
S Check DG 1B comes up to Checks DG 1B at rated rated frequency and voltage, 60 frequency and voltage.
Hz (58.8 to 61.2 Hz) and 4,160 volts (3,740 to 4,580 volts).
The student should not ask, about manually flashing the field since both voltage and frequency are indicated and normal. If asked, restate that frequency is 59.5 Hz & voltage is 4,190 VAC.
Control room to NSO, SW-VI8 is open and FI-6191 indicates 1840 gpm.
S At the MCB, check SW-V OPEN.
At the MCB, check SW flow to DG I B greater than:
gpm.
900 gpm - on ocean 0
1800 gpm - on cooling tower Contacts the control room and asks them to verify SW-V-18 open.
Checks SW flow > 1,800 S
When asked, evaluator to NSO, The bus E-6 synchronizing switch is in OFF.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.2 JPM #I9 Page 6 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENT/STEP P=Perform
- denotes a S=Simulate critical step STANDARD EVALUATION INlTlALSlDATE
- denotes critical standard SAT UNSAT
- I
- 3.
CUE:
NOTE:
- I
- 4.
CUE:
- I
- 5.
- I 6
S Place the bus E-6 Simulates placing the SNS synchronizing switch to - DG TO BUS.
to DG TO BUS.
After SNS is positioned to DG TO BUS, evaluator to NSO, BUS E-6 incoming volts is 130 volts; bus E-6 running volts is 120 volts. The synchroscope is rotating CCW slowly; the lights go out at 12 oclock and are bright at 6 oclock.
The DG is read on the incoming meter, and the bus is read on the running meter. Therefore, the incoming meter rises when the student RAISES on the voltage regulator, and conversely, the incoming meter lowers when student LOWERS on voltage regulator.
S Adjust DG 1B voltage so that Simulates matching bus E-6 INCOMING VOLTS and INCOMING VOLTS to RUNNING VOLTS match.
RUNNING VOLTS.
If speed is raised, evaluator to NSO, The synchroscope needle slows, stops and begins to rotate clockwise.
If speed is lowered, evaluator to NSO, The synchroscope needle speeds up in the CCW direction.
S Adjust engine speed until the Simulates adjusting speed SYNCH meter rotates slowly in until the SYNCH meter,
the fast direction.
rotates CW slowly.
S When BUS E6 synchronizing Places generator breaker meter pointer is between control switch to CLOSE eleven and twelve oclock and when synchroscope needle synchroscope lights are off, is between eleven and place generator breaker control twelve oclock and the switch to CLOSE.
synchroscope lights are out.
NOTE: if the applicant raises speed, real load (KW) will increase, likewise, if they lower speed, KW will decrease.
- I 7
S RAISE DG 1 B speed to pick up Uses 1 B DG speed slightly over 500 KW.
changer to RAISE speed of DG.
CUE: VARs first lowers, comes to an inflection point, then raises when the voltage is increased via the voltage regulator. VARs decrease when voltage is lowered.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM #I9 Page 7 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP P=Perform
- denotes a S=Simulate critical step STANDARD EVALUATION IN ITIALSIDATE
- denotes critical standard SAT UNSAT
- 18.
S RAISE generator voltage to RAISES generator voltage to increase lagging VARs to slightly over 200 WAR using voltage regulator in automatic mode.
increase lagging VARs to slightly over 200 WAR.
- 19.
S Place BUS E6 Places BUS E6 SYNCHRONIZING switch to SYNCHRONIZING switch OFF.
to OFF.
NOTE: loading of the DG should take place slowly over a 30 minute period. The preferred WAR loading is 2/3 of KW loading (power factor of approximately 0.85) and MAXIMUM WAR loading is % of KW loading.
- 20.
S RAISE generator KW load to Applicant explains loading desired load and maintain appropriate VARs loading.
the diesel in increments over the next 30 minutes and maintains WARS at 2/3 of KW loading.
CUE: The JPM is complete USNRC Initial Licensing Examination Seabrook Station June 2003 Section 6.2 JPM #9 Page 8 of 9
Tear-Off Sheet for Applicant initial Conditions:
0 The plant is in mode 5.
0 DG 1 B is being locally started and loaded for poskmaintenance testing.
0 Ail applicable Precautions of OS1026.09 are satisfied.
0 All prerequisites of OS1026.09 are satisfied.
0 The pre-start logs were completed 15 minutes ago by another NSO.
You are a spare NSO. You are going to simulate the local NSO actions required to start and parallel DG 1B to bus E-6.
US to Spare NSO, "Spare NSO (or student's name), simulate local starting and paralleling of DG I B IAW OS1026.09 starting at step 4.2.2. Operate the EDG in AUTO voltage control. Desired load is 5500 kW f 500 kW. The ROVER has completed step 4.2.1. The DG I B pre-start logs are complete and satisfactory."
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 8.2 JPM #9 Page 9 of 9
JOB PERFORMANCE MEASURE WORKSHEET JPM #IO: RESET THE TDEFW PUMP TURBINE TRIP THROTTLE VALVE Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of Testing Simulated Performance:
Actual Performance:
Classroom:
Simulator:
Plant:
WA reference: 2.4.35 Knowledqe of local auxiliarv operator tasks during emergency operations including svstem geography and svstem implications.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM # I O Page 1 of 7
JOB PERFORMANCE MEASURE WORKSHEET VERIFICATION OF COMPLETION Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question documentation Responses to questions Result: SAT or UNSAT (circle one)
Examiner's signature and date:
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM # I O Page 2 of 7
~
~
~
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM # I O I
.o 2.0 3.0 4.0 5.0 6.0 JOB PERFORMANCE MEASURE WORKSHEET Task Number and
Description:
Position:
NSO 0610401204 Reset The Turbine Driven EFW Pump Trip Valve.
Conditions:
A. The plant is in Mode 3 following a trip from 100% power.
B. All station AC electrical power has been lost.
C. The Turbine Driven EFW Pump started and then tripped.
Standards:
Reset the turbine driven EFW pump trip valve and start FW-P-37A per OSlO36.03, Resetting The Steam Driven ERN Pump Trip Valve.
Student Materials:
Copy of the Tear-Off Sheet.
Copy of OS1036.03, Resetting The Steam Driven ERN Pump Trip Valve, Rev. 2, Chg. 3.
Copy of OS1090.01, Manual Operation Of Remote Operated Valves, Rev.
5, Chg. 11, page 1 through 6 and 18 & 19.
Limitations On Performance:
Simulate/Perform all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM.
References:
Procedures:
0 OS1036.03, Resetting The Steam Driven EFW Pump Trip Valve 0
OS1090.01, Manual Operation Of Remote Operated Valves Technical Specifications:
0 3.7.1.2, AFW System 0
3.7.1.3, CST 3.7. IO, Area Temperature Monitoring Drawings:
1 -NHY-503584 1 -NHY-503585 Page 3 of 7
JOB PERFORMANCE MEASURE WORKSHEET SYS KA 06 I A204 2.4 2.4.35 Description Value Ability to predict impact and use procedure to correct, control, mitigate AFW pump failure.
Knowledge of local auxiliary operator tasks during emergency operations.
ROISRO 3.413.8 3.313.5
7.0 Setting
Plant, ERN Pump house.
8.0 Safety Considerations:
Hot steam piping.
0 Possible automatic pump start.
0 Rotating equipment hazard.
0 Hearing protection as posted.
Stand clear of drain valves located on the east side of the turbine.
9.0 Approximate Completion Time:
10 minutes 10.0 Initial Cue:
Initial Conditions:
0 The plant is in Mode 3 following a trip from 100% power.
0 All station AC electrical power has been lost.
0 The Turbine Driven ERN Pump started and then tripped.
You are the Roving NSO. You are going to reset the Turbine Driven ERN pump trip valve and restart the pump.
US to Roving NSO, Roving NSO (or students name), simulate resetting MS-V-129, the trip valve for emergency feed pump turbine using OS1 036.03, Resetting The Steam Driven EFW Pump Trip Valve, then restart the steam driven EFW pump.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM # I O Page 4 of 7
PERFORMANCE CHECKLIST D=Discuss ELEMENTKTEP STANDARD EVALUATION INITIALWDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT I.
P Start time Initiating cue read.
CUE:
If the student requests a Peer Check at any time during the JPM, respond: NO one is available to peer check your actions. Please continue with the task.
- 2.
S Reset MS-V-129, E M pump Simulates resetting turbine trip valve:
MS-V-129:
- a. Pull and hold the tripping
- a. Simulates pulling and rod toward MS-V-129.
holding the trip rod toward MS-V-129.
- b. ChecWplace the flat of the
- b. Simulates checking /
placing the flat of the washer against the trip rod.
washer against the trip rod.
- c. Verify the trip plunger drops c. Simulates verifying the trip plunger is in place.
into place. Gently depress the plunger, if required.
- d. Release the tripping rod.
- d. Simulates releasing the tripping rod.
- e. Turn the handwheel for
- e. Simulates turning the MS-V-I 29 CW until the latch snaps into place.
handwheel CW until the latch snaps into place.
CUE:
If the control room is contacted, acknowledge, then US to NSO, Restart the steam driven EFW pump locally.
- 3.
S Restart the. steam driven EFW Simulates restarting the pump:
steam driven EFW pump:
- a. Check MS-V-129 - RESET. a. Verifies MS-V-I 29 is reset.
CUE:
if the student checks the position of FW-V-346 locally, evaluator to student, The valve is shut.
CUE:
If the control room is contacted regarding status of FW-V-346, US to NSO, NO power is available to remotely open MI-V-346. Open FW-V-346 locally.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM # I O Page 5 of 7
PERFORMANCE CHECKLIST D= Discuss ELEM ENT/STE P STANDARD EVALUATION INITIALSDATE P=Perform
- denotes a
- denotes critical S=Simulate critical step standard SAT UNSAT CUE:
If the control room is contacted regarding step 3.2.4 of OSlO90.01 in reference to the de-clutch lever limitations on MI-V-346, US to NSO, This is an emergency. Locally open FW-V-346.
- b. Check opedopen
- b. Simulates opening mini-flow.
depressing the de-FW-V-346, EFW pump A MI-V-346 lo~ally by clutch lever and rotating the handwheel ccw.
CUE:
As MS-V-129 is opened, evaluator to student, Speed is increasing to 3600 rprn.
- c. Slowly open MS-V-129 to
- c. Simulates slowly increase speed to 3600 rpm (3500 - 3700 rpm).
opening MS-V-129 by turning the handwheel ccw.
CUE:
When the student verifies EFW pump speed remains below 3750 rpm, evaluator to student, Speed is steady at 3675 rprn.
- d. Verify the EFW pump
- d. Verifies the EFW pump governor is governor is operating properly:
operating properly:
Verify pump speed remains Verifies pump below 3750 rpm.
speed remains Fully open MS-V-129.
below 3750 rpm.
Remove MS-V-129 from its Simulates fully backseat by closing %i turn.
opening MS-V-129.
Simulates closing MS-V-I29 % turn.
CUE:
The JPM is complete.
- 4.
Stop time Time to complete the task 5 10 minutes.
Evaluator calculates time to complete task.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section 6.2 JPM #10 Page 6 of 7
Tear-Off Sheet for Applicant Initial Conditions:
0 The plant is in Mode 3 following a trip from 100% power.
0 All station AC electrical power has been lost.
0 The Turbine Driven EFW Pump started and then tripped.
You are the Roving NSO. You are going to reset the Turbine Driven EFW pump trip valve and restart the pump.
US to Roving NSO, Roving NSO (or students name), simulate resetting MS-V-129, the trip valve for emergency feed pump turbine using 081036.03, Resetting The Steam Driven EFW Pump Trip Valve, then restart the steam driven EFW pump.
USNRC Initial Licensing Examination Seabrook Station June 2003 Section B.2 JPM # I O Page 7 of 7