MONTHYEARML0316710842003-06-17017 June 2003 Relief Request, Relaxation of the Requirements of Order (EA-03-009) Regarding Reactor Pressure Vessel Head Inspections Project stage: Other ML0316400612003-06-17017 June 2003 Relaxation of the Requirements of Order (EA-03-009) Regarding Reactor Pressure Vessel Head Inspections, (Tac Nos. MB8205 & MB8206) Project stage: Acceptance Review ML0323805692003-08-19019 August 2003 Donald Cook, Unit 2, Vessel Head Inspection Results Project stage: Other 2003-06-17
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] Category:Safety Evaluation
MONTHYEARML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML22214A0012022-10-0707 October 2022 Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22166A3302022-07-26026 July 2022 Review of Quality Assurance Program Changes ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML22055A0012022-06-0808 June 2022 Issuance of Amendment No. 341 Updating the Reactor Coolant System Pressure Temperature Limits ML22102A0122022-05-0202 May 2022 Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21295A0092021-11-0303 November 2021 Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval ML21141A2612021-06-0202 June 2021 Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval ML21130A0082021-05-12012 May 2021 Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) ML21062A1882021-03-23023 March 2021 Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) ML21041A0862021-03-0303 March 2021 Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections ML21034A1552021-02-12012 February 2021 Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML21006A4582021-02-0202 February 2021 Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20366A1342021-01-13013 January 2021 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20315A4832020-12-30030 December 2020 Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable ML20247J6562020-09-10010 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7042020-09-0303 September 2020 Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval ML19347B3762020-01-31031 January 2020 Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 ML19329A0112020-01-23023 January 2020 Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor ML19304B6722019-12-31031 December 2019 Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 ML19259A0542019-10-15015 October 2019 Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan ML19196A0642019-08-23023 August 2019 Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML19134A3552019-07-11011 July 2019 Issuance of Amendments Technical Specification Task Force (TSTF) Traveler 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19031B9662019-04-10010 April 2019 Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML18346A3582019-02-0505 February 2019 Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program ML18348A4182019-01-0909 January 2019 Units and 2 Approval of Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N 729-4 ML18337A3942018-12-11011 December 2018 Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination ML18284A2542018-11-16016 November 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18249A0192018-11-13013 November 2018 Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation ML18284A3102018-10-26026 October 2018 Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 ML18131A2532018-07-0606 July 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18103A0592018-04-19019 April 2018 Request for Use of Alternative Isir 04-05, Revision 1, Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program ML17312B0302017-12-19019 December 2017 Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) ML17214A5502017-09-21021 September 2017 Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML17103A1062017-05-24024 May 2017 Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17096A6272017-04-12012 April 2017 Proposed Alternative to Use ASME OM Code Case OMN-20 ML17045A1502017-03-31031 March 2017 Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML16327A1102016-12-28028 December 2016 Cover Letter for Revised Safety Evaluation for Amendment Nos. 332 and 314 Adoption of TSTF-490, Rev. 0, and Implementation of Full-Scope Alternative Source Term ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter ML16216A1812016-08-19019 August 2016 Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML16032A0312016-02-0404 February 2016 Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) ML15327A2172015-12-11011 December 2015 Issuance of Amendments Technical Specifications Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 ML14197A0972015-11-30030 November 2015 Issuance of Amendment Regarding Restoration of Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions ML15264A8512015-11-0909 November 2015 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 2023-01-04
[Table view] |
Text
June 17, 2003 Mr. A. Christopher Bakken III, Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT 2 - RELAXATION OF THE REQUIREMENTS OF ORDER (EA-03-009) REGARDING REACTOR PRESSURE VESSEL HEAD INSPECTIONS (TAC NO. MB9543)
Dear Mr. Bakken:
The U. S. Nuclear Regulatory Commission (NRC) has approved, upon good cause shown and subject to the conditions specified below, the Indiana Michigan Power Companys (the licensees) request for relaxation of a specific requirement of Order EA-03-009 for the Donald C. Cook Nuclear Plant (D. C. Cook), Unit 2. The Order requires inspections of the reactor pressure vessel (RPV) and associated penetration nozzles at pressurized-water reactors. This relaxation is in response to the licensees letter dated June 12, 2003.
Pursuant to the procedure specified in Section IV., paragraph F. of the Order, the licensee requested relaxations from the requirement specified in Section IV., paragraph C., item (1)(b),
to perform either ultrasonic testing (UT) of each RPV head penetration nozzle or a wetted surface examination using eddy current testing (ET) or dye penetrant testing (PT) of each head penetration nozzle. The licensee requested relaxation from the Order to allow either UT or a wetted surface examination using ET or PT to inspect all but two of the RPV head penetration nozzles. Specifically for penetrations 73 and 75, the licensee requests relaxation from the Order to allow a combination of UT, ET, and PT to inspect those two nozzles. This relaxation allows the licensee to perform either UT or a wetted surface examination using ET or PT to inspect all but two of the RPV head penetration nozzles. For penetrations 73 and 75, this relaxation allows a combination of UT, ET, and PT to inspect the nozzles.
The NRC staff has reviewed and evaluated the information provided by the licensee in support of the request for relaxation and found that the licensee has demonstrated good cause for the requested relaxation. The licensee has demonstrated that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to Section IV. of the Order, and Title 10 of the Code of Federal Regulations, Section 50.55a(a)(3), the NRC staff approves, for one operating cycle commencing with startup from the spring 2003 refueling outage (U2C14),
the licensees request for relaxation and authorizes the proposed alternatives to Section IV.,
paragraph C., item (1)(b) of the Order with respect to UT and wetted surface examination testing which cannot be completed as specified in the Order.
A. Bakken The details of the NRC staffs review are contained in the enclosed safety evaluation. Please contact Mr. John Stang at (301) 415-1345 with any questions regarding this approval.
Sincerely,
/RA by LRaghavan for/
William H. Ruland, Director Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-316
Enclosure:
Safety Evaluation cc w/encl: See next page
ML031671084 *Provided SE input by memo OFFICE PDIII-1/PM PDIII-/LA EMCB/SC* OGC PDIII-1/SC PDIII/D NAME JStang THarris TChan MYoung LRaghavan LRaghavan for WRuland DATE 06/17/03 06/16/03 06/16/03 06/17/03 06/17/03 06/17/03 Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III Michigan Department of Environmental U.S. Nuclear Regulatory Commission Quality 801 Warrenville Road Waste and Hazardous Materials Div.
Lisle, IL 60532-4351 Hazardous Waste & Radiological Protection Section Attorney General Nuclear Facilities Unit Department of Attorney General Constitution Hall, Lower-Level North 525 West Ottawa Street 525 West Allegan Street Lansing, MI 48913 P. O. Box 30241 Lansing, MI 48909-7741 Township Supervisor Lake Township Hall David A. Lochbaum P.O. Box 818 Union of Concerned Scientists Bridgman, MI 49106 1616 P Street NW, Suite 310 Washington, DC 20036-1495 U.S. Nuclear Regulatory Commission Resident Inspectors Office Michael J. Finissi 7700 Red Arrow Highway Plant Manager Stevensville, MI 49127 Indiana Michigan Power Company Nuclear Generation Group David W. Jenkins, Esquire One Cook Place Indiana Michigan Power Company Bridgman, MI 49106 One Cook Place Bridgman, MI 49106 Joseph E. Pollock Site Vice President Mayor, City of Bridgman Indiana Michigan Power Company P.O. Box 366 Nuclear Generation Group Bridgman, MI 49106 One Cook Place Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John B. Giessner Director, Technical Projects Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ORDER (EA-03-009) RELAXATION REQUEST, EXAMINATION COVERAGE FOR REACTOR PRESSURE VESSEL HEAD PENETRATION NOZZLES DONALD C. COOK NUCLEAR PLANT, UNIT 2 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316
1.0 INTRODUCTION
The Nuclear Regulatory Commission (NRC) issued Order EA-03-009, dated February 11, 2003, requiring specific examinations of the reactor pressure vessel (RPV) head and vessel head penetration (VHP) nozzles of all pressurized-water reactor plants.Section IV., paragraph F., of the Order states that requests for relaxation of the Order associated with specific penetration nozzles will be evaluated by the NRC staff using the procedure for evaluating proposed alternatives to the American Society of Mechanical Engineers Code in accordance with 10 CFR 50.55a(a)(3).Section IV., paragraph F., of the Order states that a request for relaxation regarding inspection of specific nozzles shall address the following criteria: (1) the proposed alternative(s) for inspection of specific nozzles will provide an acceptable level of quality and safety, or (2) compliance with this Order for specific nozzles would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
For the Donald C. Cook Nuclear Plant, Unit 2, and similar plants determined to have a high susceptibility to primary water stress-corrosion cracking (PWSCC), in accordance with Section IV., paragraphs A. and B. of the Order, the following inspections are required to be performed every refueling outage in accordance with Section IV., paragraph C., item (1) of the Order:
- a. Bare metal visual examination of 100 percent of the RPV head surface (including 360E around each RPV head penetration nozzle), AND
- b. Either:
- i. Ultrasonic testing (UT) of each RPV head penetration nozzle (i.e., nozzle base material) from two (2) inches above the J-groove weld to the bottom of the nozzle and an assessment to determine if leakage has occurred into the interference fit zone, OR ii. Eddy current testing (ET) or dye penetrant testing (PT) of the wetted surface of each J-groove weld and RPV head penetration nozzle base material to at least two (2) inches above the J-groove weld.
Footnote 3 in Section IV., paragraph C., item (1) of the Order provides specific criteria for examination of repaired VHP nozzles.
By letter dated June 12, 2003, the Indiana Michigan Power Company (the licensee) requested relaxation to implement alternatives to the requirements of Section IV., paragraph C.,
item (1)(b), for the D. C. Cook Unit 2 VHP nozzles.
2.0 ORDER EA-03-009 RELAXATION REQUEST FOR PROPOSED ALTERNATIVE INSPECTION FOR RPV HEAD NOZZLES 2.1 Order Requirements for which Relaxation is Requested Section IV., paragraph C., item (1)(b) of the Order requires, in part, that the following inspections be performed during every refueling outage for high susceptibility plants similar to D. C. Cook Unit 2:
Either:
(i) UT of each RPV head penetration nozzle (i.e., nozzle base material) from two (2) inches above the J-groove weld to the bottom of the nozzle and an assessment to determine if leakage has occurred into the interference fit zone, OR (ii) ET or PT of the wetted surface of each J-groove weld and RPV head penetration nozzle base material to at least two (2) inches above the J-groove weld.
The licensee has requested relaxation of the requirements of Section IV., paragraph C.,
item (1)(b), of the Order as follows:
Relaxation from the Order to allow either/or UT or a wetted surface examination using ET or PT to inspect all but two of the RPV head penetration nozzles. Specifically for Penetrations 73 and 75, the licensee requests relaxation from the Order, to allow a combination of UT/ET/PT to inspect those two nozzles.
2.2 Licensees Proposed Alternative In lieu of requiring inspections to be performed as prescribed in Section IV., paragraph C.,
item (1)(b) of the Order, the licensee proposed the following alternative:
IV.C(1)(b) For each penetration perform either:
(i) Ultrasonic testing of the RPV head penetration nozzle (i.e., nozzle base material) from two (2) inches above the J-groove weld to the bottom of the nozzle and an assessment to determine if leakage has occurred into the interference fit zone; (ii) Eddy current testing or dye penetrant testing of the wetted surface of the J-groove weld and RPV head penetration nozzle base material to at least two (2) inches above the J-groove weld; OR (iii) Equivalent combination of (i) and (ii) to obtain sufficient data to assess the acceptability of the penetration nozzle base material and J-groove weld.
2.3 Licensees Basis for Relaxation The licensees submittal dated June 12, 2003, indicates that the proposed alternative is submitted under Criterion (1) of Section IV., paragraph F., of the Order, which states:
The proposed alternative(s) for inspection of specific nozzles will provide an acceptable level of quality and safety...
The licensee stated that due to the design of some of the RPV head penetration nozzles (nine nozzles have thermal sleeves installed in them), complete inspections of each RPV head penetration nozzle using one inspection method identified in Section IV., paragraph C.,
item (1)(b) of the Order cannot be achieved.
The licensee provided this proposed relaxation request since all of the RPV head penetration nozzles are not being inspected by the same method during the current scheduled refueling outage. This relaxation would allow the licensee to inspect nine nozzles using ET; one nozzle using a combination of UT, ET, and PT; one nozzle using a combination of PT and UT; and the remaining nozzles using UT. The licensee stated that this relaxation would not change the criteria of the inspection requirements identified in Section IV., paragraph C., item (1)(b) of the Order for the nozzles being inspected. All of the RPV nozzles would receive an inspection by an approved method described in the Order.
The licensee stated that ET would be performed on nine nozzles (numbers one to nine) located on the inner-most rows of the RPV head. These nozzles have centering tabs with thermal sleeves installed which prevents UT inspections because of the configuration of the UT transducers. The licensee stated that ET is the only inspection method that can be used to examine from 2 inches above the J-groove weld down to the top of the chamfer near the bottom of the nozzle. The licensee stated that penetration 73 had a minimum distance from the J-groove weld to the threaded area of approximately 0.36 inches. To achieve complete inspection coverage, the licensee performed in addition to the UT examination, an ET examination on the inside diameter surface down to the top of the chamfer, and a PT examination was performed on the threaded surface of the outside diameter down to the bottom of the threads. Penetration 73 is in the next-to-the-outermost row of the RPV head.
The licensee performed a UT examination on penetration 75 in accordance with the Order, except for a small area which had previously been weld-repaired.
The licensee stated that it was unable to accurately inspect this area with the UT method. The licensee performed a PT examination on this weld repaired area. The remaining nozzles were inspected using the UT method.
The licensee stated that all the inspections identified above were performed in accordance with Section IV., paragraph C., item (1)(b) of the Order. Therefore, based upon the above information, the licensee believes that the proposed alternative inspection (i.e., the use of a combination of previously approved and accepted inspection methods of the type described in Section IV., paragraph C., items (1)(b)(i) and (1)(b)(ii) of the Order) is sufficient to detect PWSCC and will provide an acceptable level of quality and safety since the proposed examinations covers each RPV head penetration nozzle.
2.4 EVALUATION The NRC staffs review of this relaxation request is based on Criterion (1) of Section IV.,
paragraph F. of the Order.
The licensees proposed alternative is to use the examination techniques identified in Section IV., paragraph C., item (1)(b)(i) or item (1)(b)(ii) of the Order or combination thereof. The exclusive use of either the UT or ET/PT inspection techniques for the RPV nozzles in accordance with the Order cannot be done because of the limitations imposed by the configurations of the RPV head nozzles at D. C. Cook Unit 2. The licensee has proposed to use inspection techniques that are identified in the Order. The NRC staff has reviewed the licensees proposed combination of inspection techniques and finds that the proposed inspection of the RPV nozzles will be sufficient to detect PWSCC phenomena and provide assurance of structural integrity.
The proposed alternative is acceptable because each RPV head nozzle penetration will be inspected by a method identified in Order EA-03-009, and will provide assurance of structural integrity. Therefore, the proposed alternative will provide an acceptable level of quality and safety.
3.0 CONCLUSION
The NRC staff concludes that the licensees proposed alternative to allow the use of, or a combination of, examination methods on the RPV head nozzle penetrations in accordance with Section IV., paragraph C., items (1)(b)(i) and (1)(b)(ii) of the Order is sufficient to reliably detect PWSCC and provides reasonable assurance of the structural integrity of the RPV head. Thus, the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to Section IV., paragraph F., of Order EA-03-009, the licensee has demonstrated good cause for the proposed relaxation of the Order, and the NRC staff authorizes the proposed relaxation and alternative inspection of the RPV head nozzle penetrations at D. C. Cook Unit 2 for the spring 2003 outage.
Principal Contributors: E. Reichelt A. Hiser Date: June 17, 2003