Request for Additional Information (RAI) Request for Relaxation from Section IV.c.(1)(a) of Reactor Pressure Vessel Head Inspection Order
ML031630568
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/30/2003
From: Alexion T
NRC/NRR/DLPM/LPD4
To: Benne S
Entergy Operations
Alexion T W, NRR/DLPM, 415-1326
Shared Package
ML031600489 List:
References
Download: ML031630568 (3)


Text

Thomas Alexion - REQUEST FOR ADDITIONAL INFORMATION Page 1 From:

Thomas Alexion To:

SBENNE2@entergy.com Date:

5/30/03 8:59AM

Subject:

REQUEST FOR ADDITIONAL INFORMATION

Steve, See the attached.

Tom

.'F g

IN Tha lexion-REQUES§T FORADDiTi oNAL INFORMATION

REQUEST FOR ADDITIONAL INFORMATION REQUEST FOR RELAXATION FROM SECTION IV.C.(1)(a) OF THE ORDER ARKANSAS NUCLEAR ONE. UNIT 2 The purposes of the bare metal visual (BMV) examination required by Order Section IV.C(1)(a) are to detect the presence of deposits (indicative of leakage) at the interface of the reactor pressure vessel (RPV) head and the vessel head penetration (VHP) nozzles and to provide positive assurance of the integrity of the RPV head, i.e., that no corrosion of the RPV head is occurring. For the purpose of detecting deposits indicative of leakage, BMV Is a diverse and complementary examination to the UT measurements required by Order Section IV.C(1)(b)(i) or the surface examination requirements of Order Section IV.C(1)(b)(ii). Therefore, one function of the BMV is to provide a second opportunity to identify a leaking nozzle that may have eluded detection by the non-visual examination required by Order Section IV.C(1)(b). Absent a compensatory alternative (or altematives) that supports this diverse and complementary function of the BMV for leakage detection and the function of providing assurance of integrity of the RPV head, approval of a relaxation request to not perform the BMV is unlikely.

The licensee needs to describe how its altemative examination(s) supports the functions of the BMV, in particular the diverse and complementary function of leakage detection to the non-visual examination requirements of Order Section IV.C(1)(b), such that an acceptable level of quality and safety is achieved, or how performance of a BMV results in hardship without a compensating increase in the level of quality and safety, that justifies their altemative.

C:\\WINDO WS\\TEM P\\G WIOOOO1.TMP Paae 1 Mail Envelope Properties (3ED7559F.FE5: 0: 20628)

Subject:

Creation Date:

From:

Created By:

REQUEST FOR ADDITIONAL INFORMATION 5/30/03 8:59AM Thomas Alexion TWA@nrc.gov Recipients entergy.com SBENNE2 (SBENNE2@entergy.com)

Action Transferred Date & Time 05/30/03 08:59AM Post Office Files RELAXATION.RAI MESSAGE Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

Size 3305 657 Delivered Route entergy.com No None Yes Standard No None No Standard Immediate Delivered & Opened Date & Time 05/30/03 08:58AM 05/30/03 08:59AM II C-\\WIND0WS\\TEMP\\GWJ00001i.TMP^

Paae 1