Relief Request RR-ENG-2-30, Underwater Welding at STP 1 & 2
ML031630525
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/13/2003
From: Bhalchandra Vaidya
NRC/NRR/DLPM/LPD4
To: Harrison A
South Texas
vaidya B, NRR/DLPM, 415-3308
Shared Package
ML031600489 List:
References
RR-ENG-2-30
Download: ML031630525 (5)


Text

I C:\\TEMP\\GW)OOOOl.TMP Page 1 Mail Envelope Properties (3EC14397.847: 21: 21146)

Subject:

Creation Date:

From:

Created By:

Fwd: Relief Request RR-ENG-2-30, Underwater welding at STP 1& 2 5/13/03 3:12PM Bhalchandra Vaidya BKV@nrc.gov Recipients nrc.gov owf2_po.OWFN_DO RAG CC (Robert Gramm) nrc.gov owf4_po.OWFN_DO MCT CC (Mohan Thadani)

Action Delivered Opened Delivered Opened Date & Time 05/13/03 03:12PM 05/14/03 07:3 1AM 05/13/03 03:12PM 05/13/03 03:34PM stpegs.com Awharrison (Awharrison @ stpegs.com)

Post Office owf2_po.OWFN_DO owf4_po.OWFN_DO Files Mail MESSAGE Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

Size 1452 No None Yes Standard No None No Standard Irmediate Delivered & Opened Transferred Delivered 05/13/03 03:12PM 05/13/03 03:12PM 05/13/03 03:12PM Route nrc.gov nrc.gov stpegs.com Date & Time 05/13/03 03:12PM I \\TEMP\\G}OOOOl1.TMP Page 1

IBhalchandra Vaidya-Fwd:_Relief Request RR-ENG-2-30, Underwater welding at STP 1& 2 From:

Bhalchandra Vaidya To:

Awharrison@stpegs.com Date:

5/13/03 3:12PM

Subject:

Fwd: Relief Request RR-ENG-2-30, Underwater welding at STP 1 & 2 I am forwarding the RAI questions herewith.

In order to schedule the phone call for tommorrow, I need to talk to you to get the convenient time slots.

Please get in touch with me and let know which number I should dial.

The time slot, 10:30 am - 1:30 pm, Rockville MD time, ( may be an hour to hour and a half) is okay for everybody here. Is this okay with your people ? Please let me know.

Thanks.

Bhalchandra Vaidya NRR/DLPM Licensing Project Manager, PDIV-1 Grand Gulf Nuclear Station, Unit 1 301-415-3308 M/S: 0-7D1 Mohan Thadani; Robert Gramm

~~~~~Page 1 CC:

Bhalchandra Vaidya - Relief Request RR-ENG-2-30, Underwater welding at STP 1& 2 Page 1 From:

Edward Andruszkiewicz To:

Bhalchandra Vaidya; Mohan Thadani Date:

5/13/03 2:54PM

Subject:

Relief Request RR-ENG-2-30, Underwater welding at STP 1 & 2 Attached please find the RAI for the subject relief request.

CC:

Ganesh Cheruvenki; Matthew Mitchell; Stephanie Coffin

IBhalchandraVaidya - STP Underwater.wpd Page 1 RAI for STP UNDERWATER WELDING (RR-ENG-230)

1.

Will ASME Section IX guided bend tests per OW-160 be performed on the welding procedure qualification tests?

2.

Is this welding wet or dry hyper baric, dry chamber, dry spot, etc.?

3.

What is the specific item to be welded using underwater welding?

4.

What material is the em to be welded using underwater welding made of? (ASME SA Number, type, and grade; heat treatment condition)

5.

What is the specific filler material to be used for the welding? (filler metal classification)

6.

What welding process or processes are to be used?

7.

What process or processes are to be used for cutting or metal removal?

8.

Will any additional NDE be done on this weld?

9.

What NDE will be done on this weld?

10.

Will any Examination be done on this item on an ongoing basis? (Every outage or every other outage, etc.)

11.

What is the fluence level in the area to be welded?

12.

Will the mock-up material have the same fluence level applied to it?

13.

The high neutron fluence welding mock-up testing, procedure, data and results shall be attached to the relief request.

14.

What is the licensee's basis that the proposed altemative provides an acceptable level of quality and safety?

15.

Provide information on the depth of the water at which the repair will be performed.

16.

Confirmation tests for welders shall be performed prior to the commencement of production work. The confirmation test requirements specified in AWS D 3.6 shall be followed.

17.

The licensee should provide test results of filler metal qualifications per paragraph 4.0 of code case 516-2. The minimum required ferrite number of the weld metal shall be specified in the relief request.

18.

The items above shall be included in or affached to the relief request.

I Bhalchandra Vaidya - STP Underwater.wpd

[Bhalchandra Vaidya - STP Underwater.wpd Page 2 19.

Undor Duration of Proposed Alternativcs, the licensec shall give a time for the duration becausc thero ic no guarantee that this code casc will be accepted, until it actually it published.