ML031530099
| ML031530099 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/28/2003 |
| From: | Mauldin D Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-04945-CDM/TNW/DWG, GL-89-004, NUREG-1482 | |
| Download: ML031530099 (2) | |
Text
LAFS 1 OCFR50.55a David Mauldin Vice President Mail Station 7605 Palo Verde Nuclear Nuclear Engineering TEL (623) 393-5553 P.O. Box 52034 Generating Station and Support FAX (623) 393-6077 Phoenix, AZ 85072-2034 102-04945-CDM/TNW/DWG May 28, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 11555 Rockville Pike Rockville, MD 20852
Reference:
Letter 102-04881-CDM/SAB/TNW, "Second 10-Year Interval Inservice Testing (IST) Program - Pump Relief Request No. 13", dated January 21, 2003, from C.D. Mauldin, APS to USNRC
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Withdrawal of Request for Relief (Second 10-Year Interval Inservice Testing (IST) Program - Pump Relief Request No. 13)
Pump Relief Request No. 13, submitted to the NRC in the referenced letter, proposed an alternate method for testing High Pressure Safety Injection (HPSI) Pumps when refueling interval design full flow test results are in the code specified alert range.
After re-evaluation of Generic Letter GL 89-04 Position 9, documented in NUREG-1482 Appendix A, it has been determined by Arizona Public Service Company (APS) that NRC approval of Pump Relief Request No. 13 is not necessary. This was discussed in phone conversations with the NRC staff on March 18,-2003 and May 7, 2003. Based on this determination, APS requests the withdrawal of Pump Relief Request No. 13.
No new commitments are being made to the NRC by this letter. Should you have any questions, please contact Thomas N. Weber at (623) 393-5764.
Sincerely, A member of the STARS (trategic Teaming and Resource sharing) Alliance callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- wolf Creek kDLI/1
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Withdrawal of Request for Relief (Second 10-Year Interval Inservice Testing (IST)
Program - Pump Relief Request No. 13)
Page 2 CDM/TNW/DWG/kg cc:
Regional Administrator, NRC Region IV J. N. Donohew N. L. Salgado A. V. Godwin