Resolution of Early Site Permit Topic 19 (ESP-19), Effects of Potential New Units at an Existing Site Letter from J. Lyons to R. Simard, NEI
ML031490478
Person / Time
Site: Nuclear Energy Institute
Issue date: 08/11/2003
From: Lyons J
NRC/NRR/NRLPO
To: Simard R
Nuclear Energy Institute
Jenkins R, NRR/ADIP/NRLPO, 415-2985
References
Download: ML031490478 (5)


Text

August 11, 2003 Dr. Ronald L. Simard Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

RESOLUTION OF EARLY SITE PERMIT TOPIC 19 (ESP-19), EFFECTS OF POTENTIAL NEW UNITS AT AN EXISTING SITE

Dear Dr. Simard:

This letter confirms our understandings and expectations regarding the effects of potential new units at an existing site. This topic, which is identified as ESP-19 on the list of Nuclear Energy Institutes (NEIs) generic early site permit (ESP) issues, was discussed during a public meeting on March 5, 2003 (Meeting Summary - ADAMS Accession No. ML030990608). Subsequently, NEI documented its position on this topic in a letter dated May 14, 2003.

The NRC staff offers the observations and clarifications stated below.

1. The NRC staff agrees with Item 1 of the subject NEI letter, but in the context of the exclusion area (see 10 CFR 100.3) boundary (EAB). Owner-controlled area is synonymous with controlled area, a term defined in 10 CFR Part 20 and related to personnel protection. The definition of exclusion area includes ...that area surrounding the reactor, in which the reactor licensee has the authority to determine all activities...
2. The NRC staff agrees with Item 2 of the subject letter that the ESP holder is responsible for compliance with 10 CFR 52.35.
3. The NRC staff agrees, as stated in Item 3 of the subject letter, that the ESP holder and the licensee for the nearby operating plant(s) should have appropriate managerial and administrative controls to address interface issues.
4. The NRC staff agrees that the requirements of 10 CFR 50.34(a)(11) are not applicable to an ESP application. However, operating unit(s) licensee(s) are expected to maintain awareness of activities performed under an ESP [i.e., activities authorized in accordance with 10 CFR 52.25(a)], to ensure no undue risk is posed to the operating plant from such activities. The staff is considering ESP condition(s) that would require the ESP holder to notify the operating plant licensee and the NRC prior to conducting any activity authorized under 10 CFR 52.25(a).
5. The NRC staff agrees, as stated in Item 5 of the subject letter, that the ESP applicant will identify and assess the potential impacts from nearby operating plants on the proposed site.

The NRC staff letter to NEI (J. Lyons to R. Simard,

Subject:

Use of Existing Site/Facility Information) dated December 18, 2002, provides the staffs positions on use of existing information (such as that applicable to an existing facility) in an ESP application.

R. Simard Please contact Michael Scott, ESP Project Manager, at 301-415-1421 if you have any questions on this matter.

Sincerely,

/RA/

James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

R. Simard Please contact Michael Scott, ESP Project Manager, at 301-415-1421 if you have any questions on this matter.

Sincerely,

/RA/

James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page Distribution:

Hard Copy NRLPO Rdg MScott LDudes JLyons E-mail PUBLIC NRLPO Group ACRS/ACNW RidsNrrOD (SCollins)

RidsNrrAdip (RBorchardt) RidsOgcRp RidsNrrAdpt (BSheron)

BZalcman AFernandez KCampe

  • See previous concurrence ACCESSION NO. ML031490478 OFC PM:RNRP SPA:NRLPO* DD:NRLPO* SPSB:BC*

NAME MScott JWilson MGamberoni MTschiltz DATE 8/11/03 6/2/03 6/12/03 6/16/03 OFC RLEP:SC* DD:DLPM* OGC* D:NRLPO NAME JTappert TMarsh JMoore JLyons DATE 7/1/03 7/ 9 /03 8/8 /03 8/11/03 OFFICIAL RECORD COPY

ESP-Generic cc:

Mr. David Lochbaum Mr. Eddie Grant Union of Concerned Scientists Exelon Generation 1707 H Street, NW 200 Exelon Way, KSA3-E Suite 600 Kennett Square, PA 19348 Washington, DC 20006-3919 Mr. James F. Mallay, Director Mr. Paul Gunter Regulatory Affairs Director of the Reactor Watchdog Project FRAMATOME, ANP Nuclear Information & Resource Service 3315 Old Forest Road 1424 16th Street, NW, Suite 404 Lynchburg, VA 24501 Washington, DC 20036 Mr. Ernie H. Kennedy Mr. Ron Simard Vice President New Plants Nuclear Energy Institute Nuclear Plant Projects Suite 400 Westinghouse Electric Company 1776 I Street, NW 2000 Day Hill Road Washington, DC 20006-3708 Windsor, CT 06095-0500 Mr. Russell Bell Dr. Regis A. Matzie Nuclear Energy Institute Senior Vice President and Suite 400 Chief Technology Officer 1776 I Street, NW Westinghouse Electric Company Washington, DC 20006-3708 2000 Day Hill Road Windsor, CT 06095-0500 Mr. Thomas P. Miller U.S. Department of Energy Mr. Gary Wright, Manager Headquarters - Germantown Office of Nuclear Facility Safety 19901 Germantown Road Illinois Department of Nuclear Safety Germantown, MD 20874-1290 1035 Outer Park Drive Springfield, IL 62704 Mr. James Riccio Greenpeace Mr. Vince Langman 702 H Street, NW, Suite 300 Licensing Manager Washington, DC 20001 Atomic Energy of Canada Limited 2251 Speakman Drive Rod Krich Mississauga, Ontario Vice President, Licensing Projects Canada L5K 1B2 Exelon Nuclear 4300 Winfield Road Mr. David Ritter Warrenville, IL 60555 Research Associate on Nuclear Energy Public Citizens Critical Mass Energy Patricia Campbell and Environmental Program Winston & Strawn 215 Pennsylvania Avenue, SE 1400 L Street, NW Washington, DC 20003 Washington, DC 20005

Mr. Tom Clements Mr. Ralph Beedle 6703 Guide Avenue Senior Vice President Takoma Park, MD 20912 and Chief Nuclear Officer Nuclear Energy Institute Mr. Paul Levanthal Suite 400 Nuclear Control Institute 1776 I Street, NW 1000 Connecticut Avenue, NW Washington, DC 20006-3708 Suite 410 Washington, DC 20036 Dr. Glenn R. George PA Consulting Group Mr. Jack W. Roe 130 Potter Street SCIENTECH, INC. Haddonfield, NJ 08033 910 Clopper Road Gaithersburg, MD 20878 Arthur R. Woods Enercon Services, Inc.

Dr. Gail H. Marcus 500 TownPark Lane U.S. Department of Energy Kennesaw, GA 30144 Room 5A-143 1000 Independence Ave., SW Mr. Thomas Mundy Washington, DC 20585 Director, Project Development Exelon Generation Ms. Marilyn Kray 200 Exelon Way, KSA3-E Vice President, Special Projects Kennett Square, PA 19348 Exelon Generation 200 Exelon Way, KSA3-E Kennett Square, PA 19348 Mr. Joseph D. Hegner Lead Engineer - Licensing Dominion Generation Early Site Permitting Project 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. George Alan Zinke Project Manager Nuclear Business Development Entergy Nuclear M-ECH-683 1340 Echelon Parkway Jackson, MS 39213 Mr. Charles Brinkman Westinghouse Electric Co.

Washington Operations 12300 Twinbrook Pkwy., Suite 330 Rockville, MD 20852