Category:Letter
MONTHYEARML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description ML22207B6512022-07-26026 July 2022 NEI, Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations ML22195A1662022-07-14014 July 2022 NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML22195A0202022-07-13013 July 2022 07-13-22 NRC Fee Exemption Request for NEI 21-05 Review ML22195A0672022-07-13013 July 2022 Fee Exemption Request for Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 21-05, Reporting Guidance for Licensees with Risk-Informed Licensing Bases ML22159A2772022-06-28028 June 2022 Response Letter to Richard Mogavero for Fee Exemption for the Nuclear Regulatory Commission Review Ad Endorsement of NEI 15-09, Revision 1 ML22153A2782022-06-0202 June 2022 Nie, Fee Exemption Request for Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated May 2022 ML22154A2962022-06-0202 June 2022 LTR from R. Mogavero to M. Sampson Dated Jun 2 2022 Endorsement of NEI 15-09 Cyber Security Event Notifications Rev 1 Dated May 2022 ML22152A2712022-06-0101 June 2022 Digital Instrumentation and Control Common Cause Failure Policy Considerations, Revision 1 ML22143A9362022-05-20020 May 2022 May 13, 2022, Public Meeting on Draft Regulatory Issue Summary Operational Leakage, 87 Fed. Reg. 2361 (Jan. 14, 2022) (Docket Id NRC-2021-0173) ML22110A1752022-05-0303 May 2022 NRC Response to the Nuclear Energy Institute April 1, 2022, Letter, Regarding the Nrc'S CUI Implementation Plan ML22109A2082022-04-0808 April 2022 April 8, 2022, NEI White Paper on Digital Instrumentation and Control Common Cause Policy Considerations Version 2.0 ML22110A1782022-04-0101 April 2022 April 1, 2022, Letter from NEI Regarding Nrc'S Controlled Unclassified Information Program Implementation ML22048A5812022-02-16016 February 2022 NEI 22-02: Guidelines for Weather-Related Administrative Controls for Short Duration Outdoor Dry Cask Storage Operations ML22019A2922022-01-12012 January 2022 NEI, Submittal of Proposed Revisions to Aging Management Programs XI.M33, Selective Leaching and XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements ML21343A2922021-12-0808 December 2021 NEI, Transmittal of NEI 21-07 Revision 0-B, Technology Inclusive Guidance for Non-Light Water Reactor Safety Analysis Report: for Applicants Utilizing NEI 18-04 Methodology ML21337A3802021-12-0303 December 2021 NEI Technical Report NEI 17-06 - Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications, Revision 1 ML21319A3522021-11-10010 November 2021 NRC NEI Fee Waiver Request Changes to NEI 10-04 and NEI 13-10, Dated November 10, 2021 ML21306A3652021-10-29029 October 2021 NEI Letter from D. Young to NRC S. Atack to Cease Work on Draft D of NEI 20-05, Methodological Approach and Considerations for a Technical Analysis to Demonstrate Compliance with the Eligibility Criteria of 10 CFR 73.55(a)(7) ML21342A1682021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 10-04, Identifying Systems and Assets Subject to the Cyber Security Rule, Revision 3, Dated October 29, 2021 ML21342A2032021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 13-10, Cyber Security Control Assessments, Revision 7, Dated October 29, 2021 ML22081A2002021-10-29029 October 2021 NEI Backfitting Concerns with NRCs Developing Position on Protection of Dry Storage Systems from Natural Phenomena During Short Term Operations 2024-01-22
[Table view] |
Text
August 11, 2003 Dr. Ronald L. Simard Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
RESOLUTION OF EARLY SITE PERMIT TOPIC 19 (ESP-19), EFFECTS OF POTENTIAL NEW UNITS AT AN EXISTING SITE
Dear Dr. Simard:
This letter confirms our understandings and expectations regarding the effects of potential new units at an existing site. This topic, which is identified as ESP-19 on the list of Nuclear Energy Institutes (NEIs) generic early site permit (ESP) issues, was discussed during a public meeting on March 5, 2003 (Meeting Summary - ADAMS Accession No. ML030990608). Subsequently, NEI documented its position on this topic in a letter dated May 14, 2003.
The NRC staff offers the observations and clarifications stated below.
- 1. The NRC staff agrees with Item 1 of the subject NEI letter, but in the context of the exclusion area (see 10 CFR 100.3) boundary (EAB). Owner-controlled area is synonymous with controlled area, a term defined in 10 CFR Part 20 and related to personnel protection. The definition of exclusion area includes ...that area surrounding the reactor, in which the reactor licensee has the authority to determine all activities...
- 2. The NRC staff agrees with Item 2 of the subject letter that the ESP holder is responsible for compliance with 10 CFR 52.35.
- 3. The NRC staff agrees, as stated in Item 3 of the subject letter, that the ESP holder and the licensee for the nearby operating plant(s) should have appropriate managerial and administrative controls to address interface issues.
- 4. The NRC staff agrees that the requirements of 10 CFR 50.34(a)(11) are not applicable to an ESP application. However, operating unit(s) licensee(s) are expected to maintain awareness of activities performed under an ESP [i.e., activities authorized in accordance with 10 CFR 52.25(a)], to ensure no undue risk is posed to the operating plant from such activities. The staff is considering ESP condition(s) that would require the ESP holder to notify the operating plant licensee and the NRC prior to conducting any activity authorized under 10 CFR 52.25(a).
- 5. The NRC staff agrees, as stated in Item 5 of the subject letter, that the ESP applicant will identify and assess the potential impacts from nearby operating plants on the proposed site.
The NRC staff letter to NEI (J. Lyons to R. Simard,
Subject:
Use of Existing Site/Facility Information) dated December 18, 2002, provides the staffs positions on use of existing information (such as that applicable to an existing facility) in an ESP application.
R. Simard Please contact Michael Scott, ESP Project Manager, at 301-415-1421 if you have any questions on this matter.
Sincerely,
/RA/
James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page
R. Simard Please contact Michael Scott, ESP Project Manager, at 301-415-1421 if you have any questions on this matter.
Sincerely,
/RA/
James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page Distribution:
Hard Copy NRLPO Rdg MScott LDudes JLyons E-mail PUBLIC NRLPO Group ACRS/ACNW RidsNrrOD (SCollins)
RidsNrrAdip (RBorchardt) RidsOgcRp RidsNrrAdpt (BSheron)
BZalcman AFernandez KCampe
- See previous concurrence ACCESSION NO. ML031490478 OFC PM:RNRP SPA:NRLPO* DD:NRLPO* SPSB:BC*
NAME MScott JWilson MGamberoni MTschiltz DATE 8/11/03 6/2/03 6/12/03 6/16/03 OFC RLEP:SC* DD:DLPM* OGC* D:NRLPO NAME JTappert TMarsh JMoore JLyons DATE 7/1/03 7/ 9 /03 8/8 /03 8/11/03 OFFICIAL RECORD COPY
ESP-Generic cc:
Mr. David Lochbaum Mr. Eddie Grant Union of Concerned Scientists Exelon Generation 1707 H Street, NW 200 Exelon Way, KSA3-E Suite 600 Kennett Square, PA 19348 Washington, DC 20006-3919 Mr. James F. Mallay, Director Mr. Paul Gunter Regulatory Affairs Director of the Reactor Watchdog Project FRAMATOME, ANP Nuclear Information & Resource Service 3315 Old Forest Road 1424 16th Street, NW, Suite 404 Lynchburg, VA 24501 Washington, DC 20036 Mr. Ernie H. Kennedy Mr. Ron Simard Vice President New Plants Nuclear Energy Institute Nuclear Plant Projects Suite 400 Westinghouse Electric Company 1776 I Street, NW 2000 Day Hill Road Washington, DC 20006-3708 Windsor, CT 06095-0500 Mr. Russell Bell Dr. Regis A. Matzie Nuclear Energy Institute Senior Vice President and Suite 400 Chief Technology Officer 1776 I Street, NW Westinghouse Electric Company Washington, DC 20006-3708 2000 Day Hill Road Windsor, CT 06095-0500 Mr. Thomas P. Miller U.S. Department of Energy Mr. Gary Wright, Manager Headquarters - Germantown Office of Nuclear Facility Safety 19901 Germantown Road Illinois Department of Nuclear Safety Germantown, MD 20874-1290 1035 Outer Park Drive Springfield, IL 62704 Mr. James Riccio Greenpeace Mr. Vince Langman 702 H Street, NW, Suite 300 Licensing Manager Washington, DC 20001 Atomic Energy of Canada Limited 2251 Speakman Drive Rod Krich Mississauga, Ontario Vice President, Licensing Projects Canada L5K 1B2 Exelon Nuclear 4300 Winfield Road Mr. David Ritter Warrenville, IL 60555 Research Associate on Nuclear Energy Public Citizens Critical Mass Energy Patricia Campbell and Environmental Program Winston & Strawn 215 Pennsylvania Avenue, SE 1400 L Street, NW Washington, DC 20003 Washington, DC 20005
Mr. Tom Clements Mr. Ralph Beedle 6703 Guide Avenue Senior Vice President Takoma Park, MD 20912 and Chief Nuclear Officer Nuclear Energy Institute Mr. Paul Levanthal Suite 400 Nuclear Control Institute 1776 I Street, NW 1000 Connecticut Avenue, NW Washington, DC 20006-3708 Suite 410 Washington, DC 20036 Dr. Glenn R. George PA Consulting Group Mr. Jack W. Roe 130 Potter Street SCIENTECH, INC. Haddonfield, NJ 08033 910 Clopper Road Gaithersburg, MD 20878 Arthur R. Woods Enercon Services, Inc.
Dr. Gail H. Marcus 500 TownPark Lane U.S. Department of Energy Kennesaw, GA 30144 Room 5A-143 1000 Independence Ave., SW Mr. Thomas Mundy Washington, DC 20585 Director, Project Development Exelon Generation Ms. Marilyn Kray 200 Exelon Way, KSA3-E Vice President, Special Projects Kennett Square, PA 19348 Exelon Generation 200 Exelon Way, KSA3-E Kennett Square, PA 19348 Mr. Joseph D. Hegner Lead Engineer - Licensing Dominion Generation Early Site Permitting Project 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. George Alan Zinke Project Manager Nuclear Business Development Entergy Nuclear M-ECH-683 1340 Echelon Parkway Jackson, MS 39213 Mr. Charles Brinkman Westinghouse Electric Co.
Washington Operations 12300 Twinbrook Pkwy., Suite 330 Rockville, MD 20852