Site Groundwater Data Collection for Ynps Decommissioning. Attachment 1- 5 and Verification Checklist
ML031470590
Person / Time
Site: Yankee Rowe
Issue date: 05/19/2003
From:
Framatome ANP
To:
NRC/FSME
References
-RFPFR DESD-TD-YR-02-001, Rev 1
Download: ML031470590 (103)


Text

DESD-TD-YR-02-001 Rev. 0 Attachment 1: Page I of 3 Site Ground Water Data Collection for YNPS Decommissioning Attachment 1 Radiological Profiles of Surface Soil

v r- [-- -, f, "---

- t "-,- I F-- I r - - C .... .. F---

,. I' . 1-Attachment I Distribution of Cobalt 60 with Depth, (pCi/kg wet)

Depth TS-155 TS-158 TS-171 (Beside WHT Moat) (Storage Area) (Under VC)

Asphalt --- 183 414 0-2" 18,600 9880 264 2-4" 5290 8880 < 99 4.6" 1270 866 <93 6-8" 201 17.5 137 8-10" 95 201 < 104 10-12" 215 124 <98 12-14" <96 781 14-16" <45 Distribution of Silver-108M with Depth, (pCi/kg wet)

Depth TS-155 TS-158 TS-171 (Beside WHT Moat) (Storage Area) (Under VC)

Asphalt - <56 <55 0-2" 37,400 20,600 <66 2-4" 5030 3940 <44 4-6" 1100 149 < 51 6-8" 425 <61 <52 8-10' 187 <59 <51 10-12" 157 226 < 42 12-14" <61 <53 14-16" <60 Ground Water Data for YNPS Decommissioning DESD-YR-02-001 Rev. 0 Attachment 1: Page 2 of 3


(r ------- t - At ac me - -t -- - C. -- 1 -_-. .......................

Atachment 1 Distribution of Cesium-137 with Depth, (pCi/kg wet)

Depth TS-155 TS-158 TS-171 (Beside WHT Moat) (Storage Area) (Under VC)

Asphalt -- 428 582 0-2" 18,400 7780 1490 2-4" 6070 9970 173 4-6" 1200 1660 84 6-8" 263 515 87 8-10" 115 336 < 87 10-12" < 105 167 < 81 12-14" 145 251 14-16" _ < 79 _

Ground Water Data for YNPS Decommissioning DESD-YR-02-001 Rev. 0 Attachment 1: Page 3 of 3

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page I of 34 Site Ground Water Data Collection for YNPS Decommissioning Attachment 2. H-3 Well Graphs

f - r-, r -- (-- -- ---- r- I-- .. -- r--- ---- r -,- V---- ( ( V---,

DESD-TD-YR-02-001 Rev. 0 Site Ground Water Data Collection for YNPS Decommissioning Attachment 2: Page 2 of 34 Sherman Spring REMP: 6-Month Averages 10000000 1000000 100000

-J 0.

10000 1000 100 10 in a) st 9- O0 to (0 C N LO cO co I? I1 I I~  ? I? I? CI 9 9 9 (D,- - C-- - C 00 C a a o ILI n n X X a ) X _) X X X X Date

I ------- V 7I( (- , r, t t (-- r- r - - ( --- 1. . (

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 3 of 34 Site Ground Water Data Collection for YNPS Decommissioning Sherman Spring REMP Data: H-3 1200 0

-j a-800 400 TEti~~~~~~~~~~~~-

i1r11

-1i -

li t

I1IPF

  • Lr

-e eW+rffl l j

, ,.. I TTIW I.

.iT, T I4ITJ

-IWTT cv 0 1_ ,-

J. I 11X i L- ii9

-400

.J.

-800 co LCq U) CD I co 0) 0 I

CMi CO

0) 0) 0') 0') 0') 0) 0') 0 0 o 0 IU C CU CU CU '13-,- c CU- CU CU CU o Date Legend Filled Symbols MDC Open Symbols <MDC Error Bars 2 siama

1- (-- r-- r- V-"

- ( 7~' F f c7 --: r - - F~- r( r-, V ( ---

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 4 of 34 Site Ground Water Data Collection for YNPS Decommissioning B-I: H-3 8000 Legend Filled Symbols <MDC 7000 Open Symbols MDC Error Bars 2 sigma 6000 5000 -I 4000 I 3000 2000 1000 0

-1000 ~I I I I I I I I LO) CO 0)-- 0) 0- C'I) 0Y) 0')

0) o CU) (' (Y) (C3 ('3 (I ('3 ('3 (3 (3 ('3 Date

[-i- r . .... r'--- -- . t.. - . C--- - (7---. c-- - ~.- - --- - - r -- ( ( .

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 5 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-1: H-3 9000 Legend

<MDC 8000 Ai T Filled Symbols Open Symbols <MDC I_" T t Errr Bars 2 sigma 7000 6000 C) 5000 0.

4000 I

3000 2000 1000 0 _ , & & , r- i T I

T r~~~~I co 0)

L() CO 0) 0)

0) 0 0 CJ I

co 0

0L C- C C CU C o,- C (U (u CU (U (U Date

- .. X r.. - r-- r (I-..-, s--. t-- r---- -- i(-"' r-* , ,- r:- I7 C-!-

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 6 of 34 Site Ground Water Data Collection for YNPS Decommissioning CBw2: H-3 4000 3000

-J 2000 0

0.

cv-i 1000 0

-1000 Co 0

0)

LO C)

(0 0

N-CD CD 0

0 0

0 0

C 0

O N 0

co 0

I COI CU (U CU II C: CC II C CU CD (u Date

r~~-

[---r---t r--- r---- t - r--.- - r---- r- ---- r--- f--- t r-- ----(--

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 7 of 34 Site Ground Water Data Collection for YNPS Decommissioning CBm3: H-3 2000 1000 0

-1000

-2000 co Iq LO CD - 00 0) 0 N C<)

co O 0) O 0) 0) 0) C0 0 0 0 a1) C-CU C-cu C~

cu C

cu cu C

cu cu cu C

cu c-m nate Date

r-- r --- I r-- --- r - (---- r---- r--. -. - ( - I r ¶7~ - r r---- r----

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 8 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-4: H-3 900 1-J 600 0 300 0.

=v 0

-300

-600 CD co O 0) o o N C<) 0 0 I I I I C C C C I I C- r- r- C C ~ c-I C (U Ch c- c- CU CU (u U (U (U (u CU Date

r-- r - r - 1--t--

I-- -- ( -- r- I r--

........ 1-- t- F---,

r- r,--- 1-- - --- - ---

DESD-TD-YR02-001 Rev. 0 Attachment 2: Page 9 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-5: H-3 2000 Legend Filled Symbols <MDC Open Symbols <MDC Error Bars 2 sigma _

a- 1000 0

0.

I 0 t i1Ii i i i I!iIp

-1000 co ') LO) CD co a) 0 C\'j co C0 0') I I C C C C C CU C C Cu (UI (U (UI C-(u 1U Cu (u CU (U (U (U (U~11 Date

-- rr r- F.- (---. f -- -- r--.. ( ---- - k-- ("", - - 1--- ,

F Fr--- --. v- r-- r*---

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 10 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-6: H-3 Legend I 2500 Filled Symbols <MDC Open Symbols <MDC Error Bars 2 sT.qma 1500

-I4F+/-444 I

500 T I; T

-500 co) LO) CD co 0 0- 0 co a) 0) 0') 0D C 0 C C 0

C C l c C C C (l (U ,- c-CZ CU CU CU (u CU CU Date

I r-- r-- - r- r- C.- ("- (-- r- -- 1--- f- ..-. t-1. ---- I - -- r-+--- r- r- ---

DESD-TD-YR02-001 Rev. 0 Attachment 2: Page I I of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-7: H-3 2000 Legend Filled Symbols <MDC

- 1000 Open Symbols <MDC Error Bars 2 sigma i 0 _ l l IT l l ~ IlI I -1000

-2000 0)1~ LO) (0 0)- 0) 0) C 0 CD Co C~) 0) 0) C0 o (U I II C)

01) (U C- C C- CD (U (U (U CU (U (U CU Date

r F- r --- r - r - r---- r .- F . v.---.

t - vr r--,r- F, f DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 12 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-8: H-3 2000 1-Jf 1000 C) nI I T W I I ~ T 0 I coi ~ ~ IiIII-IiU IILI - IE

_~

3I

-1000 I

-2000 I I

0) l C?) I I (C (U 00 0') C) a) 0) 0) 0) o1 0 C (UI (UI 0!

(U (U C (UI (U CU (u Date Legend Filled Symbols <MDC Open Symbols <MDC Error Bars 2 sigma

F-- r--- r - r ---I' - r- 1 I r cr r--- r r--- r---- F- r-- r--

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 13 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-9: H-3 9000 7000 m-j 5000 C,

3000 1000

-1000

't ()

LO U CD 0 CT-Cj co CD M0) 0 0) 0 0) 0) 0 0 0 0

0) CL co cn cu cu m cu o ou oD cu Date

r--- r - - ----

~-- - r-- v-- F---- -" V--

tU, Uc V-"- r F -

. DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 14 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-10: H-3 5000 4000

-J Q

3000 CO V% 2000 I

1000 0

co) 't m (O t)- CX 0 0 \ Ce)

0) 0) 0) 0 O 0) 0 0 0 0 0 0 CU C C- I C- C- ~ C C LC LC CU CU CU CU CU CU cu C C Cu Date

r--- r--- I~~~- r- - r--- r-- r--- r-- [-- F-v r-- -

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 15 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-11A: H-3 80000 Legend Filled Symbols <MDC 70000 Open Symbols <MDC Error Bars 2 sigma 60000

  • 50000 0

QL 40000 I 30000 20000 10000

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- I 0

CY) 'tj LO) CD 0) 0 ,C c.N C

0) 0) C) 0) 0) 0) 0') 0 C o

C c-I C- c- C- c- C~ C~ c-U C~

CU mU (U mU (U (U (U (U-(U Date


Average MDC

i- i7 r -r- U (-- --- -r r- - r---- r ----r-- - ,- --- - - -- F-- F--.- (---,

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 16 of 34 Site Ground Water Data Collection for YNPS Decommissioning CB-12: H-3 1000 Legend Filled Symbols MDC T -__

Open Symbols MDC ' TT

- 0 Error Bars 2 sigma o

I.

-1000

-2000 _ I I i I i I CY) I'l- LO (0 0)- co 0 0 N\ co l 0 0) 0 0 0 0 o 0 0 a) (U1 I I (U (U (U (U (U1 (u (u CU Date

- i----r--- r f- 1 1 .. C7

. -. - F-I r r---

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 17 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-1: H-3 2000 Legend Filled Symbols <MDC

.Open Symbols <MDC

. 1000 Error Bars 2 sigma NI 0 i L YT i - {i-t i

-1000 iI I I I I I I I CY) "I.I LO cc0 0) 00 0) Q C CY)

C') CY)I 0') CY) CD 0') 0 0 Io c- Co Co Co Co Co Co m co Date

(-,' ,- 1----- F ",-- 1- ( 1--- r-- r 1-- r--- r t - f-- -1 f-----

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 18 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-2: H-3 2000 Legend Filled Symbols <MDC Open Symbols <MDC 1000 __________________________ -Error Bars 2 sigma (u

0L 0 T 4eT 'I T4 l I I T t~~~i Ie I xiIii I i i I

-1000 CO LO) (Co C 0) C N

0) 0) 03) 0Y) 0) C C Co I I c-t I m ( (U (U c-I (U mU Date

r-- ( --- - [--r r---- r---- I--- 1'-- ' f I - - I---- F - - F1 r U-DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 19 of 32 Site Ground Water Data Collection for YNPS Decommissioning CW-3: H-3 2000 Legend Filled Symbols <MDC..

Open Symbols <MDC Error Bars 2 siama

-J 1000 cm) 0.

Q I 0 t ~~ I I I i i i I i I

-1000 co 00 a) C CDJ co) a) a) a) a) C) CD a) C) cI CI I CU CL C CU CU C CO CU CU mU C CZ CU CU Date

( I I I [ f I C I 1'-I - [ I I ( - [ .

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 20 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-4: H-3 1000

.J 0

0 It t I J.I1 --- I 0L cei I -1000

-2000 _ I I I I I I I i U) CD N-- cx0 0) C ~~~C\J co)

C I I 0) C o o C)

I I C~ C C~ C- C C- C-l Cu m cu cu ~cu Cu Legend Date Filled Symbols <MDC Open Symbols <MDC Error Bars 2 sigma

I' - 1 -' I - ' - - U I I I I FI I - I - I I r- LW~

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 21 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-5: H-3 3000

_, 2000 00- 1000 I i, ;I , -., 0I0 0

-1000 Co It UL) C0 cO O C 0 0 ) ', 0 0) C) C) C) .C) o C IC- C (-I l--C C C, C C C C:

--coi ( CU (U (U (u (U (U (U (U (U Date

1 - ( , 1., II ~I.- [ r - .- r--- I f- ( ( r- I . - I ...:.:I: I F---.-.. (:--- -

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 22 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-6: H-3 4000 3000

-) 2000 0L 1000 Ie 0

-1000

-2000

0) llq LO CO oo m C0 N co
0) 0) 0) 0) 0) 0') 0 C0 o 0 C I I I I I I I I (UI C C: C C C C C C Iu I CU ( . (U ( ( cc (

Date

[--~ - ~ - --- r . 1- - I .---. t., I . I , . ( . II->

. , . T-DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 23 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-7: H-3 3000 Legend Filled Symbols <MDC

___________________________________________________________ Open Symbols <MDC 2000 Error Bars 2 sigma

.J M-1000 T I~~~~~ l CI Iv 0 i ~ ~~~~~~1It I i+

I If + Ii 1 i I I l I I . I I

-1000 i I I I I I i LO) (0 t-- 00 C) 0 C)

I C)

I a)

CI 0')

CC C)I C

0) oo C

C) 0 o 0 co C C C C C C Co Co Co Co Co C Date

I'. -. f I - , -- (-- X~I r t----- r~' , 1 f( t I ~ ~ ~, ~ ~~I- , .

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 24 of 34 Site Ground Water Data Collection for YNPS Decommissioning CWw8: H-3 3000 0

2000 CI 1000 I

0

-1000 co t C O (0 0 0 0C co 0 a) 0a) ) 0 0 0 0 0 0 0 cu (0

-II I I aI I I I Date

t.... . t(- -. t, -- V7-I (r-. f .7" (. (f v- V. f - [-.. -- - -

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 25 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-9: H-3 Legend 400 Filled Symbols <MDC Open Symbols MDCl Error Bars 2 sigma 6-0 200 IL 0

-200 I I , I I ., I ,'Ia

0) LO) CD 0) 0) 0 0 CN co)
0) 0) 0) 0) 0 0) 0 0 IL CL (UI C IU (U CU (U CU CU (u CU (U)

Date

I I1 l - l-- ('-

t ( I ( f (- - 1 .- IF, (-- U - -...

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 26 of 34 Site Ground Water Data Collection for YNPS Decommissioning CW-10: H-3 400 Legend 1 300 Filled Symbols <MDC T Open Symbols <MDC .

- Error Bars 2sigma 0 200 100 I

0

-100 _~~ I ~ Il I I lII co 't Lb) CD 00 0) 0 0rl C\ CO CD C) OD C- C) 0) C 0 C)

EL C C- C C c- C C:

(u (U (U (u mU CU CU (U- cu Date

I ... .. . 1-...-

(-- I (I* ( IF* U-- (- -, r - { -

1- r- r-1 -- V-. --- - F,-

DESD-TD-YR-02-001 Rev. 0 Atachment 2: Page 27 of 32 Site Ground Water Data Collection for YNPS Decommissioning CW-1 1: H-3 13000 11000

-J 9000 0 7000 coD

3. 5000 I

3000 1000

-1000 _ Il I I I I i I CY) LC) co co 0) 0 C\J CY) 0F) 0') 0) a) 0') CD OD C 0 0 CI I, C- C C- C- IL c c C- C C- C~

(U Ca (u co (u CU CU (U Date


Average MDC

1- - (.-' 1- ( ' I ---' I ,.1 ( - I U1. - ( ;--- f - ( ,_.

- C- - F -*. ( F-- ( -- I - 4 DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 28 of 34 Site Ground Water Data Collection for YNPS Decommissioning MW-I: H-3 4000 -~~~~~

Legend..

3000 __ Filled Symbols MDC

-J Open Symbols MDC 2000 __ Error Bars 2 siama .,

a 1000 i y 1 0

I

-1000 _ l l l l l l l I~~~~~~~~~~

-2000 0):1 0-) (0 PN- co a, N CY) a, a, C C 0 IU C C C C CU C C~ C CU CU CU CU CU CU CU CU Date

177 ( -' (*-*F ( -. f . .. . ( - - - .;r (( (-7-- r----- t- ' -- (-- ( 1-X--

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 29 of 34 Site Ground Water Data Collection for YNPS Decommissioning MW-2: H-3 14000 Legend Filled Symbols <MDC i

-j Open Symbols <MDC 0 a.~10000 Error Bars 2 sigma i 6000 I _~~ i ~ ~~~~~~~~~~~~~~~

2000

-2000 C) ,It C0 0F) 0 C)l Co Ca) CY)

I

. 0) a)

0Y) 0) a) 0C 0 C C C: C C C C m

3 Date

1 -- r-- V--- -- r-I 1---- (-- tj---- 1' U 17- , .

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 30 of 34 Site Ground Water Data Collection for YNPS Decommissioning MW-3: H-3 3000 Legend

_ Filled Symbols <MDC 2000 Open Symbols <MDC

_ Error Bars 2 sigma . i 1000 C.

0 ,+ I I

-1000

-2000 I,I I I I i i i I

LO) (0 t_- 00 0) 0 N Co

0) 0) 0) 0) 0) 0) 03) 0 0 0 I I I I I I T-I~ Il CU CO CU1 C-cu ~co mU (U CU Date

--- r-

~~~~~~ ( ~~~~~~

r - --- t------ f'I- --- -- "- (--- r-- -[ t f C.- -

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 31 of 34 Site Ground Water Data Collection for YNPS Decommissioning MW-5: H-3 7500 I Legend Filled Symbols <MDC .

Open Symbols <MDC Error Bars 2 sigma 5500 ,,

0 0.

3500 ci I

1500 --I-

-500 -I.

co I'll,~J LC) CO 0) o co) m 0') 0') 0') I I o o C) 0)

I C- C-I CD a C I C- C-I C-CU (U7 CU (u (u CU (u (UI CU Date

t --- ( - 1--~~~~~ 1.

I 1- (---( (- 1-- r* -- -- -- r. .. - I -.

DESD-TD-YR-02-001 Rev. 0 Attachment 2: Page 32 of 34 Site Ground Water Data Collection for YNPS Decommissioning MW-6: H-3 1000 .

Legend Filled Symbols <MDC Open Symbols <MDC

-j Error Bars 2 sigma 0

0. >

0 s2 I

-1000 --4.

I C) 0) L() CC) t- 00 0) C C- CN C 0C) l) a) C) QCl C)

C) C) C C C- c lU rU CU c-m (U co ( CU mU Date

i--- r --- v - t--- ( ----- l-- t-- - - (--- r------ - ~ ~r.~ ~ ~r

(~~~~~~ F-. U' V "- r---

(7* ----

-,* I--

DESD-TD-YR-02-OO1 Rev. 0 Attachment 4: Page 33 of 34 Site Ground Water Data Collection for YNPS Decommissioning NSR-1: H-3 500 Legend

-j 300 Filled Symbols <MDC Open Symbols <MDC Error Bars 2 sigma

. 100

-100 T I -300

-500 I I .i I II CY) 0) LO) co a) co a) Q 0 C\ Co) aI) 03) a) a) 0 0 0 c- IU CU IU CU CU IU CU CU CU CU Date

-- r------ - t -- r-- - t- - F - r(- . ' r- f(-,-.-. t- -I-- i F -,-

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 34 of 34 Site Ground Water Data Collection for YNPS Decommissioning OSR-1: H-3 1000 Legend Filled Symbols <MDC Open Symbols <MDC .

500 Error Bars 2 sigma

-j C.

0.

CD 0

_~~~~~~~~~~~~ I.

I

-500

-1000 _

I I

0) I I

LO) CD -- 00 0') 0 0 co) 0 0 0 I I C C C C 0Cu CL co Cu C Cu CU Cu CD C-u Cu cu CU Date

DESD-TD-YR-02-001 Rev. 0 Attachment 3: Page 1 of 30 Site Ground Water Data Collection for YNPS Decommissioning Attachment 3 Monitoring Well Configuration Sketches

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 2 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION B-I New Fuel Vault DEPTH (ft)

L ground surface elevation: +1128.34 (1022.68) 0-18" deep covered metal riser pipe

-SK 4 in. dia schedule 40 PVC 10- riser pipe grout ground water 5' bentonite seal depth 18.1' _

20-filter pack sand 30 -

40 - 6" dia borehole Top of Bedrock 44 - \ 4 in. dia schedule 40 PVC slotted well screen 49.0' -

Borehole depth: 78.5' Sampled Subsurface Materials:

Bottom of well screen: 49.0' 0-8' Fill Top of well screen: 39.0' 8-44' Till 44'-78.5' Bedrock Top of filter sand: 23' Top of bentonite seal: 18' Contractor Guild Drilling Installation date: 12/30/77 Engineer: Dames & Moore

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 3 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-I N. of Fuel Building DEPTH (ft)

[ ground surface elevation: +1126.80 (1021.15) 0-16" deep road box metal cover 5-2.5 in. dia schedule 40 PVC riser pipe grout 10-ground water depth 11.7' 2' bentonite seal 15-

  • filter pack sand K

20- 2.5 in. dia schedule 40 PVC

. slotted well screen 5" dia borehole 25-Sampled Subsurface Materials:

0-0.5' Asphalt Borehole depth: 25.5' 0.5-3.5' Fill Bottom of well screen: 25' 3.5'-1 3.5' Bouldery Till -

Top of well screen: 15' 13.5'-25.5' Till Top of filter sand: 14' Contractor: Guild Drilling Top of bentonite seal: 12' Engineer Yankee Atomic Installation date: 4126-27/93

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 4 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-2 N. of Office Building DEPTH (ft)

I T ground surface elevation: +1119.87 (1014.21) 0- -

16" deep road box metal cover 5-2.5 in. dia schedule 40 PVC riser pipe rl-,

grout 10-ground water depth 13.7' 2 1.5' bentonite seal 15-filter pack sand 20- 2.5 in. dia schedule 40 PVC slotted well screen 5" dia borehole Sampled Subsurface Materials:

0-0.5' Asphalt Borehole depth: 25' 0.5-15.5' Fill/Outwash Bottom of well screen: 24.5' 15.5'-25' Bouldery Till Top of well screen: 14.5' Top of filter sand: 13.5' Contractor: Guild Drilling Top of bentonite seal: 12' Engineer: Yankee Atomic Installation date: 4/20-21/93

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 5 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-3 E. of Fire Water Tank

- ground surface DEPTH (ft) elevation: +1139.97 (1034.31) 0-16" deep road box metal cover *grout 1' bentonite seal ground water 7

depth 4.2' 2.5 in. dia schedule 40 PVC 5 - riser pipe 10-slotted well screen 15-5" dia borehole Borehole depth: 15.0' Sampled Subsurface Materials:

Bottom of well screen: 13.0' 0-0.5' Asphalt Top of well screen: 3.0' 0.5-10' Silty Outwash Top of filter sand: 5.0' 10-15' Till Top of bentonite seal: 2' Contractor: Guild Drilling Installation date: 4/29/93 Engineer. Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 6 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-4 Old Septic Leaching Field

- Top of casing elevation: 1087.21 (981.55) ground surface DEPTH (ft) elevation: 1084.5 (978.8) 0-16" deep covered metal riser pipe 2.5 in. dia schedule 40 PVC 5- K riser pipe grout 1' bentonite seal 10 -

ground water V depth 11.3' filter pack sand 15-2.5 in. dia schedule 40 PVC slotted well screen 20- 5" dia borehole Borehole depth: 20.0' Sampled Subsurface Materials:

Bottom of well screen: 19.0' 0-0.5' Asphalt 0-2' Fill Top of well screen: 9.0' 2'-7'Sand Top of filter sand: 8.0' 7'-9' Gravel Top of bentonite seal: 7.0' 9-13' Sand 13-15' Gravel Installation date: 5/4-5/93 15-20' Alluvium Contractor: Guild Drilling Engineer: Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 7 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-5 Southeast Construction Fill Area DEPTH (ft) ground surface elevation: 1070+-

0-24" deep metal riser box 10 - grout 2' bentonite seal 20-ground water V depth: 26' filter pack sand 30-40-2.5 'dia. schedule 40 PVC slotted well screen 50- 5" dia. borehole Sampled subsurface materials:

60- 0-0.2' Topsoil 0.2'-25' Fill Borehole depth: 60'6" 25'-60'6" Till Bottoms of well screen: 59' Top of well screens: 29' Contractor Guild Drilling Top of filter sand: 18' Engineer Yankee Atomic Top of bentonite seal: 16' Installation date: 9/9/94

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 8 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-6 Southeast of Sherman Dam Top of casing elevation: +1113.79 (1008.13)

DEPTH (ft) ## ground surface elevation: +1110.6 (1004.9)

K 0 -- -- -

i 24" deep metal riser box

\-~ grout 10 -

ll ground water 2' bentonite seal depth: 15' V B2 K filter pack sand 2.5 'dia. schedule 40 PVC slotted well screen 20 -

3/4 5" dia. borehole Sampled subsurface materials:

Borehole depth: 26' 0-0.2' Topsoil Bottom of well screen: 25'  :@::: :*:::: 0.2'-20' Sand and gravel Top of well screen: 15'

-o :..:.-:e:- 20'-26' Till Top of filter sand: 14' Contractor: Guild Drilling Top of bentonite seal: 12' Engineer Yankee Atomic Installation date: 9/13/94

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 9 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-7 PCA Warehouse near Waste Building floor surface DEPTH (ft) elevation: +1141.34 (1035.67) 0-Flush metal road box grout 1 bentonite seal 1' fine sand seal ground water depth: 10' 10 - V .ffilter pack sand 2.5 'dia. schedule 40 PVC slotted well screen 17 - 5" dia. borehole Well depth: 17' Sampled subsurface materials:

Bottom of well screen: 17' 0-1' Concrete Top of well screen: 7' V-6' Sand and Gravel Fill Top of filter sand: 5.5' 6-1 l'Boulder, Cobbles Top of fine sand seal: 4.5' Ill-1 TBoulders (Till?)

Top of bentonite seal: 3.5' Contractor Guild Drilling Engineer: Yankee Atomic Installation date: 1/7/97

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 10 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-8 Rad Storage Area East of Old PCA ground surface DEPTH (ft) elevation: +1140.83 (1035.17) 0-flush metal road box ground water depth: 5' V grout 1.5' bentonite seal 10 -

filter pack sand 5" dia. borehole 2.5 ' dia. schedule 40 PVC 20- slotted well screen Well depth: 19' Sampled subsurface materials:

Bottom of well screen: 19' 0-.5' Asphalt Top of well screen: 14' 0.5'-3' Sand fill (till?)

Top of filter sand: 13' 3'-1 9' Till Top of bentonite seal: 11.5' Contractor: Guild Drilling Engineer: Yankee Atomic Installation date: 9/20/94

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 11 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-9 Beneath VC Equipment Hatch

- ground surface DEPTH (ft) elevation: +1126.84 (1021.18) 0 -

Flush metal road box ground water

10 - 1.5' bentonite seal

, filter pack sand 2.5 'dia. schedule 40 PVC 20 - slotted well screen 24 - s- 5" dia. borehole Well depth: 24' Sampled subsurface materials:

Bottom of well screen: 24' 0-2" Asphalt Top of well screen: 14' 2"-9.5' Sand fill Top of filter sand: 13' 9.5'-24' Till Top of bentonite seal: 11.5' Contractor Guild Drilling Engineer: Yankee Atomic Installation date: 9/19/94

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 12 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-10 NW. Comer of Ion Exchange Pit slab surface DEPTH (ft) elevation: +1127 (1021) 0_ -

grout ground water __

l bentonite seal depth 2.5' .

2.0 in. dia schedule 40 PVC 5 - riser pipe 5" dia borehole 10-2.0 in. dia schedule 40 PVC slotted well screen Borehole depth: 11.5' Sampled Subsurface Materials:

Bottom of well screen: 11.5' 0-1.5' Concrete 1.5-10' Brown silty gravelly Top of well screen: 6.5' widely-graded sand Top of filter sand: 5.5' Top of bentonite seal: 4.5' Installation date: 12/19/97 Contractor: Geosearch Engineer: Duke Engineering & Services

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 13 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB- IA PAB Pipe Trench

- Top of casing elevation: 1023.5 (1129)

DEPTH (ft)

L ground surface vation: 1020.5(1126) 0 16" deep covered metal riser pipe ground water Q depth 3'* -=

2.0 in. dia schedule 40 PVC 5 - KX riser pipe grout I' bentonite seal 10 -

filter pack sand 15 -

2.0 in. dia schedule 40 PVC slotted well screen 20 - 5" dia borehole

  • Initial ground water depth +0.2 ft above floor Borehole depth: 20' Sampled Subsurface Materials:

0-1.5' Concrete Bottom of well screen: 19' 1.5-19.5' Brown silty gravelly Top of well screen: 9' widely-graded sand: loose Top of filter sand: 8' 19.5-20.0' Clayey silt Top of bentonite seal: 7' Installation date: 12/18/97 Contractor Geosearch Engineer: Duke Engineering & Services

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 14 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CB-12 NW Comer of Waste Disposal Building Ash Dewatering Pit floor slab surface DEPTH (ft) elevation: +1134.3 (1028.6) 0-I' bentonite seal depth 3.5' 5- 2.0 in. dia schedule 40 PVC slotted well screen 6-filter pack sand 5" dia borehole Borehole depth: 7' Sampled Subsurface Materials:

Bottom of well screen: 6.6' 0-0.5' Asphalt 0.5-10' Silty Outwash Top of well screen: 1.6' 10-15' Till Top of filter sand: 1.6' Top of bentonite seal: 0.6' Contractor: Geosearch Installation date: 12/10/97 Engineer: Duke Engineering & Services Installation date: 12/10/97

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 15 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-I N. of Diesel Generator Building DEPTH (ft)

I T ground surface elevation: +1126.49 (1020.83) 0- - -

16" deep road box metal cover 2.5 in. dia schedule 40 PVC 5- riser pipe ground water _

grout depth 7.2' 1' bentonite seal 10-filter pack sand 15 -

\

2.5 in. dia schedule 40 PVC slotted well screen 20- 4" dia borehole Borehole depth: 21.0' Inferred Subsurface Materials:

Bottom of well screen: 21.0' 0-0.5' Asphalt 0.5-12' Bouldery Till Top of well screen: 11.0' 12-21' Till Top of filter sand: 9.0' Top of bentonite seal: 8' Contractor Guild Drilling Installation date: 4/28/93 Engineer: Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 16 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-2 N. of old SI Tank DEPTH (ft)

L ground surface evation: +1138.57 (1032.9) 0 -

16" deep road box metal cover I

2.5 in. dia schedule 40 PVC 5 - riser pipe grout 1' bentonite seal 10-ground water 2 depth 12.4' filter pack sand 15-2.5 in. dia schedule 40 PVC slotted well screen K5 e 20- 5" dia borehole Borehole depth: 21.0' Inferred Subsurface Materials:

Bottom of well screen: 20.0' 0-0.5' Asphalt 0.5-15' Fill/Outwash Top of well screen: 9.0' 15'-21Till Top of filter sand: 9.0' Top of bentonite seal: 8.0' Contractor: Guild Drilling -

Installation date: 4/29/93 Engineer: Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 17 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-3 SE of Ion Exchange Pit DEPTH (ft)

L ground surface evation: 1140.20(1034.54) 0-16" deep road box metal cover 2.5 in. dia schedule 40 PVC 5- \ riser pipe

\ grout 1.5' bentonite seal ground water -

depth 8.3' 10-K filter pack sand 15-2.5 in. dia schedule 40 PVC slotted well screen 20- 5" dia borehole Borehole depth: 23.0' Inferred Subsurface Materials:

Bottom of well screen: 23.0' 0-0.5' Asphalt Top of well screen: 8.0' 0.5-7.5' Fill/Outwash 7.5-19' Till Top of filter sand: 7.0' 19-23' Bedrock Top of bentonite seal: 5.5' Installation date: 5/3/93 Contractor: Guild Drilling Engineer: Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 18 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-4 Between PCA Storage Buildings ground surface DEPTH (ft) elevation: +1141.17 (1035.5) 0-grout 2.5 in. dia schedule 40 PVC 5 - riser pipe l bentonite seal ground waterV filter pack sand depth 7.7' 10-2.5 in. dia schedule 40 PVC slotted well screen 15-5" dia borehole Borehole depth: 17.0' Inferred Subsurface Materials:

Bottom of well screen: 17.0' 0-0.5' Asphalt Top of well screen: 7.0' 0.5-17' Till Top of filter sand: 5.0' Top of bentonite seal: 5' Contractor: Guild Drilling Installation date: 5/34/93 Engineer: Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 19 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-5 S. of Service Building DEPTH (ft)

I T ground surface elevation: +1126.70 (1021.04) 0 -

'- 16" deep road box metal cover

\ 2.5 in. dia schedule 40 PVC nser pipe grout 5 -

I' bentonite seal ground water depth 8.1t Q2 10 -

K filter pack sand 15 -

2.5 in. dia schedule 40 PVC slotted well screen K5 e 20 - 5" dia borehole Borehole depth: 21.5' Inferred Subsurface Materials:

Bottom of well screen: 16.5' 0-0.5' Asphalt Top of well screen: 6.5' 0.5-12' Fil/Outwash 13'-21.5' Bedrock Top of filter sand: 5.5' Top of bentonite seal: 4.5' Contractor: Guild Drilling Installation date: 4/27/93 Engineer: Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 20 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-6 W. of Turbine Building DEPTH (ft)

L ground surface elevation: +1124.44 (1018.78) 0 -

16" deep road box metal cover 5 -

K 2.5 in. dia schedule 40 PVC riser pipe

'K grout 10 -

2' bentonite seal ground water a depth 11.4'

\

filter pack sand 15 -

K 2.5 in. dia schedule 40 PVC slotted well screen 20-K 5" dia borehole Borehole depth: 24' Inferred Subsurface Materials:

Bottom of well screen: 22' 0-0.5' Asphalt Top of well screen: 12' 0.5-14' Fill/Outwash 12'-24'Till Top of filter sand: 11' Top of bentonite seal: 10' Contractor: Guild Drilling Installation date: 4/22-23/93 Engineer: Yankee Atomic

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 21 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-7 West of Service Building near former Used Oil UST ground surface DEPTH (ft) e vation: +1127.89 (1022.23) 0

\ - 16' metal road box grout 10 -

ground water 1'bentonite seal depth: 19' V k W Y1 filter pack sand 20 - I 2.5 'dia. schedule 40 PVC slotted well screen 5" dia. borehole Sampled subsurface materials:

30 - 0-5' Silt with sand 5'-6' Fine-grained sand Borehole depth: 31' 6'-8' Cobbles Bottom of well screen: 31' 8'-31' Till (top depth uncertain)

Top of well screen: 21' Top of filter sand: 20' Contractor Guild Drilling Top of bentonite seal: 19' Engineer Yankee Atomic Installation date: 9/13/94

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 22 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-8 Southwest Bay of Turbine Building r ground surface DEPTH (ft) / elevation: +1128.25 (1022.59) 0 Flush metal road box grout 10 1.5' bentonite seal filter pack sand ground water V depth: 18' - 2.5 'dia. schedule 40 PVC 20 slotted well screen 5" dia. borehole Well depth: 26' Sampled subsurface materials:

Bottom of well screen: 26' 0-1.4' Concrete Top of well screen: 16' 1.4'-5' Sand Top of filter sand: 14.5' 5'-10' Cobbles Top of bentonite seal: 13' 10'-26' Till (top depth uncertain)

Contractor Guild Drilling Engineer Yankee Atomic Installation date: 9/14/94

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 23 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-9 N. of Diesel Generator Building DEPTH (ft) ground surface

/ elevation: +1126 (1020) 0-16" deep road box metal cover grout 1l'bentonite seal 5 - 2.0 in. dia schedule 40 PVC riser pipe ground water depth 7' 10-filter pack sand (#2) 15-2.0 in. dia schedule 40 PVC slotted well screen (0.010")

6" dia borehole 20-Borehole depth: 17.0' Observed Subsurface Materials:

Bottom of well screen: 17.0' 0-0.5' Asphalt Top of well screen: 4.0' 0.5-17' Brown dense c.sandy

f. gravelly, cobbley silt: Till Top of filter sand: 3.0' Top of bentonite seal: 2' Contractor: Geosearch Installation date: 618/98 Engineer: Duke Engineering & Services Method: Hollow Stem Auger

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 24 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-10 N. of Former Gasoline UST Location DEPTH Jlrtground

)

surface elevation: +1120 (1014) 0-16" deep road box metal cover grout

'- ' bentonite seal

\N. 2.0 in. dia schedule 40 PVC riser pipe 6" dia borehole in soil Top of Bedrock 10.2 10 I filter pack sand (#2) 4" dia borehole 15 - in bedrock 2.0 in. dia schedule 40 PVC slotted well screen (0.010")

20 -

ground watcV depth 21' -

Borehole depth: 30.5' Bottom of well screen: 30.0' Top of well screen: 15.0' Top of filter sand: 14.0' 25 -

Top of bentonite seal: 13' Installation date: 6/8/98 Method: Hollow Stem Auger Observed Subsurface Materials:

0-0.5' Asphalt -

30 - 0.5-10.2' Brown silty gravelly f. sand Contractor Geosearch 10.2-30.5' Bedrock: dry to 23,'

Engineer: Duke Engineering &' L ,;,^>< where fractures occur

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 25 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION CW-I 1 PAB at LP Cooling Pump Area 16" deep road box, metal cover DEPTH (ft) \ floor slab surface grout \ / elevation: +1128.5 (1022.5) 0-ground water depth 3' 5- 2.0 in. dia schedule 40 PVC slotted well screen (0.101")

5" filter pack sand (#2) 10 -

Borehole depth: 9.5' Sampled Subsurface Materials:

Bottom of well screen: 9' 0-1.5' Concrete Slab Top of well screen: 2' 1.5-9.5' Sand & gravel fill Top of filter sand: 1.6' Contractor Geosearch Top of bentonite seal: 0.6' Engineer Duke Engineering & Services Installation date: 6/11/98

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 26 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION MW-I S. of PAB DEPTH (ft)

I T ground surface elevation: 1140 (1034) 16" deep road box metal cover 5-2.0 in. dia carbon steel pipe riser pipe 10-ground water depth 13.5' V 2.0 in. dia carbon steel 15-slotted well screen (0.015")

20-I'sediment sump Inferred Subsurface Materials:

Borehole depth: 21' 0-0.5' Asphalt Bottom of well screen: 20' 0.5-21' Clay/silt?

Top of well screen: 10' Installation date: 4/24/98 Contractor: Geosearch Engineer: Duke Engineering & Services

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 27 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION MW-2 N. of PAB DEPTH (ft)

[ ground surface elevation: +1126' (1021')

0 -

l II 16"deep road box metal cover ground water depth 4' 2 5 -

2.0 in. dia carbon steel pipe riser pipe 10-2.0 in. dia carbon steel 15-slotted well screen (0.015")

7 I

I'sediment sump 20-Inferred Subsurface Materials:

Borehole depth: 18' 0-0.5' Asphalt Bottom of well screen: 17' 0.5-1 ' Fill 10'-18.5' Till Top of well screen: 7' 18.5' Refusal Installation date: 4/24198 Contractor: Geosearch Engineer Duke Engineering & Services

Attachment 3:

DESD-TD-YR-02-001 Rev. 0 Page 28 of 30 Site Ground Water Data Collection for YNPS Decommissioning SCHEMATIC FOR WELL INSTALLATION MW-3 N. of PAB ground surface DEPTH f/ elevation: +1126' (1021')

0-16" deep road box metal cover 5-2.0 in. dia carbon steel pipe ground water riser pipe depth 5' 10-2.0 in. dia carbon steel 15-slotted well screen (0.015")

20-I'sediment sump Borehole depth: 21' Inferred Subsurface Materials:

Bottom of well screen: 20' 0-0.5' Asphalt Top of well screen: 10' 0.5-1 'Fill I'-21'Till Installation date: 4/24/98 Note: Casing bent on installation Contractor: Geosearch causing sampling difficulty Engineer: Duke Engineering & Services

DESD-TD-YR-02-001 Rev. 0 Attachment 3, Page 29 of 30 Site Ground Water Data Collection for YNPS Decommissioninz ERM SITE MAP 399 Boyjitn Strwet 6th floor DRILLING LOG for Well #: NSR-1 ERM BogogMA02116 Pojct Yanke Nuclr Power St.Rowe ProjectNumb_. 468.01 NSR-I CUent Yee Atoik Elctric Compay taS6 dbr Joe l;Co Driling Co: Go.ewch Deter: P_t_ood_New Dats Stat0s: 22-Oct-97 Date Fnished. 22-Oct-97 Shooting LOcnA:i Rowe, M secloet Drilling Methto 4 1/4' ID HSAa &3 7/8 Air Hraner Rmse Samn Dhm: ZS' L :g 10' Slot Sz 0.01' Catng Dim 2.5 h Type PVC iingTe Boring Depth 23 Wel Depth 23' OBt Dgtm- 0 (20)/4 (2Z-23)

Surfce Ekv: MP. Depth 6oCW: -18' Notes: lhis boring was MP Eav. _o_pkted In two attempts Bk._ Sample (ppm) LobSampe DepF Wetg SU. P t- p r-y Split Spoon Desaption/Soil Classification &Dept spoon/HS &Ar-lye I Sand 2-2 12 Brwwn, fine to medium SAND, trace fine graveL piece S-l 1.0 2 Fll 3-5 of wood in tip of spoon. weU sorted, loose, dry 0-2 Misc. 8-9 12 Creysh-brown, rock fragments, some fine to medium S-2 900 QSR-/S-2/

_ 7.Fill 10-13 sand and wood fragments pooclysorted, oose, dry; 5-Z 5-7 ft t_e wood piec have a strong rhmical odor_ VOCs (8260)

.11 t.Sand 13-13 10' Brown, fine to medium SAND, trace coarse sand and S-3 5.3 l 1517 fine gravet well sorted, loose, damp 10-I1 Note: air hammeied thrugh a boulder from 11-13 feet 13 5 I se_ond boring Not: encouned water table at 18 feet Notc: lop of bedrockat2D feet eirhammered to23 feet

-16  ;-

Bottom of Boehole 23 2':Steel protective standpipe 0 -10': Portland cement/bentorite grout 10- I: Bentonte chip seal 24 . 12 -23': #1silica sand flter pack 25 13 -23': 2S"ID,0.01rO4lotted PVC weU srreen

>, to Wel Corutn (1) 140 lb. Hamer (2) 300 lb. Hamnmr Z Sandpack Wel Sc Cmut I 'd. H r

  • Bantordt S e Camant

DESD-TD-YR-02-001 Rev. 0 Attachment 3, Page 30 of 30 Site Ground Water Data Collection for YNPS Decommissionine ERM SITE MAP DRILLING LOG for Well #: OSR-1 ERM 399Bocybtr 6 . RoOr Prect Yanke Nucd_ Pow., St.4towe Prtect Number 46.0 OSR-Client Yank Acm Bectrc Corpany Logged by o Flacco DdungCo Ceosearh_ Drmer: PatGoodal Ol Date d p.Oct97 D Fi 229t7 Shooung Locatlon: Rowe, Maacued t DrWMng Metod: 4 1/4- ID HSAs Screen Da 25' Length: 10 Sot Sim 001 Cadng DAt 25' Langth: 3' Type: PVC Fiigne BoeS Depth 33' Wdl Depth 13' B-ing Dam: a, Surfae Ekev MP. Dpthtocw:. -7 Notes'.

MP Eev:

(p LSnp1e Dapth w.1l Log w ts ~ Splt Spoon Description/Soi Clsification &Depth pom/HSI Anales 1 " 1 Sand 3-5 24' Brown, fine SAND, some coarse sand and fine gravel, S-1 13Y

-2 - FnU 10_12 moderately well loose, dry 0-2 Sand 44 Ir Top 6' of spooec Brown, fine SAND, weU sorted, loose, S-2 502

_ 7 V a S-6s FMil damp; Middle of spoon r thick piece of wood (no odor); 5-7 Bottom 4' of spoon Grey, fine to very fine SAND, weU 4 4,4_ S v+< soried, loose, damp Sand 9-9 10' Brown, fine SAND, some coarse sard and fine gravel, 5-3 62 23-50/3 moderately well sorted, loose, wet 10-1T Botom o Bofore: 1-16

.16

-17

_19 _

_20 . elc,tuim

-21 . T-2: Sted protetive stardpipe 0' 15': Portand cement surface seal

.22 1.5 -25: Bentonite chip lea.

_24 . 25 -13': #1 silica sand filter pack

_ 2s3. . 3 -13': 25' ID, 0.010(-lotted PVC well screen roto fcl Blowa unts KWy bo Wel Conrutn.

(1) 140lb.Hammer (2) 300 lb. Hammer 0 Sand wWll Sceen E Cot Ct Sid. U N Bentone54 Sel Canent

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page I of 33 Site Ground Water Data Collection for YNPS Decommissioning Attachment 4 Monitoring Well Ground Water Levels

f I . ---- I . ,- - [--- - -- r- I--- , ( - 1-w- - {--' <--,( ---- -z-I, 1---- r---

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 2 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning B-1 M) , a)M ) a)M a)M M a)m m M m 9a) 9 a) 9 a) a) a) aw cn o ° o o , o o o 9 6 L , a 6 cx 6- '-,- 6. 6 L-  :&

> 6 > m > >, 6; D- > m > A:; 6; ^- > m > >

o 2 -. sn cl 2 " o " cn m D E < Z L Z w 2 < Z w : LL :E z w 2 < Z L 0 I 5t o

U 10 (I

0 uz r

° 15 -- - - - - - - - - - - - - - - - - - - - - - - - -- - - - --- - -- - - - -- - - - - -- - - -- - -- - - -- - - -- - - - - - - - - - - - -_ _ - - - -- - -- - - -- - - - -- - - -- - - - --

CD O

m 0 - J- - - - - - - - - - -- - -- - - - - - - - - -- - - - - - - - - -

In 25-30

1- 1 --

II F*- Il- -- ~ ~~~~

r~- ~ ~ - - --- (t- ( - l., I ( - t.I r ., f---- f DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 3 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning B-3 cv L) LO U) (O

0) 0) 0) 0) 0) 0) 0) 0I) 0) 0) 0)
0) 0)

L.. CL 0 L..

CI C 0 I Cu c ci) Cu 0 cu =- 0. a) co a) c) ci)

C, 0 C') 0 0 0 .1.

5- - - - - -

0 u10 - ___________________________________________________________________________________________________________-

U 15 I----------------------------------------------------------------------------------------------------------

0 m

0.

=*20-CM a

25 - -

30

I - r f ., r ,-- ( -- -- U-- . ( - I..... ( (- 7 ( . U( -,

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 4 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well CB-1 Decommissioning

~~a

.~~*. tO CD CDco C 0) 0 0 o j 0 0)

W =) co CD ° 0' 0i 0)

0) ) ) D ) 0) D ) 0v ) 0 0o _ _ 0
0) CM 0 N ..

N t) 6  ? ~- N U 0) 0)

N) (>CO ( >

') C) L Cu a -,

tO 5 U)

C) cua co

-:3a CD. .) .aa,) ..

0 0t C 0

. m,a>u

. <.aa . ~. ~ .a Cl) a~)

Cl).a ,

-n¶ ,a~ .a 0.

za

~.a ~..a Cl) .i C2a It C

. Q

) a a

9::) ~ 7.D 0>.

a a)

L a

N-N ' N to ' N '- ' . N o '~ N~- 0 N N D '- N - 0)~- N to'L 0 L[ C- c 1 -1~

I 9 I4 I I c 10 4-1-----

15 0

0 m

s20 0

a 25 30

F --.

--- t -, -,- r--- , K.- ( 1--,  ? . .,-- I (---- (1-7. (..-- r-- v-DESD-TD-YR-02-001 Rev. 0 Atachment 4: Page 5 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-2 I C)

(e ce) C) -- '4 o ( Cc) N r. Nl c 0) 0) 0 0 CN (3)o) o) CC L L) Y)CY)Rt coCD0 Y)co CO 0) 0)00) 0 )0 T T-C

~~-~~-0) N~c a (0

'- N'- '- NN'-'-

o N N Y)7 (0 (0'-

(:;)

  • N~~~~~~~'

CM

-0 N

(0 (0'

0)

N I'-l N

(

N ('s

)* 0 ()

N' a

0) 0 N 9 (0 c) N li l t I I 7I0C I I 3 I , ma l I l , C l 5c l l , l l l I , t l l t 7 ll6 )

0 0>------

OU10

'U 10 0 1 L.O 0.

a) 25 ][------------------------------------------------------

30

F, _ . f ..........

- - , .....I t . .

t. ._ s. . . ( t^ ,---* .-.(. X (- r F-, - ( -,-,

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 6 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-3 N.0 Z ^ 24 C C m; z U < z = < z u< z 2 < Z L 2 A i I I I I ' I I I ' I I I I I I I I . . I I , , I I I, I,,, I I 5.

a 10 .

U 2 15 0

0 m

s20 25 30

1- - F- -~ r-- (--- - --- -- - (. -..- (. -- - - l - -- ( 1-- I r -. -

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 7 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-4 6 .- CL 6 -- m 6 I - a 6 'L m; A " 'tm>. >, t>. >% CDA ~ ° OO

> °,mO o o CD CU

, =. o, 0, m m w 0, m. =. U 0. .. , 0, - - 0. 0 . 0 . . 0 ,

~

0 5 --

o 10 4--------------------------------------------------------

4kb 0 .- .

la U

° 15 CD 3

0 ta

  • 20 0 2-25 30

PT--- ~-:-

r---- V----

7 f--. f r----

-- (---: r----- V----- (----- V- (--

f--- (- - (-- ( --

r->-

F - F,T V-- (.1- F- (-- :-- (- --- I.-

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 9 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-6

.tr 0)

LO CD LO0co

) a)z a)

(0 0

m 0*I 0 )

co C 0--

O a) 0l CD C

o -

_ c9a a L I I I a 9

m. ~~ a). 0a g0)) .. I .0 aa - r- * . 1. 7(0 ( <r 6~ < 6 .7 .m 4i N - N -

T- c' N T N 'a a- ' tO ' N T- 0) N N (0 ' N 0 a-0 5 t+ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

a,10 -

0 420 0.

U, 0

25 ------------------------------------------------------- I 30

l 1- (W--:- r--~~~~~~~~ r---- t(---- I-- --- f - I - F~

t--- Il--- (- ., --- - f.

t--- ---- V~ [- r~--

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 10 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-7 CD CO N _ N N CO O O CO O) e a) 0) 0 0 0 0 O- T- T- T N N aw c) au aw au CD) o) 0) 0) 0) 0) cn 0 0 0 0 0 0o 0 0 0 0 D 0 a) 3 0 a) m 0 I) X m 0 ) 3 0 a) m 3 0 a)

<4 Z U- <:U Z < z LI < Z U <I z U 2 < z U 2 0 i I I I I I I I I I I I I I 5 t U

D 10 0n 0

o 15 s,,20 D

25 --

30 'I

_ r . . (7 . - F1.* (,~ I- t --- ["-"- (-, - t F-.

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 11 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-8 CD tDCD N-r-N-N-CO CO O CO O) 0)0a)0) o0~ °- o- o . N (L 60) Q 6 > 0 > > n)0 > >A . > > ° >S m °; n° °> ° ° (U (I (1 0) (U 0 0 (1 (U 0o c0 M 0 0 0 j (U m 0 W N N c N N N N N N N N N N No N N r c'n N Ns C N *- i - '- C) c s) Nq Nc N N N Ns q 10 C,

C 215 0

_ 20 0) 25 --

30

V---- rF - r - V7 ( t- -- F -1 (;. - F- r _ ( .

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 12 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-9

.;T *t *T

  • t) tn O L I t0D0 0 0 i r I- N ( 0C co 0 CD0) a) ) 0 C° - c s N N 0 ) '- oIL a C) 6 0 m

) 0 ) 0) 0 ) 0 ) 0 ) 0 )n ), m 0 > 0t 0 0 .0 0 0 0m 0 a

I. CD: en U) c (I

E U

n

= 0 cnU) 2U 2 6 (U D z0 L CU

< z0 n 0) w 2m < z0IL (3)

LL 2 n

S z 0

IL0o

m 6 z0 ) CU z

z 0 oi LL M

E A ~~~~~~~~~~~~~~~~~I , I I I I I I I I I 5-U a) 10 0

(U 0 Well covered with a temporary structure 9/96 &

2197 o 15 - -- -

0U) Well flushed por to 2/28 reading m

ca 20 C,

a 25 -

30

I--- [--,* t7- r- r1..- I U - I --, . F- t -f --

-' F- ---' - - . ' r-"--, U--" --

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 13 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-10 V, qt tr o o m co zr- I- - r-m Co cm a o 0 °-

o °,

o T- O N CU 3 o (U a) (2) 0. C 0 (U C a2 ) 0 . a) (U  : 0 ) (U3 C 2

I Z

-I .

m U) 8<- ,

  • 0 2 <

I z m I

=

1 Qow0 i I I ,I O oL I

IL 2 I

Z

. I 2

. I

, n-(

I 0

5 ---

10-ot 1 -

0 0)

O-m20 -

2 -

Cn ou -

i --- r --- ------ -- ---- 1I- --- --- r-- -- - - --- ( r- - - u '-

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 14 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-IIA 11 co co 0) Cy) ) o C) o C0 0 0 0 0 0 Cl Q co 't I Z0I CU C 0I w CI tI 0I a)

L cu IL E<= 0I l 51

, 10 0

(U C,,

0 0

so 15-0 20 0

a 25 -

30

r --- r---  :--r- - - F--- (-I r.- I:-- - r---- r---- I--- ---- F--- r- ----

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 15 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CB-12 N- co co co co C) C C) 0 0 0 0) T- T- T- T- CN CD CD CD co CD o) C) a) a) 0) 0 0 0 0 0 0 0 a) aw O a) a) L a6 ) a7 o6o o A o, O, o > o (1) co 0 C 0a3() (: 0 41) co 0 01) a E *5 < z E E < z iL E < z [L E < z D p . . I I I I I I I I I I n -

5 0

0 1 -

c o:3 o1 5 - - - - - - - - - _--_ _--_

3 CD 20 - - - - - _-_-_-_-_-_

0.

0 0

25 30

-- r--- t---- r- "", - r- r -- [- -- r r:-- - -- r-- r-I.... r-- r-F - -~ r- --- r~

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 16 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning cW-1 cn K

' 't

0) "It o) U)t0) In On N U)

CD C. 0m 0C0D O c co

01) O 0)

L.

0) Z 0) a
0) >

M a~~r-

6. o m 0) a co a o 0.. -, LU 7- I I I co Nr~ cN a co 0 CD CD 'IT Nl -

~- ~- N CD 0 N -N LO CN ce co N C C) 0 1* ' ' I 5.

a) c 10

'U Well covered 2/97 o 15 0

0

= 20 0

a 25 -

30 I

[---r-~~~I-v-- r-- --- r----- r---- - -- ( ---- F[ t------ - F --- r--- ("--,- (,---

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 17 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-2 c a cc a (2 cc a ct a 6) a a o ° o o c i N 6 - 6 , 6 c-, L m m ;0 m 0 o m; 0 o m; 0 m 0 0 a) U ' Ci o 0 O U) , o a CD 6 I I I A a , I A, , , , . o) a) co fl co a)

CD t- 00 I- (o (o to to U .1D

) t o -q nm Ctq

'T u) 14 M M 'IT M N cq M 04 T. T. r- N cq csc N N CN Cq Cq C N Cq C4 Cq 04 04 04 04 04 's N 44 0 . . . . . . . I . . . . . . . . . . . .

5.

I q 10 _- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

tn o 5 lo 0

-I----------------------------------------------------

a-ci mW20 I----------------------------------------------------

02 0.

25-30

r---- - r--- r r I - V- V---- r .. -- [----

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 18 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-3 6 I - Q 6 -, 6. -' a 6 ,- 65 6 >, ta m >- >n c= >-a 6 > 6 U m

>, O 6 >, tm>n @

(D . ,,,,, ., ,M.., ., o ,, ,,,, 0 .,,, 0 , ,,,,, ,, ,, ,. I0 0

5 a0 10 Vn U

0 la 2 15 0

m

. 20 c) 25 30

(---- [---- F-- F------ F" r -- -- I -- -- K f FF - Ff---

LF~~~~~~~~~~~~ - . '" r- r -- E~~~1 F--[7-,

v~~~~~~~~~~~~~~~~~~~~~~~~~

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 19 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-4 N ~O~~~CO ) C O CD- '

a)( CU M oW CU 0 CU n 0 CU M (U0 0

5 w) 10 0

-0 01 0D 0

25 30

[7 I-**- I' r- I--- 1- - ' 1--- 1- -- I--- 1 --

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 20 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-5 n) ci) n M c a) U) (U ( no ( nO 0 ,r (

M n o a nw U no o ( no c 29 n w a 2 I " w a 2 "I nI c 2 t 2 < z . < Z IL < Z C Z < Z < Z I 24 IL - . - I I I I . . I I I I I I I I . . I I . I . I 1 . ., I I I I I 0

5- --


- - - - - - - -~~~~~~~

o 10 0

in cn L. 15 CD 0

0 m

I20 a

25 30

'-- -- -1 ' ' ' FI---- {--

I- - f -- f - -' - -- -- I -

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 21 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-6 CV) 0)

'tt 7 V)CY)

° NrLO LO LO LO Il'- N- r N-0 a)* 0a) coa a)I 0

a) 0 a) a)

COI C) a) a

)' Cy a

>ca0. a) a I _

)

~ co cy)

(D )) q) a CY ) I-0 75 (is 0 0 I 75 N c

_- CM CD _o ' N N _ - CM N a- U) '- S n) '- N (0 - N (V)

-I ' ' ' ' ' ' ' ' ' ' ' I ' ' '

0 5 ---

10 la 0 o15 C,

co 20 D.

a 25 30

F- - r-- I 7- I--, -f i 7- , I U,t'

-- vi-.

-- 1- - 1v- - t ;V-- ('--' 1- - - I--- -'

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 22 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-7 X 't -t " U L L U ) (0 CD CD o) - - t, oO oD 0a a 0 O 0 0 0 O - '- ' - j N, m0) mm m 9 m 9(3 a ) 0) o 990)0) ) 00)00)0 0000000009

= 0 0 (U 0 0) U CU M 0 0) CU = 0 =CU 0 M  :

m 0 0oj 0 0 W CU M 0 w C

, n() E n U) E :E< Z U- Z U- Z IL i I < z LL Iz I I I I I I I I . I I I I I I I I I I ....

0 -1 I . . I I I . I . I 5 ---

a 10 -

U o 15 0

)

m 01 S 20 0

25 30 I

.1 30

I------ F --- 1---, f ---- F--- i*~~~~~~~--~~~~~-,* 7 ,- -( - - f7-F-il--- --

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 23 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-8

",r IRT 'r irn n in o CD CD C r- t 1- I.- Co Co CO COO) 0)0 n 0 n .- T- T- N N m 8LS 6) w w m C0 mg 0 w (U m 0 ci CU 0 0 cj m 0 0 CU m o 0 M m 0 ci CU 4

0 I I I I I I I I I I I I F I

5 0

u 10 0

0.

0 25 30

-- -' - - I. 1 ( V,,

j, - - (- -,-- I- ---. r--. t'--

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 24 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-9 co 0) a) 0) co c) 0) a) C" 0) 0)

0) co~~~~~~~~~~~~~~~~~~~~~~~~~:

0 a Nw 0 z LL I Lf) z CD d (6 LO l CN 91 N 0 I I 5 -

at 10 co U,

c o 15 03 a)

_1 s- 20 4--

0 25 +-

30

i---- --- r- - ---, - 7 ( --- :-- - ---

r--- (- 1---

j- r 1 --- r----- I-- f ---- *-"---

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 25 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-10 OD CO co 0) 0) 0) 0) 0 0 C0 0 T- T - N 0)) 0) 0) 0) 0) Co o o 9 0

= 0) "I 0)

=3 =1 0 (U CU  :

-, Zs z :R X < Z t E 6L 8 °Z I I I I 0

5.

0 10

-(U 2 15 0

m 20 --

--- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~~~~"

02 0

25 30

1~~f [FV

' ~ -f 7 DESD-TD-YR-02-001 Rev. 0 Attachment 4 Page 26 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning CW-11 o co 0) a) 0 ) o 0 C o o C"l

? 9 oo CD o 0) 0 0 C U0) (D 9v 9a cm 2 A > )

0

-D (1 U0 D) > f ci U0 0)6> O w

0 0) ( 3

? C) oCt! CD r~ LO Z Li.. CD< Z4 6i c6 < Z L 0 I I I I 0

5 ~^

50 --- - - - - - - - - - - - - -- - - - - - - - - - - - - ------------------------------------- - -

Cu CD, 0

¢ 15-cx 20 - - - - - - - - - - - - - - - - - - ---- - - - - - - - - - - - - - - - - - - --- - - - - - - -

25-30

(( 1--- (~~--:-- r---

F ( -- 1:,-:-- - (---:-- I-------- [-r t-f~~ ---- ~~ r--- (--- ---

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 27 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning MW-I o co 0) 0 0) 0) o o o 0 0) 0) 0 o 0o o 0 o 0 CD 0 co

0) 0) a).) co CN m N 0) C)
0) a.) L.
a. a) a 0 =3 I-M. 75 U) C U) 0 I Q 0 U) o .~ n U) C 1: 0-CY 0Y I 0 0) 0) 0)

('

0)

('

N~

c'J ('4 (' N N4 (D N

(0

('4 N_

N 0 4 5 t

@ 10 -

CU cn r

o 15 -

CD 0

0 C

-,E20 -

0.

0) 25 --

30

I -- F-- (-- r -- r--- I---- (- --- I- ( fv---, - -- (- r----

- (-- 11-- F--- (

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 28 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning MW-2 X co es coa) ) C) 0) 0) 0 0 0 C) C CD a) C) 0) C 0 0 0 0 0 L. 0. CS-II 0. 6 L. OL o~~~ a C) I I I I ci,

< C) 0 ClU) a) c - a/) o 0

5-

-- - - -- - - - -- - - - - - - - - - -- - - - _-=- - - - - - - - -- - -- - - -- - - - - - - - - - -

010 0 -

(U Un o15 o

3 0

2 m

R20-0 O

25 --

30

I f 1 -F -- (r- - - F -7. C , 1I i - ( - U- F- - (,--- --- V-1-1 -(- ( r- - F-- F- .V r-DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 29 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well

' Decommissioning MW-3 co C, 0)

CD C, 0) C, 00 C) C) C)

C) II S...

C~ 0.

I .a) a) C" a) a) 0- 0 Ci) 0 CO ('4 5 0)

CY (' ('4

('4 (v,

('

('4

('4 0

5 ----------------------- ----------------------------------------------------------------

1010 -------------------------------------------------------------------------------------------------------------

4-------------------------------------------------------------------------------------------------------------

0.

10 25 ---------------------------------------------------------------------------- ---------------------------------

30

f-- 1--- r.-- F-.- F 1- *--

( ,- ,- - L I ----- , f '- -- -

V~~~~

V7- [7 ( ~ F F

~~~~~~~~~~~~~~~~~f' F----- V 7 -

K ?- r- u-

-DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 30 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning MW-5 c o a 0)

) 0) 0) CD C0) - - T- o co co 0) 0) ) 0 ) 0) CD) 0 09 9 o C

.1 01) L ~ I S 1 L.

a)

L- a I -I -

ci cLi 7 IL a)

U) 0 a)M1a

-, U) 0 -2 a0.r U) a)

0l L.

R U) 0a o1 1 u
5. -----------------------------------------------------------------------------------------------------------
0) 10 U) 0 0 1 b20 0

0 -----------------------------------------------------------------------------------------------------------

  • 25 30

F--- (---- V F F7 F~~~~~~( F-- F-VF f- - 7 I- F, - r-- F r-- r DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 31 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning MW-6 co co co cc o o 0 T T N

0) 0) M 0M 0) 0) 0) 0) C) ) CD CD C 0 0 0)

L 6 L 1 6- 6 LI IL o, ob L CO o, b oI o o a , o i a C a) o a C o a

. ao . ) (U L. c a)

I. cc,C) I cI I c Inct

0. IC) , a) C a-U) 0 -, U) 0 -, U) 0) - U) a0 0

5 A

a

8) 10 2 15 m0

,=^20 0

D 25 30

Fr-- - F --- r....... - - --- ( - 1,- f - -- -, r,-- ---- Ir---- r--- r---- ----- r--- r--- F~-

DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 32 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning NSR-1 I-co co co co 0)

0) a) 0)Q 0)

L I 0 c a- 0

0 0) co L) c N4 0

5 __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _ __ _ __ _ _ __ _

8 __________________________________________________________________________________________________

10 o,

la m _ __ _ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ - - __ _ __ __ _ __ _ __ _ __ __ _ __ _ _

0 15 0

LI) 0.

20 --

0 25 30

f -- , 1--- r~~

[-^, ------ -- F.-- I------ -- F - -- - --I-F-, V--

F DESD-TD-YR-02-001 Rev. 0 Attachment 4: Page 33 of 33 Site Ground Water Data Collection for YNPS Ground Water Level in Well Decommissioning OSR-1 ca co co 0) 0) 0). 0)

0) 0) 0) co 0) 0) 0)
0) 0) 0) 11-C-) Cu 0

c 0 U

C) NL Z 0

0 0 CO N N CV) N CM N N. N N 0 I 5 -- -- - -- - - -- - - - - -- - - - - - - - - -- - -- - - - - - - -- - - - - - - - -- - - - - - - -

0 10 a.

0 0) 0 15 -

5 4-0 0

im zu -

25 30

DESD-TD-YR-02-001 Rev. 0 Attachment 5: Page I of 2 Site Ground Water Data Collection for YNPS Decommissioning Attachment 5 YNPS Spent Fuel Pool: Concentration of H-3, 1997-1999


- I---- - F -- -- ( r--- r- - r[- r Cn V m

C0 SPENT FUEL PIT AVERAGE QUARTERLY TRITIUM VALUES 0 E W _=

W te 1.50E-03 0 CD oC6 oC 0

1.40E-03 i

0:

1.30E-03

_r. 1.20E 10 1.10E.03 1.00E-03 rQ 9.OOE-04 E3 8.OOE-04 7.OOE-04 6.00E-04 5.OOE-04 4.OOE-04 3.OOE-04 V 10 2.OOE-04 1997 2nd 3rd 4th 1998 2nd 3rd 4th 1999 2nd 3rd 4th

E A FFAMArT)ME ^"

FRAMATOME ANP DE&S DESIGN VERIFICATION CHECKLIST Form DPR-3.9A Page 1 of 1 QA Record Type N/A Revision 4 Document No.: DESD-TD-YR-02-001 Rev.: 1 Page: 1 of 1 Document

Title:

Site Ground Water Data Collection for YNPS Decommissioning

1. Were the inputs correctly selected and incorporated into design? El Y El N 0 N/A
2. Are assumptions necessary to perform the design activity adequately E Y El N 0 N/A described and reasonable? Where necessary, are the assumptions identified for subsequent reverifications when the detailed design activities are completed?
3. Are the appropriate quality and quality assurance requirements specified? 10 Y El N El N/A
4. Are the applicable codes, standards and regulatory requirements, El Y El N 0 N/A including issue and addenda properly identified, and are their requirements for design met?

-5. Have applicable construction and operating experience been considered? El Y E N 0 N/A =

6. Have the design interface requirements been satisfied? El Y El N 0 N/A
7. Was an appropriate design method used? ElY D N - N/A
8. Is the output reasonable compared to inputs? El Y [1 N N/A =
9. Are the specified parts, equipment and processes suitable for the required El Y El N 0 N/A application?
10. Are the specified materials compatible with each other and the design E Y E N 0 N/A environmental conditions to which the material will be exposed?
11. Have adequate maintenance features and requirements been specified?. E:l Y El N 0 N/A =
12. Are accessibility and other design provisions adequate for performance of E Y El N 0 N/A needed maintenance and repair?
13. Has adequate accessibility been provided to perform the inservice E y El N 0 N/A inspection expected to be required during the plant life?
14. Has the design properly considered radiation exposure to the public and El Y N 0 N/A plant personnel?
15. Are the acceptance criteria incorporated in the design documents El Y El N 0 N/A sufficient to allow verification that design requirements have been satisfactorily accomplished? _
16. Have adequate pre-operational and subsequent periodic test D Y El N 0 N/A requirements been appropriately specified?
17. Are adequate handling, storage, cleaning and shipping requirements El Y E N ED N/A

_____ specified?

18. Are adequate identification requirements specified? El Y El N 0 N/A
19. Are requirements for record preparation review, approval, retention, etc., 0 Y El N El N/A adequately specified?

Comments:

Verified By: E. F. Maher _ _ _ _ _ _ _ _ _ _

(First, MI, Last) PRINTEDITYPED NAME SIGNATURE DATE