ML031150667
| ML031150667 | |
| Person / Time | |
|---|---|
| Site: | Limerick (NPF-039, NPF-085) |
| Issue date: | 04/25/2003 |
| From: | NRC/NRR/DLPM/LPD1 |
| To: | |
| References | |
| TAC MB6918, TAC MB6919 | |
| Download: ML031150667 (2) | |
Text
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) 6.8.4 The following programs shall be established, implemented, and maintained:
- a.
Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.
The systems include the core spray, high pressure coolant injection, reactor core isolation cooling, residual heat removal, post-accident sampling system (until such time as a modification eliminates the PASS system as a potential leakage path), safeguard piping fill system, control rod drive scram discharge system, and containment air monitor systems.
The program shall include the following:
- 1.
Preventive maintenance and periodic visual inspection requirements, and
- 2.
Integrated leak test requirements for each system at refueling cycle intervals or less.
- b.
In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.
This program shall include the following:
- 1.
Training of personnel,
- 2.
Procedures for monitoring, and
- 3.
Provisions for maintenance of sampling and analysis equipment.
- c.
Deleted.
LIMERICK - UNIT I 6-14 Amendment No. -g, 166
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) 6.8.4 The following programs shall be established, implemented, and maintained:
- a.
Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.
The systems include the core spray, high pressure coolant injection, reactor core isolation cooling, residual heat removal, post-accident sampling system (until such time as a modification eliminates the PASS system as a potential leakage path), safeguard piping fill system, control rod drive scram discharge system, and containment air monitor systems.
The program shall include the following:
- 1.
Preventive maintenance and periodic visual inspection requirements, and
- 2.
Integrated leak test requirements for each system at refueling cycle intervals or less.
- b.
In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.
This program shall include the following:
- 1.
Training of personnel,
- 2.
Procedures for monitoring, and
- 3.
Provisions for maintenance of sampling and analysis equipment.
- c.
Deleted.
LIMERICK -
UNIT 2 6-14 Amendment No. 129